Near Detector Electronics Status. Status Production Issues. Peter Shanahan FNAL MINOS Collaboration Meeting June 13, 2003. Near Detector Electronics. MINDER modules. MINDER Crate. MASTER Module. Trigger/Keeper. Component Count (not counting ~10% spares): 9328 MENUS 583 MINDERS - PowerPoint PPT Presentation
Citation preview
P. Shanahan June 13, 2003 1
Near Detector Electronics Status
• Status
• Production Issues
Peter Shanahan
FNAL
MINOS Collaboration Meeting
June 13, 2003
P. Shanahan June 13, 2003 2
Near Detector Electronics
MASTERModule
MINDERCrate
Trigger/Keeper
MINDERmodules
MA
ST
ER
Crate
Control
Read-Out Channel 0
Read-Out Channel 1
Read-Out Channel 2
Read-Out Channel 3
Read-Out Channel 4
Read-Out Channel 5
Read-Out Channel 6
Read-Out Channel 7
1818181818181818
MASTER MODULEVME Read-Out Board
Front End Crate
KE
EP
ER
68
Rea
d-O
ut B
uffe
r
VME Computer
Located Near MUX BoxEach Crate Hosts 16 MINDERs
Located in Front End VME Crate
VMEBackplane
Located in Front End VME Crate
Trig
ger
VM
E In
terf
ace
Each MINDER Module supports16 Channels, or 1/4 PMT
Each MASTER supports8 MINDERs, or 2 PMTs
VME Clock Fanout
RF ClockNUMI Interface
Tim
ing
MIN
DE
R
MIN
DE
R
MIN
DE
R
MIN
DE
R
MIN
DE
R
MIN
DE
R
MIN
DE
R
MIN
DE
R
GRD991101
To Other Crates
Component Count (not counting ~10% spares):
9328 MENUS
583 MINDERS
81 MASTERS
P. Shanahan June 13, 2003 3
Near Detector Electronics Status
• Schedule Status (BCWP/Total Budget):• 88% (April 03)
• All WBS 2.3.1 system components are in production• Problems with MENU startup
• All Printed Circuit boards in Assembly phase (or done…)
• Thorough checkout in progress
• All power supplies received/ crates in progress
• WBS 2.3.6• Auxillary systems (timing)
* Minder Timing Modules, Clock Fanouts, Master Clock Controller done
* Redesign of VME Timing Module for flexibility
P. Shanahan June 13, 2003 4
MENU Production
• Front-end daughter card• Supports and reads out QIE
• Stores digital data in pipeline
• 9328 in system
• 1440 plus spares required for CALDET
P. Shanahan June 13, 2003 5
MENU Production Problems
• Sporadic production startup:
• Fabrication
• Solder on gold contacts – not noticed until fabrication began.
• Vendor has accepted responsibility: inspection+new boards
• Vendor inspection insufficient (no microscope on QC line!)
• Assembly
• Incorrect 1st articles
• Overheated “burn-in” by vendor on 200 boards
• Poorly tuned initial automated optical inspection by vendor
• Wrong solder flux on several hundred boards
• All problems addressed by vendor
• Production has finally reached steady rate with consistent quality
• Much effort on 14th floor: Lou Dal Monte, Merle Watson, Charlie Nelson
P. Shanahan June 13, 2003 6
MENU Good News
• 5000 boards in hand
• Checkout rate of boards with no acute problems is >90%• Assumed 67% in checkout schedule• Thorough checkout of all MENU
functionality
• IIT Undergrads for Checkout• Resident at FNAL for 5 weeks• Will later take test-stand to IIT• Very helpful in meeting CALDET
schedule
• Long-term production• Rate of 330/wk will complete
production by 12/31/03
P. Shanahan June 13, 2003 7
Argonne Checkout
• MINDERS, MASTERS, KEEPERS• Minders loaded with MENUs
• Full system tests• Dave Reyna: Pedestals, DC Calibration• Tests virtually all aspects of the entire system
• Lower Level Testing• Gary Drake, Bill Haberichter, Tim Cundiff, et al.• Testing all bits, reading/writing all registers, etc
• Checkout done with a few sets of PROMs• Final PROMs will be burned post-CALDET
• Shipping for CALDET in progress
P. Shanahan June 13, 2003 8
2003 CALDET Run
• Sept. 4 – Oct. 4, 2003
• 1440 channels on Near Detector Electronics• Full instrumentation of 1 side (actual ND is one sided)
• Near only, and Near/Far running
• Production calibration of Near response• ND Electronics is principle focus of run
• Ship electronics in late June • L3 milestone 7/7/03
• Move to beam enclosure 8/18/03
P. Shanahan June 13, 2003 9
Near Detector Electronics Status
Item Number for Detector
Operation
Number for CALDET Operation
Assembled Number in Hand/Checked out
Comments
MENUs 9328 1456 5000/3000 90% passing checkout
MINDERs 583 91 150/100 Will burn final proms after CALDET
KEEPERs 45 8 All/15 “ “
MASTERs 81 16 71/21 “ “
MINDER CRATEs 45 8 10 Prep will do production checkout
MINDER PS 45 8 All/9 Prep will do production checkout
MASTER CRATEs 9 2 All/11
MASTER PS 9 2 All/3
VME Timing Module 10 2 4 Final Prototypes for CALDET
Minder Timing Module 45 8 45/42 ~few need repair post-checkout
Master Clock Controler 1 1 All Beam info interface test pending
Clock Fanout 6 1 All Beam info interface test pending
Spares (~10%) not included in this table. Various Auxillary cards not included
•All modules have CALDET quantities met
P. Shanahan June 13, 2003 10
Summary
• Near Electronics Production is Well Underway• All boards in assembly (or done!)
• CALDET quantities are met
• Thorough Checkout in progress at Argonne, FNAL• IIT help on MENU checkout
• Production appears well on schedule for detector installation