28
An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick Tooker 1 , Paul Dombrowski 2 , Frank Russo 3 , Annalisa Onnis-Hayden 1 , April Z. Gu 1 1 - Northeastern University CEE Dept.; 2 – Woodard & Curran; 3 – City of Meriden, CT NEWEA – Session 1, Innovative Treatment Technologies January 25, 2016 [email protected] ( @nbtooker)

New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT

with Side-Stream EBPR

Nick Tooker1, Paul Dombrowski2, Frank Russo3, Annalisa Onnis-Hayden1, April Z. Gu1

1 - Northeastern University CEE Dept.; 2 – Woodard & Curran; 3 – City of Meriden, CT

NEWEA – Session 1, Innovative Treatment Technologies January 25, 2016

[email protected] ( @nbtooker)

Page 2: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

Acknowledgements

• Funding provided by WERF, HRSD, W&C • City of Meriden staff • Clean Water Services – Durham Facility • Undergraduate research assistants

2

Page 3: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

Motivation for Improving EBPR

• EBPR operation is notoriously “unstable” § Sometimes due to lack of carbon

• Meriden staff are frustrated because this is the only part of plant they can’t control § And permit limits keep getting lower

3

Page 4: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

Highly Variable Effluent OrthoP in Meriden

4

0.7 mg/L TP permit limit

(April – October)

Unstable

Stable

Page 5: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

RAS WAS

PO4 release VFA uptake PHA generation

PO4 uptake PHA consumption Cell growth

Low influent rbCOD:P

Inconsistent effluent P

Typical EBPR Process Configuration

5

Page 6: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

80-95% RAS WAS

S2EBPR Process Configuration – Side-Stream RAS

5-20% RAS

6

~1 day HRT ~2-5 day SRT

Page 7: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

Hypothesized Ways S2EBPR Improves Stability

7

•  Is there VFA production in side-stream?

•  Is there active VFA uptake in side-stream reactor*?

•  Is there a shift in microbiological population?

§ To more efficient polyphosphate accumulating organisms (PAOs)?

§ With fewer glycogen accumulating organisms (GAOs)?

* - Bi et al, 2013 and Lopez et al, 2006

Page 8: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

What We Currently Know About S2EBPR

8

•  In operation at full-scale facilities §  50+ in Europe (mostly Denmark) §  ~6 in North America

• No consensus on operation § Several different flow schemes

• Standard models (e.g., BioWin, GPS-X) don’t fit observed data

• Fundamental understanding is lacking

Page 9: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

Testing to Understand S2EBPR

9

• Simulated S2EBPR Batch Testing § Meriden, CT § Durham (Clean Water Services, Tigard, OR) § Westside Regional (West Kelowna, BC) § Cedar Creek (Olathe, KS)

• S2EBPR Pilot Testing § Meriden, CT

Page 10: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

Simulated S2EBPR Batch Testing Reactors

10

Sludge from Meriden (aerobic MLSS) and Durham (TWAS) Similar initial MLVSS of ~ 6,000 mg/L 3-day anaerobic incubation Mixing once per day during sample collection

Page 11: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

VFA Production in Simulated S2EBPR Batch Test

11

5mg/LasVFA

38mg/LasVFA

121mg/LasVFA

218mg/LasVFA

•  Residual VFA quadrupled and sCOD tripled after just one day

Durham

Page 12: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

Low ORP in Simulated S2EBPR Batch Tests

12

•  Low ORP allows for fermentation and VFA production

Durham

Fermentation ORP

Methane formation ORP

Page 13: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

Key Organisms in EBPR Processes

• Accumulibacter § Commonly known PAOs §  Important for effective EBPR • Tetrasphaera § Lesser known PAOs § Widely present in WRRFs (15%+ of population) § Some are also fermenters • Competibacter § Commonly known GAOs § Competes with PAOs for VFA

13

Page 14: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

Microbiological Population Shifts in S2EBPR Batch Test

14

Durham

Accumulibacter decreased

Tetrasphaera didn’t change

Low GAO proportion

Page 15: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

15

Sample from Durham Facility (Tigard, OR)

EUB mix (general probe) in green; Accumulibacter in yellow

Page 16: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

16

Sample from Durham Facility (Tigard, OR)

EUB mix (general probe) in green; Tetrasphaera in red & orange

Page 17: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

Meriden S2EBPR Pilot – Goals

• Effectively implement S2EBPR § Stabilize EBPR operation § Reduce ferric chloride use •  Improve understanding of process

• Minimize effort for plant staff

17

Page 18: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

Meriden S2EBPR Pilot –Overview (Mar-Aug 2015)

18

RAS WAS

Nitrate Recycle Primary Effluent

•  Aerobic MLSS was feed to side-stream reactor (unused clarifier)

Target SRT ~ 3 days Actual SRT ~ 1-2 days

Page 19: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

Delayed VFA Production in Meriden S2EBPR Batch Test

19

•  1-2 day HRT not long enough for VFA generation with aerobic MLSS

Meriden

Durham

Page 20: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

Low ORP in Simulated S2EBPR Batch Tests

20

•  ORP not low long enough for residual VFA generation in first 2 days

Meriden

Fermentation ORP

Methane formation ORP

Page 21: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

In S2EBPR Pilot Reactor: Low DO, too High ORP

21

•  While DO in sludge blanket was low; ORP was too high for fermentation

DO, mid blanket

DO, blanket bottom

ORP, mid blanket

ORP, blanket bottom

sludge blanket 4-5 feet deep

Fermentation ORP

Page 22: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

Minimal Improvements to EBPR Stability w/ Aerobic MLSS S2EBPR During Meriden Pilot

22

•  Possibly due to elevated ORP in S2EBPR reactor

Secondary Effluent

PO4

Page 23: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

Meriden’s Fix: Increase PC Blanket Level for VFA

23

•  Increase carbon to anaerobic zone by primary sludge fermentation!

FeCl3 dose

PC blanket

Effluent PO4

Page 24: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

Notes from the Operators

• Be committed for significant additional sampling, analyses, and labor • Communicate constantly with engineers and

researchers • Be willing to experiment § Use your expertise!

24

Page 25: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

Takeaway Messages

• VFA production occurred in simulated S2EBPR batch reactors § But low ORP and adequate HRT required

• Aerobic MLSS is a poor feedstock for S2EBPR reactor

§ Getting ORP low enough is problematic

§ RAS, WAS, or anaerobic MLSS preferred

• Highly trained and engaged treatment plant staff is critical

25

Page 26: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

Meriden S2EBPR Pilot – Next Steps

• Pilot test #2, March 2016 • Alternative operation with RAS or TWAS

instead of aerobic MLSS § Reduce ORP in reactor §  Increase VFA production

26

Page 27: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

References

•  Lopez, C.; Pons, M.N.; Morgenroth, E. (2006). Endogenous processes during long-term starvation in activated sludge performing enhanced biological phosphorus removal. Water Research, 40, 1519-1530.

•  Bi, D.; Gou, X.; Chen, D. (2013). Phosphorus release mechanisms during digestion of EBRP sludge under anaerobic, anoxic and aerobic conditions. Water Science & Technology, 67(9), 1953-1959.

27

Page 28: New An Attempt to Sustainably Stabilize EBPR Performance at … · 2017. 10. 17. · An Attempt to Sustainably Stabilize EBPR Performance at Meriden, CT with Side-Stream EBPR Nick

Discussion & Questions

Nick Tooker, P.E., Ph.D. Student (April Gu research group) Northeastern University Civil & Environmental Engineering [email protected] @nbtooker ( ) April Z. Gu: [email protected] Frank Russo: [email protected]