This document sets out NBN Co’s proposals in respect of certain aspects of the National Broadband Network. The contents of this document representNBN Co’s current position on the subject matter of this document. The contents of this document should not be relied upon by our stakeholders (or anyother person) as representing NBN Co’s final position on the subject matter of this document, except where stated otherwise. NBN Co’s position on thesubject matter of this document may also be impacted by legislative and regulatory developments in respect of the National Broadband Network.All prices shown in this document are exclusive of any GST. © NBN Co Limited 2012
NBN Co New Developments
Scott Edwards – Technical Analyst (NewDevelopments)
Version 1.0 Commercial in Confidence
Version 1.0 Commercial in Confidence
YOUARE
HERE Approx6,000
per day
Acceleration of the Rollout to 2015
This timeline is indicative only and subject to change without notification.
Version 1.0 Commercial in Confidence
Product Plan
4
Version 1.0 Commercial in Confidence
Version 1.0 Commercial in Confidence
FSAM
6
.
Version 1.0 Commercial in Confidence
Month 1 2 3 4 5 6 7 8 9 10 11 12
Detailed Design
Community Information
Construction
Testing
Activation
For fibre to existing premises – ‘brownfields’It is estimated that the average time from work beginning to services over theNBN being available is 12 months. During the 12 months, the Fibre ServicingArea Module (FSAM) moves through the following stages:
NBN FSAM Construction Process
Version 1.0 Commercial in Confidence8
New Developments Rollout Overview
NBN Co new developments - VICTORIA
In over 322 new developments Across 964 registered stages
Currently
2559 premises 59 stages
Commercial in Confidence
Who Does What?
9
Fibre throughout the estate to each home
Lead-in fibre, Network Termination Deviceand Power Supply Unit
Wholesale open access networksupporting high speed broadband andtelephone services
NBN DeliverablesDeveloper Deliverables
Apply to NBN Co at:www.nbnco.com.au/newdevelopments
Signed Developer Agreement
Submit design for pit & pipe infrastructure
Construct ‘pathway’ to NBN standards andspecifications
Supply as –Constructed documentation andtransfer ownership of pit & pipe infrastructure toNBN Co
Commercial in Confidence
Premises Equipment
Underground lead in fibre
Street Pit
Commercial in Confidence
Premises Connection Device (PCD)
Commercial in Confidence
NBN Co
ServiceProvider
End-UserEquipment
Examples of equipment in the Home
Commercial in Confidence
Builder Deliverables - Preparing new (SDU) premises for the NBN
Commercial in Confidence
NBNCo Deliverables - Preparing new (SDU) premises
Commercial in Confidence
Fit for Purpose?
15
Commercial in Confidence
Fit for Purpose?
16
Commercial in Confidence
SuperfastInternet
Videoon
demand
MediaPhone
Tele-working
HomeSecurity
EnergyManagement
HealthMonitoring
Benefits of fibre connected homes
APPLICATIONS• Telephone, Video and
Voice call• Tele-working• Digital Healthcare• Home automation• Energy management• Security• Media sharing• Universal Remote• Video Streaming• High speed internet• Connected Appliances
Commercial in Confidence
What you shoulddiscuss withNew Homeowners:• Location of telephone and data
points
• Location of NBN EquipmentNetwork Termination Device,Power Supply Unit & Fibre WallOutlet
• Importance of fixed cabling* in thehome for future services like – IPTV,
Smart TV’s, etc.
* Connecting a wireless modem will notallow customers to utilise applications
throughout their homes like IPTV.
Ensure Category 5 cabling or higher is installed in all newhomes
Commercial in Confidence
Network Termination Device (NTD)
•The NTD is a boundary point for the fibre network and allows the user network interface (UNI) toconnect to the customer wiring. It is roughly the same size as a DSL modem.
•There are 2 x RJ-11 ports known as UNI-V ports, they will not be used in the Armidale FRS.
•There are 4 x RJ-45 ports known as UNI-D ports; up to 4 ports/RSPs will be used in the Armidale FRS.They are not common; each port is an individual terminating point for an RSP/service.
•The power port will accept the connecter from the PSU.
•The fibre input port accepts the fly lead from the FWO; this has a secure cover to prevent accidentaldisconnection or tampering with live fibre cable.
UNI-V(Voice) Port
x 2
Fibre Input Port
UNI-D (Data)Port x 4
PowerConnection
Commercial in Confidence
NTD Pre-Installation Request
For a smooth and efficient connection to high-speed broadband for yourcustomers, Builders can now request an NTD Pre Install.
NTDs should be installed at least 10 days prior to occupation
The NTD pre-install process is only available where Developments havebeen NBN Co. approved
Pre-Installation can take up to 1 hour for completion
Call 1800 881 816 to request ‘NTD Pre-Install’
Ensure the following is ready when you call:• Account Name (Development Name)
• Location
• Confirm the fibre pathway (conduit) is in place
• Confirm power availability date
• Advise number of Premises
• Projected Date for Pre-Install
Commercial in Confidence
How new homeowners activate services over the NBN?
Certified Service Providers that have gone through the NBN on-boarding process and can deliver products and services over the NBNcan be found on our website at:
www.nbnco.com.au/serviceproviders
NBN Co has so far signed with 21 different Retail Service Providers toprovide telecommunications services over the National BroadbandNetwork.
Commercial in Confidence
Builder/Cabler Responsibilities for Single Dwelling Units
1• Determine with your developer which sites/development stages will be NBN Ready
2
• Refer to NBN Co’s Preparation and Installation Guide available online at:www.nbnco.com.au/newdevelopments
3
• Determine NBN requirements and equipment locations on building plan. Determine buildingcabling requirements with customer specifications
4• Install lead-in conduit from the pit in the street to the home where the PCD will be located
5
• Install internal conduit from the PCD location outside to the internal Home Distributor (NTD,PSU, FWO location)
6• Book the NTD Pre Installation by calling 1800 881 816
Commercial in Confidence
MDU fibre deployment
1
• Refer to NBN Co’s Preparation & InstallationGuide and Building Design Guide for MultiDwelling Units online at:www.nbnco.com.au/newdevelopments
2• Supply lead-in conduit to the
communications room
3• Provide space in the communications
room and FDH
4• Supply cable trays/space in
communications room and riser shaft
5• Install conduit to units and NBN
Equipment to NBN Co’s specifications
Commercial in Confidence
Preparing new (MDU) buildings for the NBN
Commercial in Confidence
Key Resources - Builders
Subscribe to New Developments Newsletter:www.nbnco.com.au/subscriptions
Network Roll-out plan:www.nbnco.com.au/our-network/rollout-plan.html
Pit & Pipe Specifications:www.nbnco.com.au/assets/documents/installing-pit-and-conduit-infrastructure.pdf
Building Specifications:www.nbnco.com.au/assets/documents/preparation-and-installation-guide-for-sdus-and-mdus.pdf