Project Report
ON
STUDY MASS IMBALANCE GENERATED THROUGH
VARIOUS CRANK MACHINING PROCESSES AND TO
ESTABLISH CUT OFF IN MASS CENTERING MACHINE
FOR OPTIMUM VALUES
IN MASS BALANCING
BY
NITIN SARASWAT (0606340052)
In partial fulfillment of requirement for the award of degree in
Bachelor of Technology in Mechanical Engineering
(2010)
Under the Project Guidance of
Mr. LOKESH JAISWAL
(TATA CUMMINS LIMITED, JAMSHEDPUR)
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 3/63
Acknowledgement
I take this opportunity to convey my heartful thanks to th
management of TATA CUMMINS Ltd for providing me with
an
opportunity to Undergo summer training for 4-weeks insuch
an excellent plant.
I would like to express special thanks to :
Mr.Pankaj Saraswat for helping me in joining TCL as a
VT.
Mr. Lokesh Jaiswal my project guide who provided me
with the required guidance for planning and
successfully completing my project.
All the managers of the crank shaft line specially Mr.Anurag
Satsangi and Mr. Ramphal Nehra who helped me in
understanding the line and its working.
And to all the associates at crank shaft line who supported me
throughout my project.
I enjoyed my sojourn at TATA CUMMINS LTD and this would be
in my pleasant memories that I shall take back to my college.
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 4/63
NITIN SARASWAT
G.L.A.I.T.M.
Mathura2
INDEX
Acknowledgement 2
Company Profile 4Business Units (BU) 19Engine Parts 21 The Crank Shaft line 23Project Overview
27Operational Overview 34
Data Analysis 51Conclusions 53Suggestions 54
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 5/63
COMPANY OVERVIEW
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 6/63
4
TATA CUMMINS AT A GLANCE
Tata Cummins Ltd. is a 50-50 joint venture between Tata Motors and Cummins
Engine Co., Inc banker/investor W G Irwin supplied the capital for a local self taught
mechanic and inventor Clessie Cummins to begin manufacturing diesel engines.
Working out of an old cereal mill in Columbus, the first engine made by Cummins was a
Dutch designed, six horsepower, farm type diesel. By 1925, the company had begun
producing its own design with enough success that operations were relocated to a new
larger site where the Columbus Engine Plant is now located. It was here that Cummins
created the breakthroughs that solved critical problems of injection timing and
introduced a successful marine engine, originally installed in shrimp boats. The engine
proved so economical that its popularity soon spread to other applications, including
generator sets, drills, power shovels and air compressors.
Today with 45 manufacturing units in 13 countries, and worldwide distribution,
Cummins Engine Company Inc. is a largest independent manufacturer of dieselengines. The company provides products and services for customers in markets
worldwide for engines, power generation and filtration, including engine components,
natural gas engines, filtration systems and information products and services.
Our other partner Tata Motors is the largest manufacturer of commercial vehicles
in India. Tata Motors was established in Jamshedpur in 1945, with the agenda of
manufacturing steam locomotives. In 1954, the company expanded into automobile
manufacturing, through collaboration with Daimler-Benz of Germany. By the end of the
collaboration in 1969, Tata Motors had fully developed the capacity of designing and
manufacturing Medium Commercial Vehicles– taking the first step towardsindigenization. Tata Motors manufactures an entire range of Heavy, Medium and Light
Commercial Vehicles, Multi-Utility Vehicles and Passenger Cars. Tata Motors occupies
70% of the market share. Tata Motors has 4 plants: Jamshedpur, Pune, Lucknow, and
at Dharwad. The Tata Motors Plant at Jamshedpur Plant commenced production on
June 1, 1945.
Tata Cummins is a joint venture between these two world leaders. The agreement was
signed in July 1993 with plant construction starting in the industrial township of
Jharkhand-Jamshedpur in April 1994 and commercial production commenced on
January 1 1996. The entire organization has been set up from scratch at a Greenfield
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 7/63
site. The Rs 300 crore projects widely acknowledged to be the fastest implementation of
its size and nature (within budget) in the industry and within Cummins family worldwide.
VISION
Making people’s lives better by unleashing the Power of Cummins
MISSION
Motivating people to act like owners working together
Exceeding customer expectations by always being the first to market
with the best products
Partnering with our customers to make sure they succeed
Demanding that everything we do leads to a cleaner, healthier, safer environment
Creating wealth for all stake holders.
CORE VALUES:
What do we value?
• Integrity: Strive to do what is right and do what we say we will do
• Innovation: Apply the creative ingenuity necessary to make us better,
Faster, first
• Delivering Superior Results : Exceed expectations consistently
• Corporate Responsibility: Serve and improve the communities in
which we live
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 8/63
• Diversity: Embrace the diverse perspectives of all people and honor
with both dignity and respect
• Global involvement: Seek a world view and act without boundaries
6
What is Tata Cummins personality?
• Decisive
• Driven to win
• Agile
• Passionate
• Caring
What business are Tata Cummins in?
• Unleashing the power to enrich people's lives.
• Everyday. Everywhere. Everyway.
What makes them unique from competitors?
• Understand and satisfy end customers' needs best
• Easiest to do business with
• Best value
o innovative technology
o outstanding customer support
o winning partnerships
o world renowned brands
• Relentless cost reduction• Broadest and most capable global network
• Our people do whatever it takes
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 9/63
7
Tata Cummins Ltd. Products and Market:
TCL manufactures 4 and 6 cylinder versions of Cummins B series engines with a number
of ratings between 75 and 250 HP. Our Automotive B-Series Diesel engines are EURO-I and
Euro-II compliant. We have also demonstrated our capability to manufacture EURO-III
engines. The B series engine is the most popular engine in its range in the world with an
extremely simple and robust design. Our primary market is the Indian commercial vehicle
business. Tata Motors is our largest customer and ‘delivery partner’. Tata Motors entire fleet
of Medium and Heavy Commercial Vehicles uses TCL built engines. We also manufacture
base engines for power generation and construction equipment markets and supply them
through Cummins India Limited. In Automotive application our engines are used on 25
different vehicle models, ranging from 7T to 40 T GVW and wheel base from 3.2 m to 5.9 m.
These vehicles are used in applications such as bus, truck, tipper, trailer & car carrier. Our
industrial B-Series engines are used in excavators produced by Telcon (earlier known as
Construction Equipment Business Unit of Tata Motors) and also on industrial applications of
Ingersoll Rand. Besides, the engines are sold in Genset market for 85KVA power rating
through Cummins India Limited.
The Infrastructure:
TCL is one of the most modern diesel engine plants in the world with state of the art
facility. The plant is fully air conditioned with a computerized Building Management Systemfor safety and energy conservation. In an engine there are approx 370 components, of which
5 components are machined in house. These components are Cylinder Block, Cylinder Head,
Crank Shaft, Cam Shaft & Connecting Rod, which are machined on modern machining lines
with the best measuring and gauging possible for consistent quality. These 5 components
and other bought out finished (BOF) components are assembled in a state of the art
Automated Electrified Monorail assembly system combined with computer controlled
Assembly Management System (AMS), failsaifing and in process verification (IPV) at each
station assuring “build in quality”. The plant has the capacity to produce 120,000 engines per
year.
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 10/63
Organizational Tree/Structure:
Structurally the organization is divided into business units and functional units that operate
with a fair degree of autonomy. There exists cross-functional teams -the Company
Leadership Team and Plant Operating Team, which provides strategic direction at businessand departmental levels. The Company Leadership Team consists of the MD, the Vice
Presidents, and the General Managers & Asstt. General Managers of different departments
and the Plant Operating Team consist of all Business/Functional Unit Leaders.
The plant has 828 employees consisting of 152 staff at managerial levels and 676 at
Associate levels. All the associates in shop floor work in teams.
COMPANY LEADERSHIP TEAM
PLANT OPERATING TEAM
SR.MANAGERS/MANAGERS
ASSOCIATES
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 11/63
9
FUNCTIONAL SUMMARY
SHOP OPERATIONS
Tata Cummins has an installed capacity of manufacturing 60000 engines of multi model
mix in a year. For manufacturing these products the entire shop operations is divided into 2
parts- the machining process and assembling, painting & testing process. These two
activities are carried out in separate units within the company and called the Business
Units. There are in total 6 Business Units. These Business Units are responsible for
manufacturing a complete identifiable product of its own. Amongst these 6 Business units 4
are for machining process of the five major components viz. Conrod & Cam Shaft, Crank
Shaft, Cylinder Head & Cylinder Block. The other two Business Unit are for assembling,
painting and testing of the final product. In the machining Business units castings and
forgings supplied by external suppliers are machined as per the technical requirements
through various types of CNC machines. The assembly, painting & testing Business units
assemble the 5 components machined in-house and approximately 400 BOF components,
then paint and test in a highly automated plant.
Each of the Business Unit function as a profit centre within the company. They enjoy fair
amount of autonomy, responsibility & accountability in achieving their target. Each of the
Business Unit has associates working in teams facilitated by set of managers headed by a
Business Unit Leader. These managers look after the production activities besides their
area of core competence i.e. planning, maintenance & quality.
HUMAN RESOURCE
The HR function is responsible to provide a framework for attracting, developing and
retaining employees in the organization. The function includes the area of Personnel &
administration, Industrial Relations, safety, communication, community involvement as well
as the employee development, diversity, organizational development, etc. elements. The
function not only ensures that the right talent is attracted, deployed and further moulded to
the organizational requirements, it also takes care of the individual growth in line with
organizational and ABO requirements and provides all necessary conditions and facilities to
ensure employee satisfaction. HR functional co-ordinates with Tata Motors for sharing of
infrastructure and Township related facilities like schools, clubs, hospitals, etc. The function
facilitates all the contracts management of the company. The function is responsible for liaison with Government Departments and Agencies with respect to Industrial Laws,
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 12/63
Pollution Control and Environment related laws and is also responsible for ensuring
compliance with the requirements of these laws.
10
INFORMATION TECHNOLOGY
Information Technology comprising of hardware, software, communication and
networking is a critical part of the manufacturing and management processes. Information
Technology ensures that the critical data and information are available as decision
making tools and contributes significantly to the productivity of the manufacturing and
management processes. From this viewpoint the quality and delivery of appropriate
information technology and business automation infrastructure and solutions to the
different Business Units and functions is critical to the workflow process. There are
approximately 20 servers, 300 PCs connected on LAN & WAN, 256 telephone internal
exchange, 30 wireless communication sets, 60 residential telephone connections, 3 fax
machines and 2 photocopiers to provide the IT services in terms of hardware. In terms of
software it uses Oracle as RDBMS, Unix and NT Windows operating systems, forms 6i,
reports 6i as front-end, and Oracle 11i as ERP. In order to effectively provide the IT,Office Automation and Communication services the IT function is organised into two
groups Software development and Hardware & Networking.
FINANCE
The finance function is responsible for arranging borrowed funds at cost effective rates,
effecting payments to all agencies viz. suppliers, employees, government and others,
invoicing on sales and exports and collection of receivables, import and export
documentation and remittances, appropriate accounting of all transactions under
Companies Act, Income Tax Act, Cost Audit Records and Rules as well as under US
GAAP. Finance function initiates all financial controls and monitors for the compliance.
Finance function is responsible for Budgeting and Expense management and helps the
senior management and the Board of Directors in Business and Strategic Planning. It also
helps in negotiation and designing all significant agreements between the promoters. The
function is responsible for organizational compliance in relation to all Revenue and
Corporate legislations like Excise, Income Tax, Sales Tax, Foreign Exchange and is alsoresponsible for insurance of assets. The function manages all social security trust funds
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 13/63
like PF, pension, Superannuation and Gratuity. The function is responsible for strategic
pricing of the product and spares. The function provides financial information at different
levels in the organization as well as to the promoters to help the decision making process.
The function is responsible for all statutory and Governmental audits. It provides
information to various Government / semi Governmental organizations, Industry
associations and liaison with those organizations on behalf of the company.
11
PRODUCT ENGINEERING
TCL builds Cummins’ B series mechanical engines. The design of the base engine is
controlled by Cummins. Many of the external components are specific for each customer.
Therefore, each plant may have some variations on these components. To tie it all back to
Cummins centre database, these parts are released through Cummins. This ensures all
components are known to all Cummins plants, which reduces design proliferation and
evaluation time and costs. When TCL requires special parts or options based on customer
requirement, these are introduced into Cummins database through the release process
with new part numbers. PE is equipped with a Pro E workstation and AutoCAD facilities.
Design validation, simulation and pilot studies are carried out in a mechanical test lab
having noise and vibration equipment and strain gauging facilities. Two test cells andequipment for combustion optimisation enable the performance rating development.
Rating and performance development are taken from DEP and indigenised at TCL as per
customer requirements. PE Department is also responsible for mechanical development
of parts and source approval of components; product change management and
engineering releases; engine and vehicle type approval in collaboration with OE.
CUSTOMER ENGINEERING
The vision of Customer Engineering department is to” Reach out to wider cross section of
users and make life better by unleashing the power of CUMMINS”. This department’s
main function is to increase market acceptability of Tata Cummins engine, make a
presence in the non-auto segment (marine, industrial, powergen & agriculture). Proper
integration of the engine into OEM’s equipment is critical for the equipment performance,
which is enabled by following Cummins Application Engineering Procedures and work
practices. Critical functional aspects like engine air induction system, engine-cooling
system, aspects of equipment peripherals that affect durability and reliability areaddressed through the application engineering procedure. Application engineering
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 14/63
ensures that all customer needs are met and verified through continuous performance
monitoring.
Engine exports is another key focus area. There are opportunities in the worldwide
Cummins network. They are also responsible for expanding the auto market from 75HP to
250 HP and collaborate launch of new products with Tata Motors.
1
2
MATERIALS
The Materials Department in TCL is broadly categorised into three sets of distinct
functions namely Procurement, Stores and Production Planning function. The
procurement functions is responsible for providing support to the manufacturing workflow
process by ensuring the timely procurement of raw materials (forgings/ casting for MIW
lines) and other quality components (direct materials), which are almost 70 % of the
product. This is also significant in terms of finalising the strategic price of the product.
These direct parts sourced from 70 suppliers and an effective management of supply
chain and inventory and supplier relations becomes very important as these directly affect
the profitability of the company. Ensuring the timely supply of quality components, its
testing and validations, needs a very close co-ordination between this function of the
department, Product Engineering department and Sourcing department.
The stores function of this department is responsible for Production planning & control
and ensuring the dispatch of final product to the customer based on their requirement.
This department manages the movement of total materials, both direct and indirect and
the disposal of scrap within the factory premises. This includes the timely supply of raw
materials and bought out component to different workstations in the concerned BUs to
ensure effective workflow of manufacturing processes.
ENGINEERING
Engineering department in Tata Cummins comprises of three function units- Tooling
Planning and Maintenance. Tooling as a function unit caters to approximately 2000
tools, jigs & fixtures throughout the plant, which is the critical part of the manufacturing
process in terms of time, quality, and cost of production. Planning looks after Industrial
Engineering, Planning & Procurement of capital. Maintenance Function looks after
Maintenance of the Utilities (Electrical, Air Conditioner, Compressed Air, Water System),
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 15/63
material Handling Equipments, Labs and Spare Parts Division of the Plant and also looks
after the procurement, storage and issue of machinery spares.
QUALITY
Ensuring the quality of outgoing products, implementing adequate quality systems and
processes in-house and with the suppliers, training and development in quality skills,
leading improvements in internal and external failure resolution are the keyresponsibilities of the quality function. These are achieved through two functional units
viz. Manufacturing Quality and Sourcing.
1
3
The Manufacturing Quality functional unit assures quality of the five in-house
components manufactured on over 160 machines, over 500 bought out components,
about 2000 items used as tooling, about 2000 gages and bulk fluids such as engine oil,diesel, cutting and hydraulic oils; through product audits and through in-house
manufacturing process audits. The unit drives the quality systems implementation
throughout the plant and carries out regular audits to ensure the robustness of the
system. This unit has the quality engineering skill sets for problem, process and product
analysis and provides this support to the Business Units. The function drives all problem
resolution efforts related to the manufacturing process, both internal as well as external.
This functional unit also assures the outgoing quality of the final product i.e. engines
through process and product audits in the production line, at final delivery stage and
through reliable testing and evaluation of engines. They also conduct major enginerepairs and lead engine failure analysis and resolution.
SOURCING
The Sourcing functional unit is responsible for ensuring the quality of bought out parts by
locating potential suppliers, training and developing the sources, assuring and approving
their processes. They lead all problem resolution efforts related to suppliers
manufacturing processes and support their capability improvement. The unit plays a key
role in developing a part locally, which reduces the overall cost of an engine. They deal
with around 800 active parts and 74 suppliers.
AFTER MARKET
After Market Support is a function of Tata Cummins, which deals with the support to the
OEMs in terms of providing engine spares, technical know-how of the product and gathers
product related feedback from customers for improvement. There are seven major and
regular customers that is Tata Motors (4 registered ware house), CASL, CDSS and TIL.Other customers also get support from this division on need basis like Tata Motors, Pune
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 16/63
and Lucknow. This function mainly contributes by effective management of engine spares
(approximately 500 nos.) right from receiving orders from customer, giving indent for
procurement and finally delivering the materials to the indenter within schedule. It
provides technical support and information to customer on their queries and also by
publishing a bi-monthly in-house technical Journal. From management point of view
delivery of spares on time,
supporting the customer with technical know-how and knowing customer’s requirement
are critical and play an important role in ensuring customer’s confidence, faith in the
product reliability and in total organisation’s commitment to “put customer first”. Thisdepartment also provides market related data and inputs to Finance for finalising strategic
pricing of spares,
1
4
provides key customer requirements to Product Engineering for product modification as
per the customer’s requirements. Warehouse is equipped with necessary machines and
equipment to help people working there in material handling, packing and delivery to the
customer. It also contributes in maintaining a very low cost of the inventory and ensuring
maximum customer orders.
WORK SYSTEMS AT TATA CUMMINS:
TEAM BASED WORK SYSTEM:
The basic working in Tata Cummins is team based, i.e., all the shop floor associates are
organized into teams. It is a socio-technical approach to job design and aims at optimizing
the technical and the social requirements in the organization. Teams have been created
depending on distinctive output / product, job design principles, geographical proximity,
optimal number of members (8-10), identified suppliers and customers (internal).Teams are empowered to manage their day-to-day working within the parameters of team
goals, process and output measures. Managers are actively involved as coaches and
facilitators in the process. Care is taken that these activities are structured, focused and
systematic. The ultimate objective is to become a self managed team where the team can
function on their own without the help of any managers.
• We follow a 3-point triangular model to define the role of each individual in the team.
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 17/63
Each team has a team coordinator (who is also a member of the team and not in a
supervisory position) and 3 “point-leaders”. These point leaders have the lead
responsibility for the activity at each point of the triangle depicted below.
TRIANGULAR POINT MODEL
1
5
On each of the six working days of the week there is either a meeting of the team (team
meeting) or of the point leaders of a particular point from each of the teams. This ensures
that learning and improvement initiatives are spread across the plant very quickly. The team
meetings are structured and facilitated by a manager. Minutes are kept of each meeting for
follow-up to resolution and it is treated as an inseparable part of their regular work. The
organization provides facilities for the various meetings and additional resources for
covering the absence of 1 member at any point of time either to attend meetings or follow-up on improvement projects. Time is provided during regular working hours to drive home
the point that improvement activities in teams are very much a part of regular work.
Comprehensive inputs are provided to the associates in the form of training on problem
solving, communication, technical subjects, consensus process, conflict resolution,
statistical techniques and behavioral sciences to enable them to participate effectively in
team activities.
The managers and senior management regularly review improvement projects completed
and ongoing in each team. Recognition is accorded to teams and individuals for contributions and efforts.
TOTAL PRODUCTIVE MAINTENANCE:
Tata Cummins has adopted TOTAL PRODUCTIVE MAINTENANCE (TPM) to achieveoperational excellence through involvement of all employees. TPM leads to achievingzero breakdown, zero defect and zero accidents by eliminating losses, implementingkaizens and maintaining the optimal conditions of the machines. All the employees are
involved in TPM implementation including the employees working in office who are
ZERO DEFECT POINT LEADER
ZERO DOWNTIME POINT
LEADER
ZERO ACCIDENT POINT
LEADER
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 18/63
involved in Office TPM. TPM has resulted in significant reduction of breakdown, defectsand minor injuries. TPM involves 8 core activities generally called the 9 Pillars
1. Autonomous Maintenance( Jishu-Hozen)2. Individual Improvement (Kobetsu Kaizen)3. Planned Maintenance4. Quality Maintenance (Hinshutsu-Hozen)5. Office TPM6. Education/Training
7. Safety Health & Environment8. Development Management9. Tooling
Through the above 9 activities, TPM attacks the 16 major losses and improves the OverallEquipment Efficiency (OEE)
TPM Policy:
At Tata Cummins we are committed to achieving zero breakdowns, zero defects, zeroaccidents and breakthrough business goals through:
Total Employee OwnershipManagement by factsFocus on action & resultsOptimal Utilization of resources
Quality Policy:• Take care of customers
• Are obsessed with quality
• Care deeply about people
• Do what’s right and not what’s convenient
• Guarantee product leadership
• Are responsible citizens
• Are relentless improvers
Safety Health & Environment Policy:
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 19/63
Cummins Limited is committed to foster a Safer, Healthier and Cleaner environment inevery community in which our people live and work, through the following activities : -
• Develop and maintain Safety, Health and Environment Management Systems acrossthe organization which is designed to prevent accidents, to protect our personnel andenvironment, to preserve natural resources and to prevent harm to local communities.
• Systematically assess operations that have the potential to harm individuals or impact the environment.
• Set measurable objectives and targets and periodically review for continual
improvement in Safety, Health and Environmental performance.• Implement management programs to ensure our products, services and activitiesalways comply with Legal and other requirements to which the organization subscribes.
• Minimize potentially harmful effects resulting from our operations and to implementimprovements associated with the prevention of accidents, illness and pollution.
Treatment & Diversity Policy:
Equal Employment Opportunity /Diversity
• Tata Cummins is an employer that provides equal opportunity to all and strives to makeemployment decisions without regard to race, colour, religion, sex, national/regional origin,physical disability or social status. Therefore, the company’s recruitment, hiring, transfer,promotion and compensation policies shall be fair and non discriminatory.
• Tata Cummins believes that, to become a world class competitor, diversity of backgrounds, experiences and cultures is essential. This diversified talent and experienceencourages learning from each other and helps Tata Cummins become stronger. Throughcontinued involvement and effort in the community and appropriate educational institutionsTata Cummins shall strive to create and provide opportunities to women and less fortunatesections of the local society. With reference to local conditions Tata Cummins shall strive to
create an appropriate gender mix of employees.
Treatment Of Each Other At Work
One of the responsibilities of each member of Tata Cummins is to treat each other withdignity and respect. Without this the aspirations of Tata Cummins to become a world classengine company will stand remote chance.
Treating each other with dignity and respect means…
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 20/63
• We should treat each person with whom we come in contact the way we personally wantto be treated. This spirit is required for Tata Cummins to succeed with our customers.Disrespect causes conflict and hard feelings that take time and energy away from work.
• We should treat with the same dignity and respect each member of Tata Cummins familyirrespective of the reporting relationship.
• Treating with dignity implies that no one should make statements that are derogatory or embarrassing or humiliating
• Respect for others means that each of us must try to understand the different backgrounds
and ways of thinking of our people. Not everyone who works for Tata Cummins has thesame background.
• Our company stands behind these points. Therefore, we tolerate no intimidation, nodiscrimination, no lack of respect. We will investigate and act promptly on any charges or evidence of intimidation, harassment, discrimination or such actions as making obscenegestures, calling others names that are demeaning, telling jokes or stories that hurt thefeelings of others, or displaying cartoons or pictures that affect others. We hope we do notfind such situations, but when we do, we will act.
We believe that people make difference in our business. Our success as an empowered teambased organization rests primarily in protecting employees self respect besides nurturing their
potential. It is the only way the employees work well together and working well together isnecessary for Tata Cummins to become world class Engine Company.
BUSINESS UNITS AT TCL
The following are the different business at TCL.
• Assembly, Test and paint BU (ATPBU)• Cylinder Block BU (CBBU)
• Cylinder Head BU (CHBU)
• Crank Shaft BU (CRBU)
• Connecting Rod and Cam shaft BU (RCBU)
• Tool Room
• Process Engineering
In 1995 Assembly started with a capacity of 60,000 engines / annum. With Capacity
expansion in 2007 capacity increased to 1,20,000 engines. It has the capability to build
Euro-1, 2 & 3 engines (Both Mechanical and electronic versions).Cylinder Block and Cylinder Head lines had their expansions completed in 2008 and
acquired the capability to manufacture Euro 3 Blocks and Heads in 2008 which takes their
capacity to 1,20,000.
Crank shaft line is also geared up its capacity to 52,000 from 42,000 through the
expansion of facilities in 2008.
Connecting rod has the capacity to build 72,000 and Cam shaft to 78,000.
Tool room provides all the tooling, Wear parts support to Business Units. It has tool
grinding and presetting facilities. It also provide support for maintenance jobs.
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 21/63
Process engineering take cares of sustenance budget planning, allocation and spending.
It takes care that all sustenance projects are on time and within budget. It also plays a
support role in case of BU shutdown activities and improvements.
Crankshaft Business Unit (CRBU) :
Crankshaft Business Unit (CRBU) of Tata Cummins Limited produces thecrankshaft, which is then sent to the assembly for fitting into the engine. Like theconnecting rod, the raw material here is also obtained form Bharat Forge, Pune in the
form of a forging. A number of crucial and intricate operations on the crankshaft finallygive the finished product. The machining operations in CRBU are carried out across 35machines, which are divided into two lines:
• Soft Line
• Hard Line
In Soft Line, conventional machining operations like milling, facing, turning, grinding etc.are carried out The final operation in this line is Induction Hardening of the crankshaftdue to which its material becomes very hard. Further, all the stock can’t be removed inthe soft line only, as the shape of the crankshaft gets deformed due to hardening andfinishing of surfaces has to be again carried out.
Cylinder Block Business Unit (CBHU)
This is the largest business unit in the Tata Cummins limited. Cylinders blocks aremanufactured in this unit which are then send to assembly line. The raw material used iscast iron, which is bought from Tata Motors Jamshedpur. Due to heavy chip removalintense dust formation is the problem with this line. Most of the operations performed onthe block are without using coolant.
Cylinder Head Business Unit (CHBU):
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 22/63
In this business unit cylinder heads are manufactured which send to assemblyline. CHBU is a fully automated line having least number of associates in TCL. The rawmaterial is Cast Iron casting and it comes from Tata Motors, Jamshedpur. The entire lineis divided into different cells depending on similarity of the operations performed on themachines.
Assembly, Testing & Painting Business Unit (ATP BU):
The Assembly, Testing and Painting Business Unit at TCL houses one of themost sophisticated assembling and testing facilities among the Indian industries. It is atthis unit that the various Made in Works (MIW) components and the Bought Out Finished(BOF) components are assembled to produce the engine, which then undergoes throughthe processes of testing and painting before being delivered to the customer. This unit isthe biggest BU in TCL in terms of manpower employed and is broadly divided into threeloops as per the operations performed. ATPBU has several unique features which arenot found in most assembling units, which include the use of Automated ElectricMonorails (AEM), Automated Guided Vehicles (AGV), In-Process Verifications (IPV),
Assembly Management System (AMS) etc. The whole layout is essentially line-type andall the loops are further subdivided into stations and each team is assigned theresponsibility of a particular group of stations.
ENGINE PARTS
Crank Shaft: -
Crank Shaft is a strong one piece forging of heat treated alloysteel. The crank shaft must be strong enough to take thedownward push of the piston during the power stroke.
Cylinder Head: -
The cylinder Head enclose one end of engine cylindersand form the upper end combustion chamber. Thepiston head and Piston ring form lower end. Cylinder
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 23/63
head are cast in one piece from gray iron, iron alloy or aluminum allow.
Cylinder Block: -
Cylinder block is the foundation of engine. Everycomponent else is put inside or attached to the cylinder block. Cylinder block is a complicated casting. It musthave large holes for the cylinders bores.
21
Connecting Rod: -
The connecting rod is attached at one end to crank pin oncrank shaft. It attached at the other end to a piston pin.
Cam Shaft: -
Cam shaft is made of forging of cast iron. Itsfunction is to open or close the engine valve withthe help of push rod and rocker arm.
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 24/63
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 25/63
10
20
30
40
120
110
100
130
140
23
PROCESS MAP
Facing &
Counterboring
(HMT)
Shank End Turning &
MB6 Roughing
(HMT)
Mass Centring
(Schenk Avery)
Flange End &
MB6, MB7
Turning (HMT)
Induction
Hardening
(EMA)
Oil Hole
Chamfering
(Intelmac)
Washing (Bullows)
Crack Detection
(Magnafield)
Stress Relieving
Furnace
Raw Forging N
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 26/63
70
80
90
80
90
150
170
180
200190210
240
230225
250
280
170
220 220
260
270
Radial Milling
(Heller)
Straight Oil Hole
Drilling (Widia)
Cross Oil Hole
Drilling (Widia)
Straight Oil Hole
Drilling (Widia)
Cross Oil Hole
Drilling (Widia)
CNC
Re-entering
All Journals
Grinding (Landis)
Drilling &
Chamfering
(HMT)
Shank End
Grinding (MKL)
Tapping (HMT)Flange End
Grinding (MKL)
Oil Hole
Polishing(Intelmac)
Timing Hole(HMT)
Final Balancing(ABRO)
Crack Detection(Magnafield)
Final Inspection
(Marposs)
From SRF
Crank Pin Grinding
(Landis)
Super Finishing
(Nagel)
Washing
(Bullows)
Final Despatch to
Assembly N
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 27/63
25
THE CRANK SHAFT
General Description
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 28/63
Flange: The leftmost part of the crank shaft as shown in the above figure is known as
theFlange of the crank shaft.
Journals: There are at all 7 journals present on a six cylinder crank shaft. When the
crankShaft is in rotating motion; all the journals have the same axis of rotation.
Pins: There are six pins present on a six cylinder crank shaft. They do not have same
axis of rotation.
Shank: The rightmost part of the crank shaft as shown in the above figure is known as
theShank. A hole is drilled in the shank in order to fit a gear on it in the assembly.
Web: There are 12 webs present on a six cylinder crank shaft. Two webs surround one
pinon a crank shaft.
26
PROJECT OVERVIEW
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 29/63
27
PROJECT TITLE
“IMBALANCE PATTERN GENERATED IN CRANK SHAFTTHROUGH VARIOUS MACHINING OPERATIONS”
PROJECT BEGINNING
For analyzing imbalance of mass generated in crank, one should be familiar with allthe machining processes performed and then decide what process is affecting crankshaft the most.
To fulfill the above requirement my initial plans were:
• To know the crank properly.a. What is its geometry?b. What is its role in the engine?c. What type of motion it is going to be in?
• To know various operations in details.
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 30/63
• To decide what operation is affecting it the most.
• To suggest methods of control.
28
WHAT IS UNBALANCE?
Any rotating body which is having uneven distribution of mass about its axis of rotation is said to have an unbalance in it. This unbalance in the body plays a major rolewhen body has to perform a rotatory motion. The unbalance is generally caused by anextra mass ‘m’ present in the body. A similar effect is created by out –of-centremachining, non-uniform winding in armature blades of different sizes on rotors, internalflaws in casting, uneven density of material, etc.
TYPES OF UNBALANCE
The Unbalance generally is of following types:
I. STATIC UNBALANCE;
II. DYNAMIC UNBALANCE;
III. COMBINED UNBALANCE.
STATIC UNBALANCE:
When the distribution of mass is uneven but only on one side of the rotor then it iscalled as static unbalance.
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 31/63
DYNAMIC UNBALANCE
When the uneven distribution of mass is present on two different sides of axis of rotation then this type of unbalance is called as dynamic unbalance.
COMBINED UNBALANCE
When both the static & dynamic unbalance exist simultaneously ina rotating body then such an unbalance is called as combined unbalance. The abovetwo types of unbalance usually exist in theory only while in actual practice a large no. of static & dynamic unbalance exist simultaneously ina rotor.
29
RELATION B/W UNBALANCE & CENTRIFUGAL FORCE
The Unbalance ‘U’ in a rotor is directly proportional to the amount of Centrifugal force generated on rotating the rotor and also the Unbalance Isindependent of speed of the rotor and it exists even when the rotor is Stationary.
When the Unbalance rotor rotates the centrifugal force is given by :
U=mr
m=unbalance mass
r=radius at which mass is located
F=mv2/r = mrw2 = Uw2
V= linear velocity
W= angular velocity
The above relation clearly shows that the centrifugal force is directly proportionate tothe Unbalance.
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 32/63
LOCATION OF UNBALANCE
The amount of unbalance present in the rotor is as much important as thethelocation of that unbalance. The location of unbalance is is generally expressed interms of the angle at which the unbalance is located . So the unbalance is a measure of both the mass and the angle at which it is located.
PRINCIPLE OF MEASURING UNBALANCE
When a rotor is rotated, each unbalance on it gives rise to a centrifugal force . Assuming that the rotor under consideration is a rigid body, each force can be resolved into2 planes (Left Plane & Right Plane).
30
After all the forces in the two planes on these lines are being resolved, the result
that we obtain can be represented simply by unbalances at those points .
The case mentioned above is not the most usual case but it illustrates that
“the total unbalance of rigid rotor can always be represented b two weights (or
unbalances) in any two planes desired”.
The dynamic balancing machine operates on the above principle . The rotor tobe balanced is placed on the two work supporting carriages of the balancing machine
and rotated . The centrifugal forces created due to the unbalances act on the carriages
and are measured . These two forces give us the total unbalance of the rotor in these
two planes ( planes in which we have the carriages ). While measuring the unbalance ,
we have to ensure that the rotor is rotated about its normal axis of rotation . If we rotate
the rotor about any other axis, spurious unbalance shall be created by the displaced
mass of the rotor .
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 33/63
The simplest method of achieving the above mentioned objective is to rotate the
rotor while supporting it on its bearing surface .
CORRECTION OF UNBALANCE
A dynamic balancing machine measures unbalances in two planes . These are the
planes in which the rotor is supported on the balancing machine and generally these are
the planes in which the rotor has its bearings. However, the unbalance correction is made
in some other planes where it is convienent to add or remove weights. The former are
called Measurement planes, while the latter are known as correction planes.
Since the plane sin which we make corrections are different from those in which we
measure unbalance, the unbalance corrections to be made have different values
from the unbalances measured .
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 34/63
Figure 1Unbalance correction
The unbalance corrections to be made can be found out by taking moments aboutany two points and equating them to zero .
Taking moments about left correction plane :
Urb = W2(b+c)-W1a OR
UR = W2(b+c)/b - W1 a/b
UL = Unbalance correction needed in left correction plane
UR= Unbalance correction needed in right correction plane
W1= Unbalance in left measurement plane.
W2= Unbalance in right measurement plane
After having found the unbalance correction to be made we have to find out theactual weight 'm' to be added, which is dependent on the radius 'r' at which correction
has to be made. This weight is given by (for the right plane). :
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 35/63
mR= UR/rR
A similar exercise has to be done for the left plane correction side to find outcorrection required in the left correction plane. The results are as follows:
UL = W1 (a+b)/b – W2 c/b
mL= UL/rR
mL= Mass correction needed in left correction plane
mR= Mass correction needed in right correction plane.
RL = Radius at which correction is made on left side
RR = Radius at which correction is made on right side.
OPERATIONAL OVERVIEW
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 36/63
34
OPERATIONS PERFORMED ON CRANK SHAFT
Out of the various operations performed on the crank shaft, the first one is:
FACING & COUNTER BORING
PROCESS DESCRIPTION: In this process first of all the crank shaft is loadedon to the machine with flange end viewed on right to the operator.After loading the job the machine as per the pre defined program performs theface milling of the ‘flange end’ side and also of the ‘Nose end‘ side.
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 37/63
Then after the milling operation on both the ends of the crank shaft has beenperformed, counter boring is done on the Flange end side . The diameter of thecounter bore is 50mm.
CYCLE TIME: The cycle time of this machine is 3.50 minutes.
3
5
After the face milling operation on the crank shaft is performed the crank shaft is
send forward for the next operation which is MASS CENTERING.
MASS CENTERING
PROCESS DESCRIPTION : In this operation the crank is loaded with flange end
viewed right to the operator. After loading the job the machine drills centres on
both ends . These centres are drilled such that the distribution of mass on both
sides of the axis (line joining the two centres ) is approximately same.
Φ 50−+ 1
15−+ 0.5
858 0.3−+
448.5 0.25−+
C3± 0.5
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 38/63
Run out between Centers on Flange Diameter & MB1
Diameter 3 mm (Max) {except on forging parting line}
Drill Depth ( Both Ends)
+/ - 0.3mm compared to master
CYCLE TIME: The cycle time of this machine is 2.30 min.
36
Values of imbalance generated at plane 1 & plane 2 after masscentering
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 39/63
Sl.no.
PLANE1(gm)
ANGLE 1(deg)
PLANE2(gm)
ANGLE 2(deg)
1. 18 341 58.6 95
2. 29.3 41 55.2 63
3. 14.2 32 77.9 89
4. 21.1 34 44.7 95
5. 6.7 31 103.8 91
6. 30.4 59 82.1 74
7. 21.3 42 100 54
8. 7.5 29 53.3 72
9. 12.6 69 91.4 50
10. 23.6 65 89.3 24
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 40/63
37
SBCNC
FLANGE END TURNING
PROCESS DESCRIPTION: In this operation the Crankshaft is loaded on to themachine with nose end viewed left side of the operator.
The Main Journal 1 being clamped with gear seal face end being butted for lateral
location and component being center on the flange side.
Operation sequence:
1) Flange finish turning & facing2) MB 7 ,Web facing LH3) MB 7 ,Web facing RH
4) Rough grooving on MB 7 dia.5) Flange face grooving6) MB6 & MB7 rough turning7) Finish turning MB6 & MB78) Finish turning MB6 & MB 7 dia – RH
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 41/63
S p e c i a l S o f t J a w s
D e t a i l ' X '
CYCLE TIME: The cycle time of this operation is 6.0 min.
38
Values of imbalance generated at plane 1 & pane 2 after turningoperation
Sl.no. PLANE 1(gm)
ANGLE 1(deg)
PLANE 2(gm)
ANGLE 2(deg)
1. 140.2 236 92.1 229
2. 130.0 231 107 235
3. 194.1 228 137.2 225
4. 167.5 219 106.8 209
5. 189.9 222 100 210
6. 137.1 218 129.2 204
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 42/63
7. 159.3 223 115.7 234
8. 182.7 215 143.6 215
9. 177.7 227 116.5 248
10. 190.8 219 117.0 238
39
HELLER
WHIRL MILLING
PROCESS DESCRIPTION: In this operation the crank shaft is loaded on to the
machine with its nose end to the left side of the operator. Then after loading the
crank is rotated such that pin 1 is in down position. Then the crank is pushed
gently to left side such that MB1 face butts the axial locator.
OPERATION SEQUENCE: The sequence of whirl milling on Main Journals & pins isas follows:
1) Main Journal 5 & Crank Pin 6
2) Main Journal 4 & Crank Pin 5
3) Main Journal 3 & Crank Pin 4
4) Main Journal 2 & Crank Pin 3
5) Crank Pin 2
6) Crank Pin 1
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 43/63
C o m p o n e n t R e s te d o n t h e M B 7 & M
CYCLE TIME: The cycle time of this machine is 4.99 min.
40
Values of imbalance generated at plane 1 & pane 2 after Whirl-milling
Sl.no. PLANE 1(gm)
ANGLE 1(deg)
PLANE 2(gm)
ANGLE 2(deg)
1. 9.9 347 11.3 129
2. 5 244 19.6 300
3. 24.5 290 20.3 286
4. 32.1 159 40.7 140
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 44/63
5. 18.1 321 51.6 12
6. 30.4 59 82.1 74
7. 21.3 42 100.5 54
8. 7.5 29 53.3 72
9. 11.7 277 44.5 322
10. 1.7 249 26.8 322
41
WIDIA
GUN DRILLING(straight holes)
PROCESS DESCRIPTION: In this operation the crank is loaded suchthat the flange is on the right side of the operator and the pins 2 & 5are in UP position.
Then after lthe component is being loaded straight oil holes of diameter 8mm in main journals from 2-7 are drilled .
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 45/63
A
A
C
C
Brg. Oil Hole Centerline is 90' from correspondi ng
Pin Centerline.
Bearing Oil Hole Radial Locatio n w.r.t respective pin +/- 0.44
Longitudna l Locations Brgs +/-1.0
CYCLE TIME : The cycle time of this machine is 11.65 min.
42
GUN DRILLING (Cross holes)
PROCESS DESCRIPTION: In this operation the crank is loaded on therollers.
Then first, all the sharp edges are bring Debured.After that the crank shaft is being loaded on to the machine such that the flange
is at the right side of the operator and pins 2 & pin 5 are in UP position.
Then the cross holes are drilled in crank pins of diameter 7mm from 1-6.
After machining of both the holes, chips are being removed
at the intersection by rotary burr.
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 46/63
A
A
C
C
N o t e s : -
1 ) 3 2 5 8 ' 1 0 . 2 2 " + / - 1 ' i s t r u e a n g l e a l l p i n o i l h o
2 ) A l l o i l h o l e s m u s t i n t e r s e c t .
3 ) P i n o i l h o l e r a d i a l l o c a t i o n + / - 0 . 4 4
4 ) L o n g i t u d n a l L o c a t i o n s p i n o i l h o l e s + / - 1 . 2 7
D r i l l d i a 7 + / - 0 . 4 m m
D e p t h 1 1 4 + / - 0 . 5 m m
6 H o l e s
CYCLE TIME: The cycle time of this machine is 14.05 min.
43
Values of imbalance generated at plane 1 & pane 2 after gun-drilling
Sl.no. PLANE 1(gm)
ANGLE 1(deg)
PLANE 2(gm)
ANGLE 2(deg)
1. 3.7 107 16.9 20
2. 2.0 176 22.8 300
3. 24.7 286 18.3 279
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 47/63
4. 39.1 174 39.1 97
5. 14.8 312 61.2 3
6. 12.3 54 4.3 5
7. 14.6 298 34.4 324
8. 8.7 306 18.9 292
9. 13.6 276 46.2 331
10. 4.0 227 25.4 324
44
EMAINDUCTION HARDENING
Process description: In this operation the operator loads the Crankshaftwith its flange end on left hand side. Then he clamps the crank flange end in chuckand shank end between centers on all the 4 stations and do the heating of the
crankshaft as per the sequence given below.
Operation sequence: The operation sequence of the inductionhardening m/c is as follows:1). Crank Pin 1- 2- 32). Main Journal 4 – 3 – 23). Main Journal – 14). Crank Pin – 4 - 5 – 65). Main Journal 7 – 6 – 5
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 48/63
45
FURNACE
Process description: In this operation the Crankshaft is loaded
vertically with Flange side on top of the conveyor. Vertical tackle Is usedfor lifting the Crankshaft from the pallet of the Conveyor.
Unload the crankshaft vertically from the conveyor of the furnace. The conveyor speed lies b/w 900 rpm to 1400 rpm. Temperatures are set in 3 PID zones which are:
1). Zone 1 300+/- 40degrees2). Zone 2 300+/- 40 degrees3). Zone 3 275+/- 40 degrees
STAGE 3
STAGE 1
STAGE 5
STAGE 4
STAGE 2
1) As Quench Surface Hardness is 55 HRC
2) Run out of MB4 w.r.t. MB1 and MB7/Centres is 1mm Max
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 49/63
H e a t in g tim e
C o o lin g t im eS o a k in g tim e
325'c+/- 25'C
1 Ambient
3 1/23 1/2
T e m p e r a t u r e
Time
Surface Hardness 45 - 50 HRC
275'c +/- 25'C
CYCLE TIME: The cycle time of thism/c is
4-6 min.
46
Values of imbalance generated at plane 1 & pane 2 after stressrelieving
Sl.no.
PLANE1(gm)
ANGLE1(deg)
PLANE2(gm)
ANGLE2(deg)
1. 44.8 183 34.7 177
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 50/63
2. 47 185 37.1 2183. 74.1 88 37.1 594. 81.5 200 40.8 1485. 59.3 217 67.3 2136. 3.9 162 27.1 1617. 73.4 261 55.9 2818. 52.8 159 60.4 156
9. 79.4 258 62.9 28610. 72.7 176 72.7 172
LANDIS MB
Process description: In this operation the crank shaft is loaded with flange side
on left of the operator. Then the thrust wall is manually flagged and thenaccordingly the crank shaft is adjusted axially . Then the machine finish Grind thrust journal to size with following parameters:
1). Grinding Wheel speed - 45 m/sec2). Work speed for side wall Grinding -130 rpm.3). Work speed for Journal Grinding - 65 rpm.
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 51/63
1 8 7 . 3 ( r e f )
ø83.004- 0 . 0 0 9
+ 0 . 0 1 7
ø 1 1 4 m i n
3 7 . 5- 0 . 0 2 5
+ 0 . 0 7 6
4.2+/-0.2R
0 . 6 R a
1
.2
1
.2
Diametral Taper 0.013
Straightness 0.013
L
Face runout on MB 6Face Shank as well asFlange side - 0.05 max.
CYCLE TIME: The cycle time of this machine is 6.26 min.
47
Values of imbalance generated at plane 1 & pane 2 after MB grinding
Sl.no. PLANE 1(gm)
ANGLE 1(deg)
PLANE 2(gm)
ANGLE 2(deg)
1. 32 73 15.8 52
2. 34.5 105 14.3 Q148
3. 50.5 56 38.7 91
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 52/63
4. 46.2 89 18.7 125
5. 16.6 105 13.4 151
6. 15.8 109 12.8 103
7. 42 115 32 137
8. 21.2 23.4 17.5 17.0
9. 55.6 72 38.2 92
10. 14.8 116 19.8 109
FINAL BALANCING
Process description: For this operation crankshaft will be loaded on to themachine with nose end viewed left by the operator The operator Engage Clamping adaptor on to the nose side and insert thepin in the Gear timing hole. Then the brakes and the drilling unit are released so as to drill holes atrespective runs.Now , Index the Crank and the drilling unit so as to drill holes at respectiveplanes.Confirm Balance by “Balance Run 2”Crankshaft is to be dynamically balanced to 3.6 g cm per plane. The drill speed is 375 rpm and the dia. is 15.5mm.
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 53/63
C o r r e c t i o nP l a n e s
M e a s u r in gP la n e I M e a s u r i n gP l a n e I I
S T A M P T H E L E T T E R
'B ' I N T H I S L O C A T I O N A F T E R T H E B A L A N C I N G
1 2 3 4 5 6 7 8
CYCLE TIME: The cycle time of this m/c is 4.91 min.
Values of imbalance generated at plane 1 & pane 2 before final
balancing
Sl.no.
PLANE1(gm)
ANGLE1(deg)
PLANE2(gm)
ANGLE2(deg)
1. 17 121 36.3 81
2. 60.4 100 24 124
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 54/63
3. 33.3 320 30.4 87
4. 16.5 144 53.1 157
5. 9.5 187 25.4 149
6. 18.2 85 26.5 133
7. 17.2 299 27.9 302
8. 10.4 327 14.7 166
9. 25.8 295 37.6 324
10. 21.9 125 20.2 66
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 55/63
DATA ANALYSIS
5
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 56/63
Analysis of values generated for plane 1(gm)
645750433629221581
240
180
120
60
0
_ X=23.0
UC L=61.5
LCL=-15.4
Mass Centering plane 1 SBCNC1/2 pla ne 1 Heller plane 1 widia plane 1stress relieving pla ne 1MB grinnding plane 1 rad.drill. plane 1
645750433629221581
80
60
40
20
0
__ MR=14.46
UC L=47.23
LCL=0
Mass C entering plane 1SBC NC 1/2 plane 1Heller plane 1 widia plane 1 stress relieving plane 1MB grinnding plane 1rad.drill. plane 1
200
175
150
30
20
10
30
15
0
30
20
10
80
60
40
60
40
20
60
40
20
SBC NC 1/2 plane 1 Mass C entering plane 1 Heller plane 1
w idia plane 1 stress reliev ing plane 1 MB grinnding plane 1
rad.drill. plane 1
Analysis of values generated for plane 2(gm)
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 57/63
645750433629221581
200
150
100
50
0
_
X=29.6
UCL=66.6
LCL=-7.4
Mass C entering plane 2SBC NC 1/2 plane 2Heller plane 2 widia plane 2 stress relieving plane 2MB grinnding plane 2rad.drill. plane 2
645750433629221581
80
60
40
20
0
__ MR=13.9
UCL=45.4
LCL=0
Mass C entering plane 2SBC NC 1/2 plane 2Heller plane 2 widia plane 2 stress relieving plane 2MB grinnding plane 2rad.drill. plane 2
100
75
50
140
120
100
40
20
0
50
25
0
70
50
30
40
30
20
50
30
10
160
80
0
Mass Centering plane 2 SBCNC1/2 plane 2 Heller plane 2
widia plane 2 stress reliev ing plane 2 MB grinnding plane 2
rad.drill. plane 2 plane 2 value
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 58/63
Analysis of values generated for Angle 1(deg)
645750433629221581
600
450
300
150
0
_ X=199.8
UCL=494.1
LCL=-94.5
Mass C entering SBC NC 1/2 Heller A ngle 1 widia Angle 1 MB grinnding Angle 1stress relieving A ngle 1rad.drill. A ngle 1
645750433629221581
400
300
200
100
0
__ MR=110.7
UCL=361.6
LCL=0
Mass C entering A ngle 1SBC NC 1/2 Heller A ngle 1 widia Angle 1 MB grinnding A ngle 1stress relieving A ngle 1rad.drill. A ngle 1
1
1
300
200
100
120
90
60
240
160
80
300
200
100
300
200
100
232
224
216
300
150
0
rad.drill. A ngle 1 MB grinnding A ngle 1 stress reliev ing A ngle 1
widia A ngle 1 Heller A ngle 1 SBC NC 1/2 A ngle 1
Mass C entering Angle 1
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 59/63
Analysis of values generated for Angle 2(deg)
645750433629221581
450
300
150
0
_ X=159.1
UCL=424.8
LCL=-106.6
Mass C entering Angle 2SBC NC 1/2 Angle 2Heller A ngle 2 widia A ngle 2 stress relieving Angle 2MB grinnding Angle 2rad.drill. A ngle 2
645750433629221581
400
300
200
100
0
__ MR=99.9
UCL=326.4
LCL=0
Mass C entering Angle 2SBC NC 1/2 Angle 2Heller A ngle 2 widia A ngle 2 stress relieving Angle 2MB grinnding Angle 2rad.drill. A ngle 2
1
1
11
90
60
30
200
100
0
300
150
0
300
150
0
300
200
100
150
100
50
300
200
100
Mass C entering A ngle 2 SBC NC 1/2 A ngle 2 Heller A ngle 2
w idia A ngle 2 stress reliev ing A ngle 2 MB grinnding A ngle 2
rad.drill. A ngle 2
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 60/63
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 61/63
Suggestions :-
• Plane 1 value obtained after mass centering should
be minimized
• Further study needs to be done for plane 2 valueand actions should be taken to bring the average value to amin. of 25gm as against 50gm
• On studying data(I-MR) for angle 1 & angle 2Findings are:-
a) If a bias is given on machine1(mass-centering)Then consistent readings can be obtained.
b)c) Variation is quite large in case of readings of angles.
54
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 62/63
7/29/2019 Nitin Project Report2
http://slidepdf.com/reader/full/nitin-project-report2 63/63