Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
North Valley Military Institute - Board of Directors Meeting Thursday, June 18, 2015 4:00 p.m. in the Parish Hall
16651A Rinaldi Street, Granada Hills, CA 91344
AGENDA
I. Call to Order II. Adoption of the Agenda III. Public Comment – Members of the public who wish to make comments on non-
agenda items are welcome to do so at this time. Speaker cards are available at the end of this agenda. Each speaker is limited to three (3) minutes
IV. ACTION – Approval of the April, 2015 minutes (see attached) V. ACTION – Approval of the Local Control Accountability Plan – since September, the
NVMI community has been updating its Local Control Accountability Plan. Extensive input from staff, parents, students, community members, and governing board members has resulted in a revision of the 2013-2014 plan. The plan being presented to the Governing Board at this meeting represents that extensive input from stakeholders. In accordance with state law, the LCAP and its annual updates must be adopted by the Governing Board by June 30 annually. The plan is posted at www.novamil.org on a link from the main page and attached to this agenda.
VI. ACTION – Retroactive approval of the Proposition 39 Agreement with the Los Angeles Unified School District – The Governing Board had previously empowered the Superintendent to negotiate with LAUSD and sign an agreement under Proposition 39 if said agreement met the minimum requirements for NVMI’s facilities needs for the 2015-2016 school year. Dr. Ryan, the NVMI Superintendent collaborated with LAUSD to arrive at an Alternative Agreement which included the necessary classrooms, office space, and shared use space that meets NVMI’s minimum needs for the 15-16 school year. As a result, Dr. Ryan signed the Alternative Agreement, and at this time requests the board retroactively approve said agreement. (Attached to this agenda)
VII. ACTION – Retroactive approval of Food Service Authority Agreement with the Los Angeles Unified School District – The board had previously discussed that NVMI planned to enter into an agreement with LAUSD to provide food service on the Sun Valley High School Campus for the 2015-2016 school year. The Superintendent has signed the Food Service Authority agreement with the LAUSD and requests retroactive board approval of that agreement. (available at the board meeting)
VIII. DISCUSSION AND ACTION – The Director of Operations and Superintendent request the board consider the sale of receivables to Charter School Capital.
IX. ACTION – The Director of Operations requests the board approve the allocation and disbursement of $1386 in Title 2 funds during the 2014-2015 school year for teacher professional development .
X. ACTION – The Director of Operations requests board approval to submit the NVMI Consolidated Application for federal categorical programs for the 2015-2016 school year.
XI. INFORMATION AND ACTION – Schoolsite Council – Though charter schools are not required by law to have a Schoolsite Council, the Superintendent formed such a council at the beginning of his tenure at NVMI which meets monthly during the school year and consists of parents, staff, and students. The Schoolsite Council (SSC) at NVMI has specific responsibility for the Local Control Accountability Plan, as well as reviewing and giving input on the school’s budget, federal and state categorical funding, English Learner plans and activities, and Special Education plans and activities. Charter schools are required to have the equivalent of District English Leader Advisory Committees (DELACs) and Community Advisory Committees for Special Education (CACs), and the NVMI SCC fulfills those statutory requirements. The Superintendent requests a board motion acknowledging that the NVMI Schoolsite Council is serving as the DELAC and CAC to fulfill statutory requirements.
XII. DISCUSSION AND ACTION – The Superintendent has waived his right to the conduct of his annual evaluation in closed session. The board will, in open session, discuss the performance of the Superintendent , provide feedback on his job performance, and establish performance goals for the 2015-2016 academic year.
XIII. DISCUSSION AND ACTION – The board opts not to go into closed session for a discussion of possible legal action. The board will discuss possible litigation between the Episcopal Church of Saint Andrew and Saint Charles and the North Valley Military Institute and the board will discuss the school’s response to communications from legal counsel for the church.
XIV. DISCUSSION AND ACTION - Dir of Operations asks that board discussion incorporation of Healthy Workplace Healthy Family Act of 2014 into NVMI's board approved HR policy: Jan. 1, 2015 California Sick Leave Compliance: California recently enacted a statewide paid sick leave mandate for California employers called the Healthy Workplace Healthy Family Act of 2014 (AB1522). An employee who, on or after July 1, 2015, works in California for 30 or more days within a year from the beginning of employment, is entitled to paid sick leave. Employees, including part-time and temporary employees, will earn at least one hour of paid leave for every 30 hours worked. Accrual begins on the first day of employment or July 1, 2015, whichever is later. An employer may limit the amount of paid sick leave an employee can use in one year to 24 hours or three days. Accrued paid sick leave may be carried over to the next year, but it may be capped at 48 hours or six days.
XV. ADJOURN
North Valley Military Institute - Board of Directors Meeting Thursday, April 23, 2015 4:00 p.m. in the Parish Hall
16651A Rinaldi Street, Granada Hills, CA 91344 And via teleconference with Board Member Cesley Frost
from 510-599-6226 held at 3877 Lusk Street, Oakland, CA
MINUTES
I. Call to Order was at 4:15 by President Lanny West; Present Lanny West, Cesley Frost (by teleconference), Emory Josephs, Kay Deitch; absent Kevin Baxter. Others present: Sharon Bradley, LAUSD Charter Schools Division, Aida Tottiasian, LAUSD Charter Schools Division, Kellie JAckson, JR Sarenana, Karla Uribe, Steve Diab, Gina Wilson, Diane French Mila Reeder, Mark Ryan
II. The agenda was adopted unanimously. III. Public Comment – Members of the public who wish to make comments on non-
agenda items are welcome to do so at this time. Speaker cards are available at the end of this agenda. Each speaker is limited to three (3) minutes – there were no public speakers.
IV. ACTION – The board unanimously approved the March, 2015 board minutes. V. INFORMATION – Members of the school’s administrative team made presentations to
the Board of Directors regarding their operational areas of responsibility. a. Academics – Dr. Mark Ryan presented data on Benchmark #3 to the board in
powerpoint format. There was some Q/A on the benchmark data, and the board engaged with the school leadership on reasons for low performance and the preparations underway for the Smarter Balanced Assessments in May. The school administration reviewed the basic format and content of the Smarter Balanced Assessments, and the efforts to align curriculum, instruction, and assessment at NVMI with those new assessments. The board also heard from Diane French regarding classroom observation data, attendance data, and schoolwide Grade Point Averages. Diane also handed out a paper with proposed contents for a schoolwide “data dashboard” which would be updated monthly and include current data on all four NVMI pillars – Academics, Leadership, Citizenship, and Athletics, as well as financial and other pertinent data for the board and public. The board proposed the addition of several data points to the proposed dashboard, which the school administration hopes to have operational in its nascent stages for the 2015-2016 school year.
b. Leadership – Captain Steve Diab presented information about the highly successful NVMI performances at the California Cadet Corps state drill competition and Individual Major Awards (Cadet of the Year) competition held last weekend at Los Alamitos Joint Forces Training Base. He also briefed the board on the schoolwide physical challenges which are successfully being implemented in their first year of existence. There are also several upcoming events in the Leadership domain, including several parades and NVMI entrance camp in addition to the California Cadet Corps summer camp. Captain Diab also
shared information about NVMI cadet participation in the Special Olympics this coming summer.
c. Citizenship – Gina Wilson presented citizenship information to the board. There were no suspensions of expulsions in the last month. The school is attempting to focus on positive reinforcement, especially through the school’s merit system. The board asked a variety of questions about the merit system, which were answered by Ms. Wilson, Captain Diab, and Dr. Ryan.
d. Athletics – JR Sarenana presented written and verbal information to the board about both the middle school and high school sports programs. We are nearing the end of all seasons, and this first year of associate membership in CIF has been successful, despite various facility challenges. JR has been scheduling games for the 2015-2016 school year, predicated on the belief that we will likely be on the Sun Valley HS campus. The school will be offering conditioning classes and clinics during the summer through the YPI ASSETS grant program. We are also ensuring that all students comply with the policies on physical examinations prior to any interscholastic sports activities, including practices and games. Several board members asked questions about the athletics program, including questions about facilities plans for Sun Valley and what we plan to do since Sun Valley was not built as a high school and does not have baseball, softball, football, swimming, etc facilities. JR and Mark responded that as we plan for the future, those considerations will affect both which sports we offer and whether we rent outside facilities to offer those sports where the SVHS facilities are not CIF compliant.
e. Special Education – Karla Uribe presented a summary of Special education enrollment and services and discussed the possibility of providing an Autism special day class or similar program for students next year at the middle school and/or high school levels.
f. Admissions and Enrollment – Dr. Ryan assured the board that NVMI is on track to retain in excess of 90% of its current 6th through 11th graders (which is dramatically higher than national military school averages), and is on track to enroll enough students to total an enrollment in excess of 530.
g. Facilities – The superintendent reminded the board that NVMI requested Dispute Resolution with the Los Angeles Unified School District as a result of the District’s final offer for Proposition 39 property at Sun Valley High School. NVMI is still waiting for a response from the district.
VI. INFORMATION, DISCUSSION, AND ACTION – The Superintendent and Director of Operations requested authorization to enter into a temporary employment agreement with Matthew Kus to serve as Project Manager for the close-out of the lease at the 16651A Rinaldi Site (including management of the portable removal, restoration of the site to its original condition, turn off of utilities, removal of technology equipment, disposal of surplus property, sale of surplus supplies and equipment, management of the various “move” functions within the context of NVMI summer school and summer camp and summer office operations, and packing necessary furnishings, fixtures, supplies ,and equipment) and move to the Sun Valley HS Campus (including establishment of utilities connections, unpacking, key management, establishment of technology connections, public address system,
telephones, furnishings, set up of technology, implementation of LAUSD as the Food Service Authority for NVMI, office set-up, Hawk Exchange and military supply set up, and interfacing with the Sun Valley and LAUSD staffs). The term of the employment agreement will be from May 1 to not longer than August 15, 2015 for a monthly fee not to exceed $7,500 (less applicable taxes, with no health benefits). The board discussed the matter briefly after an explanation by Kellie Jackson, and then unanimously approved a motion to authorize the execution of a personal service contract with the provisions outlined above.
VII. DISCUSSION AND ACTION – Financial Matters: a. The board discussed the current cash flow situation which will necessitate the sale
of receivables in the coming weeks and months in accordance with the provisions of the March board resolution. The combination of previous receivable sales, current enrollment numbers below original estimates by about 20 students, and the need to follow through on both payroll and accounts payable necessitates the sale of additional receivables to ensure timely payment of staff and creditors. The current amount in the bank is $131,082.82 with about $43,000 due to be deposited, but these amounts are not adequate to cover payroll and bills.
b. The board discussed a draft of the 2015-2016 budget and unanimously adopted a draft 2015-2016 budget predicated on an enrollment of 531 students, revenue of $5,050,452 and expenses of $5,049,741. The board discussed the fact that while this budget is balanced, it does not make up for the deficit budget from the 2014-2015 school year. The hope is to regain full financial footing after the 2016-2017 school year, considering the projections of both increased enrollment and additional LCFF dollars.
c. The board discussed the re-selection of an auditor for the 2014-2015 fiscal year. Three bids were received from qualified auditors, and Kellie Jackson recommended the selection of Vavrinek, Trine, Day and Company for a total cost of $5750, the lowest bidder. The board voted unanimously to secure the services of Vavrinek, Trine, Day and Company.
d. The board will review and initial the February and March check register. VIII. DISCUSSION AND ACTION – NVMI is in receipt of a legal notice from the Church of
Saint Andrew and Saint Charles regarding the actions demanded by the church to be taken prior to the end of our current lease on June 30, 2015. The board discussed the content of that notice and considered action to provide a formal response to the demands made in that notice. By unanimous vote, the board directed the Superintendent to send a letter to Church’s legal counsel saying that we intend to fully comply with the provisions of the lease which call for removal of the portables and restoration of the property to its original condition. Further NVMI does not intend to pay $40,000 for the sound deadening barriers in the Parish Hall because NVMI has vacated the Hall any time the church or another outside group needed the hall, and the parish has neither lost income nor use of the hall. There remains a chance that another school would take over the property, including the portable leases, and so the letter will include a deadline of May 15 for the Church or its lawyers to contact us to alert us to whether the portables must be removed. Should we not hear from the Church or its counsel by that deadline, we will proceed with the plan to remove the
portables and restore the property to its original condition pursuant to the provisions of the original lease.
IX. DISCUSSION – The presented the current NVMI Local Control Accountability Plan (LCAP) and NVMI progress on the LCAP measures. The Superintendent also presented information about the legal obligations of the board with regards to the LCAP. The Schoolsite Council, faculty, staff, Parent Council, and student leadership have all had multiple opportunities to give input to the draft LCAP and the LCAP has undergone various modifications as a result of that input. We anticipate approval of the final version of the LCAP at the May Governing Board meeting after May Schoolsite Council, Parent Advisory Council, school staff and faculty, and cadet leadership meetings during the month of Math.
X. EDUCATION PROTECTION ACCOUNT - The board voted unanimously to approve the following resolution.
RESOLUTION REGARDING THE EDUCATION PROTECTION ACCOUNT
WHEREAS, the voters approved Proposition 30 on November 6, 2012;
WHEREAS, Proposition 30 added Article XIII, Section 36 to the California
Constitution effective November 7, 2012;
WHEREAS, the provisions of Article XIII, Section 36(e) create in the state
General Fund an Education Protection Account to receive and disburse the revenues
derived from the incremental increases in taxes imposed by Article XIII, Section 36(f)
WHEREAS, before June 30th of each year, the Director of Finance shall estimate
the total amount of additional revenues, less refunds that will be derived from the
incremental increases in tax rates made pursuant to Article XIII, Section 36(f) that will be
available for transfer into the Education Protection Account during the next fiscal year;
WHEREAS, if the sum determined by the State Controller is positive, the State
Controller shall transfer the amount calculated into the Education Protection Account
within ten days preceding the end of the fiscal year;
WHEREAS, all monies m the Education Protection Account are hereby
continuously appropriated for the support of school districts, county offices of education,
charter schools and community college districts;
WHEREAS, monies deposited in the Education Protection Account shall not be
used to pay any costs incurred by the Legislature, the Governor or any agency of state
government;
NOW, THEREFORE, IT IS HEREBY RESOLVED:
I. The monies received from the Education Protection Account shall be spent
as required by Article XIII, Section 36 and the spending determinations on how the
money will be spent shall be made in open session of a public meeting of the governing
board of North Valley Military Institute.
2. In compliance with Article X[[[, Section 36(e), with the California
Constitution, the governing board of the North Valley Military Institute has
determined to spend the monies received from the Education Protection Act as attached.
8
Expenditures through: June 30, 2015 For Fund 01, Resource 1400 Education Protection Account
Description Object Codes Object Codes Amount
AMOUNT AVAILABLE FOR THIS FISCAL YEAR Adjusted Beginning Fund Balance 9791-9795 9791-9795 0.00 Revenue Limit Sources 8010-8099 8010-8099 298,483.00 TOTAL AVAILABLE 298,483.00
EXPENDITURES AND OTHER FINANCING USES
(Objects 1000-7999) SACS Object
SACS Function
Instruction 1100 1000-1999 298,483.00 Instruction-Related Services
Instructional Library, Media, and Technology 1200, 2200, 2900
2420 0.00
Other Instructional Resources (Including Parent Participation) 2900 2490-2495 0.00 Pupil Services
Guidance and Counseling Services 1200 3110 0.00 Psychological Services 1200 3120 0.00 Attendance and Social Work Services 2900 3130 0.00 Health Services 1200, 2200 3140 0.00 Speech Pathology and Audiology Services 1100 3150 0.00
Pupil Testing Services 1100, 1900, 2100 3160 0.00
Pupil Transportation 2200 3600 0.00 Food Services 2200, 2900 3700 0.00 Other Pupil Services 3900 0.00
Ancillary Services 4000-4999 0.00 Community Services 5000-5999 0.00 Plant Services 2200 8000-8999 0.00 Other Outgo 9000-9999 0.00 TOTAL EXPENDITURES AND OTHER FINANCING USES 298,483.00
BALANCE (Total Available minus Total Expenditures and Other Financing Uses) 0.00 Note: EPA estimate from CDE 14-15 1st qtr. Apportionment
9
XI. Adjournment was a 6:28 p.m.
Page 10 of 101
§ 15497. Local Control and Accountability Plan and Annual Update Template.
Introduction:
LEA: North Valley Military Institute
Contact (Name, Title, Email, Phone Number): Dr. Mark Ryan, Superintendent, [email protected]
LCAP Year:14 ADOPTED BY THE NVMI GOVERNING BOARD AT THE JUNE 18, 2015 BOARD MEETING
Local Control and Accountability Plan and Annual Update Template
The Local Control and Accountability Plan (LCAP) and annual update template shall be used to provide details regarding local educational agencies’ (LEAs) actions and expenditures to support pupil outcomes and overall performance pursuant to Education Code sections 52060, 52066, 47605, 47605.5, and 47606.5.
For school districts, pursuant to Education Code section 52060, the LCAP must describe, for the school district and each school within the district, goals and specific actions to achieve those goals for all pupils and each subgroup of pupils identified in Education Code section 52052, including pupils with disabilities, for each of the state priorities and any locally identified priorities.
For county offices of education, pursuant to Education Code section 52066, the LCAP must describe, for each county office of education-operated school and program, goals and specific actions to achieve those goals for all pupils and each subgroup of pupils identified in Education Code section 52052, including pupils with disabilities, who are funded through the county office of education Local Control Funding Formula as identified in Education Code section 2574 (pupils attending juvenile court schools, on probation or parole, or mandatorily expelled) for each of the state priorities and any locally identified priorities. School districts and county offices of education may additionally coordinate and describe in their LCAPs services provided to pupils funded by a school district but attending county-operated schools and programs, including special education programs.
Charter schools, pursuant to Education Code sections 47605, 47605.5, and 47606.5, must describe goals and specific actions to achieve those goals for all pupils and each subgroup of pupils identified in Education Code section 52052, including pupils with disabilities, for each of the state priorities as applicable and any locally identified priorities. For charter schools, the inclusion and description of goals for state priorities in the LCAP may be modified to meet the grade levels served and the nature of the programs provided, including modifications to reflect only the statutory requirements explicitly applicable to charter schools in the Education Code.
Page 11 of 101
The LCAP is intended to be a comprehensive planning tool. LEAs may reference and describe actions and expenditures in other plans and funded by a variety of other fund sources when detailing goals, actions, and expenditures related to the state and local priorities. LCAPs must be consistent with school plans submitted pursuant to Education Code section 64001. The information contained in the LCAP, or annual update, may be supplemented by information contained in other plans (including the LEA plan pursuant to Section 1112 of Subpart 1 of Part A of Title I of Public Law 107-110) that are incorporated or referenced as relevant in this document.
For each section of the template, LEAs should comply with instructions and use the guiding questions as prompts (but not limits) for completing the information as required by statute. Guiding questions do not require separate narrative responses. Data referenced in the LCAP must be consistent with the school accountability report card where appropriate. LEAs may resize pages or attach additional pages as necessary to facilitate completion of the LCAP.
State Priorities
The state priorities listed in Education Code sections 52060 and 52066 can be categorized as specified below for planning purposes, however, school districts and county offices of education must address each of the state priorities in their LCAP. Charter schools must address the priorities in Education Code section 52060(d) that apply to the grade levels served, or the nature of the program operated, by the charter school.
A. Conditions of Learning:
Basic: degree to which teachers are appropriately assigned pursuant to Education Code section 44258.9, and fully credentialed in the subject areas and for the pupils they are teaching; pupils have access to standards-aligned instructional materials pursuant to Education Code section 60119; and school facilities are maintained in good repair pursuant to Education Code section 17002(d). (Priority 1)
Implementation of State Standards: implementation of academic content and performance standards adopted by the state board for all pupils, including English learners. (Priority 2)
Course access: pupil enrollment in a broad course of study that includes all of the subject areas described in Education Code section 51210 and subdivisions (a) to (i), inclusive, of Section 51220, as applicable. (Priority 7)
Page 12 of 101
Expelled pupils (for county offices of education only): coordination of instruction of expelled pupils pursuant to Education Code section 48926. (Priority 9)
Foster youth (for county offices of education only): coordination of services, including working with the county child welfare agency to share information, responding to the needs of the juvenile court system, and ensuring transfer of health and education records. (Priority 10)
B. Pupil Outcomes:
Pupil achievement: performance on standardized tests, score on Academic Performance Index, share of pupils that are college and career ready, share of English learners that become English proficient, English learner reclassification rate, share of pupils that pass Advanced Placement exams with 3 or higher, share of pupils determined prepared for college by the Early Assessment Program. (Priority 4)
Other pupil outcomes: pupil outcomes in the subject areas described in Education Code section 51210 and subdivisions (a) to (i), inclusive, of Education Code section 51220, as applicable. (Priority 8)
C. Engagement:
Parent involvement: efforts to seek parent input in decision making, promotion of parent participation in programs for unduplicated pupils and special need subgroups. (Priority 3)
Pupil engagement: school attendance rates, chronic absenteeism rates, middle school dropout rates, high school dropout rates, high school graduations rates. (Priority 5)
School climate: pupil suspension rates, pupil expulsion rates, other local measures including surveys of pupils, parents and teachers on the sense of safety and school connectedness. (Priority 6)
LOCAL PRIORITIES:
In addition to the above, NVMI has added a priority of ensuring that the school’s four pillars of academics, leadership, citizenship, and athletics are robust and meeting the needs of all students, (NVMI Priority 8) as well as a priority to ensure the school is fiscally sound and well governed. (NVMI Priority 9)
Page 13 of 101
Section 1: Stakeholder Engagement
Meaningful engagement of parents, pupils, and other stakeholders, including those representing the subgroups identified in Education Code section 52052, is critical to the LCAP and budget process. Education Code sections 52062 and 52063 specify the minimum requirements for school districts; Education Code sections 52068 and 52069 specify the minimum requirements for county offices of education, and Education Code section 47606.5 specifies the minimum requirements for charter schools. In addition, Education Code section 48985 specifies the requirements for translation of documents.
Instructions: Describe the process used to engage parents, pupils, and the community and how this engagement contributed to development of the LCAP or annual update. Note that the LEA’s goals related to the state priority of parental involvement are to be described separately in Section 2, and the related actions and expenditures are to be described in Section 3.
Guiding Questions:
1) How have parents, community members, pupils, local bargaining units, and other stakeholders (e.g., LEA personnel, county child welfare agencies, county office of education foster youth services programs, court-appointed special advocates, foster youth, foster parents, education rights holders and other foster youth stakeholders, English learner parents, community organizations representing English learners, and others as appropriate) been engaged and involved in developing, reviewing, and supporting implementation of the LCAP?
2) How have stakeholders been included in the LEA’s process in a timely manner to allow for engagement in the development of the LCAP? 3) What information (e.g., quantitative and qualitative data/metrics) was made available to stakeholders related to the state priorities and
used by the LEA to inform the LCAP goal setting process? 4) What changes, if any, were made in the LCAP prior to adoption as a result of written comments or other feedback received by the LEA
through any of the LEA’s engagement processes? 5) What specific actions were taken to meet statutory requirements for stakeholder engagement pursuant to Education Code sections
52062, 52068, and 47606.5, including engagement with representative parents of pupils identified in Education Code section 42238.01? 6) In the annual update, how has the involvement of these stakeholders supported improved outcomes for pupils related to the state
priorities?
Page 14 of 101
Involvement Process Impact on LCAP
2013-2014
STEP 1: The state’s priorities were reviewed by faculty and administration in several admin and faculty meetings and draft NVMI priorities were created, along with draft action steps to address the priorities along with prioritized budget plans to bring those action steps to reality. Data, including student achievement data, college going and college performance data, discipline and attendance data, and other data requested by stakeholders was reviewed extensively.
STEP 2: A draft LCAP was presented to the Governing Board for input and discussed in an open meeting.
STEP 3: The draft LCAP was presented at a community fair at which the entire school community of parents and students was present. The LCAP contents were made into large posters and students and parents were asked to provide comments and input on those large sheets. It was also made available on the NVMI website and at the school office. It was also sent in the weekly
This became the initial document that was shared with parents and students and further discussed by the staff.
The LCAP was further refined with board member input, including refinement of the priorities and action steps, along with budget considerations.
The LCAP was significantly revised to include the input from parents and students.
Page 15 of 101
Involvement Process Impact on LCAP
parent bulletin.
STEP 4: A final version of the LCAP, incorporating all input from stakeholders was presented to the NVMI governing board and discussed in a public meeting.
The board made minor adjustments to the plan, discussed the budget implications extensively, and approved the LCAP along with the preliminary budget for the 2014-2015 school year.
2014-2015
The Schoolsite Council met and discussed the LCAP extensively at both its March, 2015 and April, 2015 meetings.
The “annual update” section was completed collaboratively, extensive discussions took place regarding the metrics and NVMI performance on those metrics. The “what will be different” sections were updated collaboratively as well. . Identified needs and metrics were adjusted based on SSC input.
The faculty at is March meeting discussed the LCAP extensively and the Curriculum Committee met in April to discuss LCAP.
Changes were made to the “annual update section, identified needs, and metrics sections based on faculty input.
Cadet battalion staff discussed LCAP at March and April meetings. Some changes were made to the annual update section and slight changes to the metrics section.
Page 16 of 101
Involvement Process Impact on LCAP
The Governing Board went through the LCAP draft at both the March and April, 2015 board meetings after the SSC did its work. The Board asked questions about the various sections and gave input on both the goals and metrics to be used.
The Annual update section and “what will be different” sections were modified based no board input. Identified needs and metrics were adjusted based on board input.
At the May, 2015 SSC meeting, a final discussion took place regarding the LCAP and all members had a final opportunity to suggest any changes.
Slight modifications were made based on SSC input.
At the June, 2015 Board meeting, the board voted on the final version of the LCAP as drafted and modified by the SSC (and board) at the previous monthly meetings.
Final approval of LCAP for 2015-2016.
Page 17 of 101
Section 2: Goals and Progress Indicators
For school districts, Education Code sections 52060 and 52061, for county offices of education, Education Code sections 52066 and 52067, and for charter schools, Education Code section 47606.5 require(s) the LCAP to include a description of the annual goals, for all pupils and each subgroup of pupils, for each state priority and any local priorities and require the annual update to include a review of progress towards the goals and describe any changes to the goals.
Instructions: Describe annual goals and expected and actual progress toward meeting goals. This section must include specifics projected for the applicable term of the LCAP, and in each annual update year, a review of progress made in the past fiscal year based on an identified metric. Charter schools may adjust the chart below to align with the term of the charter school’s budget that is submitted to the school’s authorizer pursuant to Education Code section 47604.33. The metrics may be quantitative or qualitative, although LEAs must, at minimum, use the specific metrics that statute explicitly references as required elements for measuring progress within a particular state priority area. Goals must address each of the state priorities and any additional local priorities; however, one goal may address multiple priorities. The LEA may identify which school sites and subgroups have the same goals, and group and describe those goals together. The LEA may also indicate those goals that are not applicable to a specific subgroup or school site. The goals must reflect outcomes for all pupils and include specific goals for school sites and specific subgroups, including pupils with disabilities, both at the LEA level and, where applicable, at the school site level. To facilitate alignment between the LCAP and school plans, the LCAP shall identify and incorporate school-specific goals related to the state and local priorities from the school plans submitted pursuant to Education Code section 64001. Furthermore, the LCAP should be shared with, and input requested from, school site-level advisory groups (e.g., school site councils, English Learner Advisory Councils, pupil advisory groups, etc.) to facilitate alignment between school-site and district-level goals and actions. An LEA may incorporate or reference actions described in other plans that are being undertaken to meet the goal.
Guiding Questions:
1) What are the LEA’s goal(s) to address state priorities related to “Conditions of Learning”? 2) What are the LEA’s goal(s) to address state priorities related to “Pupil Outcomes”? 3) What are the LEA’s goal(s) to address state priorities related to “Engagement” (e.g., pupil and parent)? 4) What are the LEA’s goal(s) to address locally-identified priorities? 5) How have the unique needs of individual school sites been evaluated to inform the development of meaningful district and/or individual
school site goals (e.g., input from site level advisory groups, staff, parents, community, pupils; review of school level plans; in-depth school level data analysis, etc.)?
Page 18 of 101
6) What are the unique goals for subgroups as defined in Education Code sections 42238.01 and 52052 that are different from the LEA’s goals for all pupils?
7) What are the specific predicted outcomes/metrics/noticeable changes associated with each of the goals annually and over the term of the LCAP?
8) What information (e.g., quantitative and qualitative data/metrics) was considered/reviewed to develop goals to address each state or local priority and/or to review progress toward goals in the annual update?
9) What information was considered/reviewed for individual school sites? 10) What information was considered/reviewed for subgroups identified in Education Code section 52052? 11) In the annual update, what changes/progress have been realized and how do these compare to changes/progress predicted? What
modifications are being made to the LCAP as a result of this comparison?
Page 19 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
NEED: All teachers will have full credentials
METRIC: Same
All teachers have clear credentials
Affects all students
NVMI 14-15: 1 intern teacher, 6 have preliminary credentials; 13 clears Those on prelim are either in BTSA or have a plan to complete BTSA.
Any teachers who do not have clear credentials will have a signed plan to indicate how they will get them
Teachers will fully implement their plan; including participation in LAUSD BTSA; consider mentor program for teachers, especially new teachers to NVMI
All teachers will be fully credentialed with clear credentials or in the final stages of getting clear credentials
State priority 1
Page 20 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
NEED: No teachers assigned to teach a course for which they do not possess proper credential
METRIC: Same
100% of courses will be taught by teachers will proper credentials
Affects all students in all subgroups
NVMI 14-15: There are currently two teachers with short term staff permits, neither of which will require one next year
Any courses for which a teacher is not highly qualified will trigger a plan to ensure teacher works toward full credential
Ideally, what course(s) who do not have fully credentialed teachers will have a teacher in progress toward full credential
All courses will have a fully credentialed teacher
State Priority 1
Page 21 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
NEED: All students need CCSS aligned curricular materials
METRIC: Same
100% of A-G courses have CCSS aligned textbooks and instructional materials
Affects all students in all subgroups
NVMI 14-15: CPM Math books purchased; newsela.com purchased for informational text work
Math books purchased (hard copy and online-College Prep Math); newsela.com purchased but not used to full capacity because of technology troubles
Research NGSS materials and ELA/ and History/SS materials; research Study Island possibilities
Purchase NGSS and ELA materials; make decision for 17-18 about History/Social Science
State Priority 1
State Priority 2
State Priority 4
Page 22 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
NEED: School facility maintained in excellent condition; repairs ASAP
METRIC: Same
School facility maintained in excellent condition; repairs ASAP
Affects all students in all subgroups
NVMI Compliant with metric; moving to Sun Valley HS on Prop 39 offer for 15-16; in ongoing negotiations with LAUSD re: total number of available classrooms
No marginally unsafe conditions allowed to persist > 1 working day
No marginally unsafe conditions allowed to persist > 1 working day
No marginally unsafe conditions allowed to persist > 1 working day
State Priority 1
State Priority 6
Page 23 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
NEED: Special Ed credentials needed for gen ed teachers so they are dually credentialed
METRIC: # of dually credentialed teachers
At least 50% of NVMI teachers are dually credentialed in Multiple Subjects/Single Subjects AND mild/moderate RSP WITH AUT certificate
Special Education students
NVMI Programs options investigated; no program implemented due to lack of budget funds and staff overload
Program options investigated; LMU program likely to be implemented next year (need to include AUT Certificate)
Program hopefully begins in fall 2015
Ideally 50% of gen ed staff are SPED credentialed by the end of the 16-17 school year
State Priority 1
State Priority 4
Page 24 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
NEED: Curriculum maps needed for all courses aligned with CCSS
METRIC: # of courses mapped
CCSS Aligned curriculum maps created for all NVMI courses
All students in all subgroups
NVMI Maps for all courses developed in Jul, 2014; modified January 2015 and aligned to benchmarks
All levels ELA, all levels math through Pre-Cal, 5 science courses, 2 years of Spanish, and 6 History/Social Science courses have been successfully mapped with significant faculty input
Remainder of and all new courses are mapped
Any new courses mapped
State Priority State Priority 4
Page 25 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
NEED: PD For teachers on CCSS implementation
METRIC: Hours of PD and evaluations of those professional development events
Professional Development in Common Core Standards for all teachers specific to their disciplines (differentiated by teacher)
All students in all subgroups
NVMI All math teachers provided 40 hours of CPM training; CPM Teachers report high level of satisfaction with PD; gather data on differentiated PD needs of all teachers and all new hires; Professional Development offered on Reading Apprenticeship
Minimum of 40 hours provided to all math teachers; follow up needed on Study Team Strategies and how to align with SBAC interim assessments; Reading Apprenticeship and English Learner Schoolwide Strategies PD (Sentence
Minimum of 60 hours provided to all teachers, including teacher self-identified PD of at least 40 hours; differentiated PD planning; Study Team Strategies; Skill and Will; AVID training; EL and Reading Apprenticeship Strategies; Writing Across
Minimum of 60 hours provided to all teachers, including teacher self-identified PD of at least 40 hours; differentiated PD planning
State Priority 2
State Priority 4
Page 26 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
and EL Schoolwide Strategies; more follow up needed
frame, THIEVES, word walls, academic vocab, etc)
the Curriculum
NEED: Implementation of technology based intervention and assessment tools
METRIC: Student achievement data
Students receive technology based pre-assessments, interventions, and post-assessments of performance in math and ELA/ELD
All students in all subgroups
NVMI None; technology problems prevented this from happening; need to investigate options like NWEA Map (Study Island)
Sixth graders will be pre-assessed, receive computer based interventions, and post-assessed in Math and ELA
Sixth and seventh graders will be pre-assessed, receive computer based interventions, and post-assessed in Math and ELA
Sixth, seventh, and eighth graders will be pre-assessed, receive computer based interventions, and post-assessed in all core subjects
State Priority 2
State Priority 4
State Priority 6
Page 27 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
NEED: computer based resources to help identify student academic need
METRIC: Student achievement increased based on computer data
NVMI will implement computer based assessments of student achievement levels aligned with SBAC Assessments
All students in all subgroups
NVMI Implemented STAR Renaissance and AR testing partially across English classes; due to tech problems; no others implemented; no SBAC interims available when needed
Implement iready; Pearson Essay Grader; STAR Renaissance assessment system for ELA/Math
Implement Accelerated Reader
Continue implementation and adjust as necessary
Continue implementation and adjust as necessary
State Priority 2
State Priority 4
Page 28 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
NEED: Technology based observation tool
METRIC: implemented and data used to evaluate program and teacher effectiveness
NVMI will implement a technology based tool for classroom walk throughs and observations by admin/peers
All students in all subgroups
NVMI Google survey implemented and data from that survey are being collected and analyzed; data shared with faculty at faculty meetings; curriculum committee discussed data from observations; data shared with board at board meetings; data used in teacher
Google survey as observation data collection instrument; perform preliminary data analysis
Decide whether the piloted app is appropriate to move forward or if another is preferable
Implement fully and use data for analysis
State Priority 2
State Priority 4
Page 29 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
evaluation process for self-eval and eval by Superintendent
NEED: English Learner strategies implemented schoolwide
METRIC: Classroom observation data shows strategies fully implementing in
Specific EL strategies will be implemented in all NVMI classrooms across all academic disciplines
English Learners primarily, but will also benefit all students
NVMI Pull out class for beginning EL students periods 1/2 with Mr. Adorable; Word walls in about 85% of classrooms, graphic organizers and visuals in about 25%, objectives and agendas in
Implementation of five strategies: 1) word walls, 2) graphic organizers and visuals, 3) THIEVES, 4) sentence frames, and 5) objectives/ agendas on board using
Implementation of five strategies from previous year PLUS at least two additional strategies
Implementation of seven strategies from previous two years plus three additional strategies to bring the total to ten
State Priority 2
State Priority 4
Page 30 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
all classrooms about 60% of rooms; sentence frames and THIEVES being implemented sporadically; conducted PD in August, need follow up PD for all teachers, including military staff
common whiteboard protocol
NEED: Greater parental involvement
100% of new parents participate in new parent orientation
All students in all subgroups
NVMI 77% of parents participated in orientation
75% of parents schoolwide have participated in orientation
85% of new parents schoolwide have participated in
95% of new parents schoolwide have participated in
State Priority 3
State Priority 6
Page 31 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
METRIC: Numbers of parents at PAC meetings, SSC meetings, parent orientation, back to school night, student led conferences, and parent volunteer opportunities
100% of platoons are represented at PAC meetings
100% of parents attend Back to School Night and Student Led Conferences
100% of parents
About half of platoons represented at most PAC meetings
Attendance at Student Led Conference 1: 82%, SLC 2: 77%, SLC 3: 56%; Back to School Night: 84%.
SSC has about 20
75% of platoons represented at PAC meetings
75% of parents complete parent hours and participate in student led conferences and Back to School Night
orientation
85% of platoons represented at PAC meetings
85% of parents complete parent hours and participate in student led conferences and Back to School Night
orientation
95% of platoons represented at PAC meetings
95% of parents complete parent hours and participate in student led conferences and Back to School Night
Page 32 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
complete service hours
parents at each meeting
Parent leaders want more strictness on this
Need plans to improve parent attendance
NEED: Quarterly interim assessments in all classes
METRIC: Analysis of data from interim
70%> students in all subgroups proficient in all subjects and show statistically significant growth on internal interim
All students in all subgroups
NVMI
Benchmarks 1-3 administered; data analyzed and became baseline data (available separately); no SBAC interim assessments available; need
Baseline data collected during this school year.
Ideally, statistically significant growth between blueprints A and
Minimum of 5% growth in proficiency levels of all students in all subgroups when compared to baseline of 2014-2015;
Minimum of 10% growth in proficiency levels of all students in all subgroups when compared to baseline of 2014-2015;
State Priority 4
Page 33 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
assessments assessments
this to gauge student proficiency; teacher and school level analysis of data; presentations to the board; discussions in Curriculum Committee, Fac meetings, dept, grade level meetings about results.
B and B and C; A and C; presentations to the board; discussions in Curriculum Committee, Faculty meetings, and department and grade level meetings about results.
presentations to the board; discussions in Curriculum Committee, Faculty meetings, and department and grade level meetings about results.
presentations to the board; discussions in Curriculum Committee, Faculty meetings, and department and grade level meetings about results.
Page 34 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
NEED: Intensive Academic Support
METRIC: Number of students receiving support and their academic performance relative to the goals
All students requiring academic support will receive the necessary support to ensure proficiency in all subjects
All students in all subgroups
NVMI Q1: Students with Fs at Progress Report 1A were assigned AS for Q2
Q2: Students with Fs from Q1 were assigned
Q3/4: Students with Fs from Sem 1 in zero period and Saturday Academy;
Attendance rates
100% of students requiring academic support receive it.
This year is baseline data to identify performance levels.
Parent education
100% of students requiring academic support receive it.
Improvement of at least 5% over baseline performance levels in all subjects will be seen.
100% of students requiring academic support receive it.
Improvement of at least 10% over baseline performance levels in all subjects will be seen.
State Priority 4
State Priority 6
Page 35 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
overall about 65%; Anecdotal evidence is that when students attend, they pass classes; the 35%
who do not attend, continue to fail
regarding the importance of attending and taking AS seriously
70% pass CAHSEE on 1st attempt
Need further and more effective parent education on importance of Academic Support
NEED: CAHSEE Passage
At least 80% of students pass both parts of CAHSEE on first
All students NVMI 78% Pass for 10th gr in ELA; 73% Pass for 10th gr in Math;
70% pass both parts on first attempt; 100% pass prior to
75% pass both parts on first attempt; 100% pass prior to
80% pass both parts on first attempt; 100% pass prior to
State Priority 4
Page 36 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
METRIC: At least 80% of students pass both parts of CAHSEE on first attempt; 100% before graduation
attempt; 100% before graduation
100% of c/o ‘15 passed both ELA and Math; Need CAHSEE boot camp
graduation graduation; Likely CAHSEE will not be administered per SBE?
graduation
NEED: Interim assessment and data warehousing system
METRIC: Use of an interim assessment system/data warehouse;
An interim assessment system and data warehouse will be purchased and implemented fully.
All students in all subgroups; the system will be able to help disaggregate the data.
NVMI OARS purchased and is currently being used for this
Need additional training AND to decide how to align this with the SBAC interim
See interim assessment data results noted above
70%> teachers report system is helpful in promoting student
See interim assessment data results noted above
80%> teachers report system is helpful in promoting student
See interim assessment data results noted above
90%> teachers report system is helpful in promoting student
State Priority 4
Page 37 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
extent to which teachers feel the system promotes student proficiency
assessment systems; need training on use of SBAC assessments
proficiency proficiency proficiency
NEED: College Courses on the NVMI campus
METRIC: Number of students successfully completing college courses on the NVMI campus
50%> Of seniors have taken and passed an AP exam or community college course
25% Of seniors have taken and passed two AP
All students in all subgroups
NVMI Not met 10%> Of seniors have taken and passed an AP exam or community college course
20%> Of seniors have taken and passed an AP exam or community college course
30%> Of seniors have taken and passed an AP exam or community college course
5% Of seniors have taken and passed two AP exams or
State Priority 4
State Priority 6
Page 38 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
exams and/or community college courses
community college courses
NEED: SAT/ACT Prep Courses
METRIC: SAT and ACT scores and college acceptances to 2/4 year colleges
85%> students meet UC A-G requirements
85% of senior class accepted to 2/4 year colleges
All students in all subgroups
NVMI 50% met UC A-G requirements
50% accepted to 2/4 year colleges
College counselor held SAT prep sessions
25%> students meet UC A-G requirements
25% of senior class accepted to 2/4 year colleges
MEAN SAT:___
35%> students meet UC A-G requirements
60% of senior class accepted to 2/4 year colleges
MEAN SAT:___
50%> students meet UC A-G requirements
70% of senior class accepted to 2/4 year colleges
MEAN SAT:___
State Priority 4
State Priority 6
Page 39 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
NEED: Full time academic counselor
METRIC: Presence of a full time academic counselor
Connected to goals as noted above for Priority 4
All students in all subgroups
NVMI Ms. Tejada hired Connected to goals as noted above for Priority 4
Connected to goals as noted above for Priority 4
Connected to goals as noted above for Priority 4
State Priority 4
State Priority 6
NEED: Academic Support for SPED students
METRIC: Number of SPED students achieving
100% of SPED students needing academic support will receive it
SPED students
NVMI SPED Academic support is being offered separated from 3:35-4:30 daily in room 4; SPED push in services are being
25% of SPED students will achieve proficiency as noted on interim assessments across all
35% of SPED students will achieve proficiency as noted on interim assessments across all
45% of SPED students will achieve proficiency as noted on interim assessments across all
State Priority 4
State Priority 6
Page 40 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
proficiency and receiving academic support
Proficiency levels of SPED students will be equivalent to that of the schoolwide population
provided in all English at all grade levels and Math and most science and social studies in high school classrooms
subjects subjects subjects
NEED: College and Alumni outreach plan for the school
METRIC: Success
95% of students participate in EAP
50%> students
All students in all subgroups
NOTE: Eventually
NVMI College counselor is working to establish the culture; outreach to universities;
75% of students participate in EAP
10%> students ready and 25%
85% of students participate in EAP
20%> students ready and 35%
95% of students participate in EAP
30%> students ready and 45%
State Priority 4
Page 41 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
of college going and graduation.
ready and 75% “ready of conditionally ready” for college English and math as noted in EAP
the LCAP will include:
75% have completed a Bachelors degree w/in 6 years of grad
individual counseling with all seniors and their families to help with FAFSA, etc.
“ready of conditionally ready” for college English and math as noted in EAP
“ready of conditionally ready” for college English and math as noted in EAP
“ready of conditionally ready” for college English and math as noted in EAP
NEED: School library
METRIC: # of Lexile leveled books available in a searchable
A school library that meets California Department of Ed minimum recommended standards ; a minimum of
All students in all subgroups
NVMI Library with about 2000 titles started in room 4
A minimum of 2000 books will be available for SSR activities; plus at least 250 non-fiction titles
A minimum of 3000 books will be available for SSR activities; plus at least 500 non-fiction titles; move to Sun Valley will
A minimum of 4000 books will be available for SSR activities; plus at least 750 non-fiction titles
State Priority 4
Page 42 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
online system with check in/out system
4000 books allow us to merge libraries
NEED: Accelerated Reader and STAR Renaissance Programs fully implemented
METRIC: AR points and average Lexile level growth during school years
100% of students will participate to minimum English-department established standard for AR program and all students will be reading at grade level
All student in all subgroups
NVMI AR and STAR Renaissance initially implemented
AR points advertised once in bulletin; not fully implemented due to tech issues
70% of students will participate to minimum English-department established standard for AR program and 50%> of students will be reading at grade level
80% of students will participate to minimum English-department established standard for AR program and 60% > of students will be reading at grade level
90% of students will participate to minimum English-department established standard for AR program and 70%> of students will be reading at grade level
State Priority 4
Page 43 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
NEED: School Technology Plan update
METRIC: Successful involvement of all stakeholders in refining an approved technology plan
NVMI will have an approved Technology plan that meets both State of California and e-rate requirements
All students in all subgroups
NVMI Plan has been approved; needs more input from stakeholders for revision
NVMI will have an approved Technology plan that meets both State of California and e-rate requirements; plan redrafted based on stakeholder input
NVMI will have an approved Technology plan that meets both State of California and e-rate requirements; plan redrafted and submitted to state/feds for approval
NVMI will have an approved Technology plan that meets both State of California and e-rate requirements; plan implementation ongoing
State Priority 4
NEED: Excellent school attendance, low chronic absenteeism, no
95% of greater ADA
Less than 5 % of
All students in all subgroups
NVMI Attendance Rate is 93.8%;
SART meetings taking place as
92% or greater ADA
Less than 15 %
93% or greater ADA
Less than 10 %
94% or greater ADA
Less than 5 % of
State Priority 5
Page 44 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
dropouts, and 100% graduation
METRIC: Identified in the need stated above
students with 3> unexcused absences in a semester
Zero dropouts
100% graduation rate
needed; Contact with LA DA Truancy unit for parents of students with excessive whole say absences; faculty want more proactive strategies
of students with 3> unexcused absences in a semester
Zero dropouts
80% graduation rate
of students with 3> unexcused absences in a semester
Zero dropouts
90% graduation rate
students with 3> unexcused absences in a semester
Zero dropouts
100% graduation rate
NEED: Attendance incentives
ADA of 95% or greater
All students in all subgroups
NVMI Every three week, merits awarded, announced in Hawk Weekly
92% ADA 93% ADA; need plan to further reinforce attendance importance;
94% ADA State priority 5
Page 45 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
METRIC: Attendance rates
and at formation for ringing of company bells; quarterly assemblies held
categories of absences; responses to #s of absences
NEED: Effective SART/SARB protocols
ADA of 95% or greater
All students in all subgroups
NVMI SARTs implemented with individual meetings with Dr. Ryan and parents/students
92% ADA 93% ADA 94% ADA State priority 5
NEED: Dropout prevention and recovery efforts along with graduation
Zero dropouts and 100% graduation rate
All students in all subgroups
NVMI Academic and personal counselors working individually with
Zero dropouts
80% graduation
Zero dropouts
90% graduation
Zero dropouts
95% graduation
State Priority 5
Page 46 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
persistence efforts
METRIC: Dropout and graduation rates
students and families where a student is at risk of dropping out; currently only 1 senior in danger
rate rate rate
NEED: Full time personal counselor
METRIC: Presence of personal counselor
100% of students requiring support from a counselor receive that support
All students in all subgroups
NVMI Ms. DeAvila hired
70% of students requiring support from a personal counselor receive that support
75% of students requiring support from a personal counselor receive that; Interns?
80% of students requiring support from a personal counselor receive that; Interns?
State Priority 5
State Priority 6
Page 47 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
NEED: Personal Learning Plans for all students including parental involvement in the development and adoption of the plans
100% of students will have a PLP that their parents have signed off on
All students in all subgroups
NVMI Ms. Tejada completing PLPs for all high school students in Spring, 2015; need status report
100% of students will have a PLP that their parents have signed off on; students deficient in credits will develop plans to remediate
100% of students will have a PLP that their parents have signed off on
100% of students will have a PLP that their parents have signed off on
State Priority 5
NEED: Academic Warning Alert system
METRIC: Number of students failing
Less than 5% of students will fail courses each semester and graduation rates will be 100%
All students in all subgroups
NVMI Current fail rates for classes:
Course Fail Rate
Eng 6 22%
Eng 7 13%
Less than 15% of students will fail courses each semester and graduation rates will be 80%
Less than 10% of students will fail courses each semester and graduation rates will be 85%; need
Less than 5% of students will fail courses each semester and graduation rates will be 90%
State Priority 5
State Priority 6
Page 48 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
courses and not on track to graduate
Eng 8 41%
Eng 9 51%
Eng 10 29%
Eng 11 10%
Eng 12 11%
Math 6 25%
Math 7 54%
Math 8 49%
ALG1 55%
GEOM 40%
ALG2 25%
PRECAL 0%
Sci 6 17%
specific plan to address remedies for high failure rates
Page 49 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
Sci 7 29%
Sci 8 29%
BIO 33%
PHYS 3%
Hist 6 19%
Hist 7 22%
Hist 8 40%
GEOG 27%
US HIST 12%
GOV 0%
SPAN 1 37%
SPAN2 34%
JrSrSEM 4%
Page 50 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
THEATER 0%
LOC 6 14%
LOC 7 26%
LOC 8 18%
LOC 9 28%
LOC 10 4%
LOC 11 5%
LOC 12 0%
ADV LOC 6%
PT 6 6%
PT 7 6%
PT 8 15%
PT 9 15%
Page 51 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
PT 10 17%
PT 11 10%
PT 12 0%
NEED: All students identify an adult with whom they have a positive rapport
METRIC: Student ID of those adults
100% of students will have an adult with whom they have a positive rapport and can seek support
All students in all subgroups
NVMI Implemented informally but needs to be formally “checked” in the 15-16 school year
100% of students will have an adult with whom they have a positive rapport and can seek support
100% of students will have an adult with whom they have a positive rapport and can seek support
100% of students will have an adult with whom they have a positive rapport and can seek support
State Priority 5
NEED: Vibrant Hawk Exchange
100% of students will report satisfaction
All students in all subgroups
NVMI Hawk Exchange is operational, but there are significant
60% of students will report satisfaction with the Hawk
70% of students will report satisfaction with the Hawk
80% of students will report satisfaction with the Hawk
State Priority 5
Page 52 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
METRIC: Number of merits exchanged at the HX for supplies or services
with the Hawk Exchange and its inherent structure
challenges due to lack of space and staffing and minimal budget
Exchange and its inherent reward structure
Exchange and its inherent reward structure
Exchange and its inherent reward structure
NEED: Engaging after school enrichment program and outdoor education program
100% of students will have the opportunity to participate in after school and outdoor education
All students in all subgroups
NVMI ASSETs program instituted; attendance rates well below 20,000 target (need actual end of year data from YPI)
30% of students will have the opportunity to participate in after school and outdoor education opportunities
40% of students will have the opportunity to participate in after school and outdoor education opportunities
50% of students will have the opportunity to participate in after school and outdoor education opportunities
State Priority 5
Page 53 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
NEED: College going culture
METRIC: College going and completion rates; student/ parent satisfaction rates
Same as noted above re: college going and completion
All students in all subgroups
NVMI College exploration during Advisory; some colleges on campus; College visits; Class team names
Same as noted above re: college going and completion
Same as noted above re: college going and completion
Same as noted above re: college going and completion
State Priority 5
State Priority 8
NEED: Mentoring program for at risk students
METRIC: Parent and student satisfaction levels;
100% of students who need a mentoring program are able to participate
All students in all subgroups
NVMI Counseling department provides individual supports; no formal mentoring program
10% of students who need a mentoring program are able to participate
20% of students who need a mentoring program are able to participate; consider peer mentoring
30% of students who need a mentoring program are able to participate
State Priority 5
State Priority 8
Page 54 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
student retention rates
implemented program
NEED: Enhanced entrance camp strategies to help students learn school culture
METRIC: Camp pass rates, student satisfaction rates, and student retention rates
80% or more of students who start NVMI as 6th graders will culminate in 8th grade
65% or more of students who start NVMI as 6th graders will culminate 12th grade at NVMI
All students in all subgroups
NVMI Entrance Camp was successful, data is still needed about efficacy of the efforts; more formal system to evaluate camp effectiveness needs to be developed; retention rates appear to be about 80% total; need analysis
80% or more of students who start NVMI as 6th graders will culminate in 8th grade
65% or more of students who start NVMI as 6th graders will culminate 12th grade at NVMI
80% or more of students who start NVMI as 6th graders will culminate in 8th grade
65% or more of students who start NVMI as 6th graders will culminate 12th grade at NVMI
80% or more of students who start NVMI as 6th graders will culminate in 8th grade
65% or more of students who start NVMI as 6th graders will culminate 12th grade at NVMI
State Priority 6
Page 55 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
90% or more of students who start NVMI as 9th graders will graduate from 12th grade here
90% or more of students who start NVMI as 9th graders will graduate from 12th grade here
90% or more of students who start NVMI as 9th graders will graduate from 12th grade here
90% or more of students who start NVMI as 9th graders will graduate from 12th grade here
NEED: Alternatives to suspension and expulsion
METRIC: Suspension and
Suspension and expulsion rates will be lower than LAUSD
All students in all subgroups
NVMI No expulsions yet during 14/15 SY; suspension rate is higher, but due to specific incidents; variety of alternatives
Exploration of alternatives; implementation of proposed strategies
Exploration of alternatives; implementation of proposed strategies
Exploration of alternatives; implementation of proposed strategies
State Priority 6
Page 56 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
expulsion rates being used
NEED: Master Facilities Plan
METRIC: Permanent School Site
Permanent School site to accommodate long term enrollment projections
All students in all subgroups
NVMI Prop 39 alternative agreement signed in June for Sun Valley HS site
Temporary facilities
Sun Valley HS? Movement to permanent facilities?
State Priority 6
NVMI Priority 9
NEED: Revamped school emergency plan
Robust school emergency plan with necessary supports to implement
All students in all subgroups
NVMI School emergency plan revamped; monthly drills conducted; large scale earthquake drill conducted very
Participation in hazard ID and mitigation, all hazards planning, and preliminary participation in drills and
Continued implementation and practice of the draft plan; send additional cadets and adults to CERT
Full implementation of the draft plan; ; send additional cadets and adults to CERT
State Priority 6
Page 57 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
successfully; Students and staff CERT trained and participated in the drill; additional revamp necessary based on feedback from drill
tabletops; Extensive earthquake drill conducted with tests of all major components of the plan, including student request/release, first aid, morgue, operations, supply and logistics
training training
Page 58 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
NEED: Expanded course offerings (precalculus, calculus, chemistry, physics, advanced lab science, 3/4/5 Spanish, AP courses, band program, art, expanded PE program
METRIC: # of available courses that are A-G compliant; parent
All students are exposed to a robust academic program in all domains
All students in all subgroups
NVMI Precalculus and physics offered; Calculus, Spanish 4AP, Chemistry and grades 6-10 Honors in the plan for 15-16 school year; All courses are A-G compliant and were approved in summer 2014 by UC/CSU Pathways program; plans in place to get remaining courses for 15-
Offer precalculus and physics
Offer calculus and chemistry in addition to previous courses
Consider Spanish 3 and 4; possibly music and band?
Offer Spanish 5, band program, art, and advanced lab, expand AP offerings, especially online
State Priority 7
State Priority 8
Page 59 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
and student satisfaction levels
16 approved by UC/CSU system during summer 2015; need to find other electives that are UC approved
NEED: Revamped LOC and PE Curricula
METRIC: Student learning in LOC and PE, CACC promotion test pass rates;
LOC and PE curricula will be revamped
All students in all subgroups
NVMI Initial effort to revamp curriculum and align with curriculum maps and benchmarks; needs another round of professional development for
50% of students will complete the “one rank per semester” CACC expectation
60% of students will complete the “one rank per semester” CACC expectation
70% of students will complete the “one rank per semester” CACC expectation
State Priority 7
State Priority 8
Page 60 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
student satisfaction levels
military faculty; need promotion test data
NEED: Robust leadership development through the CACC
METRIC: AGI scores; Athletic participation rates and successes, parent/student satisfaction levels
Full implementation of the CACC model
All students in all subgroups
NVMI AGI not conducted this year because of Excellent score last year; intramurals participation rate much better than last year, buts still room for improvement
CACC Annual General Inspection AGI score of Superior
AGI score of Superior
AGI score of Superior
NVMI Priority #8 (NVMI’s four pillars of academics, leadership, citizenship, and athletics will be strengthened and measured regularly)
Page 61 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
NEED: Expanded intramurals and interscholastic athletics
METRIC: Number of intramural and interscholastic sports offered and participation rates; parent and student satisfaction levels
NVMIs interscholastic and intramurals athletics programs will be expansive and in line with similar military academies nationwide
All students in all subgroups
NVMI Intramurals 7-week cycle implemented with moderate success; need more excitement and involvement. Offered HS Fall girls VB, co-ed X Country, Winter boys and girls BB and boys and girls Soccer, and Spring boys VB, softball, and baseball. For MS offered boys and
Participation in CIF as a supplemental league member
All students will participate in intramurals and 25% of eligible students will participate in an interscholastic sports team
Participation in CIF as a supplemental league member (year two of a two year process)
All students will participate in intramurals and 45% of eligible students will participate in an interscholastic
Participation in CIF as a full league member
All students will participate in intramurals and 65% of eligible students will participate in an interscholastic sports team
NVMI Priority 8 (NVMI’s four pillars of academics, leadership, citizenship, and athletics will be strengthened and measured regularly)
Page 62 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
girls soccer, BB, flag football, volleyball
sports team
NEED: Expanded school and community service opportunities
METRIC: Community service hour totals
100% of cadets will complete at least 20 hours of school service per year and 20 hours of community service per year
All students in all subgroups
NVMI Unit Comm Svc about the same as last year; CACC Unit Comm Svc Award 1st place; added blood drive; need expanded offerings; better system to track service
60% of cadets will complete at least 20 hours of school service per year and 20 hours of community service per year
70% of cadets will complete at least 20 hours of school service per year and 20 hours of community service per year
80% of cadets will complete at least 20 hours of school service per year and 20 hours of community service per year
NVMI Priority #8 (NVMI’s four pillars of academics, leadership, citizenship, and athletics will be strengthened and measured regularly)
Page 63 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
NEED: Automation of citizenship tracking systems
METRIC: Successful operation of an automated system; parent and student satisfaction levels
By the 2016-2017 SY a fully integrated and automated citizenship tracking system for merits and demerits will be deployed
All students in all subgroups
NVMI Automated system is far more successful than last year; daily emails re: demerits and merits; detention reporting is electronic; upload of M/D totals to PSchl
TBD TBD By the 2016-2017 SY a fully integrated and automated citizenship tracking system for merits and demerits will be deployed
NVMI Priority 8 (NVMI’s four pillars of academics, leadership, citizenship, and athletics will be strengthened and measured regularly)
Page 64 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
NEED: Fitnessgram scores increase
METRIC: Fitnessgram scores
All students will be in the Healthy Fitness Zone in at least 5 or the 6 categories on the Fitnessgram test
All students in all subgroups
NVMI Fitnessgram administered quarters 1, 2, 3 in prep for final administration in Q4; Still need end of year data
50% of students will be in the Healthy Fitness Zone in at least 5 or the 6 categories on the Fitnessgram test
60% of students will be in the Healthy Fitness Zone in at least 5 or the 6 categories on the Fitnessgram test
70% of students will be in the Healthy Fitness Zone in at least 5 or the 6 categories on the Fitnessgram test
NVMI Priority 8 (NVMI’s four will be strengthened and measured regularly)
NEED: Schoolwide Athletic Challenges
METRIC: % of students who successfully
All students will complete their annual fitness challenge; all new students with “catch up” to complete challenges offered prior to
Al students in all subgroups
NVMI Challenges defined
Mile cadence run offered: 308 successfully completed;
High ropes
Define all challenges with input from school community; offer all challenges at least once during the 14-
65% of students complete their appropriate challenges
75% of students complete their appropriate challenges
NVMI Priority 8 (NVMI’s four will be strengthened and measured regularly)
Page 65 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
complete challenges annually and end up with their names on the perpetual plaque
their enrollment
offered: 92 completed; 5K run offered: 81 completed; 35 mi bike ride not offered; other events not offered
15 SY
NEED: Fiscal soundness
METRIC: Balanced budgets, economic reserve, fund raising amounts, school
Balanced budget, economic reserve of at least $1,000,000 and full school enrollments
All students in all subgroups
NVMI Major fiscal challenges due to increased enrollment without funding “catching up” as well as fluctuation in enrollment;
Balanced budget
Enrollment of 380
Economic reserve of $250,000
Enrollment of 480
Economic reserve of $500,000
Enrollment of 580
NVMI Priority 9 (NVMI will be fiscally sound and well governed)
Page 66 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
enrollment levels
currently below 350, which is far below 380 budget projections; results in $300K plus operating deficit which currently appears to be more than $600K
Page 67 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
NEED: Revised board bylaws and enhanced board membership
METRIC: Board membership levels and approved revised bylaws
There will be 12 members on the board and revamped board bylaws by the end of the charter term
All students in all subgroups
NVMI No progress 7 members on the board by the end of the SY
First draft of revised board bylaws
9 members on the board by the end of the SY
Fully revised board bylaws
12 members on the board by the end of the SY
NVMI Priority 9 (NVMI will be fiscally sound and well governed)
Page 68 of 101
Identified Need and Metric
(What needs have been identified and
what metrics are used to measure
progress?)
Goals
Annual Update:
Analysis of Progress
What will be different/improved for students? (based on identified metric)
Related State and Local Priorities
(Identify specific state priority. For districts and COEs,
all priorities in statute must be
included and identified; each
goal may be linked to more than one
priority if appropriate.)
Description of Goal
Applicable Pupil
Subgroups (Identify
applicable subgroups (as defined in EC
52052) or indicate “all” for all pupils.)
School(s) Affected
(Indicate “all” if the goal
applies to all schools in the
LEA, or alternatively,
all high schools, for example.)
LCAP YEAR
Year 1: 2014-2015
Year 2: 2015-2016
Year 3: 2016-2017
NEED: Revamped school website
METRIC: Revamped school website that parents, students, and outside visitors report as usable and meets needs
Revamped school website that is user friendly and contains all necessary information (Calendar, Schedule, Hawk Weekly, etc)
All students in all subgroups
NVMI Website revamped; increasing weekly “hits”; more robust posting of front page photos and information; need teachers to update pages weekly (about two thirds accomplishing this currently)
Revamped school website that is user friendly and contains all necessary information
Surveys of school community and outside visitors to site; need PD on website creation and enhancement
TBD NVMI Priority 9 (NVMI will be fiscally sound and well governed)
Page 69 of 101
Section 3: Actions, Services, and Expenditures
Instructions: Identify annual actions to be performed to meet the goals described in Section 2, and describe expenditures to implement each action, and where these expenditures can be found in the LEA’s budget. Actions may describe a group of services that are implemented to achieve identified goals. The actions and expenditures must reflect details within a goal for the specific subgroups identified in Education Code section 52052, including pupils with disabilities, and for specific school sites as applicable. In describing the actions and expenditures that will serve low-income, English learner, and/or foster youth pupils as defined in Education Code section 42238.01, the LEA must identify whether supplemental and concentration funds are used in a districtwide, schoolwide, countywide, or charterwide manner. In the annual update, the LEA must describe any changes to actions as a result of a review of progress. The LEA must reference all fund sources used to support actions and services. Expenditures must be classified using the California School Accounting Manual as required by Education Code sections 52061, 52067, and 47606.5.
Guiding Questions:
1) What actions/services will be provided to all pupils, to subgroups of pupils identified pursuant to Education Code section 52052, to specific school sites, to English learners, to low-income pupils, and/or to foster youth to achieve goals identified in the LCAP?
2) How do these actions/services link to identified goals and performance indicators? 3) What expenditures support changes to actions/services as a result of the goal identified? Where can these expenditures be found in the
LEA’s budget? 4) In the annual update, how have the actions/services addressed the needs of all pupils and did the provisions of those services result in
the desired outcomes? 5) In the annual update, how have the actions/services addressed the needs of all subgroups of pupils identified pursuant to Education
Code section 52052, including, but not limited to, English learners, low-income pupils, and foster youth; and did the provision of those actions/services result in the desired outcomes?
6) In the annual update, how have the actions/services addressed the identified needs and goals of specific school sites and did the provision of those actions/services result in the desired outcomes?
7) In the annual update, what changes in actions, services, and expenditures have been made as a result of reviewing past progress and/or changes to goals?
Page 70 of 101
A. What annual actions, and the LEA may include any services that support these actions, are to be performed to meet the goals described in Section 2 for ALL pupils and the goals specifically for subgroups of pupils identified in Education Code section 52052 but not listed in Table 3B below (e.g., Ethnic subgroups and pupils with disabilities)? List and describe expenditures for each fiscal year implementing these actions, including where these expenditures can be found in the LEA’s budget.
Goal
(Include and identify all goals from Section 2)
Related State and
Local Priorities
(from Section 2)
Actions and Services
Level of
Service
(Indicate if
school-wide or
LEA-wide)
Annual Update: Review
of actions/
services
What actions are performed or services provided in each year (and are projected to be provided in
years 2 and 3)? What are the anticipated expenditures for each action (including funding
source)?
LCAP YEAR
Year 1: 2014-15 Year 2: 2015-16 Year 3: 2016-17
All teachers have clear credentials
State priority 1
Credential analysis SCHOOL See annual progress noted in section 2 above
Credential analysis
Same Same
100% of courses will be taught by teachers will proper credentials
State Priority 1
Same as above SCHOOL See annual progress noted in section 2 above
Same as above Same Same
Page 71 of 101
Goal
(Include and identify all goals from Section 2)
Related State and
Local Priorities
(from Section 2)
Actions and Services
Level of
Service
(Indicate if
school-wide or
LEA-wide)
Annual Update: Review
of actions/
services
What actions are performed or services provided in each year (and are projected to be provided in
years 2 and 3)? What are the anticipated expenditures for each action (including funding
source)?
LCAP YEAR
Year 1: 2014-15 Year 2: 2015-16 Year 3: 2016-17
100% of A-G courses will have CCSS aligned textbooks and instructional materials
State Priority 1
State Priority 2
State Priority 4
Purchase CPM texts
Purchase ELA/ELD materials
SCHOOL See annual progress noted in section 2 above
$80,000 for CPM texts
Newsela $5000
Newsela
Analysis and selection of books for Sci/SS and ELA
Science, Social Studies; ELA texts to be purchased
School facility maintained in excellent condition; repairs ASAP
State Priority 1
State Priority 6
Ongoing maintenance schedule SCHOOL See annual progress noted in section 2
$10,000 in operating budget;
LAUSD site; $50,000 budgeted
LAUSD site; $50,000 budgeted
At least 50% of NVMI teachers are dually credentialed in Multiple Subjects/Single Subjects AND mild/moderate RSP
State Priority 1
State Priority 4
SPED Credential program through university
SCHOOL See annual progress noted in section 2 above
None $50,000 plus a need to identify grant funding sources
TBD
Page 72 of 101
Goal
(Include and identify all goals from Section 2)
Related State and
Local Priorities
(from Section 2)
Actions and Services
Level of
Service
(Indicate if
school-wide or
LEA-wide)
Annual Update: Review
of actions/
services
What actions are performed or services provided in each year (and are projected to be provided in
years 2 and 3)? What are the anticipated expenditures for each action (including funding
source)?
LCAP YEAR
Year 1: 2014-15 Year 2: 2015-16 Year 3: 2016-17
CCSS Aligned curriculum maps created for all NVMI courses
State Priority State Priority 4
Summer work by Curriculum Committee chair after faculty work in June 2014 post-school year PD
SCHOOL See annual progress noted in section 2 above
$15,000 in additional salary for Curriculum Committee chairperson
$5000 in add’l salary
$5000 in add’l salary
Professional Development in Common Core Standards for all teachers specific to their disciplines
State Priority 2
State Priority 4
Summer PD opportunities self-identified by teachers
August 2014 PD week including CCSS PD
2014-15 PD opportunities schoolwide and as requested by teachers
SCHOOL See annual progress noted in section 2 above
$10,000 budgeted for teacher identified PD opportunities
40 hrs/per T of PD $10K budgeted
40 hrs/per T of PD cost $10K budgeted
Students receive technology based pre-assessments, interventions, and post-assessments of performance in math and
State Priority 2
State Priority 4
State Priority
OARS purchased and PD for staff on creating assessments
iReady program purchased
Personal computing devices with internet access purchased
SCHOOL See annual progress noted in section 2 above
$4000 for OARS
$20,000 for iReady
Erate dollars for personal devices
$4000 for OARS
$20,000 for iReady or?
??? for personal devices with
$4000 for OARS
$20,000 for iReady or?
??? for personal
Page 73 of 101
Goal
(Include and identify all goals from Section 2)
Related State and
Local Priorities
(from Section 2)
Actions and Services
Level of
Service
(Indicate if
school-wide or
LEA-wide)
Annual Update: Review
of actions/
services
What actions are performed or services provided in each year (and are projected to be provided in
years 2 and 3)? What are the anticipated expenditures for each action (including funding
source)?
LCAP YEAR
Year 1: 2014-15 Year 2: 2015-16 Year 3: 2016-17
ELA/ELD 6 with internet access
Sprint Grant
internet access
Sprint Grant
devices with internet access
Sprint Grant
NVMI will implement computer based assessments of student achievement levels aligned with SBAC Assessments
State Priority 2
State Priority 4
OARS purchased and PD for staff on creating assessments
iReady program purchased
Personal computing devices with internet access purchased
SCHOOL See annual progress noted in section 2 above
$4000 for OARS
$20,000 for iReady or?? for personal devices w/ internet access; Sprint Grant
Same? Same?
NVMI will implement a technology based tool for classroom walk throughs and observations by admin/peers
State Priority 2
State Priority 4
Review of available apps for Smartphones
SCHOOL See annual progress noted in section 2 above
0 – done for free with Google docs
Free Free
Page 74 of 101
Goal
(Include and identify all goals from Section 2)
Related State and
Local Priorities
(from Section 2)
Actions and Services
Level of
Service
(Indicate if
school-wide or
LEA-wide)
Annual Update: Review
of actions/
services
What actions are performed or services provided in each year (and are projected to be provided in
years 2 and 3)? What are the anticipated expenditures for each action (including funding
source)?
LCAP YEAR
Year 1: 2014-15 Year 2: 2015-16 Year 3: 2016-17
Specific EL strategies will be implemented in all NVMI classrooms across all academic disciplines
State Priority 2
State Priority 4
PD on EL Strategies
Word wall supplies provided
Graphic organizer supplies provided
SCHOOL See annual progress noted in section 2 above
$500 for additional office supplies to implement EL strategies
$1000 for PD on CPM Study Team Strategies (Michele Sutorik)
TBD
Page 75 of 101
Goal
(Include and identify all goals from Section 2)
Related State and
Local Priorities
(from Section 2)
Actions and Services
Level of
Service
(Indicate if
school-wide or
LEA-wide)
Annual Update: Review
of actions/
services
What actions are performed or services provided in each year (and are projected to be provided in
years 2 and 3)? What are the anticipated expenditures for each action (including funding
source)?
LCAP YEAR
Year 1: 2014-15 Year 2: 2015-16 Year 3: 2016-17
100% of new parents participate in new parent orientation
100% of platoons are represented at PAC meetings
100% of parents attend Back to School Night and Student Led Conferences
100% of parents complete service hours
State Priority 3
State Priority 6
New Parent Orientation Summer 2014
Returning Parent Orientation Summer 2014
PAC meetings monthly
SSC meetings monthly
Back to School Night in August
Parent Service Hour tracking system
SCHOOL See annual progress noted in section 2 above
$800 for parent orientation supplies
$1000 for supplies; need to continue to work with PAC on engagement strategies to promote maximum parental participation
$1000 for supplies
Page 76 of 101
Goal
(Include and identify all goals from Section 2)
Related State and
Local Priorities
(from Section 2)
Actions and Services
Level of
Service
(Indicate if
school-wide or
LEA-wide)
Annual Update: Review
of actions/
services
What actions are performed or services provided in each year (and are projected to be provided in
years 2 and 3)? What are the anticipated expenditures for each action (including funding
source)?
LCAP YEAR
Year 1: 2014-15 Year 2: 2015-16 Year 3: 2016-17
Students in all subgroups proficient in all subjects and show significant growth on internal interim assessments
85% demonstrate CELDT growth
95% of students reclassified within 3 years at NVMI
State Priority 4
PD as noted above
Interim assessments as noted above
Targeted student support as noted below
CCSS aligned curricula as noted both above and below
Student academic and personal counseling supports as noted below
SCHOOL See annual progress noted in section 2 above
No additional expenditures as these items ate all duplicates of content from other action steps
No additional expenditures as these items ate all duplicates of content from other action steps
No additional expenditures as these items ate all duplicates of content from other action steps
Page 77 of 101
Goal
(Include and identify all goals from Section 2)
Related State and
Local Priorities
(from Section 2)
Actions and Services
Level of
Service
(Indicate if
school-wide or
LEA-wide)
Annual Update: Review
of actions/
services
What actions are performed or services provided in each year (and are projected to be provided in
years 2 and 3)? What are the anticipated expenditures for each action (including funding
source)?
LCAP YEAR
Year 1: 2014-15 Year 2: 2015-16 Year 3: 2016-17
All students requiring academic support will receive the necessary support to ensure proficiency in all subjects
State Priority 4
State Priority 6
Academic support revamp structure
Saturday school revamp for students with missing assignments
Before School homework help
Learning Resource Center added to both SPED population and gen ed population with one teacher full time and one aide full time
SCHOOL See annual progress noted in section 2 above
Pay for Academic Support teachers (average of 4 per day X 2 hours X $40/hour = $320/day X 175 days = $56,000
Saturday school = 30 days @4 hours/day X $40 per hour = $4800
175 days X $60/day (1.5 hours) = $10,500
$70,000 for teacher including benefits
$40,000 for aid including
ASSETS and/or ASES grant? Same as previous year?
ASSETS and/or ASES grant? Same as previous year?
Page 78 of 101
Goal
(Include and identify all goals from Section 2)
Related State and
Local Priorities
(from Section 2)
Actions and Services
Level of
Service
(Indicate if
school-wide or
LEA-wide)
Annual Update: Review
of actions/
services
What actions are performed or services provided in each year (and are projected to be provided in
years 2 and 3)? What are the anticipated expenditures for each action (including funding
source)?
LCAP YEAR
Year 1: 2014-15 Year 2: 2015-16 Year 3: 2016-17
benefits
Above part time stipends also include approx. $14500 in additional benefits
An interim assessment system and data warehouse will be purchased and implemented fully.
State Priority 4
OARS as noted above SCHOOL See annual progress noted in section 2 above
No additional expense
No additional expense
No additional expense
Page 79 of 101
Goal
(Include and identify all goals from Section 2)
Related State and
Local Priorities
(from Section 2)
Actions and Services
Level of
Service
(Indicate if
school-wide or
LEA-wide)
Annual Update: Review
of actions/
services
What actions are performed or services provided in each year (and are projected to be provided in
years 2 and 3)? What are the anticipated expenditures for each action (including funding
source)?
LCAP YEAR
Year 1: 2014-15 Year 2: 2015-16 Year 3: 2016-17
50%> Of seniors have taken and passed an AP exam or community college course
25% Of seniors have taken and passed two AP exams or community college courses
State Priority 4
State Priority 6
No specific activities in year 1; in year 2, anticipate addition of at least two Community College courses on the NVMI campus, which would cost approx. $15,000 plus the cost of books (estimated to be $2000)
SCHOOL See annual progress noted in section 2 above
No specific activities in year 1; in year 2, anticipate addition of at least two Community College courses on NVMI campus -cost approx. $15,000 plus the cost of books (estimated to be $2000)
TBD depending on budget; currently no plans to set aside $ for this; working with CA Comm Coll Board to pass legislation that would make the courses free to NVMI students
TBD
85%> students meet UC A-G requirements
85% of senior class accepted to 2/4 year colleges
State Priority 4
State Priority 6
Academic counselor meetings with students and families
SCHOOL See annual progress noted in section 2 above
Addition of personal counselor = $80,000 inclusive of benefits
Academic counselor works individually with students to promote pass rates
Academic counselor continues to work individually with students
Page 80 of 101
Goal
(Include and identify all goals from Section 2)
Related State and
Local Priorities
(from Section 2)
Actions and Services
Level of
Service
(Indicate if
school-wide or
LEA-wide)
Annual Update: Review
of actions/
services
What actions are performed or services provided in each year (and are projected to be provided in
years 2 and 3)? What are the anticipated expenditures for each action (including funding
source)?
LCAP YEAR
Year 1: 2014-15 Year 2: 2015-16 Year 3: 2016-17
100% of SPED students needing academic support will receive it
Proficiency levels of SPED students will be equivalent to that of the schoolwide population
State Priority 4
State Priority 6
After School academic support for SPED students
Learning Resource Center as noted above
Before school homework help in the LRC included in expenses noted above
iReady program will be used to assess and create student specific interventions
SCHOOL See annual progress noted in section 2 above
Approx $30,000 inclusive of stipends and benefits
No additional expense other than those noted above regarding LRC
Before school HW help expenses noted above
iReady expense as noted above
Additional SPED personnel =$250,000
Continued additional personnel (depending on enrollment and SPED needs)
Page 81 of 101
Goal
(Include and identify all goals from Section 2)
Related State and
Local Priorities
(from Section 2)
Actions and Services
Level of
Service
(Indicate if
school-wide or
LEA-wide)
Annual Update: Review
of actions/
services
What actions are performed or services provided in each year (and are projected to be provided in
years 2 and 3)? What are the anticipated expenditures for each action (including funding
source)?
LCAP YEAR
Year 1: 2014-15 Year 2: 2015-16 Year 3: 2016-17
95% of students participate in EAP
50%> students ready and 75% “ready of conditionally ready” for college English and math as noted in EAP
75% have completed a Bachelors degree within six years of graduation
State Priority 4
No additional specific action steps other than those noted elsewhere to improve overall academic preparation of all NVMI students, including academic support, presence of the academic and personal counselors, interim assessment data to drive instruction and intervention, and SPED support, in addition to EL strategies implemented schoolwide
SCHOOL See annual progress noted in section 2 above
No additional specific action steps other than those noted elsewhere to improve overall academic preparation of all NVMI students
No additional specific action steps other than those noted elsewhere to improve overall academic preparation of all NVMI students
No additional specific action steps other than those noted elsewhere to improve overall academic preparation of all NVMI students
A minimum of 4000 books will be available for SSR activities
State Priority 4
Book purchase in year 1 = $20,000
L4U textbook tracking system = $5000
Personnel to input book info to L4U = $5000
SCHOOL See annual progress noted in section 2 above
Book purchase in year 1 = $20,000
L4U textbook tracking system = $5000
Personnel to input book info to L4U = $5000
Move to SVHS Campus changes this; specific action steps TBD
See year 2
Page 82 of 101
Goal
(Include and identify all goals from Section 2)
Related State and
Local Priorities
(from Section 2)
Actions and Services
Level of
Service
(Indicate if
school-wide or
LEA-wide)
Annual Update: Review
of actions/
services
What actions are performed or services provided in each year (and are projected to be provided in
years 2 and 3)? What are the anticipated expenditures for each action (including funding
source)?
LCAP YEAR
Year 1: 2014-15 Year 2: 2015-16 Year 3: 2016-17
100% of students will participate to minimum English-department established standard for Accelerated Reader program and all students will be reading at grade level
State Priority 4
AR program purchase
AR PD
AR incentives
SCHOOL See annual progress noted in section 2 above
AR program purchase = $4000
AR PD = $500
AR incentives = $1500
Same as year 1 Same as year 1
NVMI will have an approved Technology plan that meets both State of California and e-rate requirements
State Priority 4
Existing tech plan was approved in June 2014; requires revamping in Curriculum Committee
SCHOOL See annual progress noted in section 2 above
No additional expense other than human capital to revamp
Need additional revisions to tech plan from schoolwide input
Need additional revisions to tech plan once again
A school library that meets CDE minimum recommended standards
State Priority 4
In year 1 of LCAP, no implementation; only research
SCHOOL See annual progress noted in section 2 above
No expense Campus move to SVHS; will use SVHS library
TBD
Page 83 of 101
Goal
(Include and identify all goals from Section 2)
Related State and
Local Priorities
(from Section 2)
Actions and Services
Level of
Service
(Indicate if
school-wide or
LEA-wide)
Annual Update: Review
of actions/
services
What actions are performed or services provided in each year (and are projected to be provided in
years 2 and 3)? What are the anticipated expenditures for each action (including funding
source)?
LCAP YEAR
Year 1: 2014-15 Year 2: 2015-16 Year 3: 2016-17
95% or greater ADA
Less than 5 % of students with 3> unexcused absences in a semester
Zero dropouts
100% graduation rate
State Priority 5
Attendance incentives
Hiring two part time attendance clerks to better track attendance
SART/SARB process
SCHOOL See annual progress noted in section 2 above
Incentives = $2500
Part time attendance clerks with salary/benefits = $50,000
SART/SARB personnel hours expense = $15,000
One full time attendance clerk; continued reporting and identification of students with poor attendance
Same as year 2
100% of students requiring support from a personal counselor receive that support
State Priority 5
State Priority 6
Personal counselor SCHOOL See annual progress noted in section 2 above
Salary and benefits = $70,000 + Intern supervisor costs of $10,000
Continuation from year 1
Continuation from year 1
Page 84 of 101
Goal
(Include and identify all goals from Section 2)
Related State and
Local Priorities
(from Section 2)
Actions and Services
Level of
Service
(Indicate if
school-wide or
LEA-wide)
Annual Update: Review
of actions/
services
What actions are performed or services provided in each year (and are projected to be provided in
years 2 and 3)? What are the anticipated expenditures for each action (including funding
source)?
LCAP YEAR
Year 1: 2014-15 Year 2: 2015-16 Year 3: 2016-17
100% of students will have a PLP that their parents have signed off on
State Priority 5
Academic counselor to initiate PLPs and family meetings
SCHOOL See annual progress noted in section 2 above
No additional expense
Academic counselor creates PLPs and parents and students sign off
Academic counselor creates PLPs and parents and students sign off
Less than 5% of students will fail courses each semester and graduation rates will be 100%
State Priority 5
State Priority 6
Director of Instruction will analyze data
PD on ways to intervene
SCHOOL See annual progress noted in section 2 above
No additional expense
Need specific action steps based on high failure rates form 14-15
TBD
100% of students will have an adult with whom they have a positive rapport and can seek support
State Priority 5
Surveys of students
Intervention lists created with those who do not identify an adult by name
SCHOOL See annual progress noted in section 2 above
No additional expense; TAC teams and Admin team to take names of students unable to identify a caring adult on campus and split
Need survey; no expense
TBD
Page 85 of 101
Goal
(Include and identify all goals from Section 2)
Related State and
Local Priorities
(from Section 2)
Actions and Services
Level of
Service
(Indicate if
school-wide or
LEA-wide)
Annual Update: Review
of actions/
services
What actions are performed or services provided in each year (and are projected to be provided in
years 2 and 3)? What are the anticipated expenditures for each action (including funding
source)?
LCAP YEAR
Year 1: 2014-15 Year 2: 2015-16 Year 3: 2016-17
the list to ensure all students are targeted and supported
100% of students will report satisfaction with the Hawk Exchange and its inherent structure
State Priority 5
HX supplies
Hiring part time HX manager
SCHOOL See annual progress noted in section 2 above
HX Supplies = $50,000
HX manager salary and benefits = $30,000
$100,,000 budgeted; need to explore grant opportunities; HX manager full time $70,000 with benefits
TBD
100% of students will have the opportunity to participate in after school and outdoor education
State Priority 5
After School program costs for enrichment and outdoor education activities, including CACC events, arts, technology, student empowerment activities, etc.
SCHOOL See annual progress noted in section 2 above
$65,000 in year one to fund those activities
$65,000 from general school operating; rest from ASSETs grant
Same as year 2
Page 86 of 101
Goal
(Include and identify all goals from Section 2)
Related State and
Local Priorities
(from Section 2)
Actions and Services
Level of
Service
(Indicate if
school-wide or
LEA-wide)
Annual Update: Review
of actions/
services
What actions are performed or services provided in each year (and are projected to be provided in
years 2 and 3)? What are the anticipated expenditures for each action (including funding
source)?
LCAP YEAR
Year 1: 2014-15 Year 2: 2015-16 Year 3: 2016-17
100% of students who need a mentoring program are able to participate
State Priority 5
State Priority 8
Limited in year 1; personal counselor to identify
CSUN interns to be utilized at no expense to school
SCHOOL See annual progress noted in section 2 above
Limited in year 1; personal counselor to identify
CSUN interns to be utilized at no expense to NVMI
Need mentoring program implemented
TBD
80% or more of students who start NVMI as 6th graders will culminate in 8th grade
65% or more of students who start NVMI as 6th graders will culminate 12th grade at NVMI
90% or more of students who start NVMI as 9th graders will graduate from 12th grade here
State Priority 6
Full time enrolment and admissions manager, 15% of salary and benefits to student retention efforts
Also, activities noted above directly and indirectly contribute to student retention and satisfaction
SCHOOL See annual progress noted in section 2 above
15% of Enrollment and Admissions Director position salary and benefits = $12,000
Need data; Admissions officer working on this issue
TBD
Page 87 of 101
Goal
(Include and identify all goals from Section 2)
Related State and
Local Priorities
(from Section 2)
Actions and Services
Level of
Service
(Indicate if
school-wide or
LEA-wide)
Annual Update: Review
of actions/
services
What actions are performed or services provided in each year (and are projected to be provided in
years 2 and 3)? What are the anticipated expenditures for each action (including funding
source)?
LCAP YEAR
Year 1: 2014-15 Year 2: 2015-16 Year 3: 2016-17
Suspension and expulsion rates will be lower than LAUSD
State Priority 6
Explore alternatives to suspension and expulsion
Provide intensive supports through academic and personal counseling as noted elsewhere in the LCAP
SCHOOL See annual progress noted in section 2 above
No additional expenses other than costs of academic and personal counselors
Dean to publish data; SSC to discuss possible action steps; implementing on campus room for students with discipline issues
Based on data from 15-16, make adjustments in plan as appropriate
Permanent School site to accommodate long term enrollment projections
State Priority 6
NVMI Priority 9
Expenses unknown in year 1; partnership with ACRE Corporation may yield some potential donors to the facilities effort; master facility planning is a must for the board and school leadership
SCHOOL See annual progress noted in section 2 above
Costs unknown $540,000 budgeted for LAUSD SVHS Colocation agreement
Upward adjustment based on increased enrollment
Robust school emergency plan with necessary supports to implement
State Priority 6
Purchase of Rapid Responder program and creation of robust emergency response plan through their system
SCHOOL See annual progress noted in section 2
$3500 which may be offset by recruiting additional schools to participate in
Not to implement Rapid Responder; align with LAUSD plan
Align with LAUSD site emergency response plan
Page 88 of 101
Goal
(Include and identify all goals from Section 2)
Related State and
Local Priorities
(from Section 2)
Actions and Services
Level of
Service
(Indicate if
school-wide or
LEA-wide)
Annual Update: Review
of actions/
services
What actions are performed or services provided in each year (and are projected to be provided in
years 2 and 3)? What are the anticipated expenditures for each action (including funding
source)?
LCAP YEAR
Year 1: 2014-15 Year 2: 2015-16 Year 3: 2016-17
Implementation of tabletop drills for all hazards and monthly drills and scenarios or exercises
above Rapid Responder program
moving forward
All students are exposed to a robust academic program in all domains
State Priority 7
State Priority 8
See notes throughout LCAP SCHOOL See annual progress noted in section 2 above
See notes throughout LCAP
See notes throughout LCAP
See notes throughout LCAP
LOC and PE curricula will be revamped
State Priority 7
State Priority 8
Summer 2014 effort to revamp curriculum maps and provide intensive PD to all milstaff
Will need additional PE equipment
SCHOOL See annual progress noted in section 2 above
No additional expense
Pursuing grant through Good Sports.com web based grant program
Need revamping and analysis of impact; no additional expense
Continued Goodsports.com grant
TBD
Page 89 of 101
Goal
(Include and identify all goals from Section 2)
Related State and
Local Priorities
(from Section 2)
Actions and Services
Level of
Service
(Indicate if
school-wide or
LEA-wide)
Annual Update: Review
of actions/
services
What actions are performed or services provided in each year (and are projected to be provided in
years 2 and 3)? What are the anticipated expenditures for each action (including funding
source)?
LCAP YEAR
Year 1: 2014-15 Year 2: 2015-16 Year 3: 2016-17
Full implementation of the CACC model
NVMI Priority #8 (NVMI’s four pillars of academics, leadership, citizenship, and athletics will be strengthened and measured regularly)
Specific action steps to be developed in Summer 2014 PD with military staff
SCHOOL See annual progress noted in section 2 above
No additional expenses anticipated
Work with COL Morden to analyze best practices for full implementation of CACC Model; COL Morden on campus 3 days a week
Continue implementation of plan from COL Morden
NVMIs interscholastic and intramurals athletics programs will be expansive and in line with similar military academies nationwide
NVMI Priority 8 (NVMI’s four pillars of academics, leadership, citizenship, and athletics will be
CIF membership
Intramurals program plan
Interscholastic coaches, uniforms, transportation, referees, supplies, etc.
SCHOOL See annual progress noted in section 2 above
CIF membership = $2500
Intramurals program plan
Interscholastic coaches, uniforms,
Year 2 of associate membership; expand offerings; budget $55,000
First year of full regular membership – need $100,000 budget plus full time Athletic Director position for both MS and HS
Page 90 of 101
Goal
(Include and identify all goals from Section 2)
Related State and
Local Priorities
(from Section 2)
Actions and Services
Level of
Service
(Indicate if
school-wide or
LEA-wide)
Annual Update: Review
of actions/
services
What actions are performed or services provided in each year (and are projected to be provided in
years 2 and 3)? What are the anticipated expenditures for each action (including funding
source)?
LCAP YEAR
Year 1: 2014-15 Year 2: 2015-16 Year 3: 2016-17
strengthened and measured regularly)
transportation, referees, supplies, etc. = $45,000
Participation in FIYA for MS athletics
athletics
Continue MS FIYA participation
100% of cadets will complete at least 20 hours of school service per year and 20 hours of community service per year
NVMI Priority #8 (as noted above)
Community service planning assigned to a full time military staff member and Director of Admissions and Enrollment (Community Outreach)
Transportation costs will be based on plan proposed by milstaff member
SCHOOL See annual progress noted in section 2 above
Transportation costs estimated at $15,000; private funding sources to be sought for this
Need community service coordinator position from faculty/staff to help coordinate efforts
TBD
Page 91 of 101
Goal
(Include and identify all goals from Section 2)
Related State and
Local Priorities
(from Section 2)
Actions and Services
Level of
Service
(Indicate if
school-wide or
LEA-wide)
Annual Update: Review
of actions/
services
What actions are performed or services provided in each year (and are projected to be provided in
years 2 and 3)? What are the anticipated expenditures for each action (including funding
source)?
LCAP YEAR
Year 1: 2014-15 Year 2: 2015-16 Year 3: 2016-17
By the 2016-2017 SY a fully integrated and automated citizenship tracking system for merits and demerits will be deployed
NVMI Priority 8 (NVMI’s four pillars of academics, leadership, citizenship, and athletics will be strengthened and measured regularly)
The LAUSD transition to MiSIS complicates this tremendously
The current plan was to integrate with PowerSchool but the unknowns of MiSIS migration make it an unknown expense and timeline
SCHOOL See annual progress noted in section 2 above
The LAUSD transition to MiSIS complicates this tremendously
The current plan was to integrate with PowerSchool but the unknowns of MiSIS migration make it an unknown expense and timeline
Continued implementation of Howard / Evalumetrics citizenship program managed by Ms. French
Consider options with MiSIS after full implementation by LAUSD
Page 92 of 101
Goal
(Include and identify all goals from Section 2)
Related State and
Local Priorities
(from Section 2)
Actions and Services
Level of
Service
(Indicate if
school-wide or
LEA-wide)
Annual Update: Review
of actions/
services
What actions are performed or services provided in each year (and are projected to be provided in
years 2 and 3)? What are the anticipated expenditures for each action (including funding
source)?
LCAP YEAR
Year 1: 2014-15 Year 2: 2015-16 Year 3: 2016-17
All students will be in the Healthy Fitness Zone in at least 5 or the 6 categories on the Fitnessgram test
NVMI Priority 8 (NVMI’s four pillars of academics, leadership, citizenship, and athletics will be strengthened and measured regularly)
Focused PE instruction
See notes about PE equipment above
SCHOOL See annual progress noted in section 2 above
See notes about PE equipment above
Continued revamping of PE curriculum
All LOC teachers will have a PE credential by end of the school year
Fully credentialed PE teachers will implement fully standards-aligned lessons on each Tuesday and Thursday PE is offered
Balanced budget, economic reserve of at least $1,000,000 and full school enrollments
NVMI Priority 9 (NVMI will be fiscally sound and well governed)
Budget planning involving the school community (begin with the LCAP process) and will be continued using the SSC
SCHOOL No progress made in 14/15; operating deficit of $300,000 plus
No specific budgetary expense
No progress anticipated but budget is projected to be balanced
Projection of $250,000 reserve
Page 93 of 101
Goal
(Include and identify all goals from Section 2)
Related State and
Local Priorities
(from Section 2)
Actions and Services
Level of
Service
(Indicate if
school-wide or
LEA-wide)
Annual Update: Review
of actions/
services
What actions are performed or services provided in each year (and are projected to be provided in
years 2 and 3)? What are the anticipated expenditures for each action (including funding
source)?
LCAP YEAR
Year 1: 2014-15 Year 2: 2015-16 Year 3: 2016-17
There will be 12 members on the board and revamped board bylaws by the end of the charter term
NVMI Priority 9 (NVMI will be fiscally sound and well governed)
Recruiting board members SCHOOL See annual progress noted in section 2 above
No expense No expense No expense
Revamped school website that is user friendly and contains all necessary information
NVMI Priority 9 (NVMI will be fiscally sound and well governed)
Website consultant
School stakeholder meetings to discuss web site needs and ideals
SCHOOL See annual progress noted in section 2 above
Consultant fees = $7500
No expense No expense
Page 94 of 101
B. Identify additional annual actions, and the LEA may include any services that support these actions, above what is provided for all pupils that will serve low-income, English learner, and/or foster youth pupils as defined in Education Code section 42238.01 and pupils redesignated as fluent English proficient. The identified actions must include, but are not limited to, those actions that are to be performed to meet the targeted goals described in Section 2 for low-income pupils, English learners, foster youth and/or pupils redesignated as fluent English proficient (e.g., not listed in Table 3A above). List and describe expenditures for each fiscal year implementing these actions, including where those expenditures can be found in the LEA’s budget.
Goal
(Include and identify all goals from Section 2, if applicable)
Related State and Local
Priorities (from Section 2)
Actions and Services
Level of Service
(Indicate if school-wide or LEA-wide)
Annual Update:
Review of actions/
services
What actions are performed or services provided in each year (and are projected to be
provided in years 2 and 3)? What are the anticipated expenditures for each action
(including funding source)?
LCAP YEAR
Year 1: 2014-15 Year 2: 2015-16 Year 3: 2016-17
Since more than 85% of the NVMI community is low income, all goals relate to low income pupils
All For low income pupils:
Schoolwide See annual progress noted in section 2 above
See actions noted in above section
N/A N/A
Goals noted above relate to EL strategies as well as overall
All For English learners:
Schoolwide See annual progress noted in section 2 above
See actions noted in above section
N/A N/A
Page 95 of 101
Goal
(Include and identify all goals from Section 2, if applicable)
Related State and Local
Priorities (from Section 2)
Actions and Services
Level of Service
(Indicate if school-wide or LEA-wide)
Annual Update:
Review of actions/
services
What actions are performed or services provided in each year (and are projected to be
provided in years 2 and 3)? What are the anticipated expenditures for each action
(including funding source)?
LCAP YEAR
Year 1: 2014-15 Year 2: 2015-16 Year 3: 2016-17
academic goals noted above
All of the above will apply to foster youth who attend NVMI
All For foster youth: Schoolwide See annual progress noted in section 2 above
See above for action steps and budget expenditures
N/A N/A
Redesignated pupils will be affected by all action steps and goals noted above
All For redesignated fluent English proficient pupils:
Schoolwide See annual progress noted in section 2 above
See above for action steps and budget expenditures
N/A N/A
Page 96 of 101
C. Describe the LEA’s increase in funds in the LCAP year calculated on the basis of the number and concentration of low income, foster youth, and English learner pupils as determined pursuant to 5 CCR 15496(a)(5). Describe how the LEA is expending these funds in the LCAP year. Include a description of, and justification for, the use of any funds in a districtwide, schoolwide, countywide, or charterwide manner as specified in 5 CCR 15496. For school districts with below 55 percent of enrollment of unduplicated pupils in the district or below 40 percent of enrollment of unduplicated pupils at a school site in the LCAP year, when using supplemental and concentration funds in a districtwide or schoolwide manner, the school district must additionally describe how the services provided are the most effective use of funds to meet the district’s goals for unduplicated pupils in the state priority areas. (See 5 CCR 15496(b) for guidance.)
The estimated increase in funds in the LCAP year calculated on the basis of the number and concentration of low income, foster youth, and English learner pupils as determined pursuant to 5 CCR 15496(a)(5) is approximately $1,400,000, which includes the additional income associated with an increase in student enrollment of approximately 150 students. The net increase WITHOUT the additional 150 students would be approximately $460,000. The expenditures noted in section 3 of the LCAP have been targeted to support all students, including: • Hiring an academic counselor and a personal counselor ($130,000 with salary and benefits) • Additional funding to support increased special education population and intensify support for special education students ($225,000) • Funding for before school homework help and a revamped Academic Support program ($75,000) • Funding for highly qualified TAC Teams that support all aspects of cadet development ($200,000 in salary and benefits) • Funding for an enhanced comprehensive athletic program and an enhanced outdoor education program ($85,000) • Funding for access to a before and after school enrichment program ($70,000) • Adoption of texts and materials for the CPM math curriculum ($65,000) • Funding for access to the newsela.com site for informational text aligned with lexile levels of student readers ($10000) • Funding for classroom libraries and the Accelerated Reader and STAR Renaissance assessment programs ($15,000) • Full implementation of interim assessments aligned with the Common Core ($15000 in stipends for assessment development) • Funding to pay teachers for development and implementation of curriculum maps for all courses aligned with the Common Core ($5000)
D. Consistent with the requirements of 5 CCR 15496, demonstrate how the services provided in the LCAP year for low income pupils, foster youth, and English learners provide for increased or improved services for these pupils in proportion to the increase in funding provided for such pupils in that year as calculated pursuant to 5 CCR 15496(a)(7). Identify the percentage by which services for unduplicated pupils must be increased or improved as compared to the services provided to all pupils in the LCAP year as calculated pursuant to 5 CCR 15496(a). An LEA shall describe how the proportionality percentage is met using a quantitative and/or qualitative description of the increased and/or improved services for unduplicated pupils as compared to the services provided to all pupils.
Page 97 of 101
NVMI has exceptionally large numbers of low income, EL, SPED, and Latino students. As such, the first year LCAP takes additional funds and prioritizes expenditures of those funds based on the input from stakeholders about what expenditures would have the greatest impact on achieving schoolwide goals. At the conclusion of the first year, the LCAP will be revisited and additional data will be available to make decisions about prioritizing courses of action and funding elements.
NOTE: Authority cited: Sections 42238.07 and 52064, Education Code. Reference: Sections 2574, 2575, 42238.01, 42238.02, 42238.03, 42238.07,
47605, 47605.5, 47606.5, 48926, 52052, 52060-52077, and 64001, Education Code; 20 U.S.C. Section 6312.
Page 98 of 101
Page 99 of 101
Page 100 of 101
Page 101 of 101
North Valley Military Institute College Preparatory Academy Governing Board
SPEAKER CARD
Date: _____________________ Name: _____________________________
I wish to address the NVMI Governing Board on the following subject:
________________________________________________________________
________________________________________________________________
Agenda Item Number: ___________________________________________
Check one:
¨ Parent
¨ Student
¨ Teacher
¨ School Staff
¨ Community Member
I understand that I am limited to three minutes. I also understand that on items that are not on the agenda, the Board may not take action pursuant to Board and State regulations.
Signed: __________________________________________________________
This information is a Public Record
Please state your full name and affiliation with NVMI when you begin your remarks in order that the official minutes record your appearance before the Governing Board.