10
P. Shanahan June 13, 2003 1 Near Detector Electronics Status Status Production Issues Peter Shanahan FNAL MINOS Collaboration Meeting June 13, 2003

Near Detector Electronics Status

Embed Size (px)

DESCRIPTION

Near Detector Electronics Status. Status Production Issues. Peter Shanahan FNAL MINOS Collaboration Meeting June 13, 2003. Near Detector Electronics. MINDER modules. MINDER Crate. MASTER Module. Trigger/Keeper. Component Count (not counting ~10% spares): 9328 MENUS 583 MINDERS - PowerPoint PPT Presentation

Citation preview

Page 1: Near Detector Electronics Status

P. Shanahan June 13, 2003 1

Near Detector Electronics Status

• Status

• Production Issues

Peter Shanahan

FNAL

MINOS Collaboration Meeting

June 13, 2003

Page 2: Near Detector Electronics Status

P. Shanahan June 13, 2003 2

Near Detector Electronics

MASTERModule

MINDERCrate

Trigger/Keeper

MINDERmodules

MA

ST

ER

Crate

Control

Read-Out Channel 0

Read-Out Channel 1

Read-Out Channel 2

Read-Out Channel 3

Read-Out Channel 4

Read-Out Channel 5

Read-Out Channel 6

Read-Out Channel 7

1818181818181818

MASTER MODULEVME Read-Out Board

Front End Crate

KE

EP

ER

68

Rea

d-O

ut B

uffe

r

VME Computer

Located Near MUX BoxEach Crate Hosts 16 MINDERs

Located in Front End VME Crate

VMEBackplane

Located in Front End VME Crate

Trig

ger

VM

E In

terf

ace

Each MINDER Module supports16 Channels, or 1/4 PMT

Each MASTER supports8 MINDERs, or 2 PMTs

VME Clock Fanout

RF ClockNUMI Interface

Tim

ing

MIN

DE

R

MIN

DE

R

MIN

DE

R

MIN

DE

R

MIN

DE

R

MIN

DE

R

MIN

DE

R

MIN

DE

R

GRD991101

To Other Crates

Component Count (not counting ~10% spares):

9328 MENUS

583 MINDERS

81 MASTERS

Page 3: Near Detector Electronics Status

P. Shanahan June 13, 2003 3

Near Detector Electronics Status

• Schedule Status (BCWP/Total Budget):• 88% (April 03)

• All WBS 2.3.1 system components are in production• Problems with MENU startup

• All Printed Circuit boards in Assembly phase (or done…)

• Thorough checkout in progress

• All power supplies received/ crates in progress

• WBS 2.3.6• Auxillary systems (timing)

* Minder Timing Modules, Clock Fanouts, Master Clock Controller done

* Redesign of VME Timing Module for flexibility

Page 4: Near Detector Electronics Status

P. Shanahan June 13, 2003 4

MENU Production

• Front-end daughter card• Supports and reads out QIE

• Stores digital data in pipeline

• 9328 in system

• 1440 plus spares required for CALDET

Page 5: Near Detector Electronics Status

P. Shanahan June 13, 2003 5

MENU Production Problems

• Sporadic production startup:

• Fabrication

• Solder on gold contacts – not noticed until fabrication began.

• Vendor has accepted responsibility: inspection+new boards

• Vendor inspection insufficient (no microscope on QC line!)

• Assembly

• Incorrect 1st articles

• Overheated “burn-in” by vendor on 200 boards

• Poorly tuned initial automated optical inspection by vendor

• Wrong solder flux on several hundred boards

• All problems addressed by vendor

• Production has finally reached steady rate with consistent quality

• Much effort on 14th floor: Lou Dal Monte, Merle Watson, Charlie Nelson

Page 6: Near Detector Electronics Status

P. Shanahan June 13, 2003 6

MENU Good News

• 5000 boards in hand

• Checkout rate of boards with no acute problems is >90%• Assumed 67% in checkout schedule• Thorough checkout of all MENU

functionality

• IIT Undergrads for Checkout• Resident at FNAL for 5 weeks• Will later take test-stand to IIT• Very helpful in meeting CALDET

schedule

• Long-term production• Rate of 330/wk will complete

production by 12/31/03

Page 7: Near Detector Electronics Status

P. Shanahan June 13, 2003 7

Argonne Checkout

• MINDERS, MASTERS, KEEPERS• Minders loaded with MENUs

• Full system tests• Dave Reyna: Pedestals, DC Calibration• Tests virtually all aspects of the entire system

• Lower Level Testing• Gary Drake, Bill Haberichter, Tim Cundiff, et al.• Testing all bits, reading/writing all registers, etc

• Checkout done with a few sets of PROMs• Final PROMs will be burned post-CALDET

• Shipping for CALDET in progress

Page 8: Near Detector Electronics Status

P. Shanahan June 13, 2003 8

2003 CALDET Run

• Sept. 4 – Oct. 4, 2003

• 1440 channels on Near Detector Electronics• Full instrumentation of 1 side (actual ND is one sided)

• Near only, and Near/Far running

• Production calibration of Near response• ND Electronics is principle focus of run

• Ship electronics in late June • L3 milestone 7/7/03

• Move to beam enclosure 8/18/03

Page 9: Near Detector Electronics Status

P. Shanahan June 13, 2003 9

Near Detector Electronics Status

Item Number for Detector

Operation

Number for CALDET Operation

Assembled Number in Hand/Checked out

Comments

MENUs 9328 1456 5000/3000 90% passing checkout

MINDERs 583 91 150/100 Will burn final proms after CALDET

KEEPERs 45 8 All/15 “ “

MASTERs 81 16 71/21 “ “

MINDER CRATEs 45 8 10 Prep will do production checkout

MINDER PS 45 8 All/9 Prep will do production checkout

MASTER CRATEs 9 2 All/11

MASTER PS 9 2 All/3

VME Timing Module 10 2 4 Final Prototypes for CALDET

Minder Timing Module 45 8 45/42 ~few need repair post-checkout

Master Clock Controler 1 1 All Beam info interface test pending

Clock Fanout 6 1 All Beam info interface test pending

Spares (~10%) not included in this table. Various Auxillary cards not included

•All modules have CALDET quantities met

Page 10: Near Detector Electronics Status

P. Shanahan June 13, 2003 10

Summary

• Near Electronics Production is Well Underway• All boards in assembly (or done!)

• CALDET quantities are met

• Thorough Checkout in progress at Argonne, FNAL• IIT help on MENU checkout

• Production appears well on schedule for detector installation