Newmarket GO Station Mobility Hub Study Open House #1 Naren Garg Amy Shepherd Metrolinx IBI Group Advisor, RER Project Planning Associate, Manager, Planning MAY 18, 2017

Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

  • Upload
    dinhque

  • View
    216

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

Newmarket GO Station Mobility Hub Study

Open House #1

Naren Garg Amy ShepherdMetrolinx IBI GroupAdvisor, RER Project Planning Associate, Manager, Planning

MAY 18, 2017

Page 2: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

INTRODUCTIONS - METROLINX

2MAY 18, 2017

• Metrolinx is an agency of theGovernment of Ontario responsiblefor the coordination of all modes oftransportation in the Greater Torontoand Hamilton Area (GTHA).

• Metrolinx is working to transform theway the region moves by building afast, convenient and integratedtransit network.

• This includes more frequent andreliable electrified GO Rail serviceknown as RER.

Page 3: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

INTRODUCTIONS - METROLINX

3MAY 18, 2017

• Currently the Barrie RailCorridor provides one-way,rush hour weekday serviceand limited weekend service.

• RER will provide the Town ofNewmarket with:• 30 minute, two-way weekday

rush hour service; and• 60 minute, two-way mid-day,

evening and weekend service.

Page 4: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

INTRODUCTIONS - METROLINX

4MAY 18, 2017

• With RER, infrastructure and facilityimprovements will be made to theBarrie Rail Corridor and theNewmarket GO Station.

• Metrolinx has retained a multi-disciplinary team from IBI Group tocomplete a Mobility Hub Study forNewmarket GO.

• The Mobility Hub Study will, in part,help inform future RER planning anddesign initiatives.

Page 5: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

PURPOSE OF TONIGHT’S OPEN HOUSE

5MAY 18, 2017

• Provide an overview on the purposeand scope of the Newmarket MobilityHub Study;

• Present findings from the site andcontextual analysis and preliminarystation design ideas;

• Explain how to provide input to theMobility Hub Study; and

• Answer questions and receivefeedback.

Page 6: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

WHAT IS A MOBILITY HUB

6MAY 18, 2017

• Mobility Hubs are major transit stations and thesurrounding areas that have:

• Significant levels of existing or planned transit;

• Connections to different modes of transportation - fromwalking to rapid transit; and

• Intensive concentrations of working, living and otheractivities.

• The 51 Mobility Hubs in the Greater Toronto andHamilton Area vary in terms of type, but all sharesimilar objectives for seamless mobility, placemakingand successful implementation.

Page 7: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

NEWMARKET GO STATION MOBILITY HUB STUDY

7MAY 18, 2017

• Opportunities exist to enhance theNewmarket GO Station area, leveragethe existing transit connections andrealize its potential as a designatedMobility Hub.

• The Mobility Hub Study is intended to:• Establish a vision for the GO Station and

the surrounding area;

• Identify opportunities for short andlonger-term improvements; and

• Support existing planning efforts andinvestment and inform ongoing initiatives.

Page 8: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

EXISTING NEWMARKET GO STATION FACILITIES

8MAY 18, 2017

• Ticket counter within Tannery building

• Ticket kiosks

• 274 commuter parking spaces

• 4 carpool spaces

• No car share or car charging stations

• No dedicated passenger pick-up anddrop-off area (PPUDO)

• Single platform with shelters

Page 9: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

EXISTING NEWMARKET GO STATION FACILITIES CONT.

9MAY 18, 2017

• Access to Nokiddaa and Tom Taylor trails

• 3 uncovered bike racks (40 spaces)

• 1 covered bike shelter (8 spaces)

• Some pedestrian amenities

• Limited signage and wayfinding

• Viva Yellow stops located 200 to 300 metres from GO rail platform

• Minimal bus integration

Page 10: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

10MAY 18, 2017

POTENTIAL STATION IMPROVEMENTS – WAYFINDING & CONNECTIVITY

Page 11: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

11MAY 18, 2017

POTENTIAL STATION IMPROVEMENTS – ADDITIONAL BICYCLE AMENITIES

Page 12: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

12MAY 18, 2017

POTENTIAL STATION IMPROVEMENTS – DESIGNATED PASSENGER PICK-UP & DROP-OFF

Page 13: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

13MAY 18, 2017

POTENTIAL STATION IMPROVEMENTS – PUBLIC REALM & PLACEMAKING

Page 14: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

14MAY 18, 2017

POTENTIAL STATION IMPROVEMENTS – STATION BUILDING & PLATFORM

Page 15: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

10MAY 18, 2017

POTENTIAL STATION IMPROVEMENTS – WAYFINDING & CONNECTIVITY

Page 16: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

11MAY 18, 2017

POTENTIAL STATION IMPROVEMENTS – ADDITIONAL BICYCLE AMENITIES

Page 17: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

12MAY 18, 2017

POTENTIAL STATION IMPROVEMENTS – DESIGNATED PASSENGER PICK-UP DROP-OFF

Page 18: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

13MAY 18, 2017

POTENTIAL STATION IMPROVEMENTS – PUBLIC REALM & PLACEMAKING

Page 19: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

14MAY 18, 2017

POTENTIAL STATION IMPROVEMENTS – STATION BUILDING & PLATFORM

Page 20: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

15MAY 18, 2017

POTENTIAL STATION RELOCATION

Page 21: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

15MAY 18, 2017

POTENTIAL STATION RELOCATION

Page 22: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

15MAY 18, 2017

POTENTIAL STATION RELOCATION

Page 23: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

15MAY 18, 2017

POTENTIAL STATION RELOCATION

Page 24: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

15MAY 18, 2017

POTENTIAL STATION RELOCATION

Page 25: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

EXISTING LAND USE CONDITIONS

16

• Mix of land uses:

• Residential (largely single-detached houses)

• Commercial / Retail

• Office

• Institutional / Public Services

• Transit

• Parkland and natural open space

• Vacant land

• Primarily low-rise, low densitydevelopment

• Some historic sites and buildings

MAY 18, 2017

Page 26: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

TRANSIT-ORIENTED DEVELOPMENT OPPORTUNITIES

18

• Recent and planned transit investment

• Land use permissions:

• Mixed Use

• Building heights of 2 to 10 storeys

• Densities of 1.5 to 2.5 FSI

• Large vacant or underutilized sites

• Public and private land ownership

• Key anchors / draws

• Neighbourhood character

MAY 18, 2017

Page 27: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

TRANSIT-ORIENTED DEVELOPMENT CONSTRAINTS

19

• Flood plain which limits land developmentand site alteration, generally restricting:

• Residential uses;

• Some Institutional uses; and

• Underground parking.

• Market demand for non-residential uses

• Roads:

• Limited east/west and north/south roadwayconnections;

• Traffic congestion; and

• Sites with limited access.

MAY 18, 2017

Page 28: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

20MAY 18, 2017

STUDY TIMING AND NEXT STEPS

Page 29: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

21MAY 18, 2017

FORMAT OF THE REMAINDER OF THE OPEN HOUSE

• Staff from IBI Group, Metrolinx and the Town ofNewmarket are here to answer questions about theMobility Hub Study.

• Please provide feedback on the information presentedtonight by:

• Speaking to Study Team members at the display stations;• Complete a Comment Sheet; and/or• Responding to the Preference Boards.

• Sign-up for the May 29th Visioning Workshop.

Page 30: Newmarket GO Station Mobility Hub Study Open House #1 Department/Transi… · Newmarket GO Station Mobility Hub Study Open House #1 ... NEWMARKET GO STATION MOBILITY HUB STUDY

22MAY 18, 2017

THANK YOU