40
New Features of CA ESP Workload Automation r11.3

New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

Embed Size (px)

Citation preview

Page 1: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

New Features of CA ESP Workload Automation r11.3

Page 2: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

Terms of This Presentation

This presentation was based on current information and resource allocations as of October

2009 and is subject to change or withdrawal by CA at any time without notice.

Notwithstanding anything in this presentation to the contrary, this presentation shall not serve

to (i) affect the rights and/or obligations of CA or its licensees under any existing or future

written license agreement or services agreement relating to any CA software product; or (ii)

amend any product documentation or specifications for any CA software product. The

development, release and timing of any features or functionality described in this presentation

remain at CA’s sole discretion. Notwithstanding anything in this presentation to the contrary,

upon the general availability of any future CA product release referenced in this presentation,

CA will make such release available (i) for sale to new licensees of such product; and (ii) to

existing licensees of such product on a when and if-available basis as part of CA maintenance

and support, and in the form of a regularly scheduled major product release. Such releases

may be made available to current licensees of such product who are current subscribers to CA

maintenance and support on a when and if-available basis. In the event of a conflict between

the terms of this paragraph and any other information contained in this presentation, the

terms of this paragraph shall govern.

2 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 3: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

For Informational Purposes Only

Certain information in this presentation may outline CA’s general product direction. All

information in this presentation is for your informational purposes only and may not be

incorporated into any contract. CA assumes no responsibility for the accuracy or completeness

of the information. To the extent permitted by applicable law, CA provides this document “as

is” without warranty of any kind, including without limitation, any implied warranties or

merchantability, fitness for a particular purpose, or non-infringement. In no event will CA be

liable for any loss or damage, direct or indirect, from the use of this document, including,

without limitation, lost profits, lost investment, business interruption, goodwill, or lost data,

even if CA is expressly advised of the possibility of such damages.

3 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 4: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

Abstract

> Attend this session to discover the latest new features

that will be included in the next release of CA ESP

Workload Automation. This release includes numerous

integrations with other CA products and incorporates

many suggestions from the ESP user community.

4 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 5: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

CA ESP Workload Automation r11.3

> Beta started September ’09

We are still accepting participants

> GA to follow beta program (early 2010)

5 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 6: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

Event Level Sensors

> Introduce Event Sensor Manager

> Introduce new WOBTRIG option to support

File Trigger Monitors

SAP Event Monitors

Database Monitor

Database Trigger Monitors

JMS Subscribe Monitors

WOBTRIG File_Trigger Agent(myAgentXP)FileName(c:\myFile.txt) UPDATE MULTIPLE

6 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 7: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

Cross-Application Processing

There are several types of cross application dependencies:

> for an external job: it has dependency to its potential home

jobs

> for an external job with POST_OLDEST setting in its application

or in the ESPPARM: it has dependency to its ancestor job in a

previous generation

> for a normal job with ANCESTOR_WAIT setting: it has

dependency to its ancestor job in a previous generation

> for an application with WAIT setting: it has dependency to its

previous application generation

7 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 8: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

Cross-Application Processing

8 What's New in ESP 11.3 Copyright © 2009 CA. All rights reserved.

Page 9: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

9 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 10: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

Cross-Application Processing

Page 11: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)
Page 12: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

Date/Time Statistics for Events

ENTER ANY COMBINATION OF THESE CODES NEXT TO THE EVENT(S) YOU WANT TO PROCESS

A Alter D Delete H Hold R Resume M Simulate

B Browse E Edit P Release U Suspend T Trigger

EVENT NEXT DUE AT LAST RUN SYS HC SC

CYBWM04.EVTDSTRG REQUIRES DS TRIGGER UNKNOWN ESPWM56 0 0

CYBWM04.EVTNWITH REQUIRES TRIGGER 2007/03/05 ESPWM56 0 0

CYBWM04.EVTSIMPL 08.35.00 2007/03/07 2007/03/06 ESPWM56 0 0

CYBWM04.EVTTRIGR REQUIRES TRIGGER 2007/03/05 ESPWM56 0 0

/*************************************************/

/* DEFINED BY TSOUSR8 AT 10.35 ON MON 26MAR2007 */

/* LAST RUN AT 11.09 ON MON 26MAR2007 */

/*************************************************/

EVENT ID(TSOUSR8.EVTABEND) SYSTEM(ESPWM56) REPLACE

INVOKE ' TSOUSR8.ASEP5600.APPLDEF(APPABEND)'

12 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 13: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

Enhanced Logging Functionality

> Unique identifier has been added to each message

> Provide better machine-readable information

> Standard message IDs will be documented

08.48.37 THU 24JAN08 ESP6064I AUDITLG: Auditlog opened, sysout class E08.48.41 THU 24JAN08 ESP6172I EVINIT: Class 0 MPL level is 308.48.42 THU 24JAN08 ESP6230I OPERCMD: BY INTERNAL ENQSELF ALWAYS08.48.42 THU 24JAN08 ESP6230I OPERCMD: BY INTERNAL RACROUTE ON08.48.42 THU 24JAN08 ESP6230I OPERCMD: BY INTERNAL EXPDSTRG SECURE08.48.42 THU 24JAN08 ESP6230I OPERCMD: BY INTERNAL AGENTRCV DEFINE NAME(ESPWM560) P08.48.42 THU 24JAN08 ESP6230I OPERCMD: BY INTERNAL LOADAGDF CYBWM01.ASEP5600.PARMLIB 08.48.42 THU 24JAN08 ESP6230I OPERCMD: BY INTERNAL CCFLOPT 2020000008.48.42 THU 24JAN08 ESP6230I OPERCMD: BY INTERNAL NODE ISLANDIA SET ROUTEJCL('//* ')08.48.42 THU 24JAN08 ESP6230I OPERCMD: BY INTERNAL CPU CA11 SET NODE(ISLANDIA) ROUTEJC08.48.42 THU 24JAN08 ESP6230I OPERCMD: BY INTERNAL CPU CA31 SET NODE(ISLANDIA) ROUTEJC08.48.42 THU 24JAN08 ESP6230I OPERCMD: BY INTERNAL RESDEF CA11 SET CPU(CA11) AVAIL(10) 08.48.42 THU 24JAN08 ESP6230I OPERCMD: BY INTERNAL DELAYINT08.48.42 THU 24JAN08 ESP6230I OPERCMD: BY INTERNAL @INITEND

13 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 14: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

Enhanced Logging Functionality

> New customizable table for echoing messages to JES job

log to be picked up by console automation

LOADESPL CYBER.ASEP5600.PARMLIB(ESPLOG)

SELECT MSGID(6030)SELECT MSGID(6040)SELECT RANGE(6060,6160)

14 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 15: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

History Reporting for Applications

> New record type for Application reporting:

Event prefix & name, event user ID

original schedule time, actual start time

actual run time, actual end time

rerun start time (if any)

accumulated REXXON run time (if any)

triggering method, triggering job/task/user

complete or rerun reason (if any)

object counts (selected, bypassed, completed, failed,

forced, inserted, purged, rerun, REXXON occurrences)

Appl flags (ended, forced, cached, critical path on,

Applhold, Applwait, instream proc, rerun)

15 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 16: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

History Reporting Improvements

> New selection criteria to allow for reporting within daily

time range

> USER STATUS field

> CRITJOB and CRITPATH fields

> RESWAITT field

16 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 17: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

History Reporting Improvements(RESWAITT)

17 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 18: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

Report Server

> Method for consolidating reporting data

> History report data is written to a database

> SQL query from ESP Reporting utility

> Can consolidate data of many Masters to one database

18 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 19: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

Report Server

> New SQL Report command allows users to retrieve data

from the view

> Example:

ReportSQL select jobname,appl,applgen,rdron,rdrondate,status,agentfrom esp_job_histwhere histid='HIST1'order by appl,applgen

ENDR

19 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 20: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

20 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 21: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

21 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 22: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

22 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 23: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

IPv6 Support

> TCPIP communications will support IPv6 (colon-

hexadecimal notation)

CA ESP Workload Automation Agents

CA ESP Workload Automation Workstation

Network Delivery Services (Master – Master)

IPv6:

FD00:7A06:0A20:0100:0000:0000:0000:0031

IPv4:

141.202.65.31

23 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 24: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

Email Subject Line

> Changed default Subject line from “ESP Event Notification”

> New Subject line includes

Jobtype jobname[(jobno)] IN APPL applname.gen

STARTED

ENDED|ENDED PREMATURELY, CMPC=CODE

SUBMISSION FAILED, STATUS: INFO

COMPLETED

REQUIRES MANUAL COMPLETION

STATE state_information

24 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 25: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

Real-Time Forecast

RT

25 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 26: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

Real-Time Forecast

26 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 27: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

Real-Time Forecast

27 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 28: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

Predicting Late Jobs

> New LATEPRED command to turn on/off

> New NOTIFY option: LATEPRED

APPL PAYROLLJCLLIB ‘FOWVA01.TESTJOBS.JCL’

NOTIFY LATEPRED USER(FOWVA01)

JOB VFJOB2RUN DAILYRELEASE VFJOB3ENDJOB

JOB VFJOB3RUN DAILY DURATION 20DUEOUT EXEC NOW PLUS 1 HOURENDJOB

28 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 29: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

Predicting Late Jobs

29 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 30: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

Predicting Late jobs

30 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 31: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

Simulation Update –Time Dependencies

31 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 32: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

FTP Enhancement

> Add site specific commands to FTP wobs

> New SITECMD statement is available

> Can specify up 4070 characters to be passed

FTP_JOB CYBJK.FTP ftpformat e compress(8) remotename /pub/cazip.exe localname /tmp/bla transferdirection down serveraddr ftp.ca.com serverport 21 SITECMD site recfm=FB SITECMD site date RUN DAILY ENDJOB

32 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 33: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

Resource Last Used Info

33 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 34: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

Integration Enhancements> CA Autosys® Workload Automation

EXTSCHED object type

> CA 11™ Workload Automation for rerun/restart

> IBM Health Checker

Can monitor the subsystem

Can monitor for high TCells and DSTCells usage

> CA License Manager

> SOA Enablement

> CA JCLCheck Workload Automation

34 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 35: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

Integration with CA JCLCheck

Y

35 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 36: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

Integration with CA JCLCheck

36 What's New in ESP 11.3 Copyright © 2009 CA. All rights reserved.

Page 37: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

Integration with CA JCLCheck

37 What's New in ESP 11.3 Copyright © 2009 CA. All rights reserved.

Page 38: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

Additional Enhancements> Can now accept any size return code from Agent work

> Resource HOLD option for NOTWITH

> Date/time stamp for global variables

> User Action with “reason”

“cancelled per Joe Smith”

> New APPLSTART workload object type

38 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 39: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

Support for New Agents

> Web Services Agent

Invoke a web services from an ESP schedule

Pass data from one web service to another

> Application Services Agent

Support for different J2EE Application Servers, including

IBM WebSphere, BEA WebLogic, Oracle Application Server,

and Jboss

Enhanced EJB and JMS Publish jobs; JMS Subscribe job as

in R6.1

39 October 12, 2009 ESP New Features of CA ESP Copyright © 2009 CA

Page 40: New Features of CA ESP Workload Automation r11 · New Features of CA ESP ... > Example: Report ... CA ESP Workload Automation Workstation Network Delivery Services (Master –Master)

New Features of CA ESP Workload Automation r11.3