The information presented at the MTA System Expansion Industry Outreach on September 12, 2006 and provided herein is intended to provide general information about upcoming MTACC projects.
It is provided with the understanding that any parties interested in submitting proposals or bidding on these projects should not rely on this information for any purpose beyond background information.
The MTA shall not be responsible for any damage from any error, inaccuracy, or omission contained in the information provided herein. In all instances, documents provided with the formal invitation for bids or requests for proposal shall control.
NOTICE
No. 7 Subway Extension
2nd Ave Subway
East Side Access
September 12, 2006
Informational Outreach Meeting
AgendaOpening Remarks
No. 7 Subway Line Extension Project
2nd Avenue Subway Project
East Side Access Project
Break (15 min)
Procurement Issues
Questions
Capital Construction
Overview of MTA Capital Construction Company
Mysore L. NagarajaPresident
Capital Construction
Expanding the MTA’s Network
East Side Access Second Avenue Subway No. 7 Subway Line Extension
EAST SIDE ACCESS
2ND
AV
E. S
UB
WA
YP
HA
SE
1
NO. 7 LINE EXTENSION
Capital Construction
East Side Access Scope3½ route miles of tunnels
A new terminal station at GCT
New yards and shop New yards and shop
New Sunnyside StationNew Sunnyside Station
Capital Construction
East Side Access Status
Completed Environmental Process Completed Preliminary EngineeringOverall Design is 67% Complete $860 million of Construction Work AwardedMore than $1 Billion Programmed in 2007
Capital Construction
Existing Tunnel
ExistingLexington Ave /63rd St Station
72nd Street Station
86th Street Station
96th Street Station
Second Ave Subway Phase 1Scope:
Tunnels from 92nd St to 62nd St
Stations at 96th St, 86th St, 72nd St and 63rd St
63rd St Subway Connection
Track & Systems from 105th St to 63rd St
Service between 96th St & Brooklyn via Broadway Line
Capital Construction
Second Avenue Subway Status
Completed Environmental Process Record of Decision July 8, 2004Completed Preliminary EngineeringStarted Final Design in April 2006Construction to start in 2006
Capital Construction
10th AvenueStation
34th StreetStation
No. 7 Subway Project Scope
• 7,000 foot tunnel extension
• 2 StationsTenth Avenue
34th Street
Hudson Yard
Capital Construction
No. 7 Subway Line Extension Status
Completed Environmental Process Completed Preliminary EngineeringStarted Final Design in April 2005Construction procurement to start in 2006
Capital Construction
Design
Construction
Schedule
EAST SIDE ACCESSDescription 1999 2000 200
12002 2003 2004 200
620102005 2008 2009 2011 201
2
2013
2014 2015 2016
SECOND AVE. SUBWAYDescription 1999 2000 2001 2002 2003 2004 2006 2008 20102005 2007 2009 2011 2012 2013 2014 2015 2016
Design
Construction
NO. 7 LINE EXTENSIONDescription 1999 2000 2001 2002 2003 2004 2006 2008 20102005 2007 2009 2011 2012 2013 2014 2015 2016
Design
Construction
2007
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Project Overview
Philip W. McGrade, P.E.,Program Manager
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
No. 7 Project Context
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
10th AvenueStation
34th StreetStation
No. 7 Proposed Alignment
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
10th Ave. Station
34th
St.
Sta
tion
Shaft A
Shaft L
• Site A shaft, adit and TBM starter tunnel
• TBM excavation and lining:27th St./11th Ave. to 41st St./8th Ave.
• Modification to existing tunnel structure west of Times Square Station
• 34th Street Station:•Cavern excavation•utility adits•liner and interior structures•Shafts P and K and adits excavation•Site P entrance excavation
• 10th Avenue Station:•Excavation •Utility Relocations•Decking•Liner and interior structures•Shaft L and adit excavation
PABT
JJCC
Shaft K
Shaft P
Contract #1 Scope
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Contract #1Horizontal AlignmentShaft Sites and Laydown Areas
Shaft SitesSite ASite L
Geotechnical Data Collection ProgramAlignment Profile and Rock LineProximity to Adjacent StructuresTunnel Boring
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Horizontal AlignmentShaft Sites and Laydown Areas
Shaft SitesSite ASite L
Geotechnical Data Collection ProgramAlignment Profile and Rock LineProximity to Adjacent StructuresTunnel Boring
Contract #1
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
TBM
Drill & Blast
Limits
10th Avenue
34th Street
TBM Limit
Shaft A
Shaft L
Drill & Blast
Drill & Blast
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Horizontal AlignmentShaft Sites and Laydown Areas
Shaft SitesSite ASite L
Geotechnical Data Collection ProgramAlignment Profile and Rock LineProximity to Adjacent StructuresTunnel Boring
Contract #1
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Number 7
Site A
Site L
Site K
Site P
Site J
Shaft & LaydownAreas:
Site A
Site P
Site K
Construction Access & Laydown Areas:
Site J
Site L
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Site A Construction Activities
Eleventh AvenueEleventh Avenue
2626thth
Stre
etSt
reet
2525thth
Stre
etSt
reet
CONSTRUCTION LIMIT
SHAFT A
TBM TUNNEL
TBM STARTER TUNNELS
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Site A Shaft and AditEleventh Avenue Site A
Soil
Rock
Adit
Existing Utilities (Typ)
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Number 7
Site L Shaft
Shaft L
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Site L Construction Activities
SHAFT L
Dye
r Ave
nue
TBM TUNNEL
42nd Street
41st Street
Tent
h A
venu
e Tenth Avenue Station
Contractor Staging
STATION OUTLINE
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Site L Shaft and Adit
41st StreetSite L
Soil
Rock
Adit
8 Story Bldg.Existing 1 Story Bldg.
to be removed
Existing Basement to be removed
Existing Basement Slab to Remain
Existing Utilities (Typ)
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Horizontal AlignmentShaft Sites and Laydown Areas
Shaft SitesSite ASite L
Geotechnical Data Collection ProgramAlignment Profile and Rock LineProximity to Adjacent StructuresTunnel Boring
Contract #1
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Geotechnical Data Collection52 Boreholes were completed as part of the No. 7 Subway Line ExtensionInformation from 680 existing Boreholes was compiled from:
Port Authority of NY & NJAmtrakMTA Long Island RailroadNYC Department of Design and ConstructionNYC Department of TransportationUS Postal Service
Packer Permeability TestsOriented Core BoringHydraulic FracturingDilatometerTeleviewer SurveyLaboratory Tests
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Geotechnical Reports
Geotechnical Baseline Report
Geotechnical Data Report
Existing Building Inventory
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Horizontal AlignmentShaft Sites and Laydown Areas
Shaft SitesSite ASite L
Geotechnical Data Collection ProgramAlignment Profile and Rock LineProximity to Adjacent StructuresTunnel Boring
Contract #1
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Jacob Javits
Convention Center
Site A
Amtrak North Access TunnelAmtrak North
River Tunnels
11th Avenue Viaduct
40’
25th St.30th St. 33rd St.
No. 7 Tunnel
Approx. Rock Line
34th Street Station
Top of Ground
Site A Adit
Future 34th Street
Station
Profile and Rock Line
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Jacob Javits
Convention Center
Site A
Amtrak North Access TunnelAmtrak North
River Tunnels
11th Avenue Viaduct
40’
25th St.30th St. 33rd St.
No. 7 Tunnel
Approx. Rock Line
34th Street Station
Top of Ground
Site A Adit
Future 34th Street
Station
Amtrak North Access Tunnel
Amtrak North River Tunnels
11th Avenue Viaduct
40’
30th St. 33rd St.
Approx. Rock Line
Top of Ground
Profile and Rock Line
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Jacob Javits
Convention Center
Future Tenth Avenue Station
Approx. Rock Line
Top of GroundAmtrak North
Access Tunnel#1#3
20’
Lincoln Tunnels
11th Avenue Viaduct34th St. 38th St.
No. 7 Tunnel34th Street Station
Future 34th Street
Station
#2
Profile and Rock Line
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Jacob Javits
Convention Center
Future Tenth Avenue Station
Approx. Rock Line
Top of GroundAmtrak North
Access Tunnel#1#3
20’
Lincoln Tunnels
11th Avenue Viaduct34th St. 38th St.
No. 7 Tunnel34th Street Station
Future 34th Street
Station
#2
Approx. Rock Line
Top of Ground
#1#3
20’
Lincoln Tunnels
38th St.
#2
37th St. 39th St.
Profile and Rock Line
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Profile and Rock Line
Port Authority Bus Terminal
Future Tenth Avenue Station
Port Authority Bus TerminalTenth
Avenue
NinthAvenue
EighthAvenue
No. 7 Tunnel
Tenth Avenue Station
DyerAvenue
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Horizontal AlignmentShaft Sites and Laydown Areas
Shaft SitesSite ASite L
Geotechnical Data Collection ProgramAlignment Profile and Rock LineProximity to Adjacent StructuresTunnel Boring
Contract #1
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Proximity to Adjacent Subsurface Structures
Hudson North River Tunnels (Amtrak & NJ Transit)
Hudson North Access Tunnel (Empire Line)
Lincoln Tunnel Tubes (1, 2, 3)
No. 7 Subway
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Horizontal AlignmentShaft Sites and Laydown Areas
Shaft SitesSite ASite L
Geotechnical Data Collection ProgramAlignment Profile and Rock LineProximity to Adjacent StructuresTunnel Boring
Contract #1
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Lining
Pre-Cast Segmental Lining
19’-6
” Diamete
r
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
TBM Performance Requirements
Tunnel ID = minimum 19 feet 6 inches + construction tolerances;650 ft minimum horizontal radius;Full-face hard rock TBM with capability to negotiate short reaches of mixed face and possible soft ground conditions;Capable of negotiating very strong & very/extremely abrasive rock (Manhattan Schist & Pegmatites);Pre-cast segmental liner;Gripper, Shield or Double-shield type TBMs.
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
TBM Performance Requirements cont’d
Equipped with:provisions for drilling probe holes and grout holes. 17 inch or larger disc cutters
Back-loaded cutter mountings
Automated guidance system
New or refurbished TBM’s
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
DESIGN ISSUES
Ground ModificationsLow rock (Mixed Face) at 27th Street along TBM pathTenth Avenue – Underground Stream bed
Close proximity of existing structures:Amtrak North River tunnelsAmtrak Access tunnel (Empire Line)Lincoln TunnelsPort Authority (Below Bus Terminal)
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Agency Coordination
NYC DOT (MPT)
NYC DEP
FDNY
Amtrak
Port Authority
Tenth Avenue Station – MPT stages
Dye
r Ave
10th
Ave
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
StationsStations
Number 7 Subway Line Extension
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
34th Street StationFinal Design Configuration
Facilities w/in Site J & LIRR requested easement
34th Street Entrance(6 escalators)
Vehicular road maintained
35th Street Entrance(North Entrance)
Site P
Site K
Service/Vent stack
Site J
COMPOSITE PLAN – Street Level
ParkingBelow
Amtrak ROW below
Service Access below via 38th Street or Marshalling Yards
Systems Facilities below 11th
Ave viaduct
Parking access ramps
Future Western Entrance by others
35h
Stre
et
Eleventh Ave
33rd
Stre
et
34h
Stre
et
36h
Stre
et
Station
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
34th Street StationContract #1 Configuration
ShaftP
Shaft K
Site J
COMPOSITE PLAN – Street Level
Amtrak ROW below
Service Access below via 38th
Street or Marshalling Yards
35h
Stre
et
Eleventh Ave
33rd
Stre
et
34h
Stre
et
36h
Stre
et
Site P entrance Utility
Tunnels
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
34th Street Entrance Plaza Entrance
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
34th Street Entrance Section looking North
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
34th Street Station Cavern Rendering
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Tenth Avenue StationTenth Avenue Station
Number 7 Subway Line Extension
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Tenth Avenue Shell – Street Plan
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Tenth Avenue StationProposed Full Build-out
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Tenth Avenue StationSection at 42nd Street Entrance
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Tenth Avenue Station Rendering
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Vibration & Settlement Criteria
Number 7 Subway Line Extension
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
General Criteria
The blasting vibration design criterion will be a mean vibration level of 2 in/sec, with specific requirements at Port Authority and Amtrak facilities
Threshold settlement of type A structures shall not exceed 3/8 –inch
Threshold angular distortion of type A structures shall not exceed 1:500
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Environmental Performance Commitments (EPC)Air Quality
Use ultra low sulfur diesel fuelUse diesel engine retrofits (Filters) to reduce emissions
Dust ControlSpray dust suppressantsInstall containment for fugitive dust
Noise & VibrationSchedule activities to minimize cumulative noise & vibration in residential areas
Cultural and Historic ResourcesActivities in sensitive areas follow Historic Resource Management Plan ProceduresIf archaeology encountered, coordinate with NYSOPRHP and NYCLPC
Access and CirculationImplement MPT Plan coordinated with NYCDOT
Design for EnvironmentUse local, recycled and durable materialsRecycle, reuse and salvage materials during deconstruction
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
Contract PackagingContract Packaging
Number 7 Subway Line Extension
PB TeamPB TeamMetropolitan Transportation AuthorityMetropolitan Transportation Authority
10th Ave. Station
34th
St.
Sta
tion
Site A
Site L
Contract #2:• Site J entrance tunnel and building construction• Sites P and K building structures and external
finishes
Contract #3:• 34th Street Station:
• Finishes• Site J and K internal finishes• Site P entrance finishes
• 10th Avenue Station:• Site L building construction and
finishes• Station finishes associated with Site L
construction• Site A building construction and finishes• Track, signal and systems installation
Contract #4 (construction not funded):• 10th Avenue Station finishes• Site M building construction and finishes• Site L finishes (partial)
Site K
Site P
Site J
Follow-on Contracts
Site M
Anil Parikh, P.E.Program Manager
Second Avenue Subway ProjectMTA Capital Construction
Second Avenue Subway
Scope:– Tunnels from 92nd St to 63rd St– Stations at 96th St, 86th St, 72nd St and 63rd St– 63rd St Subway Connection– Track & Systems from 105th St to 63rd St– Service between 96th St &
Brooklyn via Broadway Line
Benefits:– Relieves most crowded Lexington Avenue line
(86th St to Grand Central) – Connects to existing system
(Storage and Maintenance)– Early use of Tunnel Section
built in 1970’s
Phase 1Phase 1 $ 3.8 Billion $ 3.8 Billion 213,000 213,000
Cost Ridership
105th Street
Existing Tunnel(99th to 105th)
92nd Street Launch Box
Second Avenue SubwayPhase 1
Phase 1 Contract Package
Second Avenue Subway
Phase 1
Manhattan Island
ChathamSeaport GrandHouston
14 3423 42 55 72 86 96 106 116 125
2nd Ave
PHASE 1Metro North Railroad
Hanover
Park AveLex Ave3rd Ave
Lex/63
TBM TUNNEL
MINED TUNNEL
MINED CAVERN
STATION CAVERN
CUT-AND-COVER STATION
EXISTING 63RD STREET STATION
EXISTING SECTION 11 TUNNEL
LEGEND & SYMBOLS
NYCT SUBWAY LINES
PHASE 1Capital ConstructionCapital ConstructionNew York City TransitNew York City Transit
THIRD AVENUE
SECOND AVENUE
FIRST AVENUE
92N
DStreet
72N
DStreet
69th
Street
95th
StreetTUNNELS
Shaft Site
Shaft Site
TBM LAUNCH BOX
Contract No. 4 Tunnels
TBM Tunneling
92nd Street TBM Launch Box
Shaft Sites
Future Tunnels
Contract 1: Scope of Work
94th
Stre
et
95th
Stre
et
96th
Stre
et
93rd
Stre
et
97th
Stre
et
Platform
92nd
Stre
et
Entrance 3
Entrance 2
Entrance 1 Ancillary 3
Emergency ExitAncillary 1
Second Avenue
Elevator
Entry Points
Properties Planned for Full AcquisitionProperties Planned for Partial Acquisition
Properties Planned for Subsurface EasementElevator
Bump Out
30% 15%
35% 20%
Contract No. 2 – 96th Street Station
NORTH
Contract No. 3 – 63rd Street Station
• Open and fit out platform north of present F Line
• Provide additional entrances at Third Avenue
• Additional ventilation to meet NFPA 130
NORTH
68th
Stre
et
69th
Stre
et
70th
Stre
et
71st
Stre
et
72nd
Stre
et
73rd
Stre
et
Platforms
Entrance and Ancillary
EntranceEntrance
Second Avenue
Elevator
Properties Planned for Full AcquisitionProperties Planned for Partial Acquisition
Properties Planned for Subsurface EasementElevator
Bump Out
Ancillary
Contract No. 4 - 72nd Street Station
5%
30%
30%
35%
Approx. 95 feet
App
roxi
mat
ely
50 F
eet
Approximately 95 Feet
Contract No. 4 - 72nd Street Station (Cross Section)
84th
Stre
et
NORTH
85th
Stre
et
86th
Stre
et
83rd
Stre
et
87th
Stre
et
Platform
82nd
Stre
et
AncillaryAncillary
Entrance 1 Entrance 2
Second Avenue
Elevator
Entry Points
Properties Planned for Full AcquisitionProperties Planned for Partial Acquisition
Properties Planned for Subsurface EasementElevator
15%
10%
45%
30%
Contract No. 5 - 86th Street Station
27’-8”
12’-0”43’-6”
61’-0”
69’-0”
23’
19’-0”8’-9”
Contract No. 5 - 86th Street Station (Cross Section)
7’-8”
• Communication Systems
• Power
Traction Power
• Signal
Design by MTA/NYCT
Conventional Signal System
• Track
Design by MTA/NYCT
Contract No. 6 – Systems and Track
Construction Management
• Constructability Review of Final Design
• Construction Management Services for Phase 1
• Assist in Closing out of Construction Contracts
Second Avenue Subway
Construction Details for Contract 1Christopher Bennett, P.E.
Design Director,DMJM+HARRIS*ARUP JV
THIRD AVENUE
SECOND AVENUE
FIRST AVENUE
92N
DStreet
72N
DStreet
69th
Street
95th
StreetTUNNELS
Shaft Site
Shaft Site
TBM LAUNCH BOX
TBM Tunneling
92nd Street TBM Launch Box
Shaft Sites
Contract 1: Scope of Work
• Rock Profile drops off north of 91st Street• Providing a vertical rock face to start TBM operation
Project Profile
(Existing) Lexington Ave /63rd St Station
72nd St Station86th St Station
96th St Station
• Essentially “hard” rock TBM drives but …• Abrasive rock• Faults and shear zones• Curve towards 63rd Street (616’ Radius)• Need to be prepared for fissures
• Final lining omitted through future cavern zones
TBM Tunneling
• Undulating bedrock profile, differs west from east
• Fill, overlying glacial silt, sand, gravel and decomposed rock in the valleys
• Rock typically strong (generally between 5,000-12,000psi) and competent gneiss and schist with pegmatite
• Faults/shear zones range from 1’ to 100’ thick
• Major faults identified at 90th to 92nd, 68th and 64th Streets
Geology
• Undulating bedrock profile, differs west from east
• Fill, overlying glacial silt, sand, gravel and decomposed rock in the valleys
• Rock typically strong (generally between 5,000-12,000psi) and competent gneiss and schist with pegmatite
• Faults/shear zones range from 1’ to 100’ thick
• Major faults identified at 90th to 92nd, 68th and 64th Streets
Geology
• TBM Tunnels (19’-6” Finished Diameter)
• Precast Concrete Segments (10” Thick)
• Steel Fiber Reinforced
10” GROUTING
Running Tunnels
19’6” Dia.
Contract 1 Schedule
•DESCRIPTION •2006 •2007 •2008 •2009 •2010
• 91st Street to 95th Street TBM Launch Box
• TBM Tunnels
• 69th Street & 72nd Street Shafts
• Terms & Conditions plus General Requirements including Division 1
• Contract Specifications
• Temporary Works Design Criteria Manual
• Contract Drawings
• CADD Manual
• Geotechnical Baseline Report
• Geotechnical Data Report
• General Alignment Environmental Sampling Program
• Potentially Contaminated Sites - Environmental Sampling Program
• Utility Test Pit Report
• Building Information Report
• Historical Geotechnical Information
Contract 1 Documents
Second Avenue Subway
Launch Box Construction
Permanent Slurry Walls93rd to 95th Streets
Temporary Secant Pile Walls South of 92nd to 93rd Streets
Work Zone(Typical)
4 Traffic Lanes Roadway Relocated
Onto Sidewalk
Existing 20’sidewalk curb
line
FireEmergency
Access(Typical)
Alternative Delivery Zone
(Typical)
TBM Launch Box ConstructionWest Side Excavation & Decking
Proposed MPT Plan
TBM Launch Box ConstructionEast Side Excavation & Decking
Work Zone(Typical)
4 TrafficLanes
Roadway Relocated Onto Sidewalk
FireEmergency
Access(Typical)
Alternative Delivery Zone
(Typical)
Temporary Decking
Proposed MPT Plan
Work Zone(Typical)
4 TrafficLanes
Roadway Relocated Onto Sidewalk
FireEmergency
Access(Typical)
Alternative Delivery Zone
(Typical)
Temporary Decking
Future Contract 2 Work Zone
Existing 20’sidewalk curb line
TBM Launch Box ConstructionTBM Operations: Transition Zone Between Contract 1 & 96th St. Station
Proposed MPT Plan
Second Avenue Subway
Status Of Third Party Interfaces
• Parks – 96th Street Park Available
• Third Party Coordination
Utilities –plans approved by each utility
DEP – approval of sewer and water plans
DOT – stipulations provided
Community – ongoing coordination through CB 8
Construction ActivityConstruction Activity Work HoursWork Hours
Surface Work for Launch Box
Surface Work for Launch Box
• 2 Shifts, 5 days/week: 7:00am to 10:00pm
• 1 Shift Saturday: 10:00 am to 7:00 pm
• 2 Shifts, 5 days/week: 7:00am to 10:00pm
• 1 Shift Saturday: 10:00 am to 7:00 pm
Underground WorkUnderground Work 3 Shifts, 7 days/week3 Shifts, 7 days/week
Trucking & DeliveriesTrucking & Deliveries• 2 Shifts, 5 days/week: 7:00am to 10:00pm• Some night deliveries for large equipment• 1 Shift Saturday: 10:00am to 7:00pm
• 2 Shifts, 5 days/week: 7:00am to 10:00pm• Some night deliveries for large equipment• 1 Shift Saturday: 10:00am to 7:00pm
Construction Work Hours
TRAFFICTRAFFIC
• Traffic monitoring program• Maintain 4 lanes through
construction zones• Keep cross street open (12 foot lane)
• Relocate bus stops to outside of construction zones
ImpactsImpacts MitigationsMitigations
PEDESTRIANSPEDESTRIANS • Minimum 7 foot wide sidewalks
Construction Challenges
ENVIRONMENTALPERFORMANCE
CRITERIA
ENVIRONMENTALPERFORMANCE
CRITERIA
• Ultra Low Sulfur Diesel Fuel• Limit Idling Time• Minimize interruption in access to Cultural
and Historic sites• Economic Effects
ImpactsImpacts
LOCALACCESSLOCAL
ACCESS
• Maintain pedestrian access to all buildings• Maintain emergency vehicle access at all
times• Maintain special zones for deliveries• Provide areas for garbage disposal forresidential & commercial purposes
MitigationsMitigations
NOISE&
VIBRATION
NOISE&
VIBRATION
• Meet FEIS commitments• Comply with NYCDEP noise limits• Noise & vibration monitoring plan• Dampers on equipment• Limit noise to 5 decibels above existingambient noise levels
Construction Challenges
ImpactsImpacts MitigationsMitigations
Dust&
Air Quality
Dust&
Air Quality
• Air Quality Monitoring Plan
• Low sulfur fuels, 3 minute idling time,
• Clean trucks, streets and wet down dust
VectorControl
(Rodents)
VectorControl
(Rodents)
• Vector control plan to cover 1000 foot wide area
• Licensed Pesticide Applicator required
Settlementor
Movement
Settlementor
Movement
• Install Instrumentation and constantmonitoring to ensure no damage to buildings& property
Construction Challenges
“ THANK YOU ”September 12th, 2006
Dilip I. Patel, P.E.Program Manager
East Side AccessMTA Capital Construction
CQ028: Queens Open-Cut Excavation (N. Blvd. to Existing Rail Yard) CQ028: Queens Open-Cut Excavation (N. Blvd. to Existing Rail Yard)
Launch Shaft Optional ScopeLaunch Shaft Optional Scope
CQ028: Major Scope ElementsCQ028: Major Scope Elements
• Slurry walls (126,000 SF)
• Soil Excavation (195,000 CY)
• Rock Excavation (15,500 CY)
• Northern Blvd. crossing
• Dewatering
• Grouting
CM009: Major Scope ElementsCM009: Major Scope Elements
• Drill and blast assembly chamber
• TBM excavation of 4 tunnels (25,000 LF)
• Tunnel lining
• Drill and blast Wye Caverns
• Rock excavation = approx. 350,000 CY
Status of All Tunnel WorkStatus of All Tunnel Work
Queens Bored Tunnels and Structures (CQ031)
Award scheduled Summer ‘07
Harold StructuresPart I (CH053)
Award scheduled Spring ‘07
Queens Open Cut Excavation and Tunnel Under Northern Blvd. (CQ028)
Awarded in April 2006
Manhattan StructuresPart I (CM019)
Award scheduled Spring ‘07
Manhattan Tunnels Excavation (CM009)
Awarded in July 2006
LIRR Level
NYCT Subway Level(in service)
Project ScheduleProject Schedule1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011
PHASE IDraft/Final EIS, Preliminary Engineering
PHASE IIFinal Design
Manhattan ConstructionPHASE III
Queens ConstructionHarold Interlocking WorkSystemwide Work
2012
PHASE IVHarold CIL Acceptance & System Commissioning
Revenue Rolling Stock
2013
Contract Packaging Plan – Upcoming WorkContract Packaging Plan – Upcoming Work
Last Revised – 03/02/06
2001 to 2005 Projects 2006 2007 2008 2009 2010 2011 2012 2013
Power, Signals, Communications, and Other Systems Elements
CS079Power, Signals, Communications, and Other Systems Elements
CS079
Tunnel VentilationCS081
Tunnel VentilationCS081
Start-up, Testing & Commissioning
ESA Project
Start-up, Testing & Commissioning
ESA Project
55th Street Vent Plant Facility
CM013-A55th Street Vent Plant Facility
CM013-A
GCT SurfaceEntrances
CM015
GCT SurfaceEntrances
CM015
Queens Bored Tunnels, Structures & Trackwork
CQ031Queens Bored Tunnels, Structures & Trackwork
CQ031
Mid-Day Storage Yard Facility
CQ033Mid-Day Storage Yard Facility
CQ033
Harold Structures - Part 1 & GO2 Substation
CH053Harold Structures - Part 1 & GO2 Substation
CH053
Harold Structures - Part 4CH059
Harold Structures - Part 4CH059
Procure Rail Fasteners
VS077
Procure Rail Fasteners
VS077
GCT Concourse Civil & Structural, Shaft Excavation & 245 Park Ave Entrance
CM008
GCT Concourse Civil & Structural, Shaft Excavation & 245 Park Ave Entrance
CM008
Harold & Point CIL
VH051
Harold & Point CIL
VH051
GCT Caverns, 63rd St. Tunnel Rehab, Tunnel Concrete, Trackwork & Bellmouth Closure
CM012GCT Caverns, 63rd St. Tunnel Rehab, Tunnel Concrete, Trackwork & Bellmouth Closure
CM012
Manhattan Approach Tunnels Excavation by Roadheader
CM016Manhattan Approach Tunnels Excavation by Roadheader
CM016
MNR ReplacementYard at Highbridge
CM001MNR ReplacementYard at Highbridge
CM001Manhattan TunnelsExcavation
CM009Manhattan TunnelsExcavation
CM009
GCT Concourse &Cavern Finishes
CM014GCT Concourse &Cavern Finishes
CM014
Arch Street Yard and Shop Facility
CQ027 Arch Street Yard and Shop Facility
CQ027
GCT E Yard ModsMNR F/A
FMM02GCT E Yard ModsMNR F/A
FMM02
Wood InterlockingLIRR F/A
FQL35Wood InterlockingLIRR F/A
FQL35
Arch St. Yard Connection -Amtrak F/A
FQA36Arch St. Yard Connection -Amtrak F/A
FQA36
Harold F/A Stage 2FHL02 / FHA02Harold F/A Stage 2FHL02 / FHA02
Harold F/A Stage 3
FHL03 / FHA03
Harold F/A Stage 3
FHL03 / FHA03
CQ026Open-Cut ExcavateExisting Bellmouth
CQ026Open-Cut ExcavateExisting Bellmouth
Arch St. Yard Connection - LIRR F/A
FQL36Arch St. Yard Connection - LIRR F/A
FQL36
Procure Harold Material Stage 1
VHA01 / VHL01Procure Harold Material Stage 1
VHA01 / VHL01
Harold F/A Stage 4
FHL04 / FHA04
Harold F/A Stage 4
FHL04 / FHA04
Sunnyside Passenger Station
CQ034Sunnyside Passenger Station
CQ034
CQ025Demo SuperiorReed & Yard Prep
CQ025Demo SuperiorReed & Yard Prep
Queens Open-Cut Excavation (Northern Blvd to Existing Rail Yard)
CQ028Queens Open-Cut Excavation (Northern Blvd to Existing Rail Yard)
CQ028
GCT East Yard Environmental Remediation
CM017GCT East Yard Environmental Remediation
CM017
Procure Switch Exchange System
VH055Procure Switch Exchange System
VH055
Loop Interlocking –Amtrak F/A
FQA65Loop Interlocking –Amtrak F/A
FQA65
F Interlocking CIL VH062
F Interlocking CIL VH062
F Interlocking CIL VH062
Q InterlockingFQA64Q InterlockingFQA64
Loop Interlocking CIL
VQ065
Loop Interlocking CIL
VQ065
Harold Structures - Part 2
CH054Harold Structures - Part 2
CH054
Harold F/A Stage 1FHL01 / FHA01Harold F/A Stage 1FHL01 / FHA01
Procure Harold Material Stage 2
VHA02 / VHL02Procure Harold Material Stage 2
VHA02 / VHL02
Procure Harold Material Stage 3
VHA03 / VHL03Procure Harold Material Stage 3
VHA03 / VHL03
Procure Harold Material Stage 4
VHA04 / VHL04Procure Harold Material Stage 4
VHA04 / VHL04
63rd Street Tunnel Abatement
CMS1663rd Street Tunnel Abatement
CMS16 Plaza Substation, Tunnel and Ventilation Structures
CQ032Plaza Substation, Tunnel and Ventilation Structures
CQ032
DescriptionDescriptionContract # MANHATTAN
QUEENSHAROLD
Color Code
PROJECTWIDEAwarded Complete
Legend
38th Street Vent Plant Facility
CM013-B
50th Street Vent Plant Facility
CM013-C50th Street Vent Plant Facility
CM013-C
Harold Structures –Part 3 EBR-WBBP
CH057Harold Structures –Part 3 EBR-WBBP
CH057
Amtrak Buildings #1,2 & 5-8 Abatement and Demolition
CQ040
Amtrak Buildings #1,2 & 5-8 Abatement and Demolition
CQ040
Queens Bored Tunnels, Structures & Trackwork
CQ031
Harold Structures - Part 1 & GO2 Substation
CH053
GCT Concourse Civil & Structural, Shaft Excavation & 245 Park Ave Entrance
CM019CM019
Total Number of Packages = 48
Key Elements of Contract CQ031 Key Elements of Contract CQ031
Honeywell StHoneywell St
3939 thth StStM
idM
id--D
ay
Sto
rage
Yar
d
Day
S
tora
ge Y
ard
Sunn
ysid
e Su
nnys
ide
Yard
Yard
TBM TBM TunnelsTunnels
Yard Lead Yard Lead Approach StructureApproach Structure
Yard LeadYard Lead
Tunnel ATunnel ATunnel DTunnel D
Tunnel B/CTunnel B/C
3 Tunnel Fan Plant & Emergency Exit
3 Tunnel Fan Plant & Emergency Exit
Yard D Fan Plant & Emergency Exit
Yard D Fan Plant & Emergency Exit
Fan Plant & Emergency Exit
Fan Plant & Emergency Exit
CQ031 – Major Scope ElementsCQ031 – Major Scope Elements
• Excavation by TBM of soft ground tunnels
• Installation of a pre-cast tunnel liner
• Fan plants/emergency exits
• Yard Lead Tunnel TBM reception pit
• Track and benchwall
• Demolition of buildings
CQ031 - Bored TunnelsCQ031 - Bored Tunnels
SectionLength
TunnelLength
Track A Glacial Till 2,180 ft 2,180 ft
Track B/C Glacial Till 1,739 ft
Rock & Mixed Face 60 ft
Glacial Till 2,158 ft 2,218 ft
Rock & Mixed Face 415 ft
Glacial Till 3,969 ft
10,523 ft 10,523 ft
4,384 ftYard Lead
1,739 ft
Track D
CQ031 - Demolition + Cut & Cover Approach StructuresCQ031 - Demolition + Cut & Cover Approach Structures• Demolition of private properties on 43rd St.
CQ031 - Other Work ElementsCQ031 - Other Work Elements• Tunnel Trackwork and Tunnel Bench
Honeywell Bridge
Honeywell Bridge
Honeywell Bridge
39 thSt Bridge
3939 thth St Bridge
St Bridge
Mid
Mid
--Day
S
tora
ge Y
ard
Day
S
tora
ge Y
ard
Sunn
ysid
e Su
nnys
ide
Yard
Yard
Master CIL Access Road & StructureMaster CIL Access Road & Structure
CH053: Harold Structures Part ICH053: Harold Structures Part I
43rd St Bridge
4343 rdrd St BridgeSt Bridge
Modular Retaining WallModular Retaining Wall
Building DemolitionBuilding Demolition
GO2 SubstationGO2 Substation
TBM Reception Pit & Approach Structure
TBM Reception Pit & Approach Structure
Harold Access BridgeHarold Access Bridge
Pre-Cast Retaining WallPre-Cast Retaining Wall
CH053 – Major Scope ElementsCH053 – Major Scope Elements
• Excavation and Concreting of Tunnel A Reception Pit and Approach Structure
• Construct new railroad bridges at 43rd St. and 48th St.
• Construction of new retaining wall structures
• Construct new modular substation (GO2) and micro tunnels
• Building demolition
• New Harold Access Bridge and assorted utilities
CH053 – Substation Replacement Facility (GO2)CH053 – Substation Replacement Facility (GO2)
Future GO2Future GO2
Microtunnel
Duct BanksMicrotunnel
Duct Banks
CH053 – Retaining Walls (Modular)CH053 – Retaining Walls (Modular)
Future WBBP Embankment & Retaining Wall
North of Main Line Looking West to 43rd St
NY Presbyterian ChurchNY Presbyterian Church
Matura Building Demolition
CH053: Force Account Work (LIRR, Amtrak)CH053: Force Account Work (LIRR, Amtrak)
• Foundations and structural sections by CH053 contractor
• Demolition of existing structures by CH053 contractor• Electrical elements by railroad force account
CM019 - LocationCM019 - Location
Met LifeMet Life
GCT TerminalGCT Terminal
HelmsleyHelmsley
CM019 – Demolition Work at Lower Level of MNRCM019 – Demolition Work at Lower Level of MNR
BN Yard Bronx
CM019 – Site: Service Shafts and EscalatorsCM019 – Site: Service Shafts and Escalators
SHAFT #1
SHAFT #2
SHAFT #3
SHAFT #4
SHAFT #5
ESCALATOR SHAFTS
CM019 – Site: Mined CavernsCM019 – Site: Mined Caverns
GCT CavernsGCT 1 & 2 Caverns
SHAFT #1
BN Yard Bronx
X-Section
Top Heading of GCT Caverns & Mucking OperationTop Heading of GCT Caverns & Mucking Operation
Shaft # 1 LIRR MNR
Madison Yard
CM019 – Demolish Existing 47 E. 44th Street BuildingCM019 – Demolish Existing 47 E. 44th Street Building
CM019 – Other Work ElementsCM019 – Other Work Elements
245 Park Avenue Entrance
Upcoming Contract AwardsUpcoming Contract Awards
• CH053: Harold Structures - Part 1– Award Date, April 2007
• CM019: Manhattan Structures Part 1 – Award Date, June 2007
• CQ031: Queens Bored Tunnels, Structures & Trackwork– Award Date, September 2007
BREAK (15 min)
Procurement Issues
Ronald J. Pezik, P.E.Senior Director, Capital Program ProcurementMTA – NYC Transit
Email: [email protected]
Procurements to Look for Shortly:No. 7 Subway Line Extension:C-26503 Construction of the No. 7 Subway Line Extension:
Running Tunnels, Caverns & Station Structures (RFP)
Second Avenue Subway:CM-1338 Consultant Construction Management Services (RFP)
C-26002 Construction of Phase 1 of Second Avenue Subway Tunnels 92nd – 63rd Street (IFB)
East Side Access:CH053 Harold Structures Part 1 (IFB)
CM019 Manhattan Structures Part 1 (IFB)
CQ031 Queens Bored Tunnels, Structures & Trackwork (IFB)
NEW YORK STATE LOBBYING LAW
Creates two new sections in the State Finance Law:
• Section 139-j: Restrictions on “contacts”during the procurement process
• Section 139-k: Disclosure by bidders/proposersof prior non-responsibility determinations
Procurement – Where to Look
MTA Website – www.mta.info
Click on either NYC Transit or Capital Construction then Procurement
Construction & Architectural/Engineering Opportunities
Veronique (Ronnie) HakimVice President, General CounselMTA Capital Construction
Procurements:No. 7 Subway Line Extension:C-26503 Construction of the No. 7 Subway Line Extension:
Running Tunnels, Caverns & Station Structures (RFP)
Second Avenue Subway:CM-1338 Consultant Construction Management Services (RFP)
C-26002 Construction of Phase 1 of Second Avenue Subway Tunnels 92nd – 63rd Street (IFB)
East Side Access:CH053 Harold Structures Part 1 (IFB)
CM019 Manhattan Structures Part 1 (IFB)
CQ031 Queens Bored Tunnels, Structures & Trackwork (IFB)
Questions?