Page 1: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC

JUNE 23, 2016

NEW ELEMENTARY SCHOOL AT THOMAS JEFFERSON MIDDLE SCHOOL

PFRC Meeting

1

Page 2: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC

Project Parameters1. New Elementary School for the Henry Community 2. Support Strategic Plan Goal #4 – Provide Optimal      

Learning Environments3. Address capacity by providing 725 seats4. Open by start of school 20195. Multi‐story building in northwest corner of site6. Structured parking 7. Project cost $59 million 

2

Page 3: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC

Concept DesignSiting and Massing:

general building location, shape, size, and height

General site layout and circulation: frontage bus loop/service accesspick-up and drop-off

Structured parking:rough target on number of parking spotsplay area above parking

Items for consensus 3

Page 4: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC

June 15, 2016

NEW ELEMENTARY SCHOOL AT THOMAS JEFFERSON MIDDLE SCHOOL

Massing and Site Update

4

Page 5: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC Comparison between 4.2 and 4.3

Scheme 4.2a: “Biscuit”

• 1st floor exterior footprint: 27,828 gsf• Gym on third floor• Building slightly cantilevers out as it goes up• 4 stories• Linear feet of exterior skin: 3,341 linear feet• Energy Use Intensity (EUI): 18 kBTU/sf/yr• Annual energy cost: $50,201• Roof space suitable for solar panels: 26,700 sf• Post energy production EUI: 4

Scheme 4.3a: “Lobster”

• 1st floor exterior footprint: 38,723 gsf• Gym on ground floor• Building significantly steps back as it goes up• Part 3 story, part 4 story• Linear feet of exterior skin: 3,769 linear feet• Energy Use Intensity (EUI): 18 kBTU/sf/yr• Annual energy cost: $50,652• Roof space suitable for solar panels: 53,760 sf • Post energy production EUI: -2.5

5

Page 6: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC 4.2a “Biscuit” 4.3a “Lobster”6

Page 7: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC 4.2a “Biscuit” 4.3a “Lobster”

Northern-most extent of facades of 4 story building massing in “Biscuit”

Northern-most extent of facade of 4 story building massing in “Lobster”

80’ further south

7

Page 8: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC Scheme 4.3b8

Page 9: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC Scheme 4.3b 225 garage spots, 50 feet between garage and MS9

Page 10: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC Scheme 4.3b10

Page 11: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC Scheme 4.3b11

Page 12: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC Scheme 4.3b12

Page 13: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC Scheme 4.3b13

Page 14: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC Scheme 4.3b14

Page 15: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC Scheme 4.3b15

Page 16: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC Scheme 4.3b: 1st floor16

Page 17: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC Scheme 4.3b17

Page 18: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC Scheme 4.3b18

Page 19: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC Scheme 4.3b19

Page 20: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC Scheme 4.3b20

Page 21: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC Scheme 4.3b21

Page 22: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC Scheme 4.3b22

Page 23: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC Scheme 4.3b: 1st floor23

Page 24: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC Scheme 4.3b24

Page 25: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC

Concept DesignSiting and Massing:

general building location, shape, size, and height

General site layout and circulation: frontage on South Old Glebebus loop/service access on north side of sitecombined pick-up and drop-off within parking garage

Structured parking:single level parking structure with maximum amount of parkingplay area above parking

Items for consensus 25

Page 26: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC 26

Page 27: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC

Discussion

New ES on Thomas Jefferson Site27

Page 28: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC

NEXT STEPS

July 1 Concept Design to school board (information)

July 20 Concept Design to school board (action)

28

Page 29: NEW ELEMENTARY SCHOOL - apsva.us

23 JunePFRC

ADJORN

For further information please contact:

APS Project ManagerSteve [email protected]

Web links:APS Project Website PFRC Project WebsiteSubmit Public Comment and Sign up for Email Distribution

County Project ManagerMarco [email protected]

29