Northcrest Arena replacement report Appendix A report to Peterborough city council committee of the whole Sept. 22, 2014
Citation preview
Total possible points = 210 CSD14-020 - Appendix C
Item # Description Activa N Activa S CCM Fleming N Fleming S Hiawatha Kinsmen Northcrest Trent
1 Size of property - 40 marks
20+ acres = 40 marks 40 40 10 10 40 40 5 5 40
14-19 acres = 20 marks
7-13 acres = 10 marks
6 acres and less = 5 marks
Site - frontage and visibility - 10 marks 2 0 10 10 9 5 5 10 9
3 Ability to expand in future phases - takes shape of
property into consideration - 20 marks 15 20 10 5 20 20 5 5 20Great Potential - Multi-pad arena, additional
complementary facilities, supports (parking,
New Arena Site Review Scores
2
complementary facilities, supports (parking,
etc.) - 20 marks
Medium Potential - Twin Pad and some
complementary facilities - 10 marks
Limited Potential only a twin pad (no
complementary) - 5 marks
No Potential only a single pad - 0 marks
4 Zoning - and/or ease of re-zoning - 5 marks 1 1 4 5 5 3 5 2 4
5Availability of Utilities - broken down to sanitary,
gas, water, fibre, phone - 20 marks 0 0 20 10 10 5 20 20 10
Water 5
Sanitary 5
Gas 5
Fibre/phone 5
6 Cost/price for Land Acquisition - 20 marks 5 5 5 15 15 15 20 5 15
No cost for land 20 marks
No cost for land available through a long term
lease 15 marks
Price needs to be negotiated - 5 marks
Total possible points = 210 CSD14-020 - Appendix C
Item # Description Activa N Activa S CCM Fleming N Fleming S Hiawatha Kinsmen Northcrest Trent
New Arena Site Review Scores
7 Cost and/or Time to develop - 10 marks 0 0 0 5 5 0 5 3 0Low cost and time to develop 10 marks
(availability within 2 years, road access,
services, good grades)
Medium Cost and/or Time 5 marks
High Cost and/or Time 0 marks
8Timing in terms of availability of site - acquistion
timing, planning processes, etc. - 10 marks 4 0 0 7 7 4 0 0 4
Available immediately 10 marks
Available within 12 months 7 Available within 12 months 7
Available within 12-24 months 4
Over 24 months 0 marks
9 Displacement of other features/facilities - 10 marks 10 10 0 10 10 10 0 0 5Displacement requires relocation of other
features with costs - 0 marks
Some displacement with lower costs - 5 marks
No displacement -10 marks
10 Site topography - existing buildings, vegetation,
landscape, and/or other construction constraints -
15 marks 15 15 7 12 7 7 5 0 13
Flat and un-populated 15
Flat and populated 7
Grade issues, buildings and/or forested 0
11 Other Known Environmental Constraints - SWM 11 Other Known Environmental Constraints - SWM
issues, natural areas, wetland/habitats,
contamination - 20 marks 20 20 0 15 15 10 20 7 10
No constraints 20 marks
Some constraints 10 marks
Variety of constraints 0 marks
12 Public Road Access - 10 marks 3.6 3.6 7 5 7.6 10 10 5 7.6
Total possible points = 210 CSD14-020 - Appendix C
Item # Description Activa N Activa S CCM Fleming N Fleming S Hiawatha Kinsmen Northcrest Trent
New Arena Site Review Scores
Major Arterial - 10 marks
Minor Arterial - 7 marks
Collector road - 5 marks
Local road - 2 marks
No road access currently - 1 mark
13 Public Access by Transit - 10 marks 5 5 10 10 7 0 10 10 7
On existing transit route 10 marks
Easily adapted to be added to an existing route
7 marks
New route required - 3 marks
Not serviceable by City transit - 0 marksNot serviceable by City transit - 0 marks
14 Public Access - pedestrians or cyclists - 5 2 2 5 5 2 0 5 3 5
Existing route 5 marks
Potential for Route to be developed 2 marks
No route possible 0 marks
15 Proximity to other recreational and support
features- 10 marks 6 6 10 10 6 0 10 6 3
Within 2 km 10 marks
With 4 km 6 marks
Within 8 km 3 marks
Over 8 km 0 marks
Total Score 128.6 127.6 98.0 134.0 165.6 129.0 125.0 81.0 152.6
Ranking 5 6 8 3 1 4 7 9 2