Karolinska sustainability challenges
ACCESSABILTY
CONSUMABLES
WASTE
ENERGY
FOOD
CHEMICALS
PHARMACEUTICALS
TRANSPORTS
WORKING ENVIRONMENT
2 NKS - state of the art hospital buildning
PLANNED HOSPITAL BEDS 2018
Total of 715 in-patient beds *
629 beds in the new hospital building
86 beds in other buildings on the hospital grounds
Total of 287 outpatient treatment rooms
140 outpatient treatment rooms in the new hospital building
147 outpatient treatment rooms in other site buildings
Total of 129 day care rooms
103 day care rooms in the new hospital building
26 day care rooms in other buildings on the hospital grounds
Total of 43 operating theatres
35 operating theatres, of which 5 in the new hospital building
are hybrid theatres
8 operating theatres in other buildings on the hospital
grounds
TARGET HEALTHCARE PRODUCTION 2018
50,000 care episodes per year
36,500 care episodes adult patients
13,500 care episodes child patients
25,000 – 30,000 acute visits adults
approx. 35,000 acute visits children
KAROLINSKA UNIVERSITY HOSPITAL 2018
Some speciality room resource available in addition
* number of beds including psychiatry
3 NKS - state of the art hospital buildning
Concept
is launched
by the County Council's
Board of Directors
“3S
enquiry”
Project
programme
2001 20052004 2007
SNUS
enquiry
2002
Design
competition prize awarded
White Winner
2006
Decision for
new university
hospital
Design
competition
Decision to
build NKS
Decision for PPP
procurement
PPP procurement
starts
2008 2010
PPP procurement
complete, agreement signed
Construction start
2013 2017
Decision on
FHS and NKS
business
content
Hospital construction
complete
(autumn)
The hospital
opens
20162012
Karolinska
University
Hospital is
tasked with
planning the
business
content
FROM CONCEPT TO NEW HOSPITAL IN 16 YEARS
5 NKS - state of the art hospital buildning
Together towards a world class
sustainable hospitalSLL vision 2015 for NKS
• Climate neutral
• Energy effecient buildings
• Environmental 3rd part certified buildings
• Healthy indoor environment
• Sustainable materials and use of resources
• Transports with low environmental impact
• Minimize waste generation
6 NKS - state of the art hospital buildning
Facts and figures
NKS - state of the art hospital buildning7
• Gross total area: 330.000 sq.m.
• No. of floors: up to 12
• 630 single patient rooms
• Construction time: July 2010 – March
2018 (first opening in 2016)
• The largest project ever for the
Stockholm County Council, and for
Skanska
• Sweden’s first Public-Private
Partnership (PPP) for a hospital, and
one of the first of any kind
Energy efficiancy
NKS - state of the art hospital buildning8
100 % of the electricity from
renewable energy production with
low CO2 emissions. 20 % from
wind turbin power.
Local energy production =
geothermal borehole
District heating and cooling from
biomass, waste and other
renewable sources
Figures: 40 % less bought energy
compared to BBR, 110 kWh/m2.
Produce 65 %, buy 10 % district
heating and 25 % district cooling
NKS - state of the art hospital buildning9
Heat
Pump
Heating and cooling
from Boreholes
Heat and Cool storage
Cooling for process and comfort cooling.
Heating for hot water and heating
Heat recovery from equipment and
facilitySolar Panels
Technical Building
Renewable energy from district
heating and cooling
220 m deep
boreholes
Hospital building
Renewable electricity
Energy efficiancy
NKS - state of the art hospital buildning10
High performance glass and
envelope max U-value 0,5 W/m2 K
Double glass layers in the façade
Designing for daylight, air
tightness, solar radiation and heat
loss factor
Automatic shading curtains
Healthy indoor environment
1. Single patient rooms with controls of the climate
2. Environmental approved material
3. Questionnaire
4. Ventilation requirement
5. Dayligh factor ≥1,2
6. Radon in the indoor air max 50 Bq/m3
7. Moisture Safety Management according to Bygga F
8. Formaldehyde in the indoor air <0.04 mg/m3
9. Accoustic clas B/C
10. Thermal comfort
11 NKS - state of the art hospital buildning
Green FM• Green roof
• Water consumption 20% under norm
• Environmental friendly transportation
to, from and within the hospital
• Pedestrian and bikeways and
sharing station for electrical cars
• Internal logistic system for AGV and
pneumatic tube post
• Waste to be sorted in 35 fractions
• No installed irrigation system
12 NKS - state of the art hospital buildning
Miljöbyggnad – NKS will get Gold
• Swedish certification system
Sweden Green Building Council, 3rd party
• Focus areas
Energy, Indoor Environment and Chemical substances
• 4 certification levels
Gold, Silver, Bronze, Certified
13
13 NKS - state of the art hospital buildning
LEED GOLDLeadership in Energy and Environmental Design
• Independent 3rd Party Certification
USGBC – U.S. Green Building Council
• Includes 6 categories8 mandatory requirements
110 total points that can achieve
• 4 certification levelsPlatinum, Gold, Silver, Certified
• Holistic approach to the building’s
environmental performance
• NKS have achieved Gold for 1 building, 3
gold certifications left to do
14 NKS - state of the art hospital buildning
Sustainability in clinical work
Two important activities
• Procurement
• Adapt our ways of working
15 NKS - state of the art hospital buildning
Home titration
NKS - state of the art hospital buildning16
Length of
treatment
Number of meetings
Patient - Doctor
Spent doctor
time
Before Inpatient 9 days 31,5 315 min
After Telemedicine at
home3 days 9 90 min