Addenda #1 Mansfield ES Environmental Consultant RFP pg. 1 New Elementary School Mansfield Public Schools Request for Proposal for NESHAP Pre-Demolition Hazardous Building Materials Inspection, Testing, Design & Abatement/Remediation Monitoring Services Addenda #1 Issued June 26, 2020 Note: the proposal date has been changed from July 6 th to July 7 th . Proposals are Due no later than July 7, 2020 at 2:00 p.m. Questions and responses Question #1 - Has a determination been made regarding whether or not the UST mentioned in the RFP has been removed and properly closed as discussed during the site visit? Response: The UST has been removed, the Oil tank closure report will be made available to the selected firm. No work is anticipated or should be included for the oil tank at this time. Question #2 - To determine whether or not any suspect ACMs are present and adhered to the underside of the slabs for the various construction dates, core drilling in representative areas of the school would need to be completed. Can the town provide any information for the location of utilities, drainpipes etc. that may run under the slab to safely coordinate locations for core drilling or will it be the consultant’s responsibility to provide that service (hire a sub) to ensure nothing below the slab is accidentally impacted? Response: There are limited existing plans that will be provided to the selected firm. See the attached 1965 and 1989 plumbing plans and the 1957 foundation plan. Please also note the revised plan Appendix “C” plan rev 1 dated 6-26-20 depicting assumed additions, The art room addition has been changed to 1989. Question #3 – If a firm has an inhouse laboratory certified by the CTDPH, AIHA and NVLAPP. Our lab analyzes asbestos bulk samples via PLM/PLM point count analysis. If selected, would we be able to analyze collected samples inhouse or would we be expected to send those samples to an independent laboratory? Response: All consultants must utilize an independent laboratory.

New Elementary School Mansfield Public Schools Request for … · 2020-06-26 · No work is anticipated or should be included for the oil tank at this time. ... • TCLP (2 samples)

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: New Elementary School Mansfield Public Schools Request for … · 2020-06-26 · No work is anticipated or should be included for the oil tank at this time. ... • TCLP (2 samples)

Addenda #1 Mansfield ES Environmental Consultant RFP pg. 1

New Elementary School

Mansfield Public Schools

Request for Proposal for

NESHAP Pre-Demolition Hazardous Building Materials Inspection, Testing,

Design & Abatement/Remediation Monitoring Services

Addenda #1 Issued June 26, 2020

Note: the proposal date has been changed from July 6th to July 7th.

Proposals are Due no later than July 7, 2020 at 2:00 p.m.

Questions and responses

Question #1 - Has a determination been made regarding whether or not the UST mentioned in the RFP has been removed and properly closed as discussed during the site visit? Response: The UST has been removed, the Oil tank closure report will be made available to the selected firm. No work is anticipated or should be included for the oil tank at this time. Question #2 - To determine whether or not any suspect ACMs are present and adhered to the underside of the slabs for the various construction dates, core drilling in representative areas of the school would need to be completed. Can the town provide any information for the location of utilities, drainpipes etc. that may run under the slab to safely coordinate locations for core drilling or will it be the consultant’s responsibility to provide that service (hire a sub) to ensure nothing below the slab is accidentally impacted? Response: There are limited existing plans that will be provided to the selected firm. See the attached 1965 and 1989 plumbing plans and the 1957 foundation plan. Please also note the revised plan Appendix “C” plan rev 1 dated 6-26-20 depicting assumed additions, The art room addition has been changed to 1989.

Question #3 – If a firm has an inhouse laboratory certified by the CTDPH, AIHA and NVLAPP. Our lab analyzes asbestos bulk samples via PLM/PLM point count analysis. If selected, would we be able to analyze collected samples inhouse or would we be expected to send those samples to an independent laboratory? Response: All consultants must utilize an independent laboratory.

Page 2: New Elementary School Mansfield Public Schools Request for … · 2020-06-26 · No work is anticipated or should be included for the oil tank at this time. ... • TCLP (2 samples)

Addenda #1 Mansfield ES Environmental Consultant RFP pg. 2

Question #4 - We understands that CAD drawings will be required for the design phase of the project. For the inspection report however, to show the locations of identified ACMs would drawings clearly marked by hand suffice, for cost saving purposes? Or would you prefer some type of computer-generated drawings? Response: CAD drawings will not be required for the interior building areas, hand drawings or edited

PDF documents using REVU 2019 or similar software will be acceptable.

Question #5 - Can we receive an electronic copy of the last three-year AHERA re-inspection report for

the school?

Response: As noted on page 2 of the RFP, the existing management plan and reports are not available

electronically, Contact information for Allen Corson was provided if the consultant wishes to review

the documents prior to their submission.

Question #6 - There is language about entering into an agreement with the Town and indemnification

language with the insurance requirements in the RFP, however, there is no specific language about the

ability to negotiate or not allow exceptions. Could you please clarify the agreement terms and if they are

negotiable?

Response: If your firm has specific exceptions to the language contained in the insurance

requirements or RFP provide an attachment to the bid form listing those exceptions. The contract will

be negotiated with the selected firm.

Question #7 - Is there an anticipated method for demolishing / removing the portable classrooms? This

may change the approach to the survey and/or abatement plan.

Response: There is no anticipated form of removal, The portables were added to the existing school in

2000, the portables will be removed by selective demolition and the exterior wall restored for the fall

2021 school year.

Question #8 – Please confirm that the 2-bay brick garage is to be included in the survey, abatement, and

demolition.

Response: The 2 Bay brick garage is included in the survey, abatement and demolition.

Question #9 – The Phase II ESA recommends sampling for pesticides in soils around the school buildings

and in the former agricultural fields. Should scope and costs be included in the proposal?

Response: No additional testing outside of what has been requested in the RFP should be included at

this time. Any additional testing for pesticides will be reviewed with the building committee, if

additional testing is undertaken it will be provided as an hourly additional service based on the hourly

rates submitted with the RFP response. Lab Fees will be paid at actual cost.

Question #10 – The RFP requests that costs be included for remediation specifications to address RECs

identified in the Phase I and Phase II ESAs. Where should these costs be included? There is no specific

line item on the Bid Proposal Form.

Page 3: New Elementary School Mansfield Public Schools Request for … · 2020-06-26 · No work is anticipated or should be included for the oil tank at this time. ... • TCLP (2 samples)

Addenda #1 Mansfield ES Environmental Consultant RFP pg. 3

Response: The UST has been removed, do not include any additional costs in the RFP response for

specifications to address REC’s at this time. Delete all references to REC’s from Section III Scope of

Services Paragraph 1.

Question #11 – Will the specifications for the underground water tank removal be part of the architect’s

specifications, as these are not environmentally regulated?

Response: Yes the underground water tank is part of the architect’s responsibility

Question #12 – The Phase II (April 2019) identified environmental impacts to the drinking water. Has a

Significant Environmental Hazard Notification been filed with CTDEEP? Shall the proposal address any

follow up notifications?

Response: A notification has been filed with CTDDEEP. New wells are part of the project and no

follow up notifications are anticipated.

Question #13 – Is the architect or the consultant responsible for developing the demolition bid package?

Response: The architect will develop the building demolition specifications, the environmental

consultant is required to coordinate with the architect and provide all abatement specifications. The

documents should be fully coordinated and work in harmony with each other.

Question #14 – If PCB materials will be assessed visually this summer (2020), and samples collected for

analysis in 2022, how should this be addressed within the requested bid document to be prepared in

2021?

Response: An approach to PCB testing and remediation will be developed with the building

committee after the visual assessment and potential source material quantities are estimated and the

risk and reward options of testing has been reviewed with the committee. It is anticipated that all

testing and specifications will be finalized prior to bidding based on the selected approach.

Question #15 - There are no unit costs included for paint chip samples (if needed), waste

characterization samples (TCLP) TEM or SPLP samples (for potentially recycling painted concrete or

reusing as clean fill). These may be required depending on the levels of lead found in paints during the

inspection phase. Should we include unit costs for these and if so how many for each should we

assume?

Response: An updated bid form Rev 1 dated 6-26-2020 is attached to this addenda. TCLP sampling has

been included. Lead based paint as noted in Section III Scope of Services Paragraph 2A shall be

identified using XRF equipment. There will be no re-use of materials.

Question #16 – For the line item “Provide PCB specifications (PCBs less than and/or greater than 50 ppm

PCB)” Are you asking for separate specs? One for <50 and another for >50, or one spec that addresses

both?

Page 4: New Elementary School Mansfield Public Schools Request for … · 2020-06-26 · No work is anticipated or should be included for the oil tank at this time. ... • TCLP (2 samples)

Addenda #1 Mansfield ES Environmental Consultant RFP pg. 4

Response: An additional line has been added on the bid form to separate out PCB specifications for

both <50 and >50. See bid form Rev 1 dated 6-26-10.

Question #17 – Should we be providing lump sum costs for post project compliance reporting (Asbestos

Compliance Report & PCB Remedial Action Report)?

Response: Post compliance reporting cannot be accurately determined until an understanding of the

scope of environmental remediation has been determined in the discovery phase. Post compliance

reporting and project close out will be negotiated using the hourly rates provided in the RFP response.

Question #18 – Are there any existing plans of the Tunnels?

Response: There are limited existing plans that will be provided to the selected firm. See the attached

1965 and 1989 plumbing plans and the 1957 foundation plan.

General Comments

1. Appendix “C” update - Appendix “C” has been updated, please reference the attached revised

plan Appendix “C” plan rev 1 dated 6-26-20 depicting assumed additions, The art room

addition has been changed to 1989.

2. See attached updated Bid Form Rev 1 dated 6-26-2020

3. Provide a complete list of Hourly rates for al staff attached to the bid form.

End of Addenda #1

Page 5: New Elementary School Mansfield Public Schools Request for … · 2020-06-26 · No work is anticipated or should be included for the oil tank at this time. ... • TCLP (2 samples)

Bid Proposal Form For

NESHAP Pre-Demolition Hazardous Building Materials Inspection, Testing, Design and Abatement/Remediation Monitoring Services

Southeast Elementary School

Rev1 6-26-2020

Lump Sum Fee for Inspection labor to include asbestos, lead-based

paint, universal waste and PCB’s identification and list of suspect

source materials with anticipated quantities. Fee shall include

project management, four (4) meetings at Two (2) hours each with

owner/owners’ representative(s) to discuss the report, develop

options to address potential PCB remediation and to review report

preparation. For purposes of bid evaluation, assume the following

samples and provide unit price for each. The lump sum fee proposal

shall include the cost for testing samples. Cost of additional bulk

samples will be reimbursed at the unit rate.

• Lump Sum for Inspections including management and report

preparation

Independent Laboratory Analysis

• PLM (275 samples) $___________/sample

• PLM Point Count (20 samples) unit price $_________/sample

• TEM (9 samples) $______________/sample

• TCLP (2 samples) $_____________/sample

Total initial Fee (labor, samples, meetings and report) $

Provide hourly labor rate to sample suspect PCB source materials

(Sealant compounds, roofing, tars, damp-proofing, wall and floor

adhesives and paint source materials), adjacent building and/or

ground materials for PCBs

Senior Inspector – $____________Hour Inspector – $ Hour

PCB unit price for PCB source sample analysis $ /Sample

Provide unit price for PCB adjacent sample analysis $ /Sample

Roofer, Mason, Contractors for Repairing Sample Location Damage

– Contractors to be approved by owner

Paid by Owner with

0% Mark Up

Provide Costs for each Item Below

Provide Hazardous Building Materials Specifications and Drawings

(Asbestos, Lead-Based Paint, Universal Waste, Selective Demolition,

Unit Pricing) (Lump Sum)

$

Provide PCB specifications (PCB’s less than 50 ppm PCB) – (Lump

Sum)

S

Provide PCB specifications (PCB’s greater than 50 ppm PCB) – (Lump

Sum)

$

Provide PCB SIP (Self-Implementing Plan) including EPA Revisions –

(Lump Sum)

$

Page 6: New Elementary School Mansfield Public Schools Request for … · 2020-06-26 · No work is anticipated or should be included for the oil tank at this time. ... • TCLP (2 samples)

Provide PCB Performance Based Plan – (Lump Sum) $

Additional Project Design Management/Meetings Lump Sum

(Assume 40-hours) Hourly Rate = $_________/hr. to be billed hourly

$

Project Bid Services Management/Meetings/Bid Walks Lump Sum

(Assume 20-hours) Hourly Rate = $_________/hr. to be billed hourly

$

Abatement Monitoring Services

Provide lump sum for abatement monitoring (project monitor)

(Assume 45 days) Hourly Rate = $________/hr. (straight time) to be

billed hourly

$

Provide overtime rate beyond 8-hours per day for abatement

monitoring

$ /hr.

Provide management lump sum

(Assume 80-hours) Hourly Rate = $_________/hr. to be billed hourly

$

PCM 24-hour turn-around time – unit rate $ /sample

TEM 24-hour turn-around time – unit rate $ /sample

TEM 6-hour turn-around time – unit rate $ /sample

PCB verification sampling unit rate (5-day turn-around time) $ /sample

PCB verification sampling unit rate (2-day turn-around time) $ /sample

Travel Mileage Rate (Not-To-Exceed 100 miles per day), not to

exceed Federal Rate

$ /mile

NOTE: attach to this bid form on a separate page a complete list of hourly rates for all anticipated project staff.

Acknowledge Addenda

__Addenda #1 Issue 6-26-2020____________________________________________________

__________________________________________________________________________________

Authorized Signature Date

__________________________________________________ _____________________

Page 7: New Elementary School Mansfield Public Schools Request for … · 2020-06-26 · No work is anticipated or should be included for the oil tank at this time. ... • TCLP (2 samples)
spellman
Callout
1957 BLDG
spellman
PolyLine
spellman
PolyLine
spellman
Callout
1965 Addition
spellman
PolyLine
spellman
PolyLine
spellman
Callout
1989 Addition
spellman
Callout
1989 Addition
spellman
PolyLine
spellman
Callout
2001 Portables
spellman
PolyLine
spellman
Callout
1989 Addition
Page 8: New Elementary School Mansfield Public Schools Request for … · 2020-06-26 · No work is anticipated or should be included for the oil tank at this time. ... • TCLP (2 samples)
Page 9: New Elementary School Mansfield Public Schools Request for … · 2020-06-26 · No work is anticipated or should be included for the oil tank at this time. ... • TCLP (2 samples)
Page 10: New Elementary School Mansfield Public Schools Request for … · 2020-06-26 · No work is anticipated or should be included for the oil tank at this time. ... • TCLP (2 samples)