Wireless Review
7/30/2019 Network Review Ppt
http://slidepdf.com/reader/full/network-review-ppt 2/29
COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY INSTRUCTION
2
Network Snapshot
Technology Sites MSCs BSC
2G 2174 4 40
Technology Sites RNC BSC
3G 505 3
Technolgy Sites MSC BSC
CDMA 742 2 4
BU cluster wise BTS Count 2G 3G CDMA
BERHAMPUR 411 38 157
BHUBANESHWAR 380 178 119CUTTACK 842 196 293
ROURKELA 538 92 173
Network Snapshot
7/30/2019 Network Review Ppt
http://slidepdf.com/reader/full/network-review-ppt 3/29
3
COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY INSTRUCTION
Traffic Trend – NBH
GSM:
Due to reduction in free minutes, Tariff plan changes
7/30/2019 Network Review Ppt
http://slidepdf.com/reader/full/network-review-ppt 4/29
4
COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY INSTRUCTION
MOU Report
Due to reduction in free minutes, Tariff plan changes
7/30/2019 Network Review Ppt
http://slidepdf.com/reader/full/network-review-ppt 5/29
Data Traffic Growth 24 Hrs
In increasing trend.
7/30/2019 Network Review Ppt
http://slidepdf.com/reader/full/network-review-ppt 6/29
Core Network Performance- OR
ALU BSC01 planned to be re-homed from HMSC01 to HMSC04.
LAC re-dimensioning completed as Aircel ICR is closed & PSR is under observation
7/30/2019 Network Review Ppt
http://slidepdf.com/reader/full/network-review-ppt 7/29
POI utilization and its augmentation plan
GSM
CDMA
Sr. NoCircle Operator Name Working Devices Capacity in (ERL) Carried Traffic utilz Remarks
1 OR Aircel 895 791.85 338.98 42.8% 2 OR Airtel 1611 1500.55 567.2 37.8% 3 OR BSNL 785 526.51 75.71 14.4% 4 OR Cellone 2785 2650.47 574.97 21.7% 5 OR Idea 525 458.6 148.89 32.5% 6 OR Tata 1143 1027.44 194.19 18.9% 7 OR Vodafone 928 867.89 409.06 47.1% 8 OR RTL 3525 3143.15 1176.89 37.4%
Sr. No CIRCLEOperator
NameWorking E1's
Capacity[Erl]
Carriedtraffic (ERL)
Utiliz. Action plan to bring down the utilization @70%
1 OR Aircel 88 2439.92 2071.81 85.97% Traffic balancing has been done
2 OR Airtel 279 8177.41 5664.22 69.25%15 E1 augmented on dated 05th Jul'2013 & 10 E1
augmented on 13th Jul'2013 for Airtel O/G & SO generated
for 25 E1 augmentation in RTL O/G TG.
3 OR Cellone 189 5521.51 4052.7 72.60%Letter submitted to BSNL for 33 E1s augmentation on 14th
Jun'13 (19 & 14 E1s from MSC2 & MSC3 respectively)
4 OR Idea 65 1897.33 1110.14 57.61%
5 OR Tata 68 1947.84 1086.21 56.64%
6 OR Vodafone 146 4260.96 2922.1 68.09%
7 OR RCOM CDMA 48 1313.2 507.44 42.37%
8 OR BSNL TAX 64 1671.33 469.01 28.32%
7/30/2019 Network Review Ppt
http://slidepdf.com/reader/full/network-review-ppt 8/29
Network Congestion
****76 TGT Required for partial faulty Cases where as rest of 45 casesplanned by next week.
Congestion relief Plan No of Cells
Hardware Issues 138
New Site Planned 11
New Site Required 26
Physical Optimization required for Traffic Sharing 17
TRX Addition Required 228
6 TRX/6 Sector Upgradation 36
Grand Total 456
Requirement forDecongestion-3G
No of Cell
BPC Card Required 15New Site Required 26
Circle
Count of Congested Cells
CDMA GSM HSD 3G
OR 0 456 NA 15
7/30/2019 Network Review Ppt
http://slidepdf.com/reader/full/network-review-ppt 9/29
KPI Performance-CDMA
All CDMA KPI’s meeting the benchmark
7/30/2019 Network Review Ppt
http://slidepdf.com/reader/full/network-review-ppt 10/29
KPI Performance-GSM
TASR :Sites fluctuation>9 times increased 215 to 263 & Flicks Count increased 21588 to 33874 as compared to wk-3
301 Cells continuously coming for TASR (27 cells=TRX upgrade required,45 Cells=BSS issues need to be cleared,105 cells=Transport & 86
Cells= Utility issues need to cleared)
TCR:RTC drop increased from 42863 WK-3 to 61460 WK-4 & & Flicks Count increased 21588 to 33874 as compared to wk-3301 Cells continuously coming for TCR (TRX Addition for 8 cells ,16 cells further physical optimization required .HW issues in 17,109
cells=Transport & 66 Cells= Utility issues need to cleared . Impacted due to increase in RTC drop
7/30/2019 Network Review Ppt
http://slidepdf.com/reader/full/network-review-ppt 11/29
KPI Performance-3G NBH
Data PS drop rate & SHO 3G KPI Meeting the Bench markCS+PS Access Failure: After Firewall Activity done in SGSN end, then Paging Response increases in Orissa circle.
So RCB 5,7,13 utilization Increases to 80%.In Busy Hour CS and PS Access Failure Increases.
30 sites having CE utilization More than 80%.BPC card Required For Augmentation.After 123 Plan Lunch,IUPS utilization >70%.BW Augmentation Pending in RDN end.
Day to day fiber cut Decreased Access Success Rate as well as increased call drop rate.
7/30/2019 Network Review Ppt
http://slidepdf.com/reader/full/network-review-ppt 12/29
12
COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY INSTRUCTION
BBH KPI’S GSM CDMA 3G
7/30/2019 Network Review Ppt
http://slidepdf.com/reader/full/network-review-ppt 13/29
COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY INSTRUCTION
13
RF KPI Trend – CDMA-Top 10 Town
Top 10 Tch Completion affected due to frequent site outages. NWA for the week 99.03% 23 cells affected intermittently due to Low Call Volume ( < 50 calls during BBH)
16 cells affected due to null zone / remote facing cells
4 Cells affected due to BB nil, Low Voltage cases
4 cells affected due to low antenna height
6 cells affected due to hardware hang issue due to High Room Temperature
7/30/2019 Network Review Ppt
http://slidepdf.com/reader/full/network-review-ppt 14/29
COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY INSTRUCTION
14
RF KPI Trend – CDMA - RON
RON TCH Completion degrading due to LCV for 365 cells, Standalone & remote facing cells – 309 cells,
NWA dip – 96.81 (multiple fiber cut, DG auto issue, BB issue & SEB failure). Access issue-3 cell, RF cable
theft-3cell, HW issue in 11 cell, E1 Fluctuation in increasing trend.
7/30/2019 Network Review Ppt
http://slidepdf.com/reader/full/network-review-ppt 15/29
COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY INSTRUCTION
15
MAJOR ACTIVITIES CONDUCTED DURING THE WEEK - CDMA
Sl. No Activity Status KPI Impacting/Purpose of the Activity
1Physical Optimization completed for 7 cells in Top 10 & 5
cells in RON (as per DCR improvement plan)Completed TCH Completion Rate slightly improved
2PM activity conducted in 5 sites in Top 10, 15 sites in RON
(as per DCR improvement plan)Completed Site hygiene improved
3BM Drive Test completed for Berhampur. Drive Analysis
under progress
Completed Analysis under progress
4 Database audit for Huawei sites completed completed Database discrepancies cleared
5 NL audit completed for 56 cells CompletedUnwanted neighbours deleted. Neighbourlist updated as
required
6Survey for Mayfair location completed at 13 locations
across OrissaCompleted
Survey for coverage status as per marketing
requirement
7/30/2019 Network Review Ppt
http://slidepdf.com/reader/full/network-review-ppt 16/29
COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY INSTRUCTION
16
All KPI are in improving trend
RF KPI TREND – GSM – TOP 10 TOWN
7/30/2019 Network Review Ppt
http://slidepdf.com/reader/full/network-review-ppt 17/29
COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY INSTRUCTION
17
TCR:RTC drop increased from 42863 WK-2 to 61460 WK-3 & & Flicks Count increased 21588 to 33874 as compared to wk-3
301 Cells continuously coming for TCR (TRX Addition for 8 cells ,16 cells further physical optimization required .HW issues in 17,109 cells=Transport & 66
Cells= Utility issues need to cleared . Impacted due to increase in RTC drop
Rx-Qual : KPI dipped on 22 & 27 Jul’13 due to sites Flicks increases in IBSC63 & IBSC61
RF KPI TREND – GSM – RON
7/30/2019 Network Review Ppt
http://slidepdf.com/reader/full/network-review-ppt 18/29
COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY INSTRUCTION
18
MAJOR ACTIVITIES CONDUCTED DURING THE WEEK - GSM
Circle Activity DescriptionPurpose & Reason for
carrying out the Activity
Date of Activity Remarks
Orissa NL Audit Completed for 12 cells NW KPI Improvement 22th & 25th July 13 Completed
Orissa FR to HR tuning for 20 cells NW KPI Improvement 25th & 27th July 13 Completed
Orissa SD Reconfiguration for 80 cells NW KPI Improvement 22th & 26th July 13 Completed
Orissa LAC Change for 14 sites NW KPI Improvement 22th & 24th July 13 Completed
Orissa TRP Tuning done for 53 sites NW KPI Improvement 22th & 24th July 13 Completed
Orissa Physical Optimization 12 sites NW KPI Improvement 22th & 28th July 13 Completed
Orissa Survey for coverage – Mayfair
Ascertaining coverage
status at Mayfair locations
as per marketing team
23rd to 28th July 13 Completed
RF KPI T d 3G BBH
7/30/2019 Network Review Ppt
http://slidepdf.com/reader/full/network-review-ppt 19/29
COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY INSTRUCTION
19
RF KPI Trend – 3G BBH
CS+PS Access Failure: After Firewall Activity done in SGSN end, then Paging Response increases in Orissa
circle. In Busy Hour CS and PS Access Failure Increases.
30 sites having CE utilization More than 80%. BPC card Required For Augmentation.
After 123 Plan Lunch,IUPS utilization >70%.BW Augmentation Pending in RDN end.
Day to day fiber cut Decreased Access Success Rate as well as increased call drop rate.
7/30/2019 Network Review Ppt
http://slidepdf.com/reader/full/network-review-ppt 20/29
COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY INSTRUCTION
20
MAJOR ACTIVITIES CONDUCTED DURING THE WEEK – 3G
Sl. No Activity Status
KPI Impacting/Purpose
of the Activity
15 site packet loss issue Resolve afterTransport card rectification on jajpur
town. Completed
CS+PS Access failure
Improved
2 12 cells optimization done CompletedCS+PS Access failure
Improved
33 site PM activity done with
Transport team .
Completedfor Packet loss issue
rectification
7/30/2019 Network Review Ppt
http://slidepdf.com/reader/full/network-review-ppt 21/29
COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY INSTRUCTION
21
•Drive Test Status
S.No Total BM DT Scope Total BM DTCompleted
% of
CompletionScope
% of
PendingScope
Remarks
170 (10 Voice BM,10 GPRS BM,02
MOS,38 IB BM,10 highway BM)
6 (3 BM,3
HW)8.57 % 91.43%
% S C &
7/30/2019 Network Review Ppt
http://slidepdf.com/reader/full/network-review-ppt 22/29
COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY INSTRUCTION
22
Packet Loss > 2% : Site Counts & Bucketisation
Reason
CircleName
No. of Node BHaving Packet
Loss>2%Due to MW
issueDue to FiberMedia issue
Due to BWconstraint
Due to Utility Issue
ORISSA 142 5 0 17 120
7/30/2019 Network Review Ppt
http://slidepdf.com/reader/full/network-review-ppt 23/29
COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY INSTRUCTION
23
Zero Cell
Bucketization 3G CDMA GSM ETR
ACCESS ISSUE 3 6 RCOM
Accessories Theft case 9 10Accessories required/ Planned by
31 July-13
Hardware issue 3 ETR by 31 July-13
IP COLO issue 2 Escalated to Concern
PAC 3 ETR by 31 July-13
Transport issue 3 ETR by 24th July-13
Under rectification 3 ETR by 2 Aug-13Utility issue ETR by 24th July-13
Grand Total 12 9 21
7/30/2019 Network Review Ppt
http://slidepdf.com/reader/full/network-review-ppt 24/29
COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY INSTRUCTION
24
Customer Complaints Trend – All Technologies
Month wise 1000 per sub. Trend
Month wise no of complaints escalated Trend
Month GSM CDMA 3G
Jan 0.3 0.3 0.3
Feb 0.2 0.2 0.2
March 0.5 0.1 0.5
April 0.3 0.3 0.3
May 0.4 0.3 0.4
June 0.6 0.4 0.6
Month GSM CDMA 3G
Jan 410 30 65
Feb 300 26 49
March 298 16 44April 387 32 36
May 415 31 46
June 525 60 61
7/30/2019 Network Review Ppt
http://slidepdf.com/reader/full/network-review-ppt 25/29
25
COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY INSTRUCTION
RJIL Project
RJIL Tower Delivery
7/30/2019 Network Review Ppt
http://slidepdf.com/reader/full/network-review-ppt 26/29
26
COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY INSTRUCTION
Cluster Site CountSurvey Completed asDeclared by Cluster
Lead
ANNEXURE- H-COPY
SUBMITTED
HAND SKETCH & SHELTER
LAYOUT WITH DIMENSION
SCAN COPY SUBMITTED
BALASORE 283 186 177 140 BERHAMPUR 282 144 130 109
BHUBANESWAR 532 155 117 111 SAMBALPUR 342 135 61 71 Grand Total 1439 620 485 431
RJIL – Tower Delivery
OFC P j t P2 RJIL D li
7/30/2019 Network Review Ppt
http://slidepdf.com/reader/full/network-review-ppt 27/29
27
COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY INSTRUCTION
SUMMARY OFC P2 PROJECT
Sl No Scope Activity Progress(KM)
1
103
Cumulative Achievement Till Date 42.99
2 Achievement In Last 1 Week 0.3km T&D Compete & 1 New
section(T&D) started
3Material Utilization Report
134 km duct & 43.45 km OFC
received & Handed over to Vendor
4
Hand Over Formalities Completed With
O&M
10section - complete & 11section -
WIP
OFC Project P2 – RJIL Delivery
S t R i d O i
7/30/2019 Network Review Ppt
http://slidepdf.com/reader/full/network-review-ppt 28/29
COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY INSTRUCTION
28
Wireline (Fiber and Utilities)
Requirement of 392 Battery Banks for BTS Sites to reduce Down time and Improve NWA availability.
Requirement of 200 DG battery to maintain DG Sets in Auto Mode to avoid site outage SEB failure .
Requirement of 100 SMPS for BTS sites where SMPS faults are recurring in nature and of vintage Make .
100 sites BER case PAC to be replaced as High Room Temperature affecting site performance as well as customer
satisfaction. Also hardware failure rate increasing & affecting R&R process & NWA.
SEB Restoration at 5 Sites (Gotmara, Sanibazar, Station Bazar,Ghanteswar and Biswanathpur).
Permanent SEB connectivity at 03 Operational sites where Dg is running continuously (Kutiguda,Balguda and Torenga).
Access issue of Bhimtanki, Maharsi College , Sailshree Vihar (Bhubaneswar) & Nayabazar(Balasore) to be resolved.
Joint closure 800 required for tray replacement.
150 KM Fiber re routing required to bury overhead cables & shift the cable to safer site. Which would be affectedduring road expansion.
200 KM OFC required for undergrounding & re routing.
Wireless
250 ALU 900TGT required to relieve GSM Traffic Congestion
8 BPC card & 6 RU 40 card required to decongest the network & clear ‘0’ cells
Support Required - Orissa