N
New Primary & Secondary School at Lyde Green
DOCUMENT NAMEDATE OF ISSUEDESCRIPTION
PAGE 1954-2822-B-Drop-In Information2020-06-30 Issued for Comment
1
SITE LOCATION PLAN
Secondary School Site
Park
Primary School
Site
Honeysuckle Road Ro
man
Ro
ad
Coxgrove Hill
CORE AREA Sports Pitches
Public Park (NEAP)
Housing Area Near Completion
Future Area of Housing
Housing Area
Housing Area
Visitor Car Park
New Primary & Secondary School at Lyde GreenSite LocatioN PLaN
Design TeamProperty ServicesSouth Gloucestershire Council
New Primary & Secondary School at Lyde GreenSite DeSiGN StrateGy
Design TeamProperty ServicesSouth Gloucestershire Council
New Primary & Secondary School at Lyde GreenSite PLaN
Design TeamProperty ServicesSouth Gloucestershire Council
New Primary & Secondary School at Lyde GreenaeriaL view 1
Design TeamProperty ServicesSouth Gloucestershire Council
New Primary & Secondary School at Lyde GreenaeriaL view 2
Design TeamProperty ServicesSouth Gloucestershire Council
New Primary & Secondary School at Lyde GreenBuiLDiNG eLevatioNS
DRAWING NUMBER STATUS
PROJECT TITLE PROPERTY NAME
DRAWING TITLE
SCALE:DRAWN:CHECKED:PROJECT CODE:DATE:
PROJECT ORIGINATOR PHASE/SECTION LOCATION DWG TYPE ROLE DWG No
PROPERTY SERVICESREVISION NOTES:
South Gloucestershire CouncilThe Council OfficesBadminton Road, Yate.SOUTH GLOUCESTERSHIRE BS35 1HFTEL: 01454 868686
1 : 1
30/06/2020LGTS-SGC-P1-XX-DR-A
Lyde Green Primary & Secondary SchoolsLyde Green Primary & Secondary schoolsJulesChecker
155Various Perspectives - Sheet 3 S3.1
1 : 13D View 2 with Landscape
1 : 13D View 4 with Landscape
1 : 13D View 7 with Landscape
PDF created with pdfFactory Pro trial version www.pdffactory.com
Secondary School
Primary School
FroNt eLevatioN
rear eLevatioN
Secondary SchoolPrimary School
6Design TeamProperty ServicesSouth Gloucestershire Council
New Primary & Secondary School at Lyde Greeneye - LeveL viewS
7Design TeamProperty ServicesSouth Gloucestershire Council
8
New Primary & Secondary School at Lyde GreenGrouND FLoor PLaN
UP
12
11
10
9
8
7
6
5
4
3
2
1
58.83 m²Classroom 001
15.24 m²Meeting Room
9.55 m²Photocopier
60.88 m²Reception Classroom
58.74 m²Classroom 002
5.80 m²Services
18.39 m²Administration
PG.0311.23 m²
Head TeacherPG.01
12.04 m²Pe Store
5.09 m²Kitchen Office
43.64 m²Kitchen
24.78 m²Store
589.66 m²Four Court Sports Hall
28.88 m²Staircase
102.39 m²Resistant Materials
82.83 m²Art Classroom
93.70 m²Art Classroom
82.72 m²Textiles
103.69 m²Food Technology
N
Canopy
62.28 m²Reception Classroom
24.42 m²Stairwell
2.71 m²Store
58.67 m²Classroom 004
9.18 m²Quiet Room
3.28 m²Break Out
21.04 m²Plant Room
12.66 m²Access WC
2.24 m²WC
2.24 m²WC
2.24 m²WC
2.24 m²WC
2.24 m²WC
2.24 m²WC
3.07 m²Cleaner
6.90 m²Lobby
4.73 m²Access WC
22.05 m²Stairwell
12.82 m²Lobby
14.19 m²Chair Store
3.32 m²Store
4.31 m²WC3.99 m²
WC
5.75 m²Comm. Store
36.13 m²Library
140.37 m²Hall No1
99.88 m²Hall No2
3.45 m²Break Out
2.68 m²Break Out
104.23 m²Corridor
2.24 m²WC
2.24 m²WC
11.41 m²Caretaker
5.84 m²Lift
83.63 m²Corridor
41.36 m²Circulation
Canopy Canopy
12.94 m²Group Room
8.41 m²LV / Services
2.45 m²WC
2.45 m²WC
7.41
m²
Sto
re7.
36 m
²S
tore
82.95 m²Graphics
29.69 m²Preparation
5.23 m²Store
9.95 m²Deputy Head
2.60 m²WC
2.60 m²WC
102.18 m²Corridor
58.75 m²Classroom 005
19.78 m²SWR
24.64 m²Lobby
30.39 m²Administration
11.55 m²Service Riser
6.19 m²Store
23.18 m²Corridor
5.47
m²
Sic
kR
oom
15.91 m²Head Teacher
2.65 m²WC
2.65 m²WC
7.75 m²PA Office
7.91 m²Office
5.14 m²Interview
5.16 m²Interview
5.10 m²Interview
16.62 m²Conference Room
7.78 m²Store
5.26
m²
Sto
re5.
30m
²S
tore
61.60 m²Stairwell
5.88 m²Lift
2.60 m²WC
2.60 m²WC
2.60 m²WC
2.60 m²WC
2.60 m²WC
2.32 m²WC
2.52 m²WC
2.60 m²CLNR
4.93 m²Access WC
98.96 m²Kitchen
167.15 m²Dining Area
Main Entrance
Pupils Entrance
Community Entrance
120.56 m²Dance Studio
90.37 m²Drama Hall
7.51
m²
Ser
vice
Ris
er
7.24 m²Office
71.90 m²Corridor
2.06 m²WC
2.27 m²WC
2.27 m²WC
2.23 m²WC
24.61 m²Store
20.53 m²Stairwell
57.12 m²Changing No2
56.93 m²Changing No1
11.77 m²Community Lobby
20.7
1m
²B
leac
her S
eats
2.23 m²WC
2.27 m²WC
2.27 m²WC
2.27 m²WC
4.12 m²Sprinklers
9.97 m²Room
7.58 m²Changing
7.48 m²Changing
14.60 m²Premesis Man.
12.24 m²Store
12.72 m²Tuck Shop
14.60 m²Office/Changing
357.98 m²Circluation
357.98 m²Circluation
PROPERTY SERVICES REVISION NOTES:
SOUTH GLOUCESTERSHIRE COUNCILTHE COUNCIL OFFICES,BADMINTON ROAD, YATE.SOUTH GLOUCESTERSHIRE BS35 1HFTEL: 01454 868686
DRAWING NUMBER STATUS
PROJECT TITLE PROPERTY NAME
DRAWING TITLE
SCALE:DRAWN:CHECKED:PROJECT CODE:DATE:
PROJECT ORIGINATOR PHASE/SECTION LOCATION DWG TYPE ROLE DWG No
1 : 100
30/06/2020LGTS-SGC-P1-XX-DR-A-S3.4
Lyde Green Primary & Secondary SchoolsLyde Green Primary & Secondary schoolsJulesChecker
100Proposed Ground Floor Plan S3.4
Status S5.2 - 04.06.2020 - Room Areas and room Schedule revised to 00.00m2
1 : 100Ground Floor Plan - Departmental Areas
PDF created with pdfFactory Pro trial version www.pdffactory.com
Design TeamProperty ServicesSouth Gloucestershire Council
9
New Primary & Secondary School at Lyde GreenFirSt FLoor PLaN
24
23
22
21
20
19
18
17
16
15
14
1312
11
10
9
8
7
6
5
4
3
2
1
242322212019181716151413
12 11 10 9 8 7 6 5 4 3 2 1
4.71 m²Break out
58.68 m²Classroom
58.83 m²Classroom
5.77 m²Services
58.96 m²Classroom
58.85 m²Classroom
58.75 m²Classroom
58.67 m²Classroom
27.29 m²Stairwell
13.88 m²Office
54.77 m²Classroom (E)
55.16 m²Classroom (E)
54.85 m²Classroom (E)
54.85 m²Classroom (E)
54.85 m²Classroom (E)
54.85 m²Classroom (M)
54.85 m²Classroom (M)
54.85 m²Classroom (M)
54.85 m²Clasroom (M)
61.55 m²Classroom (H)
122.12 m²Corridor
49.95 m²Void
240.25 m²Void
N
58.82 m²Classroom
58.80 m²Classroom
6.80 m²Store
Ref
uge
93.12 m²Corridor
4.71 m²Break Out
2.68 m²Void to Below
3.12 m²Void to Below
3.56 m²Void to Below
40.90 m²Staff Room
Refuge
61.64 m²Void
2.45 m²WC
2.45 m²WC
2.45 m²WC
2.45 m²WC
2.45 m²WC
2.45 m²WC
8.96 m²Group Room
15.03 m²SWR
5.89 m²Store
53.57 m²Services
22.09 m²Stairwell
22.49 m²Void to Below
64.52 m²Corridor
12.84 m²Food Tech
24.42 m²Stairwell
2.45 m²WC
5.82 m²Lift
8.39 m²Server
4.93 m²Access WC
54.85 m²Classroom (E)
2.82 m²WC
2.82 m²WC
19.90 m²SWR
8.42 m²Void 8.23 m²
Void
2.45 m²WC
2.45 m²Cleaner
2.70 m²WC
50.83 m²Classroom (H)
54.85 m²Classroom (E)
18.28 m²Group Room
2.60 m²WC
2.60 m²WC
2.60 m²WC
2.60 m²WC
2.60 m²WC
2.32 m²WC
2.52 m²WC
2.60 m²WC
4.42
m²
Acc
ess
WC
5.93 m²Lift 26.28 m²
Stairwell
600.14 m²Void
22.19 m²Void
8.31 m²Group Room
9.06 m²SENCO
9.06 m²SEN/MI
20.53 m²SEN Base
11.55 m²Service Riser
183.53 m²Circulation
9.74 m²Hygiene Room
7.93 m²Store
3.40 m²WC
3.40 m²WC
3.40 m²Cleaner
9.26 m²Server
78.58 m²Plant Room
6.83 m²Store
115.34 m²Library Area
11.4
2m
²S
ervi
ceR
iser
2.04 m²WC
2.25 m²WC
2.25 m²WC
2.25 m²WC
2.25 m²WC
66.62 m²Corridor
20.45 m²Stairwell
65.48 m²ICT Classroom65.47 m²
Music Classroom
2.25 m²WC
SF.62
2.22 m²WC
SF.63
8.50 m²ControlSF.64
213.79 m²Void
10.77 m²Void
209.44 m²Void
8.09 m²Music Practice
13.18 m²Music Practice
8.12 m²Music Practice
PROPERTY SERVICES REVISION NOTES:
SOUTH GLOUCESTERSHIRE COUNCILTHE COUNCIL OFFICES,BADMINTON ROAD, YATE.SOUTH GLOUCESTERSHIRE BS35 1HFTEL: 01454 868686
DRAWING NUMBER STATUS
PROJECT TITLE PROPERTY NAME
DRAWING TITLE
SCALE:DRAWN:CHECKED:PROJECT CODE:DATE:
PROJECT ORIGINATOR PHASE/SECTION LOCATION DWG TYPE ROLE DWG No
1 : 100
30/06/2020LGTS-SGC-P1-XX-DR-A-S3.4
Lyde Green Primary & Secondary SchoolsLyde Green Primary & Secondary schoolsJulesChecker
101Proposed First Floor Plan S3.4
Status S5.2 - 04.06.2020 - Room Areas and room Schedule revised to 00.00m2
1 : 100First Floor Plan - Departmental Areas
PDF created with pdfFactory Pro trial version www.pdffactory.com
Design TeamProperty ServicesSouth Gloucestershire Council
New Primary & Secondary School at Lyde GreenSecoND FLoor PLaN
10
54.85 m²Classroom (E)
54.85 m²Classroom (E)
55.16 m²Classroom (E)
54.77 m²Classroom (E)
13.88 m²Office
121.22 m²Corridor
N
76.11 m²Laboratory No1
82.93 m²Laboratory No2
82.74 m²Laboratory No3
19.90 m²SWR
27.29 m²Stairwell
2.82 m²WC
2.82 m²WC
82.75 m²Laboratory No5
86.65 m²Laboratory No4
62.98 m²Preparatory Room
7.77 m²Void
7.77 m²Void
87.98 m²Laboratory No6
11.55 m²Service Riser
26.28 m²StairwellSS.24
5.93 m²Lift7.04 m²
Group Room
164.50 m²Circulation
14.31 m²Office
75.05 m²Laboratory no7
55.40 m²Classroom
55.91 m²Classroom
55.60 m²Classroom
60.14 m²Classroom
2.08 m²WC
2.25 m²WC
2.25 m²WC
2.25 m²WC
2.25 m²WC
2.23 m²WC
20.45 m²Stairwell56.68 m²
Classroom
2.25 m²WC
56.74 m²Classroom
4.42 m²ACC WC
2.27 m²WC 2.27 m²
WC2.27 m²WC
2.27 m²WC
2.27 m²WC
60.45 m²Corridor
14.11 m²Store
22.27 m²Store
7.88 m²Room
5.22 m²Cleaner
11.1
4m
²S
ervi
ceR
iser
PROPERTY SERVICES REVISION NOTES:
SOUTH GLOUCESTERSHIRE COUNCILTHE COUNCIL OFFICES,BADMINTON ROAD, YATE.SOUTH GLOUCESTERSHIRE BS35 1HFTEL: 01454 868686
DRAWING NUMBER STATUS
PROJECT TITLE PROPERTY NAME
DRAWING TITLE
SCALE:DRAWN:CHECKED:PROJECT CODE:DATE:
PROJECT ORIGINATOR PHASE/SECTION LOCATION DWG TYPE ROLE DWG No
1 : 100
30/06/2020LGTS-SGC-P1-XX-DR-A-S3.4
Lyde Green Primary & Secondary SchoolsLyde Green Primary & Secondary schoolsJulesChecker
102Proposed Second Floor Plan S3.4
Status S5.2 - 04.06.2020 - Room Areas and room Schedule revised to 00.00m2
1 : 100Second Floor Plan - Departmental Areas
PDF created with pdfFactory Pro trial version www.pdffactory.com
Design TeamProperty ServicesSouth Gloucestershire Council
11
New Primary & Secondary School at Lyde GreenDeSiGN StatemeNtThis is a summary of the process of designing the school buildings and should to be read alongside the images and plans shown above. Further information will be included within the planning application.
Project Summary
The design for the new schools seeks to create an inspirational environment and a sense of progression for pupils within the joint new Primary and Secondary School. Balancing the changing needs of pupils and staff and the ethos of a Learning village was a key design consideration, as well as the sustainable future for the school, which is under-pinned by a sustainable Passivhaus design.
Design Rationale
The new school is proposed as a partly two and three storey building, set at the upper level of a gently sloping site. The building is designed to create a new landmark whilst being sympathetic to the surrounding community and well integrated to the immediate external landscape. The new development creates a distinctive building in the setting of the new Lyde Green Neighbourhood, offering both educational and community facilities.
Architecture
The new school building has been designed to create an impact on arrival with a feature entrance and a modern and contemporary look. This is achieved through a simple architectural form, clean lines, large glazed openings and a choice of materials and colours that reflect the urban setting. Good design will ensure that the new school is fit for purpose, efficient to manage, as well as being secure and safe to use. The layout will offer a sense of wellbeing, welcoming, opportunity to excel, explore, create and enthuse pupils to want attain higher goals of achievement throughout their academic pursuits.
Materials
The choice of materials has been carefully considered to reflect its urban setting whilst being sustainable and low maintenance. A warm, natural colour palette has been used including a pale brick, coloured high pressure laminate cladding and timber slats on the underside of canopies. A slight different colour nuance distinguishes the Primary from the Secondary. High level windows set on the roof plane within a triangular shape add a splash of colour and an element of fun. All windows and doors are proposed to be powder coated aluminium, high performance and triple glazed. The building will be constructed using cross laminated timber (CLT) for all structural elements including exter-nal walls, internal load bearing/shear walls and all floors.
Layout
The building is designed with a shared main entrance that leads into an open, part two storey atrium that forms the spine of the school. This central hub can be accessed by all, creates a sense of community and enable display of learning and shared values. From the main entrance visitors can access both the Primary and the Secondary School. The Primary school is zoned into two wings, the classroom block facing the rear of the site connected to the external play areas and the multi-use halls, kitchen and library at the front of the site with easy access for community use. A covered link connects the library with the classroom block and creates a secluded area for a library garden.
The Secondary school has three main volumes arranged around a large courtyard. At the front sits a three storey teaching block with specialist classrooms on the ground floor, general classrooms on the first floor and Science classrooms on the second floor. The central area connected to the atrium provides a dining area, a multiuse hall (Drama, Dance Studio) and changing facilities on the ground floor, a resource area/ library, SEN and music facilities on the first floor and general classrooms on the second floor. A 4-court sports hall is located at the north side of the court yard with easy access to the sports facilities and playing fields.
Sustainability
The Council has signed a Climate Emergency declaration and pledged to provide the leadership to enable South Gloucestershire to become carbon neutral by 2030. The sustainable considerations applied to this project are listed below.
1.Energy -reduction of carbon emissions, including the use of energy efficient building services, plant and equipment, low or zero-carbon energy-generating technologies, and the ability to monitor energy use by sub-metering. 2.Health and Well-being - a design that impact on the health or well-being of building occupants, including visual and thermal comfort, indoor air and water quality, acoustic performance, and providing low-risk, safe and secure access to and use of buildings.3.Transport - access to public transport networks and local amenities, along with the provision of information on travel options to building occupants, the provision of cyclist facilities and the limitation of car parking.4.Water - opportunities for reducing water consumption through the use of efficient sanitary ware, the reuse and recycling of water, the provision of leak detection and prevention of leaks, monitoring controls and the provision of water-efficient equipment.5.Materials - consideration for the embodied life-cycle environmental impacts of materials, the use of responsibly sourced materials and the robustness of the building fabric.6.Waste - reducing construction waste, the possible use of recycled aggregates, the provision of space to encourage operational recycling and encouraging the specification of finishes by the building’s occupants.7.Land Use and Ecology - consideration of the environmental impact of site selection including its ecological value and the protection of existing ecological features, mitigating the impact on and enhancing the ecological value of a site and limiting any long-term impacts on a site’s biodiversity.8.Pollution - impacts of surface water run-off from a site and the impact of light and noise pollution on neighbours.9.Ventilation - building design should provide controlled and natural ventilation in most areas supplemented with MVHR. High airtightness.10.Lighting - maximise the use of daylight and provide energy efficient lighting to school premises. There should be an integrated design of high quality day lighting and electric lighting. Ensure electric lighting installation is energy efficient and incorporates lighting controls or switching arrangements to maximise energy efficiency.11.Maintenance - new buildings should be designed for ease of maintenance and reduction of health hazards12.Renewables – use of solar PV panels and possible air source heat pumps
Design TeamProperty ServicesSouth Gloucestershire Council