15
NextGen Program Update NextGen Program Update Wade Lester

NextGen Program Update Wade Lester NextGen Research DB NextGen Test Facility Management Consortium Leadership NextGen Program Management

Embed Size (px)

Citation preview

Page 1: NextGen Program Update Wade Lester NextGen Research DB NextGen Test Facility Management Consortium Leadership NextGen Program Management

NextGen Program UpdateNextGen Program UpdateWade Lester

Page 2: NextGen Program Update Wade Lester NextGen Research DB NextGen Test Facility Management Consortium Leadership NextGen Program Management

Embry-Riddle’s Role in Embry-Riddle’s Role in NextGenNextGen

Page 3: NextGen Program Update Wade Lester NextGen Research DB NextGen Test Facility Management Consortium Leadership NextGen Program Management

Integrated Airport Integrated Airport Initiative?Initiative?A consortium of industry leaders

to research and promote NextGen concepts

Formed March, 2006Catalyst for the development of

what is now the Daytona Beach NextGen Test Facility

Page 4: NextGen Program Update Wade Lester NextGen Research DB NextGen Test Facility Management Consortium Leadership NextGen Program Management

Membership includes: •ERAU(co-lead)•Lockheed Martin(co-lead)•Boeing•CSC•Ensco•Frequentis•Mosaic ATM•Sensis•Volpe Center•Barco•Harris

Page 5: NextGen Program Update Wade Lester NextGen Research DB NextGen Test Facility Management Consortium Leadership NextGen Program Management

What is the Daytona Beach What is the Daytona Beach NextGen Test Facility (DBNTF)?NextGen Test Facility (DBNTF)?

Initially named the Integrated Airport

DBNTF provides the platform for research and development of NextGen concepts

DBNTF will evolve into a robust platform that will support myriad systems and technologies

Learn more: www.nextgenair.org

Page 6: NextGen Program Update Wade Lester NextGen Research DB NextGen Test Facility Management Consortium Leadership NextGen Program Management

NextGen Test FacilityNextGen Test FacilityImprovements

◦ Installed additional data storage capacity◦ Install Lockheed-Martin’s ERAM system –

limited capability – mid-October◦ Install CSC’s Traffic Management Advisor

(TMA) – limited capability – mid-October◦ Install additional power capacity – in

progress◦ Install 10mbps Internet connectivity – in

progress◦ AT Coach simulation software – procurement

in progressFuture Plans

◦ Possible second site◦ Future funding for DBNTF

Page 7: NextGen Program Update Wade Lester NextGen Research DB NextGen Test Facility Management Consortium Leadership NextGen Program Management

NextGen Program StatusNextGen Program Status

Page 8: NextGen Program Update Wade Lester NextGen Research DB NextGen Test Facility Management Consortium Leadership NextGen Program Management

The “OTA”The “OTA”Key Points

◦ In effect until 2013◦ Embry-Riddle provides the Program

Manager◦ Tasks assigned to consortium members◦ Other agencies can use this contract

vehicle

Page 9: NextGen Program Update Wade Lester NextGen Research DB NextGen Test Facility Management Consortium Leadership NextGen Program Management

The “OTA”The “OTA”Other Transaction Agreement

◦ Work under this OTA … expands the integrated airport concept and laboratory to serve as a Next Generation Air Transportation System (NextGen) Test Facility

◦ ERAU and the FAA will perform operational research, evaluation and demonstration of synergy among available, emerging and planned NextGen concepts, procedures, technologies and capabilities at the NextGen Test Facility, and at other facilities or locations as required by specific tasking.

◦ This facility is a component of the NextGen Test Bed centered on the state of Florida.

Page 10: NextGen Program Update Wade Lester NextGen Research DB NextGen Test Facility Management Consortium Leadership NextGen Program Management

Work Under OTAWork Under OTA Task A – Demonstrate the Integration of Convective

Weather into TMA and ERAM:◦ Effort supported by: Embry-Riddle, Lockheed-Martin,

CSC, Ensco, Boeing, Volpe Center◦ Project is well underway and on schedule. ◦ The formal demonstration is scheduled for November

18, 2008. ◦ A second event for Test Facility ribbon cutting and

demonstrations for VIPs and media is planned for early December, 2008.

Task D – Flight Data Object Demonstration◦ Effort supported by: Lockheed-Martin and Embry-Riddle◦ The kickoff meeting was conducted and issues

resolved.◦ The project plan drafted and submitted to members.◦ The formal demonstration is scheduled for early March,

2009. Task E – UAV Research Opportunity

Page 11: NextGen Program Update Wade Lester NextGen Research DB NextGen Test Facility Management Consortium Leadership NextGen Program Management

OTA Task ScheduleOTA Task Schedule

Page 12: NextGen Program Update Wade Lester NextGen Research DB NextGen Test Facility Management Consortium Leadership NextGen Program Management

Task A – Weather Task A – Weather ComponentComponentStoryboardRUC WindEnsco ProductDiscussion

Page 13: NextGen Program Update Wade Lester NextGen Research DB NextGen Test Facility Management Consortium Leadership NextGen Program Management

Freeze Horizon 120 Nm

Metering Fixes

Orlando International Airport

ZJX15

ZJX78

Page 14: NextGen Program Update Wade Lester NextGen Research DB NextGen Test Facility Management Consortium Leadership NextGen Program Management

Note: This diagram is not the final “as-is” diagram. It is for discussion purposes only at this time.

PGUI Operator

TGUI Operator

Pseudo Pilot

D-Pos AT Controller

R-Pos AT Controller

Na

tion

al

RU

C

Da

ta

Na

tion

al

NE

XR

AD

D

ata

Flight Plan Controller

Simulation Engine

(ATCoach)

ERAM RUC Data

ATCoach Weather Scenario

ATCoach Sim

Scenario

Flight Plans

Simulation

Simulation Generation

Tool (SGET)

Radar DataUser CommandsNEXRAD Data

RUC Data

Flight Information

Service

Flight Objects

ERAM

HADDS Interface

HADDS ZJX Adaptation

Data

HADDSFlight Information

Track Information

Route Status

General Information

Metering List Updates

Metering Data

Flight Information

Track Information

Route Status

General Information

Metering List Updates

Metering Data

TMA Processes

PGUI TGUI

TMA ZJX Adaptation

Data

TMA

CREWERAM ZJX Adaptation

Data

R-PosD-Pos

Conflict Probe

RUC Data

RUC Data

Flight Plans

Page 15: NextGen Program Update Wade Lester NextGen Research DB NextGen Test Facility Management Consortium Leadership NextGen Program Management

PGUI Operator

TGUI Operator

Pseudo Pilot

D-Pos AT Controller

R-Pos AT Controller

Weather Data Inputs

Na

tion

al

RU

C

Da

ta

NextGen Testbed Weather Server

Na

tion

al

NE

XR

AD

D

ata

Flight Plan Controller

Simulation Engine

(ATCoach)

ERAM RUC Data

ATCoach Weather Scenario

ATCoach Sim

Scenario

Flight Plan Updates

Simulation

Simulation Generation

Tool (SGET)

Radar DataUser CommandsNEXRAD Data

RUC Data

Ensco Forecast Convection

Service

Forecast Convection

Data

Ensco Weather Services

WRF ModelForecast

Convection Data

Ensco Weather Model

Forecast Convective Wx

Flight Plan Updates

Forecast Convective Wx

ERAU RUC Weather Publisher

ServiceRUC Data

ERAU Weather Services

ftp RUC Data

RUC Weather Client

SWIM

Flight Information

Service

Flight Objects

Convective Weather

Client

ERAM

HADDS Interface

HADDS ZJX Adaptation

Data

HADDSFlight Information

Track Information

Route Status

General Information

Metering List Updates

Metering Data

Flight Information

Track Information

Route Status

General Information

Metering List Updates

Metering Data

TMA Processes

PGUI TGUI

TMA ZJX Adaptation

Data

TMA

Forecast Convective Wx

CREWS/CWX

ERAM ZJX Adaptation

Data

R-PosD-Pos

Conflict Probe

IA3

Forecast Convective Wx

ForecastConvective

Wx

Wx Conflicts

Forecast Convective Wx

Forecast Convective Wx

Flight Plan Updates

RUC Data

RUC Data

RUC Data

RUC Data

RUC Data

Forecast Convective Wx,RUC Data

Forecast Convective WxFP Updates