NO. 2
TO THE DRAWINGS AND THE PROJECT MANUAL
PROJECT NAME: ML Cisneros Administration Building Renovations
CLIENT NAME: Lockhart I.S.D.
LOCATION: Lockhart, Texas
PROJECT NUMBER: 1690-07-01
PROPOSAL DATE: Tuesday, October 24, 2017, Time:2:00 PM
ADDENDUM DATE: Friday, October 20, 2017
For additional information regarding this project, contact Josh Cogburn at
800.687.1229.
THIS ADDENDUM INCLUDES:
Structural
Architectural
Mechanical
Electrical
Technology
1 Page
1 Page
1 Page
1 Page
1 Page
AND ALL ATTACHED REVISED DRAWING REFERENCES IN THE ADDENDUM
10/20/17
Project Name: ML Cisneros Administration Building Renovations
Client: Lockhart ISD
Lockhart, Texas
Project Number: 1690-07-01
Structural Items For
Addendum No. 2
Page 1 of 1
STRUCTURAL ITEMS FOR ADDENDUM NO. 2 NOTICE TO PROPOSERS:
A. This Addendum shall be considered part of the contract documents for the above-mentioned project as though it had
been issued at the same time and incorporated integrally therewith. Where provisions of the following supplementary
data differ from those of the original contract documents, this Addendum shall govern and take precedence.
B. Proposers are hereby notified that they shall make any necessary adjustments in their estimate on account of this
Addendum. It will be construed that each Proposer’s proposal is submitted with full knowledge of all modifications and
supplemental data specified therein. Acknowledge receipt of this addendum in the space provided on the proposal
form. Failure to do so may subject Proposer to disqualification.
REFERENCE IS MADE TO THE DRAWINGS AND THE PROJECT MANUAL AS NOTED:
DRAWINGS:
AD No 2, Struct Item 1: To the Drawings, Sheet S0.5, “DEMOLITION PLAN – SECTION 1 – ROOF ”
1) Callout “NEW CONDENSOR LOCATION (200 LB)” shall be removed from roof demolition plan in two locations with
associated equipment location.
2) Callout “LOCATE MECHANICAL UNIT OVER BEAM. 2 ½” CORE FOR ROOF PENETRATION SHALL BE A MINIMUM
OF 6” FROM FACE OF BEAM. DO NOT DAMAGE EXISTING REINFORCEMENT” shall be removed from roof
demolition plan.
3) Callout “ASSUMED STRUCTURE IS CONCRETE BEAM SPANNING BETWEEN EXISTING CONCRETE COLUMNS WITH
5” CONCRETE SLAB. CONTRACTOR TO VERIFY EXISTING CONDITIONS PRIOR TO CONSTRUCTION. NOTIFY
ENGINEER OF RECORD IF EXISTING CONDITIONS VARIES FROM ASSUMED STRUCTURE.” shall be removed from
roof demolition plan.
END OF STRUCTURAL ADDENDUM
F-1252
Project Name: ML Cisneros Administration Building Renovations
Client: Lockhart ISD
Lockhart, Texas
Project Number: 1690-07-01
Architectural Items For
Addendum No. #2
Page 1 of 1
ARCHITECTURAL ITEMS FOR ADDENDUM NO. 2 NOTICE TO PROPOSERS:
A. This Addendum shall be considered part of the contract documents for the above-mentioned project as though it had
been issued at the same time and incorporated integrally therewith. Where provisions of the following supplementary
data differ from those of the original contract documents, this Addendum shall govern and take precedence.
B. Proposers are hereby notified that they shall make any necessary adjustments in their estimate on account of this
Addendum. It will be construed that each Proposer’s proposal is submitted with full knowledge of all modifications and
supplemental data specified therein. Acknowledge receipt of this addendum in the space provided on the proposal
form. Failure to do so may subject Proposer to disqualification.
REFERENCE IS MADE TO THE DRAWINGS AND THE PROJECT MANUAL AS NOTED:
DRAWINGS:
AD No 1, Arch. Item 1: To the Drawings, Sheet A7.1, “ROOF PLAN,”
1) Remove scope of work for new condensers and cutting back roof previously included as part of Addendum 1.
END OF ARCHITECTURAL ADDENDUM
10/20/17
Project Name: ML Cisneros Administration Building Renovations
Client: Lockhart ISD
Lockhart, Texas
Project Number: 1690-07-01
Mechanical Items for
Addendum No. 2
Page 1 of 1
MECHANICAL ITEMS FOR ADDENDUM NO. 2 NOTICE TO PROPOSERS:
A. This Addendum shall be considered part of the contract documents for the above-mentioned project as though it had
been issued at the same time and incorporated integrally therewith. Where provisions of the following supplementary
data differ from those of the original contract documents, this Addendum shall govern and take precedence.
B. Proposers are hereby notified that they shall make any necessary adjustments in their estimate on account of this
Addendum. It will be construed that each Proposer’s proposal is submitted with full knowledge of all modifications and
supplemental data specified therein. Acknowledge receipt of this addendum in the space provided on the proposal
form. Failure to do so may subject Proposer to disqualification.
REFERENCE IS MADE TO THE DRAWINGS AND THE PROJECT MANUAL AS NOTED:
DRAWINGS: AD No 2, Tech. Item 1: To the Drawings, Sheets MD1.1, MD1.2, MD1.3, MH1.1, MH1.2, MH1.2 “MECHANICAL DEMOLITION
FLOOR PLAN & MECHANICAL FLOOR PLAN – SECTIONS 1,2,3, & 4”
1) Omit box note stating “Automated Logic EMCS…”, Note to state “Automated logic, Alerton, & Trane are the approved
control companies by the district.”
AD No 2, Tech. Item 2: To the Drawings, Sheet MH6.1 “MECHANICAL ROOF PLAN”
1) Refer to mechanical roof plan, condensers to be relocated from roof to ground next to existing condenser.
END OF TECHNOLOGY ADDENDUM
Z:\HUCKABEE - AUSTIN\LOCKHART\2 016 0751 005 M L CISNEROS ADMIN CONVERSION\01 ADMIN 2 016 0751 005\ADDENDA 2 016 0751 005\ADDENDA
2\ADDENDUM 2 - MECHANICAL 1690-07-01.DOCX
ESTES, McCLURE & ASSOCIATES REGISTRATION NO. F-893
Project Name: ML Cisneros Administration Building Renovations
Client: Lockhart ISD
Lockhart, Texas
Project Number: 1690-07-01
Electrical Items For
Addendum No. #2
Page 1 of
ELECTRICAL ITEMS FOR ADDENDUM NO. 2 NOTICE TO PROPOSERS:
A. This Addendum shall be considered part of the contract documents for the above-mentioned project as though it had
been issued at the same time and incorporated integrally therewith. Where provisions of the following supplementary
data differ from those of the original contract documents, this Addendum shall govern and take precedence.
B. Proposers are hereby notified that they shall make any necessary adjustments in their estimate on account of this
Addendum. It will be construed that each Proposer’s proposal is submitted with full knowledge of all modifications and
supplemental data specified therein. Acknowledge receipt of this addendum in the space provided on the proposal
form. Failure to do so may subject Proposer to disqualification.
REFERENCE IS MADE TO THE DRAWINGS AND THE PROJECT MANUAL AS NOTED:
DRAWINGS:
AD No 2, Elec. Item 1: To the Drawings, Sheet EDS1.1, “ELECTRICAL DEMOLITION SITE PLAN,”
1) Changed ‘LUMINAIRE DEMOLITION PLAN NOTES’ – ‘Note L1’ to read “EXISTING WALKWAY POLES TO REMAIN IN
PLACE. EXISTING POST TOP FIXTURE TO BE REMOVED AND PRELACED WITH NEW LED POT TOP LIGHTING.
EXISTING CIRCUIT TO BE REUSED TO PROVIDED POWER TO LIGHTS.”
2) Added note to ‘LUMINAIRE DEMOLITION PLAN NOTES’ – ‘Note L3’ to read “REUSE EXISTING CONDUIT AND
WIRING IF IN GOOD CONDITION. CONTRACTOR TO VERIFY EXISTING CONDITONS AND TO PROVIDE
NECESSARY EXTENSIONS TO CONDUIT AND WIRING TO LOWER CONDUIT BELOW NEW PARKING LOT.”
3) Refer to attached drawing EDS1.1 for the placement of ‘L3’ next to existing conduit runs.
AD No 2, Elec. Item 2: To the Drawings, Sheet ES1.1, “ELECTRICAL SITE PLAN,”
1) Changed ‘ELECTRICAL SITE PLAN NOTES’ – ‘Note C1’ to read “EXISTING POST TOP FIXTURE TO BE RETROFITTED
WITH NEW LED BULB TO BE PURCHASED AND INSTALLED BY THE ELECTRICAL CONTRACTOR. ELECTRICAL
CONTRACTOR WO PROVIDE TOPAZ PART #LPT36/85/INT/E26. REPLACEMENT GLOBE TO BE PROVIDED BY
OWNER.”
2) Added note to ‘ELECTRICAL SITE PLAN NOTES’ – ‘Note C4’ to read “RELOCATED EXISTING CIRCUIT TO PROVIDE
POWER TO LIGHTS. REFEED EXISTING CIRCUIT FROM PANEL ‘HA’. EXISTING CONDUIT AND WIRING TO BE
REUSED AS POSSIBLE. EXTEND CONDUIT AND WIRING AS NECESSARY.”
3) Refer to attached drawing ES1.1 for the placement of ‘C4’ next to the walkway light’s circuit callout. Removed new
conduit and wiring runs between fixtures.
AD No 2, Elec. Item 3: To the Drawings, Sheet EP6.1, “ELECTRICAL ROOF PLAN,”
1) Refer to attached sheet ‘EP6.1’- Relocate condenser disconnects as shown.
AD No 2, Elec. Item 4: To the Drawings, Sheet EP8.1, “ELECTRICAL PANEL BOARD SCHEDULES,”
1) Refer to panel ‘HA’, for courtyard lighting, provide single pole 20A breaker in this panel with #10 wire.
AD No 2, Elec. Item 5: To the Drawings, Sheet EL8.1, “ELECTRICAL LIGHTING LUMINAIRE SCHEDULE,”
1) Refer to attached drawing EL8.1 for part number change for Type ‘R’ fixture.
1 o
Project Name: ML Cisneros Administration Building Renovations
Client: Lockhart ISD
Lockhart, Texas
Project Number: 1690-07-01
Technology Items for
Addendum No. 2
Page 1 of 1
TECHNOLOGY ITEMS FOR ADDENDUM NO. 2 NOTICE TO PROPOSERS:
A. This Addendum shall be considered part of the contract documents for the above-mentioned project as though it had
been issued at the same time and incorporated integrally therewith. Where provisions of the following supplementary
data differ from those of the original contract documents, this Addendum shall govern and take precedence.
B. Proposers are hereby notified that they shall make any necessary adjustments in their estimate on account of this
Addendum. It will be construed that each Proposer’s proposal is submitted with full knowledge of all modifications and
supplemental data specified therein. Acknowledge receipt of this addendum in the space provided on the proposal
form. Failure to do so may subject Proposer to disqualification.
REFERENCE IS MADE TO THE DRAWINGS AND THE PROJECT MANUAL AS NOTED:
DRAWINGS: AD No 2, Tech. Item 1: To the Drawings, Sheet ET1.1“ELECTRICAL COMMUNICATIONS FLOOR PLAN – SECTION 1”
1) Omit Door intercom system at reception and door 100A.1. Provide single button door release at reception to control
100A.2. Door 100A.1 to be open during normal business hours
AD No 2, Tech. Item 2: To the Drawings, Sheet ET1.2“ELECTRICAL COMMUNICATIONS FLOOR PLAN – SECTION 2”
1) Provide an additional A/V input in Control/IDF 200A mounted above workstation millwork backsplash.
2) Remove the word “Crestron” from notes 5 and 6.
END OF TECHNOLOGY ADDENDUM
Z:\HUCKABEE - AUSTIN\LOCKHART\2 016 0751 005 M L CISNEROS ADMIN CONVERSION\01 ADMIN 2 016 0751 005\ADDENDA 2 016 0751 005\ADDENDA
2\ADDENDUM 2 - TECHNOLOGY 1690-07-01.DOCX
ESTES, McCLURE & ASSOCIATES REGISTRATION NO. F-893
MECHANICAL GENERAL NOTES:
1.
2.
3.
4.
5.
6.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
MECHANICAL CONTRACTOR TO PROVIDE TO THE PLUMBINGCONTRACTOR THE RECOMMENDED AC MANUFACTURER'SDATA FOR CONDENSATE TRAPS PER EACH TYPE OF UNIT.
THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLEFOR REMOVAL OR ADJUSTMENT OF ALL HOLD DOWN BOLTSON COMPRESSORS AT HVAC EQUIPMENT TO ALLOW FORPROPER VIBRATION ISOLATION.
THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLEFOR REMOVAL OF ALL ABANDONED SCREWS, PIPING, TAPE,PAPERS, PACKING PRODUCTS, ETC.
ALL EQUIPMENT SHALL BE PROPERLY LABELED PERSPECIFICATIONS.
CLOSE ALL OUTSIDE AIR DAMPERS UPON INSTALLATIONAND KEEP ALL OUTSIDE AIR DAMPERS CLOSED UNTIL THE"TEST AND BALANCE" IS PERFORMED.
NO MECHANICAL EQUIPMENT THAT REQUIRES SERVICE(i.e. FANS, ROOFTOP UNITS, ETC.) ON ROOF SHALL BECLOSER THAN 10'-6" TO EDGE OF BUILDING.
THE MECHANICAL CONTRACTOR SHALL NOT INSTALL ANYROOF EQUIPMENT CLOSER THAN 5'-0" TO ANY ADJACENTWALLS, EXPANSION JOINTS, AND/OR PARAPETS.
COORDINATE WITH THE PLUMBING CONTRACTORLOCATION OF ALL ROOFTOP UNITS WITH ALL PLUMBINGVENTS. MAINTAIN 10'-0" MINIMUM SEPARATION.
COORDINATE ALL ROOFTOP UNITS, DUCTWORK, ANDGRILLES WITH ALL TRADES BEFORE INSTALLING.
MECHANICAL CONTRACTOR SHALL COORDINATE WITH THEROOFING CONTRACTOR ALL COUNTER FLASHING REQUIREDAT ROOF CURBS.
MECHANICAL CONTRACTOR SHALL COORDINATE WITH THESTEEL ERECTOR AND ROOFING CONTRACTOR THEINSTALLATION OF ALL ROOF MOUNTED EQUIPMENT.
MECHANICAL CONTRACTOR IS RESPONSIBLE FORCOORDINATING SLOPE OF STRUCTURAL STEEL TO ALLOWROOF CURBS TO BE INSTALLED LEVEL.
ALL ROOFTOP UNITS AND CURBS TO BE INSTALLED LEVEL.ROOFTOP UNIT MFG. TO PROVIDE SEAL BETWEEN UNIT ANDCURB.
NO MECHANICAL EQUIPMENT THAT REQUIRES SERVICE(i.e. FANS, CONDENSING UNITS, ETC.) ON ROOF SHALL BECLOSER THAN 10'-6" TO EDGE OF BUILDING.
INSTALL CONDENSERS PER MANUFACTURER CLEARANCES.
MECHANICAL CONTRACTOR SHALL SUBMIT TO ARCHITECT/ENGINEER REFRIGERANT LINE SET DESIGN AND ROUTINGPER MANUFACTURER FOR REVIEW BEFORE INSTALLATIONBEGINS.
THE MECHANICAL CONTRACTOR SHALL APPLY ULTRA-VIOLET PROTECTIVE COATING OVER REFRIGERANTINSULATION PER MANUFACTURER.
COORDINATE ALL AIR HANDLERS, DUCTWORK, GRILLES,CONDENSING UNITS, AND NEW REFRIGERANT LINES WITHALL TRADES BEFORE INSTALLING.
7.
MECHANICAL PLAN NOTES:
1 PROVIDE A CONTROLLER FOR MECHANICAL EQUIPMENT TO BE CONTROLLED BY EMCS.
NEW AUTOMATED LOGIC EMCS TO BE PROVIDED WITH NEW CONTROLLERS TO EACHINDIVIDUAL MECHANICAL EQUIPMENT. NEW AND EXISTING. CONTRACTOR TO FIELDVERIFY EXISTING EQUIPMENT TO BE PICKED UP BY EMCS. NEW PIPING PACKAGES/CONTROL VALVES TO BE PROVIDED.
EXISTING CHILLER TOREMAIN.
RTU #LIB
AC #MDF
D
AC #IDF
1
1 1
1
1
1
EXISTING AC.
2
NEW CONDENSERS ON GROUND. MECHANICALCONTRACTOR TO PROVIDE 4" CONCRETE PAD.POUR IN PLACE LEVEL. ROUTE REFRIGERANTLINES NEATLY.
EMA Engineering and ConsultingTyler ▪ Austin ▪ HoustonPhone: 1-800-933-0538TBPE Firm Registration No. F-893www.estesmcclure.com
NEW WORK REQUIRED FOR INSTALLATION OF A COMPLETE AND WORKINGSYSTEM.
SUBMISSION OF BID WILL BE CONSIDERED ACKNOWLEDGMENT THAT THE
CONTRACTOR HAS VISITED THE SITE AND HAS VERIFIED ALL EXISTING JOBCONDITIONS AND INCLUDED ANY NECESSARY MODIFICATION TO EXISTING AND
Sheet No.Job No.
Drawn By:
Date:
Pro
ject
:
Copyright © 2017, Huckabee & Associates, Inc.
MR MH6.1
MECHANICAL ROOF PLAN
09/27/2017
1690-07-01
ML C
ISN
ER
OS
AD
MIN
IST
RA
TIO
N B
UIL
DIN
G R
EN
OV
AT
ION
SF
OR
LO
CK
HA
RT
I.S
.D.
LO
CK
HA
RT
, T
EX
AS
1/8" = 1'-0"1 MECHANICAL ROOF PLAN
Rev
isio
n /
Dat
e
110/1
8/1
7A
ddendum
#1
210/1
9/1
7A
ddendum
#2
1
///
///
/
/
/
//
/
///
///
///
///
///
///
///
///
/
/
/
/
/
/
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
/
/
/
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
//
/
///
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
///
///
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
/
/
/
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
/
/
/
///
///
///
///
///
///
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
///
///
/
/
/
/
/
/
/
/
/
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
//
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
/
/
/
///
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
//
/
/
/
/
///
/
/
/
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
/
/
/
///
///
///
///
/
/
/
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
///
/
/
/
/
/
/
/
/
/
/
/
/
//
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
O
O
O
O
O
O
O
O
O
O
//
l
l
l
///
///
///
///
///
///
///
/
/
/
/
/
/
///
///
/
/
/
/
/
/
//
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
/
/
/
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
OO
OO
OO
OO
OO
OO
OO
OO
OO
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
OO
OO
OO
OO
OO
X
X
X
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
/
/
/
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
///
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
///
/
/
/
///
///
///
///
///
///
///
/
/
/
/
/
/
///
/
/
/
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
///
/
/
/
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
/
/
/
///
///
///
///
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
///
///
///
///
///
///
/// ///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
l
l
O
O
O
OO
O
O
O
O
O
O
O O
O
O
O
l
l
l
l
l
l
l
ll
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
SS
SS
SS
SS
SS
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
Sheet No.Job No.
Drawn By:
Date:
Proj
ect:
Copyright © 2017, Huckabee & Associates, Inc.
Revis
ion
/Da
te
///
///
/
/
/
//
/
///
///
///
///
///
///
///
///
/
/
/
/
/
/
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
/
/
/
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
//
/
///
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
///
///
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
/
/
/
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
/
/
/
///
///
///
///
///
///
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
///
///
/
/
/
/
/
/
/
/
/
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
//
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
/
/
/
///
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
//
/
/
/
/
///
/
/
/
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
/
/
/
///
///
///
///
/
/
/
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
///
/
/
/
/
/
/
/
/
/
/
/
/
//
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
O
O
O
O
O
O
O
O
O
O
//
l
l
l
///
///
///
///
///
///
///
/
/
/
/
/
/
///
///
/
/
/
/
/
/
//
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
/
/
/
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
OO
OO
OO
OO
OO
OO
OO
OO
OO
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
OO
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
OO
OO
OO
OO
OO
X
X
X
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
/
/
/
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
///
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
///
/
/
/
///
///
///
///
///
///
///
/
/
/
/
/
/
///
/
/
/
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
///
/
/
/
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
/
/
/
/
/
/
///
///
///
///
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
///
///
///
///
///
///
/// ///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
///
l
l
O
O
O
OO
O
O
O
O
O
O
O O
O
O
O
l
l
l
l
l
l
l
ll
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
SS
SS
SS
SS
SS
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
Sheet No.Job No.
Drawn By:
Date:
Proj
ect:
Copyright © 2017, Huckabee & Associates, Inc.
Revis
ion
/Da
te
H1
RTU #LIB
EXISTING CHILLER TOREMAIN.
GH- 20,22,24
GH- 15,17
AC #MDF
MDP- 2,4,6
1
1
CL- 1
CL- 1
AC #IDFGH- 23,25
ON GROUND
ON GROUND
2
EMA Engineering and ConsultingTyler ▪ Austin ▪ HoustonPhone: 1-800-933-0538TBPE Firm Registration No. F-893www.estesmcclure.com
NEW WORK REQUIRED FOR INSTALLATION OF A COMPLETE AND WORKINGSYSTEM.
SUBMISSION OF BID WILL BE CONSIDERED ACKNOWLEDGMENT THAT THECONTRACTOR HAS VISITED THE SITE AND HAS VERIFIED ALL EXISTING JOBCONDITIONS AND INCLUDED ANY NECESSARY MODIFICATION TO EXISTING AND
Sheet No.Job No.
Drawn By:
Date:
Pro
ject
:
Copyright © 2017, Huckabee & Associates, Inc.
KJL EP6.1
ELECTRICAL ROOF PLAN
09/27/2017
1690-07-01
ML C
ISN
ER
OS
AD
MIN
IST
RA
TIO
N B
UIL
DIN
G R
EN
OV
AT
ION
SF
OR
LO
CK
HA
RT
I.S
.D.
LO
CK
HA
RT
, TE
XA
S
1/8" = 1'-0"1 ELECTRICAL ROOF PLAN
SEE SHEET EP0.1 FOR GENERAL NOTES AND PLAN NOTES APPLICABLE TO THE ENTIREDRAWING SET.
ELECTRICAL GENERAL NOTES(SOME NOTES MAY NOT BE USED)
1.
Rev
isio
n /
Dat
e
21
0/1
9/1
7A
ddendum
#2
EMA Engineering and ConsultingTyler ▪ Austin ▪ HoustonPhone: 1-800-933-0538TBPE Firm Registration No. F-893www.estesmcclure.com
NEW WORK REQUIRED FOR INSTALLATION OF A COMPLETE AND WORKINGSYSTEM.
SUBMISSION OF BID WILL BE CONSIDERED ACKNOWLEDGMENT THAT THE
CONTRACTOR HAS VISITED THE SITE AND HAS VERIFIED ALL EXISTING JOBCONDITIONS AND INCLUDED ANY NECESSARY MODIFICATION TO EXISTING AND
Sheet No.Job No.
Drawn By:
Date:
Pro
ject
:
Copyright © 2017, Huckabee & Associates, Inc.
SSW EL8.1
ELECTRICAL LIGHTING
LUMINAIRE SCHEDULE
09/27/2017
1690-07-01
ML C
ISN
ER
OS
AD
MIN
IST
RA
TIO
N B
UIL
DIN
G R
EN
OV
AT
ION
SF
OR
LO
CK
HA
RT
I.S
.D.
LO
CK
HA
RT
, T
EX
AS
ML CISNEROS ADMINISTRATION BUILDING RENOVATIONS ML CISNEROS ADMINISTRATION BUILDING RENOVATIONS
TYPE
MARK MOUNTING DESCRIPTION PART NUMBER EQUAL #1
PART NUMBER
EQUAL #2
PART NUMBER
EQUAL #3
PART NUMBER
EQUAL #4
PART NUMBER
EQUAL #5 VOLTAGE
MAX
VA
A 2 x 4 TROFFER, GENERAL PURPOSE LITHONIA#2BLT4-30L-ADP-MVOLT-EZ1-LP8XX
COLUMBIA EQUAL METALUX EQUAL HEW EQUAL DAYBRITE EQUAL 277 V 30 VA
A1F GYP 1 x 4 TROFFER, GENERAL PURPOSE LITHONIA#BLT4-30L-ADP-MVOLT-EZ1-DGA14-LP8XX
COLUMBIA LLT SERIESEQUAL
METALUX EQUAL HEW EQUAL DAYBRITE EQUAL 277 V 30 VA
A1FE GYP 1 x 4 TROFFER, GENERAL PURPOSE LITHONIA#BLT4-30L-ADP-MVOLT-EZ1-DGA14-LP8XX-EL14L
COLUMBIA ELLT SERIESEQUAL
METALUX EQUAL HEW EQUAL DAYBRITE EQUAL 277 V 30 VA
A23 T-GRID 2 x 2 TROFFER, GENERAL PURPOSE LITHONIA#2BLT2-33L-ADP-MVOLT-EZ1-LP8XX
COLUMBIA EQUAL METALUX EQUAL HEW EQUAL DAYBRITE EQUAL 277 V 30 VA
A24 T-GRID 2 x 2 TROFFER, GENERAL PURPOSE LITHONIA#2BLT2-40L-ADP-MVOLT-EZ1-LP8XX
COLUMBIA EQUAL METALUX EQUAL HEW EQUAL DAYBRITE EQUAL 277 V 40 VA
AE 2 x 4 TROFFER, GENERAL PURPOSE LITHONIA#2BLT4-30L-ADP-MVOLT-EZ1-LP8XX-EL14L
COLUMBIA EQUAL METALUX EQUAL HEW EQUAL DAYBRITE EQUAL 277 V 30 VA
AF GYP 2 x 4 TROFFER, GENERAL PURPOSE LITHONIA#2BLT4-30L-ADP-MVOLT-EZ1-LP8XX-DGA24
COLUMBIA EQUAL METALUX EQUAL HEW EQUAL DAYBRITE EQUAL 277 V 30 VA
AFE GYP 2 x 4 TROFFER, GENERAL PURPOSE LITHONIA#2BLT4-30L-ADP-MVOLT-EZ1-LP8XX-DGA24-EL14L
COLUMBIA EQUAL METALUX EQUAL HEW EQUAL DAYBRITE EQUAL 277 V 30 VA
AS GYP 2 x 4 TROFFER, GENERAL PURPOSE LITHONIA#2BLTX4-30L-ADP-MVOLT-EZ1-LP8XX
COLUMBIA EQUAL METALUX EQUAL HEW EQUAL DAYBRITE EQUAL 277 V 30 VA
ASE GYP 2 x 4 TROFFER, GENERAL PURPOSE LITHONIA#2BLTX4-30L-ADP-MVOLT-EZ1-LP8XX-EL14L
COLUMBIA EQUAL METALUX EQUAL HEW EQUAL DAYBRITE EQUAL 277 V 30 VA
B T-GRID 2 x 4 TROFFER, GENERAL PURPOSE LITHONIA#2BLT4-48L-ADP-MVOLT-EZ1-LP8XX
COLUMBIA EQUAL METALUX EQUAL HEW EQUAL DAYBRITE EQUAL 277 V 34 VA
BE T-GRID 2 x 4 TROFFER, GENERAL PURPOSE LITHONIA#2BLT4-48L-ADP-MVOLT-EZ1-LP8XX-EL14L
COLUMBIA EQUAL METALUX EQUAL HEW EQUAL DAYBRITE EQUAL 277 V 34 VA
D SURFACE, CHAIN 4' FIBERGLASS STRIP LITHONIA#FEM-L48-4000LM-LPAFL-MD-MVOLT-GZ10-XXK-80CRI-MHHK120
COLUMBIA EQUAL METALUX EQUAL HEW EQUAL DAYBRITE EQUAL 277 V 31 VA
DE SURFACE, CHAIN 4' FIBERGLASS STRIP WITH EMERGENCYBATTERY
LITHONIA#FEM-L48-4000LM-LPAFL-MD-MVOLT-GZ10-XXK-80CRI-BSL722-MHHK120
COLUMBIA EQUAL METALUX EQUAL HEW EQUAL DAYBRITE EQUAL 277 V 31 VA
F T-GRID/GYP OPEN REFLECTOR CF TRT 6" DOWNLIGHT GOTHAM #EVO-XX/10-6AR-MD-LSS PRESCOLITE#LF6LEDG4-6LFLED5G4
PORTFOLIO#LD6A-10-D010TE-ERM6A10-8-40-6LM0-LI
SPECTRUM#RDFO6LEDXT-13L/XX-RD6FSG
LOL#C6L10NUVBZ10V/C6L10DLXXWCCLPVB
277 V 12 VA
F2 T-GRID/GYP OPEN REFLECTOR CF TRT 6" DOWNLIGHT GOTHAM #EVO-XX/20-6AR PRESCOLITE#LF6LEDG4-6LFLED6G4
PORTFOLIO#LD6A-15-D010TE-ERM6A15-8-40-6LM0-LI
SPECTRUM#RDFO6LEDXT-20L/XX-RD6FSG
LOL#C6L15NUVBZ10V/C6L1520DLXXCCLVB
277 V 19 VA
F2E T-GRID/GYP OPEN REFLECTOR CF TRT 6" DOWNLIGHT GOTHAM #EVO-XX/20-6AR PRESCOLITE#LF6LEDG4-6LFLED6G4
PORTFOLIO#LD6A-15-D010TE-ERM6A15-8-40-6LM0-LI
SPECTRUM#RDFO6LEDXT-20L/XX-RD6FSG
LOL#C6L15NUVBZ10V/C6L1520DLXXCCLVB
277 V 19 VA
FE T-GRID/GYP OPEN REFLECTOR CF TRT 6" DOWNLIGHT GOTHAM #EVO-XX/10-6AR-MD-LSS-EL PRESCOLITE#LF6LEDG4-EMR-6LFLED5G4
PORTFOLIO#LD6A-10-D010TE-EMBOD-ERM6A10-8-40-6LM0-LI
SPECTRUM#RDFO6LEDXT-13L/XX-EM-RD6FSG
LOL#C6L10NUVBZ10VEM/C6L10DLXXWCCLPVB
277 V 12 VA
P PENDANT DIRECT LINEAR PENDANT VISA #CP4515-L40K-H-26" (FIELDVERIFY OVERALL HEIGHT)
METALUX EQUAL COLUMBIA EQUAL PHILLIPS EQUAL HEW EQUAL 277 V 38 VA
P4 CABLE LINEAR LED PENDANT LITHONIA#GRD-LLP-4FT-MSL4-80CRI-40K-ID1500LMF-0/100-MIN10-ZT-277V-SCT-F2/24A
ALERA EQUAL CORELITE EQUAL HEW EQUAL LEDALITE EQUAL 277 V 51 VA
P4E CABLE LINEAR LED PENDANT LITHONIA#GRD-LLP-4FT-MSL4-80CRI-40K-ID1500LMF-0/100-MIN10-ZT-277V-SCT-1EC-F2/24A
ALERA EQUAL CORELITE EQUAL HEW EQUAL LEDALITE EQUAL 277 V 51 VA
P8E CABLE LINEAR LED PENDANT LITHONIA#GRD-LLP-8FT-MSL8-80CRI-40K-ID1500LMF-0/100-MIN10-ZT-277V-SCT-1EC-F2/24A
ALERA EQUAL CORELITE EQUAL HEW EQUAL LEDALITE EQUAL 277 V 102 VA
R POLE LED POST TOP RETROFIT LEIGHT BULB TOPAZ #LPT36/850/INT/E26 NO EQUAL NO EQUAL NO EQUAL NO EQUAL 277 V 36 VA
S WALL/CEILING ARCHITECTURAL LED WALL PACK, DARKSKIES COMPLIANT
NO EQUAL KENALL#MR13FFD-PP-XX-20LXXK-DV
LUMINAIRE LED#APX13-25W-XX-UNV-FL-DIM-SHCAB
NO EQUAL NO EQUAL 277 V 24 VA
SE WALL/CEILING ARCHITECTURAL LED WALL PACK, DARKSKIES COMPLIANT
NO EQUAL KENALL#MR13FFD-PP-XX-20LXXK-DV-LEL
LUMINAIRE LED#APX13-25W-XX-UNV-FL-DIM-SHCAB-EMB310
NO EQUAL NO EQUAL 277 V 24 VA
X WALL MOUNTED SPEC GRADE LED EXIT FIXTURE LITHONIA #LQC-1-R-ELN DUAL-LITE #SESRBNE SURE-LITES #CX-7-1-SD MULE EQUAL CHLORIDE #SC-N-U-R-W-IC 277 V 2 VA
Z2F POLE HIGH PERFORMANCE AREA LIGHT LITHONIA#DSX1-LED-60C-1000-XXK-TFTM-XX
COLUMBIA EQUAL MCGRAW EDISON#GLEON-AF-04-LED-XX-T2-XX-800-MS/X-L40 / SSS5M25SXN2 /TMP1 / AB1
PHILIPS EQUAL GE EQUAL 480 V 418 VA
ZF POLE HIGH PERFORMANCE AREA LIGHT LITHONIA#DSX1-LED-60C-1000-XXK-TFTM-XX-SPA-DF-PIRH/SSS-25-5G-DM19AS POLE
COLUMBIA EQUAL MCGRAW EDISON EQUAL PHILIPS EQUAL GE EQUAL 480 V 209 VA
ZZZ NO SUBSTITUTES TO ANY LISTED FIXTUREWILL BE ACCEPTED
Rev
isio
n /
Dat
e
110/1
8/1
7A
ddendum
#1
210/1
9/1
7A
ddendum
#2
1
1
2
L
LL
LL
L
LL
LLL
L
L
L
L
L
L
L LLS S S S S
L S
L
S
L L
L
F
FF
L
L
L
V
L
S H
L L
S
75
S
30S
75
115
115
EB
S
1S
DS
R
WL
WL
WLWL
WL
WL
WL
WL
WL
WL
WL
2
2
2
2
2
2
2
2
22
2
2
2
2
2
2
2
22
2
2
2
2
2
2
S
S S
S S
S S
S S
2
2
200B.3
2
2
2
2
COLLAB AND MODELING
208
CORRIDOR
231
ADMIN.
209
ASST. SUPER. FOR C&I
210
STORAGE
209A
ASST. SUPER.
215
CONFERENCE ROOM
211
WORK ROOM
213
OPEN OFFICE
218
EXEC. DIRECTOR OF STUDENTSERVICES
222
MEDICAID
219
DIAGNOSTICIANS
221SPECIAL ED. COORD. / DIAG
220
SPEC. EDUCATION FILES
223
UTILITY
233
ADMIN.
224
STORAGE
224A
ASST. SUPER.
225
PUBLIC INFO.
226
EXEC. ADMIN.
227
CONFERENCE
229SUPER.
228
CORRIDOR
200B
BOARD ROOM
200
CONTROL/IDF
200A
BREAK ROOM
230
JANITOR
204
WAITING AREA
201
RESTROOM
202
RESTROOM
203
ESL COORD.
217
EXPANSION
206
PIEMS
205
STORAGE
207
UTILITY
232
ADMIN.
214
STAIR
231A
UTILITY CLOSET
232A
UTILITY CLOSET
233A
STAIR
231B
EXPANSION
212
ESL COACH
2162
2
2
WL
22
2
2
2
2
S
WL
2
3
4
2
2
2
2
2
3
4
STORAGE
201A
2
2
22
2
PODIUM
S
S
S
7
7
7
6 6
6
28
5
5
5
22
2
11
12
11
9
9 10
S
S S
DAIS
J
WALL 1
WALL 2
WALL 3
CAM 1
CAM 2
CAM 3
TOP OF SHAFT
13
14
114
1
14
14
14
1414
14
14 1
1
1
1
1
14
1
14
1
14
1
14 1
14
14
14 14 14
1
1
141
141
14
1
141
1414 14
14
14
1414
14
1
1
1
151
15 1
15
2
EMA Engineering and ConsultingTyler ▪ Austin ▪ HoustonPhone: 1-800-933-0538TBPE Firm Registration No. F-893www.estesmcclure.com
NEW WORK REQUIRED FOR INSTALLATION OF A COMPLETE AND WORKING
SYSTEM.
SUBMISSION OF BID WILL BE CONSIDERED ACKNOWLEDGMENT THAT THE
CONTRACTOR HAS VISITED THE SITE AND HAS VERIFIED ALL EXISTING JOB
CONDITIONS AND INCLUDED ANY NECESSARY MODIFICATION TO EXISTING AND
Sheet No.Job No.
Drawn By:
Date:
Pro
ject
:
Copyright © 2017, Huckabee & Associates, Inc.
JAP
ET1.2
ELECTRICAL
COMMUNICATIONS FLOOR
PLAN - SECTION 2
09/27/2017
1690-07-01
ML C
ISN
ER
OS
AD
MIN
IST
RA
TIO
N B
UIL
DIN
G R
EN
OV
AT
ION
S
FO
R
LO
CK
HA
RT
I.S
.D.
LO
CK
HA
RT
, T
EX
AS
1/8" = 1'-0"1
ELECTRICAL COMMUNICATION FLOOR PLAN - SECTION 2
1. ELECTRICAL CONTRACTOR SHALL PROVIDE ALL CONDUIT AND STANDARD
BACKBOXES FOR SYSTEMS SHOWN ON THIS DRAWING IN BASE PROPOSAL.
2. IN ANY EXPOSED AREAS SUCH AS GYMNASIUMS, SHOPS, FIELDS HOUSES,
JANITORS CLOSETS, OR MECHANICAL/ELECTRICAL ROOMS ALL LOW VOLTAGE
CABLING SHALL BE ENCLOSED IN CONDUIT.
3. ALL COMMUNICATIONS CABLING SHALL RUN DOWN THE CORRIDORS AND
BRANCH OFF TO EACH CLASSROOM. TRUNKING SHALL BE RAN PRIMARILY
PERPENDICULAR TO BUILDING WALLS AND SHALL NOT BE RAN OVER
CLASSROOMS.
4. WHERE NO FINISHED CEILINGS ARE SCHEDULED ALL DEVICES, CONDUIT, AND
BACKBOXES SHALL BE INSTALLED UP AGAINST BOTTOM OF DECK AND SHALL NOT
PROTRUDE BELOW BOTTOM OF STEEL. THE ARCHITECT SHALL APPROVE ALL
ROUTING OF ALL EXPOSED ROUGH-INS PRIOR TO PLACEMENT.
5. ANY SIGNAL, OUTLET OR OTHER DEVICE MOUNTED ON A COLUMN, PILASTER,
OR SIMILAR WALL OFFSET SHALL BE CENTERED.
6. COORDINATE MOUNTING HEIGHT OF DEVICES ABOVE MILLWORK WITH
ARCHITECTURAL PLANS.
7. VERIFY MARKERBOARD, TACKBOARD, AND DOOR SWING LOCATIONS WITH
ARCHITECTURAL PLANS - DO NOT INSTALL DEVICES IN THESE AREAS.
8. COORDINATE EXACT LOCATION OF ALL DEVICES, ETC. INSTALLED IN MOVEABLE
FURNITURE WITH ARCHITECT AND OWNER.
9. CONFIRM ALL COMMUNICATIONS DEVICE LOCATIONS WITH ARCHITECT PRIOR
TO ROUGH-IN. THE ARCHITECT RESERVES THE RIGHT TO LOCATE DEVICES
ANYWHERE WITHIN EACH ROOM AND DETERMINE SURFACE RACEWAY ROUTING IF
APPLICABLE.
10. COORDINATE EXACT MECHANICAL EQUIPMENT LOCATION AND TYPE WITH
MECHANICAL PLANS AND MECHANICAL CONTRACTOR. DO NOT INSTALL CONDUIT
WITHIN 3'-0" OF ANY HVAC DEVICE UNLESS THE DEVICE SERVES THAT UNIT.
11. FIRE ALARM CONTRACTOR SHALL PROVIDE DUCT MOUNTED SMOKE
DETECTORS AND CONTROL RELAYS WHERE REQUIRED. MECHANICAL
CONTRACTOR SHALL INSTALL HOUSING AND SAMPLE TUBES IN DUCT. FIRE ALARM
CONTRACTOR TO PROVIDE LOW VOLTAGE CONNECTION TO FIRE ALARM.
12. FIRE ALARM CONTRACTOR SHALL VERIFY CIRCUIT STYLE, QUANTITY, AND
LOCATIONS OF DEVICES TO MEET ALL APPLICABLE CODES, LAWS, AND ALL
REQUIREMENTS OF THE LOCAL AUTHORITY HAVING JURISDICTION FOR INCLUSION
IN BASE PROPOSAL.
13. REFER TO SPECIFICATION DIVISION 27 AND 28 FOR ADDITIONAL INFORMATION.
ELECTRICAL COMMUNICATION
GENERAL NOTES
N
PLAN
2
N.T.S.
KEY PLAN - 2ND FLOOR
PROVIDE TWO 2" HOLES CORE DRILLED IN FLOOR FOR COMMUNICATIONS CABLING
BETWEEN FLOORS.
PROVIDE POKE-THRUS WITH 2" CONDUIT STUBBED UP UNDER WALL MOUNTED
EQUIPMENT RACK FOR POINT TO POINT CONNECTIONS FROM DAIS TO CONTROL ROOM.
EXTEND TWO 1" CONDUIT FROM ACCESSIBLE SPACE ABOVE DROP CEILING, DOWN
INSIDE WALL, AND UNDER SLAB TO FLOOR BOX. PROVIDE POWER AND DATA TO FLOOR
BOX THROUGH SEPARATE CONDUITS UNDER SLAB.
MOUNT DEVICE 6" ABOVE MILLWORK BACKSPLASH.
A/V PLATE FOR HDMI AND VGA INPUT.
A/V PLATE FOR HDMI OUTPUT AND CONTROL.
SUBWOOFER FOR SOUND REINFORCEMENT SYSTEM.
DATA DROP TO BE ROUTED TO A/V EQUIPMENT RACK.
JUNCTION BOX AT 44" A.F.F. FOR TOUCH PANEL.
WALL MOUNT EQUIPMENT RACK.
LOCAL PTZ CAMERA.
LOCAL FIXED CAMERA.
DATA RECEPTACLE FOR ELEVATOR LOBBY EMERGENCY TWO-WAY COMMUNICATIONS.
SEE DETAIL.
ELECTRICIAN TO PROVIDE SURFACE MOUNT RACEWAY TO THIS LOCATION.
PROVIDE MANUAL PROJECTOR SCREEN. REFER TO SPECIFICATIONS FOR MORE
DETAILS.
ELECTRICAL COMMUNICATION
PLAN NOTES
1
2
3
4
5
6
7
8
9
10
11
12
Rev
isio
n /
Dat
e
110/1
8/1
7A
ddendum
#1
210/1
9/1
7A
ddendum
#2
13
14
15
1
2