14
Neil Geddes CCLRC Head of e-Science Director of the UK Grid Operations Support Centre

Neil Geddes CCLRC Head of e-Science Director of the UK Grid Operations Support Centre

  • Upload
    gerek

  • View
    30

  • Download
    1

Embed Size (px)

DESCRIPTION

Neil Geddes CCLRC Head of e-Science Director of the UK Grid Operations Support Centre. NGS “Today”. Interfaces. OGSI::Lite WSRF::Lite. Projects e-Minerals e-Materials Orbital Dynamics of Galaxies Bioinformatics (using BLAST) GEODISE project UKQCD Singlet meson project - PowerPoint PPT Presentation

Citation preview

Page 1: Neil Geddes  CCLRC Head of e-Science Director of the UK Grid Operations Support Centre

Neil Geddes CCLRC Head of e-Science

Director of the UK Grid Operations Support Centre

Page 2: Neil Geddes  CCLRC Head of e-Science Director of the UK Grid Operations Support Centre

NGS “Today”

Projectse-Mineralse-MaterialsOrbital Dynamics of GalaxiesBioinformatics (using BLAST) GEODISE projectUKQCD Singlet meson projectCensus data analysis MIAKT projecte-HTPX project.RealityGrid (chemistry)

Users LeedsOxfordUCLCardiffSouthamptonImperialLiverpoolSheffieldCambridgeEdinburghQUBBBSRCCCLRC.

InterfacesOGSI::LiteOGSI::LiteWSRF::LiteWSRF::Lite

Page 3: Neil Geddes  CCLRC Head of e-Science Director of the UK Grid Operations Support Centre

Oxford and Leeds (White Rose Grid)

Page 4: Neil Geddes  CCLRC Head of e-Science Director of the UK Grid Operations Support Centre

Manchester and CCLRC-RAL

Page 5: Neil Geddes  CCLRC Head of e-Science Director of the UK Grid Operations Support Centre

Also includes:

http://www.csar.cfs.ac.uk/256 Itanium2 processor SGI Altix512 processor Origin3800

•Thus, the NGS provides access to over 2000 processors, over 36TB of "data-grid"

capacity, common scientific applications and extensive data archives.

•Other resource providers anticipated to join in the future …

http://www.hpcx.ac.uk/Full installation = 1600 IBM p690+ Regatta processors currently 1236 processors

EMBL Nucleotide Sequences

NCBI, BLAST, EMBOSS, FASTA, Gaussian

Page 6: Neil Geddes  CCLRC Head of e-Science Director of the UK Grid Operations Support Centre
Page 7: Neil Geddes  CCLRC Head of e-Science Director of the UK Grid Operations Support Centre

Production Status

• TODAY• 4 new core nodes operational• 136 Users registered (36 since 1 September ’04)• Grid enabled – Globus v2 (VDT distribution v1.2) at present• BDII information service (GLUE + MDS Schemas)• Data Services – Oracle, SRB and OGSA-DAI• Growing base of user applications• MyProxy and CA services provided by GOSC• VO Management Software – LCG-VO • User support: Helpdesk

• Next…• Other Middleware [gLite/OMII etc…]• NGS Portal• Resource Broker• SRB production service

Page 8: Neil Geddes  CCLRC Head of e-Science Director of the UK Grid Operations Support Centre
Page 9: Neil Geddes  CCLRC Head of e-Science Director of the UK Grid Operations Support Centre

Training

• December 8-10•Train the trainers

•NGS, e-Science Centres

• Quarterly “New Users” at NeSC• EGEE + NGS mods

• Computing Services workshop ~ June

• GOSC/NGS sysadmin training•First “face to face” meeting• Need “New Sites” training

Page 10: Neil Geddes  CCLRC Head of e-Science Director of the UK Grid Operations Support Centre

Other Developments

• NGS newsletter• OMII helpdesk

• Resource Broker (LCG) available for early adopters

• TeraGrid• UK certificates accepted on TeraGrid• Looking at INCA with Jenny Schopf

•Part of accounting dev’t. with e-Markets• Meeting with OSG iGOC• HPCX, CSAR, CCPs• Collect user exemplars

• Agreed acknowledgement

Page 11: Neil Geddes  CCLRC Head of e-Science Director of the UK Grid Operations Support Centre

GOSC Timeline

Q2 Q4 Q2 Q3Q1Q4Q3Q2Q1Q3

2004 20062005

EGEE gLite alpha release

gLite release 1

OMII release

NGS Expansion(Bristol, Cardiff…)

OGSA-DAI

WS plan

NGS ProductionService

NGS WS Service

EGEE gLite releaseOMII Release

NGS Expansion

WS2 plan

NGS WS Service 2

“Tomorrow”

Web Services based National Grid Infrastructure

Page 12: Neil Geddes  CCLRC Head of e-Science Director of the UK Grid Operations Support Centre

UofA

HPCx

UofD

GOSC

NGS Core Nodes: Host core services, coordinate integration, deployment and support+free to access resources for all VOs. Monitored interfaces + services

NGS Sites: Integrated with NGS, some services/resources available for all VOs Monitored interfaces + services

NGS Connected Sites: Integrated with NGS, support for some VO’sMonitored interfaces (+security etc.)

RAL Oxford

LeedsMan. CSAR

UofB

UofC

CommercialProvider

PSRE

Page 13: Neil Geddes  CCLRC Head of e-Science Director of the UK Grid Operations Support Centre

UK e-Infrastructure

LHC ISIS TS2HPCx + HECtoR

Regional and Campus grids

Users get common access, tools, information, Nationally supported services, through NGS

Integratedinternationally

VRE, VLE, IE

Page 14: Neil Geddes  CCLRC Head of e-Science Director of the UK Grid Operations Support Centre

Timeline

Q2 Q4 Q2 Q3Q1Q4Q3Q2Q1Q3

2004 20062005

EGEE gLite alpha release

gLite release 1

OMII release

NGS Expansion(Bristol, Cardiff…)

OGSA-DAI

WS plan

NGS ProductionService

NGS WS Service

EGEE gLite releaseOMII Release

NGS Expansion

WS2 plan

NGS WS Service 2