    TINNo.05007151253 UK)TINNo. 9969101838UP)CST No.GB-5383743 t 26,04-03UPTTNo GA-0484616 l 28-04-03

    RA.J HYAMAONSTRUCTIONSVT.TD.Ofilce P-908, Sanjay Nagar, haziabad. Phone 2786379

    date: 1"r July, 2013o. RSCPL/2013n47

    To: (i) TheExecutive Engineer, National Highway. Construction Division, pWD. BareillyUttar Pradesh E-mail:[email protected]

    (ii) The Supeiintending ngineer, 8th NationalHighwayChcle, PWD, BareillyUttarPradesh E-mail:[email protected]

    (iii) The CliiefEngineer, NationalHighwayWin& PublicWorks Department, 6,M.c,Marg, Lucknow, UttaxPmdesh E-mail:[email protected]

    Subject: Queries/ Request for Additional Infbrmation:RFQ for Widening of existing single lanecaniageway o two lane oaniageway with paved shoulder and Strengthening rom Km, 0.000

    to 50.675 of NH-730A in the state of Uttar Pradesh the "Project,) through an Engineering,Procument and Conshuction the "EPC") Contract

    Dear ifls).

    \ e requesl ou lo provide nlormation o our ollowing queries:

    . 1. Ministry of Road Transporr & Highways, hrough ts let ter no. NIV37010/4/2010.pIC pt.-RFAQ) dated 28' Janua.ry 013, has approved some 67-8=59 applicants as eualified for theNational Highways Projects o be taken up on EPC mode. The eligibility limit of suchApplicants s valid up to September 013.

    Are all the quqlified applicants listed in the Mnistry's letter dated 28s January 2013automatically 'Qualified,for bidding for th above referrd prcject or theie applicsnts haveto go through he QualificatiotrProcess gain?

    2. ln th RFQ document, he Time for Completion ofthe above project s given 1 % years which, asper guideline available n the Model EPC Ageement, includes he ddvelopmeat f the projectalso. Considering he Design-Build (EPC) r[ode, the Time for Completion s grosslyinsufficient.The development phase tself takes some 9 to 12 months which in&r alia includes subsoilinvestigation, surveys, design of highway andmajor bridges, via duots and other structures,

    . procurement of applicable permits which fiuther intr alia includes (a) permission of the StateGovemment or extraction of boulders rom quarry; (b) Permission of Village panchayats and

    Pollution Control Board for installation of crushers; c) Licence for use of explosives; (d)Permission of the State Covemment or druwing water from riverkeservoft; (e) Licence fiominspector of factories or other competent Authority for setting up batching plani; (f) Clearance fPollution Control Board for setting up batching plantj (g) Clearanie of Village panchiyats andPollution Conhol Board fo. setting up asphalt plant; (h) Permission ofVillage panchayats andState Covemme.nt or bonow earth etc. All these activities ake substantial ime.

    The conshuction phase inter alia includes strengthening of tho exlsting carriageway andconstruction of the new caniageway,construction of paved shouldersdrains repair&shengthning of existing bridges & structures, onstruotion of new major bridges, viadrich &shuctules and allied works. For the above project t would reasonably equire 24 to 30 months.

    In view of the above, a reasomble Time for Completion (design, development &construction) would be 36 to 42 months othendse unnecessary ExteNion of Time for

    ' Completion would be required, Plase onsider eviriou ofappropriate Time ofcompletion.

    Regd. ffce 2308, ali No. 62, s9$d$f M.B.Extn. adarpur, ewDelhiEmail [email protected]

  • 8/13/2019 Nh 730a-Epc Queries

    2/2

    3. What s the status ofthe following:

    a. Availability of land for the wideniirg of road?

    b. Relocation of utilities?

    c. Tree cutfing?' d. Envi.onmental cleamnce fthe Project?

    4. The start and end ohainages of the project have been given in the RFQ. Could you pleaseprovide he name ofthe starting and nding owns and he distriots where hese all?

    5. Who would be the Authori8's Engireer for supervising he Project? n case hd Department NHPWD) would be supervising Engineer which office would be the Arithoriry's Engineer?

    6. In case a consultant would be appointed or supervising he Prcject, what is the status of itsappointment? Would be the consultant e in plac before he Appointed Date?

    7. Would there be a provision or hioe Escal.ation n the Bidding Document?

    . 8. Please rovide clarification for subscript i4" inserted n the last colum4 oftable under panigraph1 . 1 . 1 ?

    9. Would there be a provision for bonus n the bidding documents.

    Thanking you in anticipatiotr;

    Your5Faithfully.For Raj Shyama Constuctions Pvt Ltd

    - t\ - U . a -r*tc\\-t6

    I rapesn lagr,Managing ireclor.

    Page of 2