1

NORTH ADDITION OFFICE BUILDING

The Regents of the University of California

Committee on Grounds and Buildings

November 2015

ATTACHMENT 2: PROJECT GRAPHICS

Page 2: NORTH ADDITION OFFICE BUILDING - Board of Regentsregents.universityofcalifornia.edu/regmeet/nov15/gb3attach2.pdf · NORTH ADDITION OFFICE BUILDING The Regents of the University of

UC DAVIS HEALTH SYSTEM

NORTH ADDITION OFFICE BUILDING LOCATION AT SACRAMENTO CAMPUS

2

PROJECT LOCATION

Page 3: NORTH ADDITION OFFICE BUILDING - Board of Regentsregents.universityofcalifornia.edu/regmeet/nov15/gb3attach2.pdf · NORTH ADDITION OFFICE BUILDING The Regents of the University of

UC DAVIS HEALTH SYSTEM

NORTH ADDITION OFFICE BUILDING LOCATION AT SACRAMENTO CAMPUS

North Addition

3

North

Page 4: NORTH ADDITION OFFICE BUILDING - Board of Regentsregents.universityofcalifornia.edu/regmeet/nov15/gb3attach2.pdf · NORTH ADDITION OFFICE BUILDING The Regents of the University of

UC DAVIS HEALTH SYSTEM

NORTH ADDITION OFFICE BUILDING SITE & FIRST FLOOR PLAN

4

North

North/South (to be

Demolished)

Page 5: NORTH ADDITION OFFICE BUILDING - Board of Regentsregents.universityofcalifornia.edu/regmeet/nov15/gb3attach2.pdf · NORTH ADDITION OFFICE BUILDING The Regents of the University of

UC DAVIS HEALTH SYSTEM

NORTH ADDITION OFFICE BUILDING TYPICAL FLOOR

Collaboration

5

Building Occupants • Heart & Vascular • Hospital • Administration • Infection

Prevention • Patient Care

Services • Neurology • Performance

Excellence • Pharmacy

Operations • PM&R Therapies • Surgery • Trauma

North

Page 6: NORTH ADDITION OFFICE BUILDING - Board of Regentsregents.universityofcalifornia.edu/regmeet/nov15/gb3attach2.pdf · NORTH ADDITION OFFICE BUILDING The Regents of the University of

UC DAVIS HEALTH SYSTEM

NORTH ADDITION OFFICE BUILDING SUSTAINABILITY GOALS

Harvest Daylighting in interior spaces

Sustainability Goals

• Whole Building Energy Model

• LEED Gold Baseline

• LEED Platinum Stretch goal

Mechanical System

Performance • High performance

equipment & controls

• SMUD Savings by Design

Electrical System Performance

• LED lighting and controls

• SMUD Savings by Design

Water Conservation

• High efficiency fixtures

• Minimal, Valley-wise landscaping

Integrated lighting and

HVAC controls

Efficient glazing systems &

shading

6

View From North View From North

Page 7: NORTH ADDITION OFFICE BUILDING - Board of Regentsregents.universityofcalifornia.edu/regmeet/nov15/gb3attach2.pdf · NORTH ADDITION OFFICE BUILDING The Regents of the University of

UC DAVIS HEALTH SYSTEM

NORTH ADDITION OFFICE BUILDING EXTERIOR IMAGES & MATERIALS

View From Southwest View From Northwest

Precast concrete & masonry Glazing & storefront Metal panel systems Fenestration pattern & detail

7

Page 8: NORTH ADDITION OFFICE BUILDING - Board of Regentsregents.universityofcalifornia.edu/regmeet/nov15/gb3attach2.pdf · NORTH ADDITION OFFICE BUILDING The Regents of the University of

UC DAVIS HEALTH SYSTEM 8

NORTH ADDITION OFFICE BUILDING

View From North