WELCOMENeighborhood Transportation Forum
6:00 – 7:30 PM
NE 65th Street Vision Zero Project
Transit Projects
NE Seattle Paving Projects
Banner Way/NE 75th Street Redesign
NE 70th St and I-5 Walking and Biking Improvements
www.seattle.gov/transportation/NE65VisionZero.htmFEBRUARY 2017
OVERVIEW
Vision Zero is our plan to end traffic deaths and serious injuries by 2030. There have been several serious pedestrian and bicycle collisions on NE 65th Street over the last three years.
To help reach our goal, we are launching a collaborative process to review street conditions along NE 65th St.
Project Goals• Improve safety for people walking, biking, driving, and
taking transit• Improve access to Roosevelt Link station• Improve transit service• Improve bicycling and walking• Maintain business access
NE 65TH STREET VISION ZERO PROJECT
www.seattle.gov/transportation/NE65VisionZero.htmFEBRUARY 2017
ROOS
EVEL
T W
AY N
E
BANNER WAY NE
UNIV
ERSI
TY W
AY N
EBR
OOKL
YN A
VE N
E
11TH
AVE
NE
NE 77TH ST
NE 75TH ST
NE 72ND ST
NE 71ST ST
NE 69TH ST
NE 66TH ST
NE 56TH ST
NE 67TH ST
NE 60TH ST
NE 59TH ST
NE 57TH ST
NE 73RD ST
NE 70TH ST
NE 68TH ST
NE 62ND ST
NE 65TH ST
NE 63RD ST
LAKE
CIT
Y WAY
NE
NE 62ND ST
NE 58TH ST
WEEDIN PL NE
NE 78TH ST
NE NAOMI PL
14TH
AVE
NE
17TH
AVE
NE
15TH
AVE
NE12
TH A
VE N
E
19TH
AVE
NE
20TH
AVE
NE
RAVE
NN
A AV
E N
E
25TH
AVE
NE
29TH
AVE
NE
31ST
AVE
NE
35TH
AVE
NE
21ST
AVE
NE
24TH
AVE
NE
23RD
AVE
NE
26TH
AVE
NE
30TH
AVE
NE
33RD
AVE
NE
34TH
AVE
NE
HIL
LMAN
PL
NE
6TH
AVE
NE
5TH
AVE
NE
8TH
AVE
NE
39TH
AVE
NE
40TH
AVE
NE
Cowen Park Ravenna
Park
DahlPlayfield
RooseveltReservoir
RooseveltHigh School
NE 65th Vision Zero Project Study AreaFuture Roosevelt Link Light Rail Station (2021)Banner Way NE Corridor Project (2017)Potential Roosevelt to Downtown RapidRide Line (2021)11th/12th Ave NE Paving Project (2020)*15th Ave NE Paving Project (2018)*25th Ave NE Paving Project (2017)*35th Ave NE Paving Project (2018)*NE 70th St and I-5 NSF Walking and Biking Improvements (2018)Proposed NE 70th St Bike Upgrades (2018)
*Year of completion is tentative
5
å
NE 61ST STNE RAVENNA BLVD
www.seattle.gov/transportation/NE65VisionZero.htmFEBRUARY 2017
Collisions in the last 5 years
Collision types
COLLISIONS
From 2012 to present, there have been 232 collisions along NE 65th St. Within that period, there have been 4 fatal and 1 serious injury collision. Severe crashes have occurred more frequently west of 25th Avenue NE.
NE 65TH STREET VISION ZERO PROJECT
40353025201510
50Nu
mbe
r of c
ollis
ions
AnglesCycl
es
Head on
Left turn
Other
Parked ca
r
Pedestrian
Rear ended
Right turn
Sideswipe
ROOS
EVEL
T W
AY N
E
BROO
KLYN
AVE
NE
NE 77TH ST
NE 75TH ST
NE 72ND ST
NE 71ST ST
NE 69TH ST
NE 66TH ST
NE 56TH ST
NE 67TH ST
NE 60TH ST
NE 59TH ST
NE 73RD ST
NE 70TH ST
NE 68TH ST
NE 65TH ST
NE 63RD ST
NE 62ND ST
NE 58TH ST
WEEDIN PL NE
NE 78TH ST
NE NAOMI PL
17TH
AVE
NE
15TH
AVE
NE
12TH
AVE
NE
19TH
AVE
NE
20TH
AVE
NE
RAVE
NN
A AV
E N
E
25TH
AVE
NE
29TH
AVE
NE
31ST
AVE
NE
35TH
AVE
NE
23RD
AVE
NE
26TH
AVE
NE
6TH
AVE
NE
8TH
AVE
NE
39TH
AVE
NE
Cowen Park
Ravenna Park
DahlPlayfield
RooseveltReservoir
5
NE 61ST STNE RAVENNA BLVD
Rooseveltå
Loyal Heights
å
Ecksteinå
ConcordiaLutheran
å
Assumption St Bridget
å
Bryant
å
!( !(!(!( !( !( !( !(
!( !( !( !( !(!( !( !(
!( !(
!( !(!(
!(!( !( !( !(
!( !(
!(!( !( !( !( !(
!(!( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !(!(
5 Year Collision Count1-56-910-1314-1718-21
!(
!(
!(
!(
!(
www.seattle.gov/transportation/NE65VisionZero.htmFEBRUARY 2017
5-year map of collisions involving vulnerable users
COLLISIONS: VULNERABLE USERS
From 2012 to present, all the fatal and serious injury collisions on NE 65th Street have involved people walking and people on bicycles. Some road users are more vulnerable than others like the elderly, the disabled, and children.
Both pedestrian and bicycle collisions have occurred throughout the corridor. All the fatalities occurred at intersections.
NE 65TH STREET VISION ZERO PROJECT
ROOS
EVEL
T W
AY N
E
BROO
KLYN
AVE
NE
11TH
AVE
NE
NE 77TH ST
NE 75TH ST
NE 72ND ST
NE 71ST ST
NE 69TH ST
NE 66TH ST
NE 56TH ST
NE 67TH ST
NE 60TH ST
NE 59TH ST
NE 57TH ST
NE 73RD ST
NE 70TH ST
NE 68TH ST
NE 65TH ST
NE 63RD ST
NE 62ND ST
NE 58TH ST
WEEDIN PL NE
NE 78TH ST
NE NAOMI PL
14TH
AVE
NE
17TH
AVE
NE
15TH
AVE
NE
12TH
AVE
NE
19TH
AVE
NE
20TH
AVE
NE
RAVE
NN
A AV
E N
E
25TH
AVE
NE
29TH
AVE
NE
31ST
AVE
NE
35TH
AVE
NE
21ST
AVE
NE
23RD
AVE
NE
26TH
AVE
NE
6TH
AVE
NE
8TH
AVE
NE
39TH
AVE
NE
Cowen Park
Ravenna Park
DahlPlayfield
RooseveltReservoir
5
NE 61ST STNE RAVENNA BLVD
Rooseveltå
Loyal Heights
å
Ecksteinå
ConcordiaLutheran
å
Assumption St Bridget
å
Bryant
å
Pedestrian Collisions 2012-2016
Bicycle Collisions 2012-2016
Biggest safety problems
www.seattle.gov/transportation/NE65VisionZero.htmMAY 2017
NE 65TH STREET VISION ZERO PROJECT
WHAT WE HEARD FROM THE COMMUNITY
Neighborhood Transportation Forum – February 28, 2017
What we heard• Safety improvements need to be made• Install short- and long-term improvements as soon as possible• Biggest concerns:
- Lack of left-turn lanes and signals- Unclear lane configuration/unpredictable behavior- Lack of safe pedestrian crossings
Online Survey – February 28 to March 14, 2017
Feeling of safety walking or biking
Quality and number of pedestrian crossingsWhat we heardHow people currently get around the neighborhood vs. how they want to
Chances of getting injured while walking or biking
Very dissatisfied21% (86)
Very satisfied10% (39)
Somewhat satisfied23% (96)
Neither satisfiednor dissatisfied14% (59)
Somewhat dissatisfied32% (130)
Very unsafe19% (78)
Somewhat unsafe38% (157)
Very likely23% (95)
Very likely23% (95)
Very unlikely7% (29)
Somewhat unlikely11% (45)
Neither unlikelynor likely15% (60)
Somewhat safe23% (95)
Neither safenor unsafe10% (39)
Very safe10% (41)
88%
89%
58%
55%
63%
43%
43%
37%
34%
32%
14%
13%
10%
3%
3%
51%
6%
3%
0%
85%
53%
39%
10%
5%
2%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
0% 10% 20% 30% 40% 50% 60% 70%
Walk (or use mobility device)
Personal car, truck, or van
Bus, trolley, or train
Bike
Ridesharing (Uber, Lyft, etc.)
Carsharing (Car2Go, Zipcar, etc.)
Taxi
Walk (or use mobility device)
Personal car, truck, or van
Bus, trolley, or train
Bike
Ridesharing (Uber, Lyft, etc.)
Carsharing (Car2Go, Zipcar, etc.)
Taxi
Speeding/aggressive driving
Lack of quality crossings
Failure to yield right of way to peds
Distracted driving
Congestion on streets
Other (please specify)
Unclear or lack of signage
Lack of quality street surfaces
Lack of quality sidewalks
Lack of lighting
Driving under the influence
www.seattle.gov/transportation/NE65VisionZero.htmMAY 2017
NE 65TH STREET VISION ZERO PROJECT
WHAT WE’VE DONE
Near-term improvements
• Lowered the speed limit on NE 65th St from 30 to 25 MPH between 8th Ave NE and 12th Ave NE
• Repainted all crosswalks on the corridor to enhance pedestrian safety
• Increased size of traffic signals from 8 inches to 12 inches to improve visibility
• Added reflective backing to traffic signals to improve visibility, especially at night
• Added pedestrian countdown timers to all signalized intersections between NE Ravenna Blvd and 39th Ave NE
• Added a centerline median with posts at NE 65th St and Roosevelt Way NE enhance the safety of southbound to eastbound left turns
Upgraded traffic signals on NE 65th St Pedestrian countdown timer
Lower speed limit on NE 65th St from 8th Ave NE to 12th Ave NE Centerline median with posts at NE 65th St and Roosevelt Way NE
www.seattle.gov/transportation/NE65VisionZero.htmMAY 2017
NE 65TH STREET VISION ZERO PROJECT
SEGMENT OVERVIEW MAP
Different cross-sections are proposed for different segments of NE 65th St
NE Ravenna Blvd to Roosevelt Way NE & 12th Ave NE to 20th Ave NE
Roosvelt Way NE to 12th Ave NE
20th Ave NE to 39th Ave NE
1
23
ROOS
EVEL
T W
AY N
E
BANNER WAY NE
UNIV
ERSI
TY W
AY N
EBR
OOKL
YN A
VE N
E
11TH
AVE
NE
NE 77TH ST
NE 75TH ST
NE 72ND ST
NE 71ST ST
NE 69TH ST
NE 66TH ST
NE 56TH ST
NE 67TH ST
NE 60TH ST
NE 59TH ST
NE 57TH ST
NE 73RD ST
NE 70TH ST
NE 68TH ST
NE 62ND ST
NE 60TH ST
NE 57TH ST
NE 65TH ST
NE 63RD ST
LAKE
CIT
Y WAY
NE
NE 62ND ST
NE 58TH ST
WEEDIN PL NE
NE 78TH ST
NE NAOMI PL
14TH
AVE
NE
17TH
AVE
NE
15TH
AVE
NE
12TH
AVE
NE
19TH
AVE
NE
20TH
AVE
NE
RAVE
NN
A AV
E N
E
25TH
AVE
NE
29TH
AVE
NE
31ST
AVE
NE
35TH
AVE
NE
39TH
AVE
NE
21ST
AVE
NE
24TH
AVE
NE
23RD
AVE
NE
26TH
AVE
NE
30TH
AVE
NE
33RD
AVE
NE
34TH
AVE
NE
Cowen Park Ravenna
Park
DahlPlayfield
RooseveltReservoir
5
NE 61ST STNE RAVENNA BLVD
1 12 3
www.seattle.gov/transportation/NE65VisionZero.htmMAY 2017
NE 65TH STREET VISION ZERO PROJECT
Sidewalk
Sidewalk SidewalkPlantingStrip
PlantingStrip
Bike Lane Bike LaneTravel Lane Travel LaneCenter Turn Lane
SidewalkPlanting Strip
Planting Strip
Travel Lane/Parking Travel Lane/Parking
EXISTING
OPTION A
Sidewalk SidewalkProtectedBike Lane
ProtectedBike Lane
Travel Lane Travel LaneCenter Turn LaneTransit Stop
PlantingStrip
1 SEGMENT 1 OPTIONSNE Ravenna Blvd to Roosevelt Way NE & 12th Ave NE to 20th Ave NE
Option B1 at Transit Stops
Option B2 at Transit Stops
• Protected bike lanes• Passing “lane” switches sides based on location of transit stop• Cars can pass bus• No on-street parking
Sidewalk SidewalkProtectedBike Lane
ProtectedBike Lane
Travel Lane Travel LaneTransit Stop
PlantingStrip
Sidewalk
Note: All cross-sections are looking west.
SidewalkPlantingStrip
PlantingStrip
Protected Bike Lane
Protected Bike Lane
Travel Lane Travel LaneCenter Turn Lane
OPTION B
• Standard bike lane• Parallel Neighborhood Greenway on NE 66th St & NE 68th St • Buses would stop in bike lane• No on-street parking
• Protected bike lanes• No on-street parking
• Protected bike lanes • In-lane transit stops• Cars wait behind bus• No on-street parking
www.seattle.gov/transportation/NE65VisionZero.htmMAY 2017
NE 65TH STREET VISION ZERO PROJECT
EXISTING
OPTION A
2 SEGMENT 2 OPTIONS
Roosevelt Way NE to 12th Ave NE
OPTION B
• Protected bike lanes• In-lane transit stops• Cars wait behind bus• No on-street parking
• No protected bike lanes• Parallel Neighborhood Greenway
on NE 66th St/NE 68th St• Transit-only lane with sharrows• No on-street parking
Sidewalk SidewalkPlantingStrip
ProtectedBike Lane
TransitStop
Travel Lane Travel LaneLeft Turn LaneTransit Stop
ProtectedBike Lane
Sidewalk SidewalkPlantingStrip
Left Turn LaneTravel Lane/Parking Travel Lane/Parking PlantingStrip
Sidewalk SidewalkPlantingStrip
Transit Lane with Sharrow
Transit Lane with Sharrow
Travel LaneLeft Turn LaneTravel Lane PlantingStrip
Note: All cross-sections are looking west.
www.seattle.gov/transportation/NE65VisionZero.htmMAY 2017
NE 65TH STREET VISION ZERO PROJECT
EXISTING
OPTION A
3 SEGMENT 3 OPTIONS
20th Ave NE to 39th Ave NE
• No bike lanes• Parallel Neighborhood Greenway on NE 68th St• Allow all-day on-street parking
Sidewalk SidewalkPlantingStrip
Travel Lane/Parking Travel Lane/Parking PlantingStrip
Sidewalk SidewalkPlantingStrip
Parking ParkingTravel Lane Travel Lane PlantingStrip
Note: All cross-sections are looking west.
www.seattle.gov/transportation/NE65VisionZero.htmMAY 2017
NE 65TH STREET VISION ZERO PROJECT
BUS TRAVEL TIMES
What we’ve heardNE 65th St is a major transit corridor and many people travel by bus or want to travel by bus more often.
Proposed bus stop consolidation
What we learnedWe modeled our options to better understand the impacts on bus travel. We learned that bus travel times can be improved in all options by reducing the number of bus stops in the corridor. Buses travel fastest when they stop in the travel lane.
ROOS
EVEL
T W
AY N
E
NE 72ND ST
NE 71ST ST
NE 69TH ST
NE 66TH ST
NE 67TH ST
NE 60TH ST
NE 59TH ST
NE 73RD ST
NE 70TH ST
NE 68TH ST
NE 65TH ST
NE 63RD ST
NE 62ND ST
NE 58TH ST
WEEDIN PL NE
NE NAOMI PL
17TH
AVE
NE
15TH
AVE
NE
12TH
AVE
NE
19TH
AVE
NE
20TH
AVE
NE
RAVE
NN
A AV
E N
E
25TH
AVE
NE
23RD
AVE
NE
26TH
AVE
NE
Cowen Park Ravenna
Park
5
NE 61ST STNE RAVENNA BLVD Bus stop to closeBus stop to remainNew bus stop
Travel Time During PM Peak Period, Eastbound NE Ravenna Blvd to 25th Ave NEExisting Option A Option B1 Option B2
Buses 8.1 6.9 5.9 6.3
Private vehicles 5.4 4.7 5.3 5.3
Note: Travel times are in minutes.
www.seattle.gov/transportation/NE65VisionZero.htmMAY 2017
NE 65TH STREET VISION ZERO PROJECT
ON-STREET PARKING UTILIZATION
Parking on NE 65th St is often highly utilized near the business districts. In the residential areas, it is less utilized.
Daytime (10 AM - 4 PM)
Weekend Daytime (11 AM - 5 PM)
Parking Utilization< 50% 51 - 75% 76 - 100% > 100%
ROOS
EVEL
T W
AY N
E
2 5T H
AVE
NE
NE 63RD ST
8TH
A VE
NE NE 65TH ST
15TH
AVE
NE
NE 73RD ST
BROO
KLYN
AVE
NE
RO
9TH
AVE
NE
1 1T H
AVE
NE
RAV
ENN
AAV
EN
E
NE 70TH ST
NE 68TH ST
NE 62ND ST
12TH
AVE
NE
NERAVENNA
BV
NE 60TH ST
NE 59TH ST
NE 72ND ST
NE 71ST ST
14T H
A VE
NE
21S
TA V
EN
E
NE 67TH ST
23R
DAV
EN
E
NE 58TH ST
NE 66TH ST
16TH
AVE
NE
17TH
AVE
NE
18TH
AVE
NE
19TH
AVE
NE
20TH
AVE
NE
EN
E
NE
WEEDIN PL NE
NE NAOMI PL
20TH
PL
NE
NE 64TH ST
24T H
AVE
NE
22N
DAV
EN
E
NE 61ST ST
NE 69TH ST
HIL
LMAN
PL
NE
6 TH
A VE
NE
5 6TH
AVE
NE
THAV
EN
E
NE 57TH ST
FROULAPLAYGROUND
RAVENNA
PARK
RAVENNA BOULEVARD
RAVE
NN
ARA
VIN
E
COW
ENPA
RK
Legend
Street Parking by Category
ROOS
EVEL
T W
AY N
E
2 5T H
AVE
NE
NE 63RD ST
8TH
A VE
NE NE 65TH ST
15TH
AVE
NE
NE 73RD ST
BROO
KLYN
AVE
NE
RO
9TH
AVE
NE
1 1T H
AVE
NE
RAV
ENN
AAV
EN
E
NE 70TH ST
NE 68TH ST
NE 62ND ST
12TH
AVE
NE
NERAVENNA
BV
NE 60TH ST
NE 59TH ST
NE 72ND ST
NE 71ST ST
14T H
A VE
NE
21S
TA V
EN
ENE 67TH ST
23R
DAV
EN
E
NE 58TH ST
NE 66TH ST
16TH
AVE
NE
17TH
AVE
NE
18TH
AVE
NE
19TH
AVE
NE
20TH
AVE
NE
EN
E
NE
WEEDIN PL NE
NE NAOMI PL
20TH
PL
NE
NE 64TH ST24
T HAV
EN
E
22N
DAV
EN
E
NE 61ST ST
NE 69TH ST
HIL
LMAN
PL
NE
6 TH
A VE
NE
5 6TH
AVE
NE
THAV
EN
E
NE 57TH ST
FROULAPLAYGROUND
RAVENNA
PARK
RAVENNA BOULEVARD
RAVE
NN
ARA
VIN
E
COW
ENPA
RKLegend
Street Parking by Category
ROOS
EVEL
T W
AY N
E
2 5T H
AVE
NE
NE 63RD ST
8TH
A VE
NE NE 65TH ST
15TH
AVE
NE
NE 73RD ST
BROO
KLYN
AVE
NE
RO
9TH
AVE
NE
1 1T H
AVE
NE
RAV
ENN
AAV
EN
E
NE 70TH ST
NE 68TH ST
NE 62ND ST
12TH
AVE
NE
NERAVENNA
BV
NE 60TH ST
NE 59TH ST
NE 72ND ST
NE 71ST ST
14T H
A VE
NE
21S
TA V
EN
E
NE 67TH ST
23R
DAV
EN
E
NE 58TH ST
NE 66TH ST
16TH
AVE
NE
17TH
AVE
NE
18TH
AVE
NE
19TH
AVE
NE
20TH
AVE
NE
EN
E
NE
WEEDIN PL NE
NE NAOMI PL
20TH
PL
NE
NE 64TH ST
24T H
AVE
NE
22N
DAV
EN
E
NE 61ST ST
NE 69TH ST
HIL
LMAN
PL
NE
6 TH
A VE
NE
5 6TH
AVE
NE
THAV
EN
E
NE 57TH ST
FROULAPLAYGROUND
RAVENNA
PARK
RAVENNA BOULEVARD
RAVE
NN
ARA
VIN
E
COW
ENPA
RK
Legend
Street Parking by Category
Overnight (10 PM - 7 AM)
Note: Parking data was gathered in January 2017.
www.seattle.gov/transportation/NE65VisionZero.htmMAY 2017
NE 65TH STREET VISION ZERO PROJECT
PARALLEL NEIGHBORHOOD GREENWAYIf a protected bike lane is not installed on NE 65th St, then we would build a parallel neighborhood greenway on NE 68th St.
Most promising route - NE 68th St
Neighborhood Greenway - Route Options Scorecard
NE 68th St
NE 68th/NE 70th
St Hybrid NE 70th St
1. Safety
Vehicle volume & type • • •Traffic speed • • •Collision history • • •Arterial crossings • • •2. Route Conditions
Steepness of hills • • •Directness and continuity • • •Condition of street, drainage and sidewalk • • •3. Community
Access to schools & transit • • •Neighborhood destinations • • •Summary
•= 10 5 3 3
•= 5 4 4 5
•= 0 0 2 1
Total Points 70 50 55
ROOS
EVEL
T W
AY N
E
NE 72ND ST
NE 71ST ST
NE 69TH ST
NE 66TH ST
NE 56TH ST
NE 67TH ST
NE 60TH ST
NE 59TH ST
NE 73RD ST
NE 70TH ST
NE 68TH ST
NE 62ND ST
NE 60TH ST
NE 57TH ST
NE 65TH ST
NE 63RD ST
NE 58TH ST
WEEDIN PL NE
17TH
AVE
NE
15TH
AVE
NE
12TH
AVE
NE
19TH
AVE
NE
20TH
AVE
NE
RAVE
NN
A AV
E N
E
25TH
AVE
NE
29TH
AVE
NE
31ST
AVE
NE
35TH
AVE
NE
39TH
AVE
NE23RD
AVE
NE
26TH
AVE
NE
Cowen Park Ravenna
Park
5
NE 61ST STNE RAVENNA BLVD
NE 68th St/NE 70th St hybrid
ROOS
EVEL
T W
AY N
E
NE 72ND ST
NE 71ST ST
NE 69TH ST
NE 66TH ST
NE 56TH ST
NE 67TH ST
NE 60TH ST
NE 59TH ST
NE 73RD ST
NE 70TH ST
NE 68TH ST
NE 62ND ST
NE 60TH ST
NE 57TH ST
NE 65TH ST
NE 63RD ST
NE 58TH ST
WEEDIN PL NE
17TH
AVE
NE
15TH
AVE
NE
12TH
AVE
NE
19TH
AVE
NE
20TH
AVE
NE
RAVE
NN
A AV
E N
E
25TH
AVE
NE
29TH
AVE
NE
31ST
AVE
NE
35TH
AVE
NE
39TH
AVE
NE
23RD
AVE
NE
26TH
AVE
NE
Cowen Park Ravenna
Park
5
NE 61ST STNE RAVENNA BLVDNE 70th St
ROOS
EVEL
T W
AY N
E
NE 72ND ST
NE 71ST ST
NE 69TH ST
NE 66TH ST
NE 56TH ST
NE 67TH ST
NE 60TH ST
NE 59TH ST
NE 73RD ST
NE 70TH ST
NE 68TH ST
NE 62ND ST
NE 60TH ST
NE 57TH ST
NE 65TH ST
NE 63RD ST
NE 58TH ST
WEEDIN PL NE
17TH
AVE
NE
15TH
AVE
NE
12TH
AVE
NE
19TH
AVE
NE
20TH
AVE
NE
RAVE
NN
A AV
E N
E
25TH
AVE
NE
29TH
AVE
NE
31ST
AVE
NE
35TH
AVE
NE
39TH
AVE
NE
23RD
AVE
NE
26TH
AVE
NE
Cowen Park Ravenna
Park
5
NE 61ST STNE RAVENNA BLVD
Other options we considered
www.seattle.gov/transportation/NE65VisionZero.htmMAY 2017
NE 65TH STREET VISION ZERO PROJECT
DESIGN QUESTIONS WE’VE HEARD
We are still planning and will continue to evaluate additional safety improvements to be included in the NE 65th St Vision Zero Project.
Will the project include safer crossings for people walking? Before we design pedestrian crossings, we need to identify a preferred cross-section for the entire NE 65th St corridor. Will the project include painted curb bulbs?As soon as we determine the final channelization of the street and the construction timeframe, we can evaluate the usefulness of curb bulbs and other tactical improvements.
Will speed limits be lowered on the rest of the corridor?After the February forum, we lowered the speed limit from 30 to 25 MPH between 8th Ave NE and 12th Ave NE. We will do further evaluation to see if we can enhance safety by lowering the speed limit on other segments of NE 65th St and nearby streets, like Roosevelt Way NE and 12th Ave NE.
Will the Seattle Police Department increase DUI enforcement and/or prevention efforts?SDOT regularly works with the Seattle Police Department on DUI prevention and enforcement efforts. Deterring impaired driving is a top priority for Vision Zero and patrols will be deployed to the area.
Will the Seattle Police Department do photo enforcement?We are waiting until after the project is fully constructed to work with the Seattle Police Department on whether photo enforcement would be an effective traffic safety tool.
www.seattle.gov/transportation/NE65VisionZero.htmMAY 2017
WHAT HAPPENS NEXT?
We will take your feedback on the cross-section options and begin to identify preferred cross-sections for the NE 65th St corridor.
We will then develop a corridor-wide plan to improve safety and mobility on NE 65th St.
Project TimelineFebruary 28: Held first Neighborhood Transportation Forum
March-May: Implemented short-term safety improvements
May 18: Held second Neighborhood Transportation Forum
Summer/Fall: Identify preferred corridor-wide plan and continue outreach to corridor stakeholders
2018/2019: Implement corridor-wide improvements
Stay InformedYou can sign up for the project mailing list on our project webpage: www.seattle.gov/transportation/NE65VisionZero.htm
Email us with your thoughts at [email protected]
NE 65TH STREET VISION ZERO PROJECT
www.seattle.gov/transportation/NE65VisionZero.htmMAY 2017
TELL US WHAT YOU THINK
Online SurveyPlease take our online survey to weigh in on potential street design concepts by June 1.
NE 65TH STREET VISION ZERO PROJECT
THANK YOU!
Survey Website: www.surveymonkey.com/r/NE65thVZ