16
ZAIN 3G O&M 1 (16) Prepared (also subject responsible if other) No. ECS/SD/BSD Ngoc Duc Phan XD Approved Checked Date Rev Reference ECS/SD/BSD Ngoc Duc Phan XD 2007-09-23 A On site Node B Connection and Integration Procedure 1- Change Laptop TCP/IP to IP: 169.254.1.2 (S MASK 255.255.0.0). Note RBS default IP: 169.254.1.1 2- Open Command prompt and ping the NB default IP. If failed please recheck the ip setting. 3- To open EMAS, double click Internet Explore with default IP 169.254.1.1 http://169.254.1.1/em/index_stubbed.html 4- Click Configuration - O&M Access to load the XYZA_OAM_access.xml script. Page 1 of 16

Node B Connection Procrdure

Embed Size (px)

DESCRIPTION

process

Citation preview

  • ZAIN 3G O&M 1 (16)

    Prepared (also subject responsible if other) No.

    ECS/SD/BSD Ngoc Duc Phan XD Approved Checked Date Rev Reference

    ECS/SD/BSD Ngoc Duc Phan XD 2007-09-23 A

    On site Node B Connection and Integration Procedure 1- Change Laptop TCP/IP to IP: 169.254.1.2 (S MASK 255.255.0.0). Note RBS default IP: 169.254.1.1 2- Open Command prompt and ping the NB default IP. If failed please recheck the ip setting. 3- To open EMAS, double click Internet Explore with default IP 169.254.1.1

    http://169.254.1.1/em/index_stubbed.html 4- Click Configuration - O&M Access to load the XYZA_OAM_access.xml script.

    Page 1 of 16

  • ZAIN 3G O&M 2 (16)

    Prepared (also subject responsible if other) No.

    ECS/SD/BSD Ngoc Duc Phan XD Approved Checked Date Rev Reference

    ECS/SD/BSD Ngoc Duc Phan XD 2007-09-23 A

    5- Just follow the onscreen instruction, as below.

    Make sure Use configuration file is ticked and select Configuration Automatic (No Wizard) is selected.

    Page 2 of 16

  • ZAIN 3G O&M 3 (16)

    Prepared (also subject responsible if other) No.

    ECS/SD/BSD Ngoc Duc Phan XD Approved Checked Date Rev Reference

    ECS/SD/BSD Ngoc Duc Phan XD 2007-09-23 A

    Make sure the result is successful.

    Check the O&M Configuration summary.

    Page 3 of 16

  • ZAIN 3G O&M 4 (16)

    Prepared (also subject responsible if other) No.

    ECS/SD/BSD Ngoc Duc Phan XD Approved Checked Date Rev Reference

    ECS/SD/BSD Ngoc Duc Phan XD 2007-09-23 A

    Page 4 of 16

  • ZAIN 3G O&M 5 (16)

    Prepared (also subject responsible if other) No.

    ECS/SD/BSD Ngoc Duc Phan XD Approved Checked Date Rev Reference

    ECS/SD/BSD Ngoc Duc Phan XD 2007-09-23 A

    The node b will re-start.

    2nd Script (External Hardware) Change PC IP setting according to RBS IP pool (New IP). EX: Node B IP: 10.11.4.9 (Thin Client IP must set to 10.11.4.10) MASK : 255.255.255.248

    Upon successfully loaded the O&M script, go to software management -

    Configuration Version and right click to create CV. Name this CV as ONM (Your nick name).

    Open Element Manager (EMAS) with RBS new IP and run SITE EQUIPMENT xml file.

    Page 5 of 16

  • ZAIN 3G O&M 6 (16)

    Prepared (also subject responsible if other) No.

    ECS/SD/BSD Ngoc Duc Phan XD Approved Checked Date Rev Reference

    ECS/SD/BSD Ngoc Duc Phan XD 2007-09-23 A

    Page 6 of 16

  • Select Automatic (no wizard)

    ZAIN 3G O&M 7 (16)

    Prepared (also subject responsible if other) No.

    ECS/SD/BSD Ngoc Duc Phan XD Approved Checked Date Rev Reference

    ECS/SD/BSD Ngoc Duc Phan XD 2007-09-23 A

    Click on BROWSE and select Site_equipment_config..xml

    Page 7 of 16

  • ZAIN 3G O&M 8 (16)

    Prepared (also subject responsible if other) No.

    ECS/SD/BSD Ngoc Duc Phan XD Approved Checked Date Rev Reference

    ECS/SD/BSD Ngoc Duc Phan XD 2007-09-23 A

    Click on FINISH

    Page 8 of 16

  • Check list of CV available:

    ZAIN 3G O&M 9 (16)

    Prepared (also subject responsible if other) No.

    ECS/SD/BSD Ngoc Duc Phan XD Approved Checked Date Rev Reference

    ECS/SD/BSD Ngoc Duc Phan XD 2007-09-23 A

    Page 9 of 16

  • TO CREATE A FINAL CV - Go to SOFTWARE

    ZAIN 3G O&M 10 (16)

    Prepared (also subject responsible if other) No.

    ECS/SD/BSD Ngoc Duc Phan XD Approved Checked Date Rev Reference

    ECS/SD/BSD Ngoc Duc Phan XD 2007-09-23 A

    Right click on Configuration Version (CV) and select CREATE

    Page 10 of 16

  • ZAIN 3G O&M 11 (16)

    Prepared (also subject responsible if other) No.

    ECS/SD/BSD Ngoc Duc Phan XD Approved Checked Date Rev Reference

    ECS/SD/BSD Ngoc Duc Phan XD 2007-09-23 A

    Fill in the CV name and Comment. Click APPLY Click on SET START

    Page 11 of 16

  • ZAIN 3G O&M 12 (16)

    Prepared (also subject responsible if other) No.

    ECS/SD/BSD Ngoc Duc Phan XD Approved Checked Date Rev Reference

    ECS/SD/BSD Ngoc Duc Phan XD 2007-09-23 A

    List of CV should be display:

    Page 12 of 16

  • ZAIN 3G O&M 13 (16)

    Prepared (also subject responsible if other) No.

    ECS/SD/BSD Ngoc Duc Phan XD Approved Checked Date Rev Reference

    ECS/SD/BSD Ngoc Duc Phan XD 2007-09-23 A

    Right click on the highlighted CV (newly created) and select RELOAD Name this CV as Final_CV_Date Select YES

    Page 13 of 16

  • ZAIN 3G O&M 14 (16)

    Prepared (also subject responsible if other) No.

    ECS/SD/BSD Ngoc Duc Phan XD Approved Checked Date Rev Reference

    ECS/SD/BSD Ngoc Duc Phan XD 2007-09-23 A

    Open Element Manager (EMAS) again to check Antenna status

    All ASC and RET status must ENABLED and UNLOCKED.

    Page 14 of 16

  • ZAIN 3G O&M 15 (16)

    Prepared (also subject responsible if other) No.

    ECS/SD/BSD Ngoc Duc Phan XD Approved Checked Date Rev Reference

    ECS/SD/BSD Ngoc Duc Phan XD 2007-09-23 A

    Page 15 of 16

  • ZAIN 3G O&M 16 (16)

    Prepared (also subject responsible if other) No.

    ECS/SD/BSD Ngoc Duc Phan XD Approved Checked Date Rev Reference

    ECS/SD/BSD Ngoc Duc Phan XD 2007-09-23 A

    Check Alarm List

    Page 16 of 16