47
Next Generation Concrete Surface Larry Scofield, P.E. IGGA and ACPA 12-5-19

Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

Next Generation Concrete

Surface Larry Scofield, P.E.

IGGA and ACPA

12-5-19

Page 2: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

Presentation Outline

• What Was the Necessity and How Did the Industry Respond

• Next Generation Concrete Surface (NGCS) Development

• NGCS Deployment

• What is Next

Page 3: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

Necessity is the Mother of Invention

“The application of common sense to a really hard problem”

Lockheed F-117 Nighthawk

• German physicist Arnold Sommerfel

• 1964, Pyotr Ufimtsev- Soviet mathematician

• 1970s Lockheed analyst Denys Overholser

found Ufimtsev's paper

• 1975 to 1988 - Development

Page 4: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

Looking Back

Things Appear Easier Once You Know the Answer

Page 5: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

2 hrs

7 hrs

7 hrs

1956

1956

1971

1965

1969

Page 6: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F
Page 7: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

The Necessity

• Infrastructure Exists -In the US Concrete Pavements were Textured with Transverse Tining

• Quality of Life Issue - At the Turn of the Century Noise Became an Issue

• Tire-Pavement Noise Measurement --No Standardized US Method

• Tire Whine - Transverse Tining has Objectionable Tonal Properties

• Tipping Point - Fifth Largest City In US Covered Up with AC

• Sounds of Safety - Wasn’t Working

• Trading Walls for Pavements - Gaining Traction

Page 8: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

Trading Walls for Pavements

Page 9: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

The Solution

• 2005: PCA funds a $2.1 M Noise Research Program Conducted by ACPA

• 2006 – 2009: ACPA Contracts with Purdue Herrick Laboratories –Dr. Robert Bernhard

• 2005: ACPA Develops Dual Probe OBSI Equipment (Caltrans, ADOT, Dr. Donavan)

• 2007: First Test Strip at MnROADs and First Test Section on I-355 In Chicago

• 2007 – 2009: ACPA Contracts with Illingworth and Rodkin to Develop Concrete REMELs, Joint Slap App

• 2011- Present: IGGA Takes Over Heavy Lifting of Field Deployment

Page 10: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

The Problem

• Tinning Tonal Properties

• No Standard Test Method

• No Standard Test Tire

• Industry Promoting Wider Spacers

Page 11: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

Noise Annoyance

Volume(Too Loud)

Frequency(Off Station)

Page 12: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

Noise Spectrums for Different Textures (CPX)

H z3 0 0 4 0 0 5 0 0 1 k 2 k 3 k 4 k L in( A )

d B ( A )

2 0

4 0

6 0

8 0

1 0 0

1 2 0

C : ( ( A ) H z ; 1 0 5 . 5 2 d B ( A ) / 2 . 0 0 E - 0 5 P a ; 3 . 7 7 6 E + 0 0 P a )A v e r a g e d S p e c t r u m C h 1 M ic F

H z3 0 0 4 0 0 5 0 0 1 k 2 k 3 k 4 k L in( A )

d B ( A )

2 0

4 0

6 0

8 0

1 0 0

1 2 0

C : ( ( A ) H z ; 9 6 . 6 3 d B ( A ) / 2 . 0 0 E - 0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e r a g e d S p e c t r u m C h 1 M ic F

H z3 0 0 4 0 0 5 0 0 1 k 2 k 3 k 4 k L in( A )

d B ( A )

2 0

4 0

6 0

8 0

1 0 0

1 2 0

C : ( ( A ) H z ; 9 6 . 0 4 d B ( A ) / 2 . 0 0 E - 0 5 P a ; 1 . 2 6 8 E + 0 0 P a )A v e r a g e d S p e c t r u m C h . 1

H z3 0 0 4 0 0 5 0 0 1 k 2 k 3 k 4 k L in( A )

d B ( A )

2 0

4 0

6 0

8 0

1 0 0

1 2 0

C : ( ( A ) H z ; 1 0 4 . 1 4 d B ( A ) / 2 . 0 0 E - 0 5 P a ; 3 . 2 2 1 E + 0 0 P a )A v e r a g e d S p e c t r u m C h 1 M ic F

H z3 0 0 4 0 0 5 0 0 1 k 2 k 3 k 4 k L in( A )

d B ( A )

2 0

4 0

6 0

8 0

1 0 0

1 2 0

C : ( ( A ) H z ; 1 0 1 . 8 5 d B ( A ) / 2 . 0 0 E - 0 5 P a ; 2 . 4 7 5 E + 0 0 P a )A v e r a g e d S p e c t r u m C h 1 M ic F

Longitudinal TinedUniform Transverse Tined Random Transverse Tined

Diamond Grind Astro Turf

Page 13: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F
Page 14: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

It’s the Transverse Tining Not the Material!

Page 15: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

No Standard Tire Pavement Procedures

Page 16: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

Tire-Pavement Noise Measurement

GM OBSI ACPA OBSI

Page 17: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

Tire-Pavement Noise Measurement

•What Tire to Use?

•How Does this Represent the Fleet 2005-2006 Aqua Tread

• 2006- 2014 SRTT

Page 18: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

Purdue Noise Research

Surface Texture

• Effect of Blade and Spacer Width, Grind Depth, and Custom Blades

• Effect of Grooves width and depth

• Friction

• Rolling Resistance

Transverse Joint Effects

• Opening Width

• Sealed or unsealed

• Faulting: Fault Level, step or step down fault

Page 19: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

Purdue Tire Pavement Test Apparatus (TPTA)

• Tests 10 – 30 MPH

• Test Two Tires at Once

• Environmental Control

• Both OBSI and Texture Testing

• Six Samples On Wheel

• Sample Size is 84” X 24”

• 12 Test Sections Per Test Interval

Page 20: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

Surface Texture Testing

OBSI

Page 21: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

Diamond Grind Texture Evaluated

Page 22: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

Purdue Grinding Results

• No unique relationship could be found between spacer width, blade width, and spacer/blade configuration

• The controlling factor was the variability in the fin/land profile height resulting from the grinding process

Page 23: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

Its About the Resulting Fin Profile

Page 24: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

Fin/Land Wear Study

• As-Ground Condition

• Lightly Sanded

• Fins/lands Broken Down

• Removing the micro texture by polishing the surface increased the overall noise level

• Reducing the macro texture to promote a uniform fin profile reduced the overall level

Page 25: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

NGCS Compared to Post Traffick CDG

NGCS

CDG

• NGCS Type Surface was About 3 dBA

Page 26: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

TPTA Transverse Joint Effects

Joint Effect

• Joint Opening (1/8 to 1 inch )

• Joint Fault (0, 1/16, 3/16)

• Sealed and Unsealed

Page 27: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

More TPTA Transverse Joint Effects

Page 28: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

Joint Effects on Noise

Faulting Effects on Noise – 3/8 JointEffect of Fault Level on Overall Tire-Pavement Noise Level

0.0

2.0

4.0

6.0

8.0

10.0

12.0

0.000 0.050 0.100 0.150 0.200 0.250 0.300

Fault Level (inches)

Inc

rea

se

in

Ov

era

ll O

BS

I

No

ise

Le

ve

l (d

BA

)

Quiet

100 DBA

Noisy

105 dBA

Very

Noisy

110 dBA

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

0 0.2 0.4 0.6 0.8 1 1.2

Joint Opening Width (Inches)

So

un

d P

ress

ure

Leve

l (d

BA

)

Very Noisy

110 dBA

Noisy

105 dBA

Quiet

100 dBA

Joint Opening Width

Page 29: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

Proof of Concept of Testing

Page 30: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

First Full Size Grinder Application (Chicago I-355)

Flush Grind

Grooved

Page 31: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

Test Results Over Time (Chicago I-355)

100.2 100.3

102.0

102.9103.2

103.7 103.6 103.7104.1

104.5

105.2

94

96

98

100

102

104

106

108

110

So

un

d I

nte

nsit

y L

evel,

dB

A

Pavement Section

NCHRP 10-67 Texture Locations--OBSIOverall A-wtd Levels

CDGNGCS

TurfDrag

+Long

Groove

TurfDrag

+Shallow

3/4"LongTine

HeavyTurf

Drag

BurlapDrag

+1/2"

UniformTransTine(GA)

TurfDrag

+3/4"LongTine

No DragTexture

+3/4"

LongTined

BurlapDrag

RandomTransve

Tine

BurlapDrag

1"Uniform

TransveTine

TurfDrag

+Skewed

RandomTransve Tined

Page 32: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F
Page 33: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F
Page 34: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

NGCS LITE

Page 35: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

MnROAD Test Results

98.8

99.8100.4 100.6

100.9101.4

101.7 101.8

94

96

98

100

102

104

106

108

110

So

un

d In

ten

sit

y L

evel,

dB

A

Pavement Section

XX & XX OBSI

Overall A-wtd Levels

EA

NGCS

NGCS EA

CDG

NGCS

LITE

Exposed

AggregateCDG

Montecello NGCS

Montecello CDG

Page 36: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

Friction Measurement Devices

Copyright © 2008 Ron Kurtus, and School for Champions LLC @http://www.school-for-champions.com

Page 37: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

UMTRI SUV ABS Braking Testing

Chicago I-355

Page 38: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

Anisotropic Friction Behavior

Page 39: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

MnROAD Friction Results

Page 40: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

Kansas I-70 Friction Results

Page 41: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

1.9

1.5

1.2

1.0

0.9

0.7

0.3

0

1

2

Me

an

Te

xtu

re D

ep

th (

mm

)

Pavement Section

Mean Texture Depth

NGCS

GroovedAstroTurf

ExposedAggregate

CDG

AstroTurfDrag Long

Tined

BurlapDrag

Page 42: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

1.81.9

2.0 2.0 2.1 2.12.2

0

1

2

3

Ma

xim

um

Wa

ter

De

pth

(m

m)

Pavement Section

Maximum Water Depth (mm)

NGCS

GroovedAstroTurf

ExposedAggregate

CDGAstroTurfDrag

LongTined

BurlapDrag

Page 43: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

Studded Tire Damage

Page 44: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

NGCS is a Diamond Grinding Procedure

CDG NGCS

Page 45: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

In Summary

• Its Another Tool In the Tool Box

• Quietest Non Porous Texture to Date

• MnDOT, Caltrans, and VADOT have conducted NGCS Research Projects

Page 46: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

What’s Next

• Perhaps Narrow Grooving Blade Widths

• Single Pass Head Development?

Page 47: Next Generation Concrete Surface · 60 80 1 0 0 1 2 0 C : ( (A ) H z ; 9 6 . 6 3 d B (A ) / 2 . 0 0 E -0 5 P a ; 1 . 3 5 7 E + 0 0 P a )A v e ra g e d S p e c t ru m C h 1 M ic F

Questions