10
5443000mN 5442000mN 5441000mN 309000mE 310000mE 311000mE 312000mE NELSON BAY RIVER NELSON BAY RIVER 9000mE 11000mE 8000mE 24000mN 22000mN 20000mN Baseline for Local Grid Local Grid 5442000mN 5441000mN 309000mE 310000mE Process Plant and Stockpile Area Access Road Bund Wall/Drain Diversion on 30m setback from creek drainage Area for Recirclation and make up Water Dams Design Drawn FIGURE Scale Cad File A. Hyde Page PRM Cad and Graphics 11.10.2011 10.2011 1 : 12,500 (A3) Sml001m019.dwg Rev2.1 SHREE MINERALS LIMITED . Aerial Photograph - March 2006 Nelson Bay River Iron Ore Project - NW Tasmania Showing Local Grid and MGA94 Systems Snapshot at end of Year 1 Bund Wall/Drain Diversion heading to Sedimentation Dam at RL70m (To be Designed) 5431000mN metres Scale 1 : 12 500 500 400 300 200 100 0 Air Photography - TASMAP 01 March 2006 Position of Air Photography approximate 5443000mN 313000mE Proposed Mining Lease Boundary 311000mE 312000mE 312000mE 10000mE 23000mN Topsoil Dump Waste Dump RL90m Explosives Storage Area Acid Neutralisation Plant MINE OFFICE BATH HOUSE ROM STOCKPILE MINE VEHICLE PARKING PRODUCT STOCKPILE GENERATORS SEWERAGE TREATMENT FUEL STORAGE REFUELING CRUSHING AND PROCESSING AND WORK SHOP STORAGE AREA

NELSON BAY RIVER Scale 1 : 12 500 0 100 200 300 400 500epa.tas.gov.au/documents/shree minerals ltd - nelson bay river mine... · Nelson Bay River Iron Ore Project - NW Tasmania Showing

  • Upload
    halien

  • View
    217

  • Download
    3

Embed Size (px)

Citation preview

5443000mN

5442000mN

5441000mN

309000mE

310000mE

311000mE

312000mE

NELSON BAY RIVER

NELSON BAY RIVER

9000mE

11000mE

8000mE

24000mN

22000mN

20000mNBaseline for Local Grid

Local Grid

5442000mN

5441000mN

309000mE

310000mE

Process Plant andStockpile Area80000m²

Access Road

Bund Wall/Drain Diversionon 30m setback from

creek drainage

Area for Recirclation andmake up Water Dams

DesignDrawn

FIGURE

ScaleCad File

A. Hyde PagePRM Cad and Graphics 11.10.2011

10.2011 1 : 12,500 (A3)Sml001m019.dwg Rev2.1

SHREE MINERALS LIMITED

.Aerial Photograph - March 2006

Nelson Bay River Iron Ore Project - NW Tasmania

Showing Local Grid and MGA94 Systems

Snapshot at end of Year 1

Bund Wall/Drain Diversionheading to Sedimentation Dam

at RL70m (To be Designed)

5431000mN

metres

Scale 1 : 12 500

5004003002001000

Air Photography - TASMAP 01 March 2006Position of Air Photography approximate

5443000mN

313000mE

Proposed Mining Lease Boundary

311000mE

312000mE

312000mE

10000mE 23000mN

Topsoil Dump

Waste DumpRL90m

Explosives StorageArea

Acid NeutralisationPlant

MINEOFFICEBATHHOUSE

ROM

STOCKPILE

MINE VEHICLE

PARKING

PRODUCT

STOCKPILE

GENERATORS

SEWERAGE

TREATMENT

FUEL STORAGE

REFUELING

CRUSHING AND

PROCESSING

ANDWORK SHOP

STORAGE

AREA

5443000mN

5442000mN

5441000mN

309000mE

310000mE

311000mE

312000mE

NELSON BAY RIVER

NELSON BAY RIVER

9000mE

11000mE

8000mE

24000mN

22000mN

20000mN

Baseline for Local Grid

Local Grid

5442000mN

5441000mN

309000mE

310000mE

Access Road

Bund Wall/Drain Diversionon 30m setback from

creek drainage

Area for Recirclation andmake up Water Dams

Deep Magnetite Pit

DSO Pit

DesignDrawn

FIGURE

ScaleCad File

A. Hyde PagePRM Cad and Graphics 11.10.2011

10.2011 1 : 12,500 (A3)Sml001m018.dwg Rev2.0

SHREE MINERALS LIMITED

.Aerial Photograph - March 2006

Nelson Bay River Iron Ore Project - NW Tasmania

Showing Local Grid and MGA94 Systems

Snapshot at end of Year 5

Sedimentation Dam/Runoff Collection Dam

RL85m

Bund Wall/Drain Diversionheading to Sedimentation Dam

at RL70m (To be Designed)

Bund Wall to Toe of Dumpsetback 10m

5431000mN

metres

Scale 1 : 12 500

5004003002001000

Air Photography - TASMAP 01 March 2006Position of Air Photography approximate

5443000mN

313000mE

Proposed Mining Lease Boundary

311000mE

312000mE

312000mE

10000mE 23000mN

Process Plant andStockpile Area80000m²

Explosives StorageArea

Acid NeutralisationPlant

MINEOFFICEBATHHOUSE

ROM

STOCKPILE

MINE VEHICLE

PARKING

PRODUCT

STOCKPILE

GENERATORS

SEWERAGE

TREATMENT

FUEL STORAGE

REFUELING

CRUSHING AND

PROCESSING

ANDWORK SHOP

STORAGE

AREA

Topsoil Dump

5443000mN

5442000mN

5441000mN

309000mE

310000mE

311000mE

312000mE

NELSON BAY RIVER

NELSON BAY RIVER

9000mE

11000mE

8000mE

24000mN

22000mN

20000mN

Baseline for Local Grid

Local Grid

5442000mN

5441000mN

309000mE

310000mE

Access Road

Bund Wall/Drain Diversionon 30m setback from

creek drainage

Area for Recirclation andmake up Water Dams

Deep Magnetite Pit

DSO Pit

DesignDrawn

FIGURE

ScaleCad File

A. Hyde PagePRM Cad and Graphics 11.10.2011

10.2011 1 : 12,500 (A3)Sml001m017.dwg Rev4.0

SHREE MINERALS LIMITED

.Aerial Photograph - March 2006

Nelson Bay River Iron Ore Project - NW Tasmania

Showing Local Grid and MGA94 Systems

End of Mining - Mine Layout Plan

Sedimentation Dam/Runoff Collection Dam

RL85m

Bund Wall/Drain Diversionheading to Sedimentation Dam

at RL70m (To be Designed)

Bund Wall to Toe of Dumpsetback 10m

5431000mN

metres

Scale 1 : 12 500

5004003002001000

Air Photography - TASMAP 01 March 2006Position of Air Photography approximate

5443000mN

313000mE

Proposed Mining Lease Boundary

311000mE

312000mE

312000mE

10000mE 23000mN

Process Plant andStockpile Area80000m²

Explosives StorageArea

Acid NeutralisationPlant

MINEOFFICEBATHHOUSE

ROM

STOCKPILE

MINE VEHICLE

PARKING

PRODUCT

STOCKPILE

GENERATORS

SEWERAGE

TREATMENT

FUEL STORAGE

REFUELING

CRUSHING AND

PROCESSING

ANDWORK SHOP

STORAGE

AREA

LEGEND

Waste Dump Rehabilitated

DSO Pit and Tailing Dam Filled with Water

5443000mN

5442000mN

5441000mN

309000mE

310000mE

311000mE

312000mE

NELSON BAY RIVER

NELSON BAY RIVER

9000mE

11000mE

8000mE

24000mN

22000mN

20000mN

Baseline for Local Grid

Local Grid

5442000mN

5441000mN

309000mE

310000mE

Access Road

Deep Magnetite Pit Area

DSO Pit Area

DesignDrawn

FIGURE

ScaleCad File

A. Hyde PagePRM Cad and Graphics 14.10.2011

10.2011 1 : 12,500 (A3)Sml001m021.dwg Rev1.0

SHREE MINERALS LIMITED

.Aerial Photograph - March 2006

Nelson Bay River Iron Ore Project - NW Tasmania

Showing Local Grid and MGA94 Systems

Mining Areas 10 Years after End of Mining

5431000mN

metres

Scale 1 : 12 5005004003002001000

Air Photography - TASMAP 01 March 2006Position of Air Photography approximate

5443000mN

313000mE

Proposed Mining Lease Boundary

311000mE

312000mE

312000mE

10000mE 23000mN

LEGEND

Waste Dump Rehabilitated

DSO Pit and Tailing Dam Filled,and Main Pit Filling with Water

Elevation

-200.00

-180.00

-160.00

-140.00

-120.00

-100.00

-80.00

-60.00

-40.00

-20.00

0.00

20.00

40.00

60.00

80.00

100.00

120.00

140.00

0

North-West

100 200 300 400 500

0 500

Elevation

-200.00

-180.00

-160.00

-140.00

-120.00

-100.00

-80.00

-60.00

-40.00

-20.00

0.00

20.00

40.00

60.00

80.00

100.00

120.00

140.00

0 100 200 300 400

Deep Magnetite Pit Long Section

Deep Magnetite Pit Cross Section

West East

South-East

400

0

DesignDrawn

FIGURE

ScaleCad File

A. Hyde PagePRM Cad and Graphics 08.06.2011

06.2011 1 : 3,000 (A3P)Sml001m013.dwg Rev1.0

SHREE MINERALS LIMITED

.Deep Magnetite Pit Cross and Long Sections

Nelson Bay River Iron Ore Project - NW Tasmania

A A'

A

A

'

B B'

B

B

'

50 0 10050SCALE 1 : 3 000 (V & H)

Metres

Elevation

0.00

20.00

40.00

60.00

80.00

100.00

120.00

140.00

0 100

Elevation

0.00

20.00

40.00

60.00

80.00

100.00

120.00

140.00

160.00

0 100 200 300 400 500

0 500

DSO Pit Long Section

North-West South-East

DSO Pit Cross Section

West East

A A'

DesignDrawn

FIGURE

ScaleCad File

A. Hyde PagePRM Cad and Graphics 08.06.2011

06.2011 1 : 3,000 (A4P)Sml001m014.dwg Rev1.0

SHREE MINERALS LIMITED

.DSO Pit Cross and Long Sections

50 0 10050SCALE 1 : 3 000 (V & H)

Metres

B B'

Nelson Bay River Iron Ore Project - NW Tasmania

0 100

A

A

'

B

B

'

SHREE MINERALS

PROCESS SKETCH

H

1 2 3 4 5 6 7 8 9 10 11 12

H

801

566

H

1 2 3 4 5 6 7 8 9 10 11 12

CLIENT:

SCALE:

A1SIZE:

Perth WA 6000 Australia

Level 10, 207 Murray Street

Carillon City Tower

ENGENIUM PTY LTD

G

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10 111 2 3 4 5 6 7 8 9 10 11 12

A

B

C

D

E

F

G

www.engenium.com.au

Fax: +61 8 6460 0391

Tel: +61 8 6460 0300

ABN 52 105 152 994

SKETCH No:

ISSUED FOR INFORMATION ONLY

01.07.11 DATE:

9141A-0000-SKE-001

NTS A RE:

request by Engenuim Pty Ltd.this clause and must be returned upon

extracts of this information must contain confidentiality obligations. Any copies or

party agreeing to be bound by thesesuch authorised disclosure is subject to the order, enquiry with which it is issued. Any than that stated on the particular contract,

shall it be used for any purpose other or communicated to any other party, nor

it must not be copied, reproduced, viewed written permission from Engenium Pty Ltd, is issued on the condition that, except with

Engenium Pty Ltd. It is confidential and contained on it remains the property of

This sketch and all the information

CONSTRUCTION

NOT FOR

FIXED GRIZZLY 400mm APERTURES

ROM BIN 150t

PRIMARY CRUSHER

C80

BIN

150t

SECONDARY

CRUSHER

HP100

P80-40

ROM ORE

600w@1m/s

600w@1m/s

70tph

BIN

HPGR

RP3-6

100tph

P100-6

P80-3

P100-3

SLURRY PUMP

WARMAN 6/4 EAH

TAILS THICKENER

TAILS DAM

RAW WATER PROCESS WATER DAM

CON THICKENER

FILTER PRESS

PROCESS WATER

10 DEG LAUNDER

SECONDARY MAG SEP

CLEANER MAG SEP

15 DEG LAUNDER

ROUGHER

MAG SEP

APRON FEEDER

1200mm*8m

HPGR SCREEN

BALL

MILL

DERRICK SCREEN

30tph

1

2

3

4

5

6

7

8

9

10

11

13

12

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33 34

ROUGHER TAILS

WATER

WATER

10 DEG LAUNDER

STREAM NO:

SOLID (tph)

WATER (tph)

%SOLIDS(W/W)

Fe %

SIO2 %

STEAM NAME

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

CA

T 992

CA

T 992

SHREE MINERALS

PLANT LAYOUT

SHEET 1 OF 2

H

1 2 3 4 5 6 7 8 9 10 11 12

H

801

566

H

1 2 3 4 5 6 7 8 9 10 11 12

CLIENT:

SCALE:

A1SIZE:

Perth WA 6000 Australia

Level 10, 207 Murray Street

Carillon City Tower

ENGENIUM PTY LTD

G

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10 111 2 3 4 5 6 7 8 9 10 11 12

A

B

C

D

E

F

G

www.engenium.com.au

Fax: +61 8 6460 0391

Tel: +61 8 6460 0300

ABN 52 105 152 994

SKETCH No:

ISSUED FOR INFORMATION ONLY

DATE:

9141A-0000-SKE-002

1:250 RE:

request by Engenuim Pty Ltd.this clause and must be returned upon

extracts of this information must contain confidentiality obligations. Any copies or

party agreeing to be bound by thesesuch authorised disclosure is subject to the order, enquiry with which it is issued. Any than that stated on the particular contract,

shall it be used for any purpose other or communicated to any other party, nor

it must not be copied, reproduced, viewed written permission from Engenium Pty Ltd, is issued on the condition that, except with

Engenium Pty Ltd. It is confidential and contained on it remains the property of

This sketch and all the information

CONSTRUCTION

NOT FOR

ELEVATION

PLAN

PRIMARY CRUSHER

SECONDARY CRUSHERHPGR

RL 10.5

RL 7.8

RL 17

RL 4

HPGR

SECONDARY CRUSHER

PRIMARY CRUSHER

05 5 10 15 Metres

SCALE 1 : 250

TO LIMS 1

TO LIMS 1

MMC

BALL MILL

LIMS 1 LIMS 2

LIMS 3

DERRICK SCREEN

FEED

DERRICK

FEED

TAILS

60006000600060003200

TYP.

CONC THICKENER

THICKENER

TO TAILS

RL 8

RL 13

SHREE MINERALS

PLANT LAYOUT

SHEET 2 OF 2

H

1 2 3 4 5 6 7 8 9 10 11 12

H

801

566

H

1 2 3 4 5 6 7 8 9 10 11 12

CLIENT:

SCALE:

A1SIZE:

Perth WA 6000 Australia

Level 10, 207 Murray Street

Carillon City Tower

ENGENIUM PTY LTD

G

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10 111 2 3 4 5 6 7 8 9 10 11 12

A

B

C

D

E

F

G

www.engenium.com.au

Fax: +61 8 6460 0391

Tel: +61 8 6460 0300

ABN 52 105 152 994

SKETCH No:

ISSUED FOR INFORMATION ONLY

DATE:

9141A-0000-SKE-003

1:150 RE:

request by Engenuim Pty Ltd.this clause and must be returned upon

extracts of this information must contain confidentiality obligations. Any copies or

party agreeing to be bound by thesesuch authorised disclosure is subject to the order, enquiry with which it is issued. Any than that stated on the particular contract,

shall it be used for any purpose other or communicated to any other party, nor

it must not be copied, reproduced, viewed written permission from Engenium Pty Ltd, is issued on the condition that, except with

Engenium Pty Ltd. It is confidential and contained on it remains the property of

This sketch and all the information

CONSTRUCTION

NOT FOR0 6

SCALE 1 : 150

3 9 Metres3

RL 10

LIMS 3LIMS 2LIMS 1

DERRICK SCREEN

BALL MILL

FEED

DERRICK

FEED

TAILS

MMC

FILTER HOUSE

HOUSE

FILTER

PLAN

ELEVATION

�22M

CONC THICKENER

�30M

TAILING THICKENER

HPGR

FROM

HPGR

FROM