Page 1: Non-Res Lighting Savings Forecast Project Timelines

September 6th

Non-Res Lighting Savings Forecast

Project Timelines

Hot Water

Page 2: Non-Res Lighting Savings Forecast Project Timelines

ETHAN MANTHEY

Page 3: Non-Res Lighting Savings Forecast Project Timelines
Page 4: Non-Res Lighting Savings Forecast Project Timelines

JESSICA AIONA

Page 5: Non-Res Lighting Savings Forecast Project Timelines

NON-RESIDENTIAL LIGHTING

MOMENTUM SAVINGS FORECAST

Page 6: Non-Res Lighting Savings Forecast Project Timelines

MODEL STRUCTURE AND SCOPE

3

Sectors

14

Applications

3

Purchase

Triggers

16

Technologies

Page 7: Non-Res Lighting Savings Forecast Project Timelines

CALCULATING MARKET SAVINGS

Baseline Stock

Consumption

Actual Stock

Consumption

Baseline = Frozen Baseline = Sales Mix Frozen at 2015 Efficiency

Market Savings

Page 8: Non-Res Lighting Savings Forecast Project Timelines

RAPID CHANGE EXPECTED

Page 9: Non-Res Lighting Savings Forecast Project Timelines

24% DECREASE IN

CONSUMPTION

Page 10: Non-Res Lighting Savings Forecast Project Timelines

372 aMW

MARKET SAVINGS

Page 11: Non-Res Lighting Savings Forecast Project Timelines

LED Sales Dominate in 2020

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2015 2016 2017 2018 2019 2020

TLED

T5SO

T5HO

T12

Pin CFL

Metal Halide

Mercury Vapor

LED Luminaire

LED Lamp

Inc

High PressureSodiumHal

CFL

32W T8

28W T8

25W T8

Page 12: Non-Res Lighting Savings Forecast Project Timelines

57% LED Sales by 2020

Technology 2015 2020

25W T8 1.4% 0.5% 28W T8 6.3% 3.3% 32W T8 40.5% 21.5% CFL 3.5% 1.0% Hal 3.6% 1.9% High Pressure Sodium 0.7% 0.4% Inc 7.0% 1.7% LED Lamp 6.7% 12.9% LED Luminaire 4.8% 16.7% Mercury Vapor 0.0% 0.0% Metal Halide 2.1% 0.5% Pin CFL 8.1% 5.1% T12 6.5% 2.2% T5HO 4.6% 3.8% T5SO 1.3% 0.7% TLED 3.0% 27.8%

Page 13: Non-Res Lighting Savings Forecast Project Timelines

LED Stock Grows Quickly

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2,015 2,016 2,017 2,018 2,019 2,020

TLEDT5SOT5HOT12Pin CFLMetal HalideMercury VaporLED LuminaireLED LampIncHigh Pressure SodiumHalCFL32W T828W T825W T8

Page 14: Non-Res Lighting Savings Forecast Project Timelines

43% LED Stock by 2020

Technology 2015 2020

25W T8 2.2% 1.1% 28W T8 6.0% 5.2% 32W T8 47.4% 33.9% CFL 4.2% 0.8% Hal 1.1% 0.4% High Pressure Sodium 1.4% 0.5% Inc 1.8% 0.3% LED Lamp 6.3% 12.7% LED Luminaire 2.3% 13.6% Mercury Vapor 0.1% 0.0% Metal Halide 3.3% 1.0% Pin CFL 6.5% 4.1% T12 8.7% 3.4% T5HO 5.2% 5.0% T5SO 2.3% 1.4% TLED 1.1% 16.5%

Page 15: Non-Res Lighting Savings Forecast Project Timelines

JESSICA AIONA

BONNIE WATSON

ETHAN MANTHEY

Page 16: Non-Res Lighting Savings Forecast Project Timelines

16

TIMELINES

Page 17: Non-Res Lighting Savings Forecast Project Timelines

17

Lighting

Outdoor Lighting Stock Assessment (Planning Phase)

Kicked Off June 29

Data Collection Protocols Dec.-Jan. ’18 RTF Market Analysis Subcommittee Mar. ‘18 Outline of Research Approach Apr. ‘18

Page 18: Non-Res Lighting Savings Forecast Project Timelines

18

Lighting

Distributor Sales Data

In Contracting Kick Off in October

Engage Distributors Jan. - Apr. ’18 Data by July ’18

Res Lighting Model RBSA

Calibration and Capacity Integration

Scoping Fall-Jan. '18 Updating model Jan.-May/June '18 Complete June '18

Page 19: Non-Res Lighting Savings Forecast Project Timelines

19

HVAC

HVAC Market Intelligence Study

Kicked Off August 1 Technology Guide Nov. ’17 Expert Interviews Sept.–Oct. ‘17 AHR HVAC Trade Show Mar. ’18 NEEA Distributor Sales Data

Kicked Off Engaging with distributors Oct.-Nov. ’17 Sales Data Results Q1, ‘18

Page 20: Non-Res Lighting Savings Forecast Project Timelines

20

HVAC

Res HVAC Model Development

Planned to Kick Off in in October Model Method – Nov. ‘17 RTF Subcommittee – TBD Model Sprints – Dec. ‘17- Ongoing

Res HVAC Baseline Study Planning

Contract This Fall Research Plan – Early ‘18 Field Data Collection Protocol – Early ‘18

Page 21: Non-Res Lighting Savings Forecast Project Timelines

21

Data Centers

Market Intelligence and Scoping

Study Kick Off September 8 Review Existing Sources Sept. - Oct. ’18 Expert Interviews Dec. - Jan. ‘18 Model Scope & Method Apr. ‘18

Page 22: Non-Res Lighting Savings Forecast Project Timelines

Hot Water

Model Scoping

Kicked Off August 16

Model Inputs Research – Sept. ‘17 Methodology Working Session – Oct. ’17 RTF Subcommittee – Nov. ‘17 Model Method – Jan. ’18

Model Development

Contract this Fall

Page 23: Non-Res Lighting Savings Forecast Project Timelines

BONNIE WATSON

Page 24: Non-Res Lighting Savings Forecast Project Timelines

Deep Dive:

Hot Water Model

Scoping

Page 25: Non-Res Lighting Savings Forecast Project Timelines

WHY WE CARE

market shifts

high energy

use

savings potential

Page 26: Non-Res Lighting Savings Forecast Project Timelines

THE ULTIMATE GOAL

Understand how

total energy consumption

for residential hot water

is changing over time, and

estimate momentum savings

for the 7th Power Plan.

Page 27: Non-Res Lighting Savings Forecast Project Timelines

HOW WE GET THERE

1. Begin exploration of building a full-market

residential consumption model for the 7th

Power Plan time period

2. Figure out what data is available to us now

3. Assess data gaps

4. Develop plan for moving forward

Page 28: Non-Res Lighting Savings Forecast Project Timelines

THE TASKS Task 1. Model Inputs Research (September)

Review existing sources • 7th Power Plan, RTF workbooks, BPA and regional

program data, RBSA, others

Determine magnitude of potential momentum savings over the 7th Plan period

Page 29: Non-Res Lighting Savings Forecast Project Timelines

THE TASKS Task 2. Working Session (October)

Explore options to answer the questions in BPA’s four-question framework: • Question 1: What is the market? • Question 2: How big is the market? • Question 3: What are the total market savings? • Question 4: What are the program savings? Essentially – how do we think we are going to determine momentum savings for this market?

Page 30: Non-Res Lighting Savings Forecast Project Timelines

THE TASKS Task 3. RTF Market Analysis Subcommittee

(November)

We want input, review, and guidance • High level approach • Methodological questions

We very much value stakeholder SME review and feedback

Page 31: Non-Res Lighting Savings Forecast Project Timelines

THE TASKS Task 4. Model Scope and Method (January)

Builds off previous tasks, roadmap of where we are going. Documents the approach and calls out next steps (e.g., filling data gaps) Deliverable: written memo

Page 32: Non-Res Lighting Savings Forecast Project Timelines

NEXT PHASE

The next phase is to begin building out a hot water full market consumption model (Beginning in January)

Page 33: Non-Res Lighting Savings Forecast Project Timelines
Page 34: Non-Res Lighting Savings Forecast Project Timelines

THX!