20
NOAA/NESDIS support of ESA’s ADM/Aeolus mission Lars Peter Riishojgaard Joint Center for Satellite Data Assimilation

NOAA/NESDIS support of ESA’s ADM/Aeolus mission

  • Upload
    burke

  • View
    42

  • Download
    1

Embed Size (px)

DESCRIPTION

NOAA/NESDIS support of ESA’s ADM/Aeolus mission. Lars Peter Riishojgaard Joint Center for Satellite Data Assimilation. Overview. ADM/Aeolus Mission highlights NWP relevance Data policy Baseline ground segment US role. ADM highlights. Tech demo mission to be launched in 2011 - PowerPoint PPT Presentation

Citation preview

Page 1: NOAA/NESDIS support of ESA’s ADM/Aeolus mission

NOAA/NESDIS support of ESA’s ADM/Aeolus mission

Lars Peter Riishojgaard

Joint Center for Satellite Data Assimilation

Page 2: NOAA/NESDIS support of ESA’s ADM/Aeolus mission

LWG Meeting, Destin 02/01/2010

Overview

• ADM/Aeolus– Mission highlights– NWP relevance– Data policy– Baseline ground segment– US role

2

Page 3: NOAA/NESDIS support of ESA’s ADM/Aeolus mission

LWG Meeting, Destin 02/01/2010

ADM highlights

• Tech demo mission to be launched in 2011• First space-borne demonstration of wind lidar

measurement• Potentially a large contributor to NWP skill

– Currently, the Global Observing System is dominated by mass (temperature) measurement

– No direct, vertically resolved wind measurement available over uninhabited regions

3

Page 4: NOAA/NESDIS support of ESA’s ADM/Aeolus mission

LWG Meeting, Destin 02/01/2010

ADM-Aeolus

• Doppler Wind Lidar

• Cross-track HLOS winds

• HLOS (z) = 2-3 m/s

• Profiles 0–30 [email protected] km

• Once every 200 km length

• Aerosol and molecular measurement channel

• Dawn-dusk polar-orbiter

• Launch date June 2011

www.esa.int/esaLP/LPadmaeolus.html

(Stoffelen et al., BAMS, 2005)

4

Page 5: NOAA/NESDIS support of ESA’s ADM/Aeolus mission

LWG Meeting, Destin 02/01/2010

Current Upper Air Mass & Wind Data Coverage for operational NWP

Upper AirMass Observations

Upper AirWind Observations

5

Page 6: NOAA/NESDIS support of ESA’s ADM/Aeolus mission

LWG Meeting, Destin 02/01/20106

Page 7: NOAA/NESDIS support of ESA’s ADM/Aeolus mission

LWG Meeting, Destin 02/01/2010

ADM data policy

• ADM/Aeolus is an R&D mission, but … due to the value of these observations to

NWP, ESA and WMO are making ADM part of the WMO Global Observing System

• Unprecedented step for ESA• Data will be made available to the WMO

member NMHS’s in “real time” • Disseminated via the GTS

7

Page 8: NOAA/NESDIS support of ESA’s ADM/Aeolus mission

LWG Meeting, Destin 02/01/2010

Baseline ground segment

• Single receiving station at Svalbard– Full orbital dumps; 50 Mb of science data

per orbit– 110 s total visibility required for one orbit

• 30 s for antenna locking• 80 s for data dump• Any additional data may require additional time

(e.g. QRT or stored orbits)

8

Page 9: NOAA/NESDIS support of ESA’s ADM/Aeolus mission

LWG Meeting, Destin 02/01/2010

NRT stream

– Near Real Time, defined as data (level 1B) having latency of 3 h or less for the end user

– NRT is targeted for global NWP and should in principle be available for all orbits

– Low ADM orbit height => blind orbits in spite of high latitude of Svalbard

– WMO requirement for global NWP is 1 h

9

Page 10: NOAA/NESDIS support of ESA’s ADM/Aeolus mission

LWG Meeting, Destin 02/01/2010

QRT stream

• Quasi Real Time data targeted at regional NWP and other applications– Latency of 30 min or less– Assuming 20 (or 15) minutes total processing

time, the QRT stream will consist of the last 10 (or 15) minutes of the orbit dumped either at the beginning of the pass (“AEAP”) or at the end of the pass (“ALAP”)

– No Southern Hemisphere QRT data in Svalbard only scenario

10

Page 11: NOAA/NESDIS support of ESA’s ADM/Aeolus mission

LWG Meeting, Destin 02/01/2010

QRT “AEAP” Scenario using Svalbard and Troll, assuming 15 (red+blue) or 20 minutes (blue) total processing time

(all figures courtesy of H. Nett, ESA/ESTEC)

11

Page 12: NOAA/NESDIS support of ESA’s ADM/Aeolus mission

LWG Meeting, Destin 02/01/2010

QRT (II)

• QRT availability for Europe is guaranteed under combined Troll/Svalbard scenario

• QRT will not be available for North America under this scenario

• However, a receiving station at Troll now appears unlikely due to financial constraints

• On request from LPR, ESA has studied implications of adding either Wallops or Svalbard as additional ground receiving stations

12

Page 13: NOAA/NESDIS support of ESA’s ADM/Aeolus mission

LWG Meeting, Destin 02/01/2010

ADM pass duration at Svalbard (red) and Fairbanks (green)

13

Page 14: NOAA/NESDIS support of ESA’s ADM/Aeolus mission

LWG Meeting, Destin 02/01/2010

ADM pass duration (elevation > 2 deg) at Svalbard (red) and Wallops (blue)

14

Page 15: NOAA/NESDIS support of ESA’s ADM/Aeolus mission

LWG Meeting, Destin 02/01/2010

ADM pass duration (elevation > 1 deg) at Svalbard (red) and Wallops (blue)

15

Page 16: NOAA/NESDIS support of ESA’s ADM/Aeolus mission

LWG Meeting, Destin 02/01/2010

QRT “AEAP” Scenario using Svalbard and Wallops, assuming 15 (red+blue) or 20 minutes (blue) total processing time

16

Page 17: NOAA/NESDIS support of ESA’s ADM/Aeolus mission

LWG Meeting, Destin 02/01/2010

QRT (III)

• Fairbanks adds relatively little to QRT scenario; sees basically the same orbits as Svalbard; adds robustness for NRT stream

• Due to near-perfect longitude, Wallops is a useful addition in spite of the low latitude

• Assuming 1 deg minimum elevation angle, Northern Hemisphere QRT will be available for all orbits under Svalbard/Wallops scenario

17

Page 18: NOAA/NESDIS support of ESA’s ADM/Aeolus mission

LWG Meeting, Destin 02/01/2010

US involvement

• NOAA/NESDIS owns suitable antennas at Wallops Island; currently not fully utilized

• Dedicating an antenna to ADM as a secondary receiving station for a few (<6) orbits per day, 2-3 minutes per orbit would accomplish the following– Guarantee QRT (< 30 min latency) for eastern

North America– Add robustness and reliability of global NRT data

18

Page 19: NOAA/NESDIS support of ESA’s ADM/Aeolus mission

LWG Meeting, Destin 02/01/2010

Recent development

• Kathy Kelly, NOAA/NESDIS briefed by LPR and WB on May 15, 2009– Kelly has verified technical feasibility with OSO staff; cost

not seen as a major issue– Subject brought to the attention of the NESDIS AA who

expressed support• COPC (Committee for Operational Processing

Centers) briefed by LPR on October 22, 2009– Formal request for NOAA ground support for ADM being

submitted to NESDIS by COPC Principals

19

Page 20: NOAA/NESDIS support of ESA’s ADM/Aeolus mission

Current status• Technical requirements being investigated by

NESDIS/OSO (Amburgey)– Antennas, hardware, software, data

transmission options, …• MoU for ground support being drafted by

NESDIS/OSD (Yoe)• Opportunity for broader NOAA involvement in

ADM and other wind lidar activities? (LPR, MH)

LWG Meeting, Destin 02/01/201020