Novel Decision Support System for Underground Power Network Asset Management
Asawin Rajakrom
CAMT, CMU
August 29, 2009
Problem and Justification
69/115 kV Customer
230/500 kV
Grid Station
Substation
Power Plant
12/24 kV Customer
12/24 kV
220/380 V Customer
69/115 kV
220/380 V
Problem and Justification Failure of distribution feeder directly impacts end users’
wellbeing Concerns on safety, health, environment and aesthetics
are increasingly high Network equipment is reaching its designed service age Overhead feeder facilities are vulnerable to external
environment Investment on feeder rehabilitation is extremely high Better decision making of utility asset management can
be obtained through a sort of DSS that can incorporate all impacted factors: technical, economical, societal, and environmental aspects.
Research Questions How shall the power distribution domain knowledge
be modeled? How can the risks of distribution network failure be
efficiently assessed? How can the costs involving network failure and
preventive action be quantified? How can the social and environmental consideration
be included in investment decision?
Key Assumptions Conversion of overhead distribution line into underground
feeder is of the prime concern. Risk assessment is solely based on the performance of
network components, not considering any other aspects such as network configuration, or operating process (e.g. switching philosophy).
Snap shot comparison, investment cost of network reinforcement at the time of network failure is of interest and compared with the cost of failure.
Available data are of sufficient quality to enable assessment modules to predict corresponding outputs/outcomes.
DSS tries to replicate the decision making of human experts so that the utility expert’s judgment are assumed sufficient to validate the models.
Publications1. “Improvement of Underground Cable Installation
Performance by Knowledge Management”, the 16th Conference of the Electric Power Supply Industry, Mumbai, India, 2006.
2. “Asset Categorization for Enhanced Asset Management Using Object Oriented Approach”, the 16th Conference of the Electric Power Supply Industry, Mumbai, India, 2006.
3. “Enhance Decision Making on Underground Power System Implementation Using MCDA”, the 16th Conference of the Electric Power Supply Industry, Mumbai, India, 2006.
4. “Underground Power Line Risk Assessment Using Heuristic Approach”, the 1st Software, Knowledge, Information Management and Applications, Chiang Mai, Thailand, 2006.
Publications5. “Fuzzy Risk Assessment for Distribution System Asset
Management”, Presented at the Conference of Asian Energy Week 2007, Bangkok, Thailand, 2007.
6. “Fuzzy Multicriteria Approach for Power Distribution System Risk Analysis” , Presented at Energy21C: The 10th International Transmission and Distribution Conference & Exhibition, Sydney, Australia, 2007.
7. “Determination of Power Distribution Network Risk Using Fuzzy Markov”, the 2nd Software, Knowledge, Information Management and Applications, Kathmandu, Nepal, 2008.
8. “Asset Modeling To Support Cost-Risk Evaluation In Distribution System Asset Management”, the 17th Conference of the Electric Power Supply Industry, Macau SAR, China, 2008.
Methodologies and Tools Asset categorization
CommonKADS Categorization and Assessment template
Ontology 101 UML CIM/RDF/XML
Risk assessment: Fuzzy logic Markov chain MS Excel
Methodologies and Tools Cost evaluation:
Interrupted energy rate (IER) Work breakdown structure (WBS)
Multicriteria Decision Analysis: Analytic Hierarchy Process (AHP)
Tools: Protégé 2000 MATLAB MS Excel
DSS FrameworkM
ark
ov
Chain
Distress indicators
FIS Present Asset Condition
Future Asset Condition
Deterioration Rate
Initial Asset Condition Operational
Environment
FIS
FIS
Present/Future Failure Likelihood
Expected Repair Time
Connected Load
IER
x
-
Customer
xPrice Cap
Repair CostUtility
Outage Cost
+
Upgrade
Replacement
Conversion
vResolution Cost
MC
DA
(AH
P)
Invest
ment
Opti
on
x Financial Index
Public Interest
Technical Matter
Asset Categorization
Risk Module Decision Module
Cost Module+
Age
Asset Categorization
AssetnamedescriptioncommissioningDate
ComponentmaterialCodematerialDetail
AssetContainer
ImplementationCostnamedescriptioncommissioningDate
ConditionGradenamegradeinspectionDaterelativeImportanceDegree
FeederampacityratedVoltagepredictedFailurePotentialexpectedFailureDuration
PointComponent
LocationnamecoordinateXcoordinateY
FailurefailureDescriptionfailureDatefailureTimefailureDuration
OutageCostcostOfOutage
InvestmentCriteriadegreedescription
CustomercustomerIDcustomerTypeIERkWpriceCap
Stressordegreedescription
has has
locateAt
supplyhas
operateIn hashas
isis
is
iscompose
compose
AssetnamedescriptioncommissioningDate
ComponentmaterialCodematerialDetail
AssetContainer
FeederampacityratedVoltagepredictedFailurePotentialexpectedFailureDuration
ComponentGroup
OverheadLine UndergroundLine
PoleAssembly CableComponentConductorAssembly
CableContainerLightningProtection
UndergroundSwitches
CircuitSwitches
LinearComponentlength
Conductor
OHConductor UGCable
DuctBank
PointComponent
Pole
Manhole
UGCable
Splice
Splice
Duct
Manhole
Rack
Pole
Guy
Crossarm
Fittings
Arrester
Groundwire
Switches
Recloser
FuseCutout
Splice
Insulator
Conductor
RMU
ATS
UnitSubstation
Simulation
Simulated Feeder
3 MW Industry
T1: 4,000 kVA
T4: 2,500 kVA
T6: 4,000 kVA
T2: 3,000 kVA
T3: 2,000 kVA
2 MW Commercial
T5: 2,500 kVA
Substation 24kV bus1 2 3 4 5 6 7 8 9 10 11 12 13
14
15
16
17
18
19
20
21
22
23
24
25
26LS3
T1 T2 T3
T4
T5
T6
Substation
SimulationFeeder Condition Grade:
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
0 10 20 30 40 50
Serviced Year
Con
ditio
n G
rade
SimulationFailure Rate Contributed by Feeder Condition:
0%
10%
20%
30%
40%
50%
60%
0 5 10 15 20 25 30 35 40
Serviced Year
Failu
re R
ate
SimulationFinancial Analysis of Alternative Options:
-
1.00
2.00
3.00
4.00
5.00
6.00
7.00
0 10 20 30 40 50
OutageByDeterioration(Benefit)
OutageByTree(Benefit)
Bare(Cost)
ASC(Cost)
UG(Cost)
SimulationInvestment Decision Hierarchy:
Select the Most Suitable Feeder Rehabilitation
Technical Financial Social
Reliability
Bare OH
ASC OH
UG
Construction Maintenance Aesthetics Safety
Bare OH
ASC OH
UG
Bare OH
ASC OH
UG
Bare OH
ASC OH
UG
Bare OH
ASC OH
UG
Bare OH
ASC OH
UG
SimulationRanking of Investment Options:
CriteriaSignificant
WeightBare OH ASC OH UG
Reliability 0.0901 0.0548 0.3583 0.5869
Construction 0.0110 0.4545 0.4545 0.0909
Maintenance 0.0274 0.4545 0.4545 0.0909
Finance 0.5949 0.4899 0.4507 0.0594
Safety 0.2075 0.0698 0.1659 0.7644
Aesthetics 0.0692 0.0909 0.0909 0.8182
Overall marks (%) 33.46 35.85 30.69
Feeder Condition Grade:
0
0.2
0.4
0.6
0.8
1
1.2
0 10 20 30 40 50
Year
Co
nd
itio
n G
rad
e
Case Studies: Feeder Rehabilitation in Industrial Estate
Feeder Failure Rate:
1.49
1.50
1.51
1.52
1.53
1.54
1.55
1.56
1.57
1.58
0 5 10 15 20 25 30 35 40
Year
Failu
re R
ate
(tim
es/y
ear)
Case Studies: Feeder Rehabilitation in Industrial Estate
Financial Analysis of Alternative Options:
-
2.00
4.00
6.00
8.00
10.00
12.00
14.00
0 5 10 15 20 25 30 35 40
Year
Mill
ion
Bah
t Outage
ASC OH
UG
Case Studies: Feeder Rehabilitation in Industrial Estate
Investment Decision Hierarchy:
Select the Most Suitable Feeder Rehabilitation
Technical Financial Social
Reliability
ASC OH
UG
Construction Maintenance Aesthetics Safety
ASC OH
UG
ASC OH
UG
ASC OH
UG
ASC OH
UG
ASC OH
UG
Case Studies: Feeder Rehabilitation in Industrial Estate
Case Studies: Feeder Rehabilitation in Industrial Estate
Ranking of Investment Options:
CriteriaSignificant
WeightASC OH UG
Reliability 0.4580 0.1429 0.8571
Construction 0.0557 0.8333 0.1677
Maintenance 0.1392 0.8333 0.1677
Finance 0.2510 0.9000 0.1000
Safety 0.0720 0.1429 0.8571
Aesthetics 0.0420 0.1000 0.9000
Overall marks (%) 46.65 53.35
Case Studies: Undergrounding Feeders in World Heritage Site
Particular Requirement:
Criteria Subcriteria DescriptionTechnical Reliability Well protection and well performance of network equipment
Installation Simplicity of construction and installation of duct, cable, switchgear and transformer including less adverse effect to public sector
Maintenance Convenience of underground network maintenance (inspection, repair, replacement) and operation
Extension Network expansion (new substation connected) and new customer connection can be achieved with ease
Conversion process Simplicity of conversion step from existing overhead to underground) as well as including less adverse effect to customers and public in vicinity.
Aesthetic The network shall be in harmony with the cityscape and existing construction
Safety Safety to employees and public communityCost Cost of implementation; this cost will eventually be borne by
every stakeholder
Case Studies: Undergrounding Feeders in World Heritage Site
Investment Decision Hierarchy:
Select the Most Suitable Underground System
Technical Cost Aesthetics
Reliability
DR-CS
DR-US
DB-CS
Installation Maintenance
DB-US
Extension Conversion
DR-CS
DR-US
DB-CS
DB-US
DR-CS
DR-US
DB-CS
DB-US
DR-CS
DR-US
DB-CS
DB-US
DR-CS
DR-US
DB-CS
DB-US
DR-CS
DR-US
DB-CS
DB-US
DR-CS
DR-US
DB-CS
DB-US
Case Studies: Undergrounding Feeders in World Heritage Site
Ranking of Investment Options:
CriteriaSignificant Weight
DR-CS DR-US DB-CS DB-US
Reliability .1183 .0477 .1080 .2588 .5854
Construction & installation
.0453 .0732 .1969 .1969 .5330
Maintenance .0534 .0569 .1219 .5579 .2633
Extension .0159 .3750 .1250 .3750 .1250
Conversion procedure .0275 .1250 .1250 .3750 .3750
Aesthetics .6333 .3750 .1250 .3750 .1250
Cost .1062 .5579 .2633 .1219 .0569
Overall marks (%) 31.81 14.08 33.61 20.50
Conclusion and Future Work Asset model of expressivity, interchangeability,
extensibility, reusability and integratability Human expert emulation of risk assessment Balancing of risk, cost and performance of asset
through MCDM mechanism Proposed approaches can be extended to cover other
area such as: Rehabilitation of transmission lines or substations Risk assessment of underground cable system
Thank you
Asset Categorization Purpose: To determine risks, costs and socials
factors associated with the implementation of power distribution network.
Domain: Encompass medium voltage distribution feeder including network components, network operation, and operational environment
Scope: Limited to information that aids determining risks, costs and socials factors involved with distribution feeder.
Asset CategorizationInformal description: Distribution feeder is used to carry electric current through
electrical wire. Distribution feeder runs along public road. Overhead feeder is an electrical wire laying or hanging on
insulator which in turn supported supporting structure. Failure occurs when feeder fails to perform an intended
function such as carrying electric current, withstanding presence voltage, threatening the living standard.
Power utility does not gain revenue due to unavailability of energy sale when feeder fails.
Burying distribution network improve city aesthetics. etc.
Asset CategorizationClasses and Attributes: Pole is a distribution network component Material cost of pole is 8,104.00 baht. Labor cost of pole installation is 8,376.80 baht. Condition grade of pole inspected on March 20, 2009 is 1.8. Feeder comprises of overhead cable and underground cable. Feeder PI417 supplies Imperial Hotel. etc.
Asset CategorizationClasses and Attributes:
FeederAssetContainer
name
Asset
name
Component
code
commissioningDate
unitPrice
Conductor Insulator Pole
is
is
is isis
contains
Risk AssessmentCondition Grade of Distribution Assets:
Grade Description Verbal Grade
1No noticeable deterioration. Some aging may be visible
good
2Some deterioration is evident, but the function of component is not significantly affected.
Adequate
3Moderate deterioration. Ability to function is adequate.
Fair
4Serious deterioration. Ability to function is significantly affected.
Poor
5Severe deterioration. General failure or a complete failure of component
Failed
Risk AssessmentFeeder Component Categories and Contributing Weight:
Category i Weight (Wi)
Component i,j Weight (Wi,j)
Pole structure 1 5 Pole 1,1 4Crossarm 1,2 3Guy 1,3 3Fittings 1,4 3
Conductor assembly 2 5 Conductor 2,1 5Insulator 2,2 5Splice 2,3 3
Lightning protection 3 2 Overhead ground wire 3,3 3Lightning arrester 3,2 5
Circuit protection 4 8 Fuse cutouts 4,1 3Switch 4,2 5Recloser 4,3 3
Risk AssessmentCategory and Overall Condition Grade:
Hj = [W1j …Wij … WNij]*[C1j… Cij… CNii]
Cij is condition grade fuzzy set of each distress indicator
Wij is scalar normalized weight given to each distress indicator Hj is condition grade fuzzy set of category
C = [W1 …Wi … WM]*[H1… Hj… HM]
Hj is condition grade fuzzy set of cateogory Wj is scalar normalized weight given to each categoryC is overall condition grade fuzzy set
Risk AssessmentFuzzy Rules for Deterioration Model:
Deterioration Rate (D’) Condition Grade (C)
Age (A) good adequate fair poor failed
new average fast fast very fast very fast
young average average fast fast very fast
Meddle-aged slow average average fast fast
Old very slow slow slow average fast
Very old very slow very slow slow average average
Risk AssessmentTime Based Condition Grade Evaluation Using Markov Transition Model:
10000
1000
0100
0010
0001
),...,(),...,(5,45,4
4,34,3
3,23,2
2,12,1
115151
tt
tt
tt
tt
Ct
Ct
Ct
Ct
DD
DD
DD
DD
Risk AssessmentFuzzy Inference System:
InferenceFuzzification Defuzzification
Knowledge
Base
Expert Knowledge Field Data
Sub
ject
ive
Obj
ect
ive
Inputs Output
• Degree of feeder overload Degree of feeder overvoltage Degree of exposure to
mechanical harmfulness Asset condition
Failure likelihood
Risk AssessmentStage Wise Fuzzy Reasoning Process:
RB1:Load currentAmbient temp.Ventilation
Thermal violation degree
RB2:Lght. exposureLght protectn.Pollution
Voltage violation degree
RB3:TreeAccidentAnimal
Mecha. contact degree
RB4:ThermalVoltageMechanical
Stressor degree
RB5:StressorCondition grd.
Failure possibility
Risk AssessmentFuzzy inference rules to deduce feeder failure possibility:
Feeder failure possibility
Stressor degreevery low low Medium High very high
Condition grade
good very low Low Medium High very highadequate very low Low Medium high very high
fair very low Low Medium high very highpoor very low Low Medium high very highfailed very high very high very high very high very high
Cost EvaluationSectoral Customer Damage Cost (Sectoral IER)
0
100
200
300
400
500
600
700
800
900
0 2 4 6 8 10
Interruption duration (hours)
Dam
age
cost
(Bah
t) Residential
Small general service
Medium general service
Large general service
Specific business
Government
Cost EvaluationAverage and Composite Damage Cost (IER)
Duration 2 s 1 m 30 m 1 hr. 2 hr. 4 hr. 8 hr.
MEA 3.033 1.944 19.020 65.996 136.717 245.184 458.956
PEA 8.533 13.131 37.661 62.794 105.610 208.010 374.720
All customers 6.452 8.905 30.587 63.881 117.097 221.618 405.735
IER (Bath/kWh)MEA 53.799PEA 60.165
60.348
Cost EvaluationPrice Cap
CustomerType
Size(kW)
Rate Price Cap
On peak Off peak On peak Off peak
Residential 3.6246 1.1914 1.5289 0.1011Small business < 30 3.6246 1.1914 1.5289 0.1011Medium business 30 – 99 2.6950 1.1914 0.5993 0.1011Large business > 999 2.6950 1.1914 0.5993 0.1011
Cost EvaluationWork Breakdown Structure (WBS)
WBSTask name: Pole installationScope: installing 12 m concrete pole on ordinary groundMaterial:
Code Description Quantity5625-668-12100 Concrete pole 12m 1
5620-643-00100 Cement 105610-641-00100 Rough sand 0.5Manpower:
Position Number
Worker 2
Technician 1
Crane Operator 1
Machine:
Machine & Tool Number
Mobile crane 1
Duration: 2 hrs.
Responsible person: Somsak
Cost EvaluationTypical Cost Figure for 1 Circuit-km UG Feeder:
Components Qty Unit Cost
Duct 1000 m 1,500,000.00
Manhole 4 set 200,000.00
Cable support 4 set 54,644.80
Underground cable 3,000 m 4,026,750.00
Splice 9 set 45,602.64
Terminator 3 set 30,588.00
Total cost 6,457,585.44
Cost EvaluationConcept of Loss of Fixed Asset by Prevention
Replacement
Analytical Hierarchy Process (AHP)Hierarchical Structure Decision Model:
Goal
Criterion1 Criterion2 Criterion3
Subcriterion11
Alternative1
Alternative2
Alternative3
Alternative4
Subcriterion12
Alternative1
Alternative2
Alternative3
Alternative4
Alternative1
Alternative2
Alternative3
Alternative4
Alternative1
Alternative2
Alternative3
Alternative4
Analytical Hierarchy Process (AHP)Numerical Rating and Verbal Preference:Numerical
ScaleVerbal Importance Explanation
1 Equal importance Two activities contribute equally to the object
3 Moderate importance Slightly favors one over another
5 Essential or strong importance
Strongly favors one over another
7 Demonstrated importance
Dominance of the demonstrated in practice
9 Extreme importance Evidence favoring one over another of highest possible order of affirmation
2,4,6,8 Intermediate values When compromise is needed
Analytical Hierarchy Process (AHP)Comparison Matrix:
Criteria Alternative 1 Alternative 2 Alternative 3 ….. Alternative n
Alternative 1 1 a12 a13 a1n
Alternative 2 a21 1 a23 … a2n
Alternative 3 a31 a31 1 … a3n
….. … … … 1 …
Alternative n an1 an2 an3 … 1
i, j = 1,…., naij = 1,….,9 aji = 1/ aij
Analytical Hierarchy Process (AHP)Consistency Check:
1. Determine the principal Eigen value: lmax 2. Compute the consistency index (CI)
3. Compute the consistency ration (CR)
1max
n
nCI
RI
CICR
SimulationResults Analysis and Discussion: Data modeling Data availability and sufficiency Accuracy:
Inclusion of impacted factors Expert knowledge
Applicability
Results Analysis and Discussion: Failure rate of assessed feeder estimated from DSS of 1.5 times/year
lower than actual events of 7. Result obtained looks alright when compared to other feeders operating in
neighboring area. Difference possibly due to:
Different deterioration behavior of components Some components may deteriorate faster than 2d0 under certain stressor Fuzzification and fuzzy rules design, workmanship, switching, overheat/overvoltage effect or particular
features inherent to assessed feeder. Undergrounding system cannot compete with overhead counterpart if
only financial aspects are considered. Cost figured already provided for each option.
Case Studies: Feeder Rehabilitation in Industrial Estate
Case Studies: Undergrounding Feeders in World Heritage Site
Results Analysis and Discussion: Aesthetic and world heritage site harmony are prime
important for decision making. Information on feeder configuration and design are
offered by asset model. Cost figured already provided for each option. If there exist more criteria/requirements to examine,
they can be added into the decision hierarchy without any difficulty