22
REFUELLING STATION OPENING 10TH MAY 2016 | NPL | TEDDINGTON | LONDON

NPL Opening 10th may

Embed Size (px)

Citation preview

Page 1: NPL Opening 10th may

REFUELLING STATION OPENING10TH MAY 2016 | NPL | TEDDINGTON | LONDON

Page 2: NPL Opening 10th may

Agenda:

• 10.30 Introduction and Welcome Sir Roger Bone, NXD, ITM Power

• 10.35 Hydrogen Refeulling in the UK Dr Graham Cooley ,CEO, ITM Power

• 10.45 The Toyota Mirai Jon Hunt, Manager Toyota & Lexus Fleet Marketing

• 10.55 The Hyundai ix35 FCEV Robin Hayles, Product PR Manager

• 11.05 The Honda Clarity FCX Nik Pearson, European PR Communications Manager Honda Motor Europe

• 11:15 Kangoo ZE H2 700 bar van Fabio Ferrari, CEO, Symbio FCell

• 11.25 Q&A Chaired by Sir Roger Bone, NXD, ITM Power

• 11.40 Move outside to see the station

• 12.00 Official Opening of station Andrew Jones MP, Parliamentary Under Secretary of State for Transport

• 12.20 Tour of station Dr Simon Bourne, CTO ITM Power and refuel demo

• 12.45 Ride and Drive Starts

• 12.50 Lunch and networking

• 15.00 End

REFUELLING STATION OPENING10TH MAY 2016 | NPL | TEDDINGTON | LONDON

Page 3: NPL Opening 10th may

Welcome

• To the first of many refuelling station openings

• An important day for ITM Power

• An important day for UK hydrogen refuelling

• The future of road transportation

• Thank you to our funders FCH JU and OLEV

“The best way to predict your future is to create it”(Abraham Lincoln)

REFUELLING STATION OPENING10TH MAY 2016 | NPL | TEDDINGTON | LONDON

Page 4: NPL Opening 10th may

ITM Power | History

• First AIM listed fuel cell & hydrogen company

• 2004 IPO | £10m | ITM.L

• 2006 Secondary | £30m

• 2012 -16 Expansion | £23m

• Two facilities in Sheffield | 70 staff

• Manufacturing business model

£13.94m projects under contract | £6.52m in negotiation | £20.46m total

REFUELLING STATION OPENING10TH MAY 2016 | NPL | TEDDINGTON | LONDON

Page 5: NPL Opening 10th may

HYDROGEN

REFUELLING

IN THE UK

DR GRAHAM COOLEY

CEO, ITM POWER

Page 6: NPL Opening 10th may

AN ENERGY REVOLUTION

HYDROGEN ENERGY SYSTEMS

AN ENERGY REVOLUTION

Renewable Energy is Transforming the Energy Landscape

• World power generation reached 5,000GW in 2015

• Wind reached 432GW and solar reached 65GW of global installations in 2015 (~10%)

• Both need energy storage to sustain the growth rate

Page 7: NPL Opening 10th may

ENERGY STORAGE: THE NEED

HYDROGEN ENERGY SYSTEMS

UK WIND CURTAILMENT

• Evidence of grid balancing problems from Germany and Denmark

• Problems start at 20% capacity | UK hit this threshold at the end of 2013

• Wind curtailment is rising faster than wind capacity

• 1TWhr is enough energy for 3 million FCEV’s to drive 350 miles

Page 9: NPL Opening 10th may

FUEL CELL VEHICLES

VEHICLES | ROLL OUT

WHAT IS A FUEL CELL VEHICLE?

An EV drive train that’s refuelled rather than recharged

• Refuel in 3 mins

• Range 300 miles

• Managed energy export

Page 10: NPL Opening 10th may

FUEL CELL VEHICLES

VEHICLES | ROLL OUT

WHAT IS A FUEL CELL VEHICLE?

An EV drive train that’s refuelled rather than recharged

Page 11: NPL Opening 10th may

700BAR FC RANGE EXTENDER

HYKANGOO RANGE EXTENDER FOR EV VAN

Customer service, support & maintenance

• Renault type approved

• EU wide phone number

• Dealership and franchise garage support

VEHICLES | ROLL OUT

Page 12: NPL Opening 10th may

FCEV REFUELLING STATION

VEHICLES | ROLL OUT

WHAT IS AN FCEV REFUELLING STATION?

Page 13: NPL Opening 10th may

FCEV REFUELLING STATION

VEHICLES | ROLL OUT

WHAT IS AN FCEV REFUELLING STATION?

ITM Power Electrolyser

80kg/day expandable to

500kg/day in 20ft container

Dispenser

350 and 700 bar refuelling point

Buffer Tank

20bar 15m3 tank

BOC | Linde Compression

Ionic Compressor and gas storage,

600kg/day

Payment Unit

Card reader, touchscreen and

printer for cash register receipt

Tube trailer connection

Off take of hydrogen for back up

supply and other applications

Page 14: NPL Opening 10th may

HYDROGEN ENERGY SYSTEMS

SHELL FORECOURT AGREEMENT

SHELL EXTRA SERVICES AT COBHAM (M25)

Page 15: NPL Opening 10th may

HYDROGEN ENERGY SYSTEMS

SHELL EXTRA SERVICES AT COBHAM (M25)

SHELL FORECOURT AGREEMENT

*Source: ITM Power

Page 16: NPL Opening 10th may

HYDROGEN ENERGY SYSTEMS

UK INFRASTRUCTURE ROLL OUT

ITM POWER | STATION ROLL OUT15 UK stations | 2000 kg/day by the end of 2018

UK Government plan to deploy 65 refuelling stations by 2020

Page 17: NPL Opening 10th may

HYDROGEN ENERGY SYSTEMS

ITM EXISTING AND PLANNED

HRS SITES

STATION LOCATIONS

HRS Provider Location

ITM Power M1, Sheffield

ITM PowerTeddington, London (under construction)

ITM PowerRainham, London (planning approved)

ITM Power Shell site in South East (planned)

ITM Power Shell site in South East (planned)

ITM Power Shell site in South East (planned)

ITM Power South East (planned)

ITM Power UK, under negotiation

ITM Power UK, under negotiation

ITM Power UK, under negotiation

200kmIllustrative

driving range

(half tank)

Page 18: NPL Opening 10th may

HYDROGEN ENERGY SYSTEMS

PLANNED HRS SITES

A further 16 potential HRS sites have

been identified across the UK

• Developing a strong track record in gaining

planning permission for stations in the UK

• 16 UK HRS planning applications approved

from 10 different local authorities.

STATION LOCATIONS

Page 19: NPL Opening 10th may

BUS REFUELLING STATIONS

HYDROGEN ENERGY SYSTEMS

Page 20: NPL Opening 10th may

ENERGY STORAGE | CLEAN FUEL

GREEN HYDROGEN

GREEN HYDROGEN

Strategy alternatives to ensure low carbon footprint

• Direct coupling AMP | EMEC | CEME

• Grid balancing NPL

• Renewable contracts Forecourts

Page 21: NPL Opening 10th may

FCEV RIDE & DRIVE

FCEV RIDE & DRIVE

ENERGY STORAGE | CLEAN FUEL

Three mile ride & drive

• Starts at 12:45

Page 22: NPL Opening 10th may

REFUELLING STATION OPENING10TH MAY 2016 | NPL | TEDDINGTON | LONDON