Upload
duonglien
View
222
Download
2
Embed Size (px)
Citation preview
NAVAL AVIATION STRIKE WEAPONS
Presented To:
Air Armament Symposium
New Frontiers in Warfighting
RADM T. HeelyProgram Executive Officer
Strike Weapons and Unmanned Aviation12-13 October 2004
Navair Networking For Sea Trial And Sea Enterprise
F/A-18 AWL
IBAR
LAND RANGE
CH
INA
LA
KE
ACETEF
E-2C ESTEL
P-3C
ATR
PATU
XENT R
IVERPO
INT
MU
GU
F-14 WSIC SEA RANGE
POTENTIAL DNET NODES
MARITIME BATTLECENTER INTEGRATION LABS
TRAINING SYSTEMS
CURRENT DNET NODES
BOEING - SEATTLE
NAS FALLON
LOCKHEED - FORT WORTHMBCINTEGRATION LAB
TRAINING SYSTEMSDIVISION - ORLANDO
JNTF - COLORADOSPRINGS
BOEING - ST. LOUISMCB - QUANTICOFORT IRWIN NTC
MCB - 29 PALMS
RAYTHEON - TUCSON
EDWARDS AFB
EGLIN AFB
CHARLESTON
JFCOM
ABERDEEN
MBCINTEGRATIONLABS
PF27804a
SEA POWER 21Naval Aviation Capabilities
SEA SHORE
SPACE
AIR
WARFIGHTER
SENSORSNETWORKS
DECISION AIDS WEAPONS
SEABEDFORCENET
FORCENET
SEA BASING
SEA STRIKE
SEA SHIELD
FORCENET
PLATFORMS• CVN 21• AEA• F/A-18C/D/E/F• JSF• UCAV-N
• E-2CADV. HAWK.
• E-6B• MMA• MH-60R & S
WEAPONS• JASSM• JSOW,
AARGM/QB• JDAM/HART• DAGR/LOGIR• JCM
• AIM-120AMRAAM P3I
• AIM-9X• TOMAHAWK
SENSORS• ATFLIR AESA
PHASE II• SHARP P3I• AEA DIGITAL SYS• MMA• JMOD II
• SH-60R MMRS(SAR/PD)
• RMP P3I• AQS-22
NETWORKS• WIDE BAND
NETWORK• LINK 16• JSIP-N
FOLLOW-ON
• CDL-N• JMPS• CEC / JCTN• TBMCS• JC-2, IT-21,
NMCI
NAVAL AVIATION CAPABILITIESNAVAL AVIATION CAPABILITIES
SEA STRIKE• TIME SENSITIVE STRIKE• PERSISTENT ISR• ELECTRONIC WARFARE /
INFORMATION OPERATIONS• SHIP-TO-OBJECTIVE MANEUVER• COVERT STRIKE
SEA SHIELD• THEATER AIR & MISSILE
DEFENSE• LITTORAL SEA CONTROL• HOMELAND DEFENSE• FORCE ENTRY ENABLING
SEA BASING• ACCELERATED DEPLOYMENT &
EMPLOYMENT TIME• ENHANCED SEA-BORNE
POSITIONING OF JOINT ASSETS• OFFENSIVE & DEFENSIVE POWER
PROJECTION• INTEGRATED JOINT LOGISTICS• COMMAND AND CONTROL
ACQUISITION & LIFE CYCLE SUPPORT
Persistent IntelligenceSurveillance &
Reconnaissance
Persistent IntelligenceSurveillance &
ReconnaissanceSea-Based OperationsSea-Based Operations
Assured AccessAssured Access
Effects-Based OperationsEffects-Based Operations
Homeland DefenseCONUS
Homeland DefenseCONUS
Information & Knowledge AdvantageInformation & Knowledge Advantage
Mine CountermeasuresMine Countermeasures
Time Critical TargetsTime Critical Targets
Sea Strike Weapons RoadmapN78 1Q 2004 (POM 06)
Maverick
TOW / HELLFIRE
SLAM ER
JSOW “A”
JDAMLGB
JCM, APKWSGP Bombs
JSOWAARGMSDB II
JSOW “A” and “C”
HARM BLK V
LGB, GBU-24
TODAY FYDP 2012 2020
JDAM
LR Standoff
MR Standoff
Direct Attack
DA Moving/ MobileTarget
2.75”/5.00” ROCKET, GP Bombs
TACTOM(HSW)
JSOWAARGMSDB II
JDAMJCM, APKWS
GP Bombs
JCMSDB II
JDAM 82, 83, 84GBU 24, LGB
Maverick
APKWS, GP Bombs
SLAM ERTLAM Blk III / TACTOM
HARM BLK V and AARGM
SLAM ERTLAM Blk III / TACTOM
HELLFIREJCM
GP Bombs, LGB JCMSDB II
PF27804a
Sea Strike Weapons RoadmapMajor Roles & Responsibilities
CNO MAJCOMS SYSCOMS Tech. Base
NCDPSP21
CapabilityGaps
MaterielRequirements
RFIMateriel Options
Materiel Opportunities
ProposedMateriel Solutions
Sea StrikeCapabilityRoadmap
POM
Sea StrikeWeaponsRoadmap
(N702,N75,N76/77/78,APW)
IRADCRADSnTP3I
COTS
(NAVAIR,NAVSEA) (Labs, Industry, Acad.)(NSWAC, MAWTS,CFFC,MCCDC,NWDC,COCOMS)
NCDPSea Trial
Prioritized Solutions
Sea StrikeCapabilityRoadmap
PF27804a
Time Sensitive Targeting
TST is NOT just a weapon, it is a KILL CHAINTST is NOT just a weapon, it is a KILL CHAIN
TSTPr
ogra
ms
Kill
Chai
n
• Weapons bodies are robust and effective– Exception is HSW
• Existing weapons need forcenet enablers– WDL– Dual-mode – MIDEF– ATR
• Kill Chain needs work– Almost all the tools are there
– COAC is choke pointCID is weak
JEFX04
PF27804a
Mission Flow
FIND FIX TRACK TARGET ENGAGE ASSESSPRE-PLANNED
FIXED THROUGH WX
JIPTL DPSS JDAM National
SOF PSS-OFF SOF SOF JDAM SOFPredator DPSS Predator GCCS JDAM ATARS
Global Hawk Raindrop
Global Hawk DCGS HSW TARPS
AESA/GMTI AESA/GMTI AESA/GMTI AESA/GMTI JCM National
THIRD PARTY MOBILE
THROUGH WX
SELF TGT MOVING
THROUGH WX
THIS IS FORCENETTHIS IS FORCENET
THESE ARE PROGRAMSTHESE ARE PROGRAMS
CAOC: Bugsplat
CID Clearance to
Engage
Self tgt STILL involves
CAOC analysis /
clearance to fire
CIDChain of custody
BDA cited by COCOMS as not effective during
OIF/OEF Information was collected but CAOC was not capable of analyzing 700 combat sorties / day
FORCENET is the link that codifies the kill chain FORCENET is the link that codifies the kill chain
PF27804a
Mission Planning And Targeting:PGM Support & FORCEnet Roadmap
FY06-10:FORCEnet
TODAY:PROGRAM SPECIFIC SOLUTIONS
FY03-04:CONSOLIDATED SYSTEMS
ISRMANAGEMENT
ISRMANAGEMENT
INTELEXPLOITATION
INTELEXPLOITATION
COMMANDER’SDECISION / FORCE
ASSIGNMENT
COMMANDER’SDECISION / FORCE
ASSIGNMENT
MISSION PLANNING
AND TARGETING
MISSION PLANNING
AND TARGETING
ENTERPRISE ARCHITECTURE
OS
NE
TW
OR
KIN
G
OS
OS
TESTES COPCOPSINGLE
COP
TOMAHAWKPLANNER
S/W APPSS/W APPS
S/W APPSS/W APPS
S/W APPSS/W APPS
S/W APPSS/W APPSS/W APPSS/W APPS
S/W APPSS/W APPS
S/W APPSS/W APPSS/W APPSS/W APPS
S/W APPSS/W APPS
S/W APPSS/W APPSS/W APPSS/W APPS
S/W APPSS/W APPS
GCCSGCCS--MM
DPSSDPSS
LPMPLPMP
TAMPSTAMPS
TEAMSTEAMS
PFPSPFPS
TPSTPS
DIWSDIWS
PTWPTW
JASSM PTMJASSM PTM
TESTES--NN
TISTIS
TCSTCS
BGHPESBGHPES
SRMTSRMT
COPCOP
JOINT PRECISIONTARGETING TOOLS
COMMON COMMON GROUNDGROUNDSTATIONSTATION
JOINT MISSIONPLANNER
PF27804a
Tomahawk Weapons SystemFirst to the Fight since 1991
• 1900 missiles launched in combat since 1991 (160/year)• OIF and OEF
– 898 missiles launched in OIF/OEF (US and UK)– Loaded 1525 Tomahawks on 49 platforms in support of 7 Strike Groups Deploying to
OIF – Cross-decked 110 missiles in theater during OIF – First time Tomahawk employed as tactical vice strategictactical vice strategic weapon due to reduction in
mission planning timelines• Timeline reduced by a factor of 9 from Tomahawk IOC to present• Thru-put increased by factor of 5 from Tomahawk IOC to present
– 300% improvement in Submarine System Reliability from Desert Strike to OIF
Event Date Total
Desert Storm Jan-91 288
Southern Watch (Zaafaraniyah) Jan-93 45
Bushwacker (Intel Center) Jan-93 23
Deliberate Force (Bosnia) Sep-95 13
Desert Strike Sep-96 31
Desert Fox Dec-98 330
Allied Force (thru 5/5/99) Mar-May 99 218
Enduring Freedom Oct 01-Pres 82
Operation Iraqi Freedom Mar 03-Pres 803
PF27804a
Operation Iraqi Freedom
• Block III Missile increasingly versatile, accessible & employable
• 803 TLAM’s launched (US/UK) in 3 weeks
• 381 TLAMs launched in 48 hour period (21/22 Mar)
– 288 TLAMs launched in Desert Storm, 230 TLAMs in Allied Force
– 37 ships & subs
• Increased weapons responsiveness - ~90% reliable
– 36% of all missions launched < 24 hours from mission tasking
• Increased planning forward deployed
– 7 APS Dets planned 267 of 802 missions
• Efficient planning
– Federated targeting plan
– GPS accuracy was good enough – FOR TODAY
– Rapid execution
– Missiles spun up, ready for launch
– Shorter ranges, frequently routes planned direct to target
– Net-Meeting used as rapid planning, status and execution decision aid
1 Month – IOC/1986 1 week – Desert Storm/1991 1/2 day – Iraqi Freedom/2003 5 minutes – TACTOM/2004Moving in right direction; Block IV will get us the rest of the way
PF27804a
JW1
Tactical TomahawkTactical TomahawkWeapon System OverviewWeapon System Overview
Tactical Tomahawk Weapon System
53
TMPC
APS
TC2S(Tomahawk Command and Control System)
MDSPTW
TTWCS(Tactical Tomahawk Weapon Control System)
AUR(All-Up-Round)
UHFSATCOM
GPS
JIC
Threat and Target Data
NGA
Mapping, Charting &Geodesy
5 0
IRAQ
SAU DI AR ABIAOM AN
EM IRA T ES
JO RDAN
SYRIA
PAKI STAN
AFGHA NISTAN
4 5 5 5 656 0
QATAR
Ad-Da wha h
BAHRAINDhah ran
IRAN
Du ba i
L ing eh
Bush ire
Jask2 5
30
B ag h d a d
R iy ad h
KUWAIT
Ma traMasqat
Sur
4 0
20
T ay ma
Me din a
Jiddah Me cc a
Hufof
King Kh alidMil it ary City
Abu Dha bi
qom
Ahraz
Shira z
Esfaha n
Yazd
KermanRafha
5 0
IRAQ
SAU DI AR ABIAOM AN
EM IRA T ES
JO RDAN
SYRIA
PAKI STAN
AFGHA NISTAN
4 5 5 5 656 0
QATAR
Ad-Da wha h
BAHRAINDhah ran
IRAN
Du ba i
L ing eh
Bush ire
Jask2 5
30
B ag h d a d
R iy ad h
KUWAIT
Ma traMasqat
Sur
4 0
20
T ay ma
Me din a
Jiddah Me cc a
Hufof
King Kh alidMil it ary City
Abu Dha bi
qom
Ahraz
Shira z
Esfaha n
Yazd
KermanRafha
5 0
IRAQ
SAU DI AR ABIAOM AN
EM IRA T ES
JO RDAN
SYRIA
PAKI STAN
AFGHA NISTAN
4 5 5 5 656 0
QATAR
Ad-Da wha h
BAHRAINDhah ran
IRAN
Du ba i
L ing eh
Bush ire
Jask2 5
30
B ag h d a d
R iy ad h
KUWAIT
Ma traMasqat
Sur
4 0
20
T ay ma
Me din a
Jiddah Me cc a
Hufof
King Kh alidMil it ary City
Abu Dha bi
qom
Ahraz
Shira z
Esfaha n
Yazd
KermanRafha
5 0
IRAQ
SAU DI AR ABIAOM AN
EM IRA T ES
JO RDAN
SYRIA
PAKI STAN
AFGHA NISTAN
4 5 5 5 656 0
QATAR
Ad-Da wha h
BAHRAINDhah ran
IRAN
Du ba i
L ing eh
Bush ire
Jask2 5
30
B ag h d a d
R iy ad h
KUWAIT
Ma traMasqat
Sur
4 0
20
T ay ma
Me din a
Jiddah Me cc a
Hufof
King Kh alidMil it ary City
Abu Dha bi
qom
Ahraz
Shira z
Esfaha n
Yazd
Kerman
Rafha
GCCS-M(Shipboard)
TacticalPicture,
Threat Data
PositionInformation
NationalImagery Sources
ImageryTacticalImagery Sources
Imagery
ExternalCommunications
Strike Planning,Coordination,
Execution, and Reporting. TCI
DistributionOperationalCommand
Tasking,Coordination,
and Reporting
Inflight Retargeting Missile H&S,
BDI, BDII
Global InformationGrid (GIG)
MILSATCOM
COE
AUR IOC: May 2004
Slide 11
JW1 TTWS uses COE and and GCCS/M for its C4I sources and has completed all appropriate interoperability tests while connected to the current generation networks. With the exception of TSN, all external communications are through the existing data links on whatever platform the system is installed.Jeff Winston, 3/15/2004
PF27804a
Tactical TomahawkMission Profile
New Capabilities with Bl
9801509_UK.FH7REF 9705674A_UK.FH7
ock IV
Tasking
Imagery
Defenses
Map Data
Tactics
Ashore Planning
PreplannedMissions
TailoredMissions
Afloat Planning
TaskingTa
Targeting Data
ctical PictureGPS Data
Anti-jamGPS
BDIImage
Health andStatus
PlatformPlanning
Inflight RetargetingLoiter Mission
TERCOMBackup
WeaponControl
AlternateTarget
TimeCriticaTarget
l
SafeArea
DSMAC IIAMapPrimary
Target
PF27804a
Tomahawk Shooters SupportingGlobal CONOPS & Sea Strike
SSGN
SSGN/SOFStrike Element
Strike/TMD Surface Action Group
CGDDG
Expeditionary StrikeGroup
LHA(R)
LPD
LSD
CG
SSN
DDG
Carrier StrikeGroup
CG
DDG
T-AOE(X)
SSN
DDG
CVN(X)
Total Tomahawks = 339 Total Tomahawks = 249
Total Tomahawks = 424
Total Tomahawks = 126/154
Sea Power 21 Global CONOPS maximized distributed Tomahawk Strike capability across the Force
PF27804a
JSOW-C Program
• Standoff Outside of Point Defense• JSOW-A airframe and INS/GPS• Uncooled commercial I2R sensor with
Autonomous Target Acquisition (ATA)• Terminal Seeker• Broach Warhead
– Blast/Fragmentation/Penetrator
• Standoff Outside of Point Defense• JSOW-A airframe and INS/GPS• Uncooled commercial I2R sensor with
Autonomous Target Acquisition (ATA)• Terminal Seeker• Broach Warhead
– Blast/Fragmentation/Penetrator
• Increased PK • Increased PK • Precision Accuracy • Precision Accuracy
• OPEVAL complete– 10 of 11 on target
• 100% warhead effectiveness• ≈4’ CEP w/ ≈6’ equivalent penetration• LRIP deliveries began in Sep 04 on schedule• Production rate doubled in POM• IOC in Jan 05• WDL ATCD participant
• OPEVAL complete– 10 of 11 on target
• 100% warhead effectiveness• ≈4’ CEP w/ ≈6’ equivalent penetration• LRIP deliveries began in Sep 04 on schedule• Production rate doubled in POM• IOC in Jan 05• WDL ATCD participant
Description Status
Future CapabilityFY07 – SAASM insertion
FY10 – Relocateable / moving target capability
PF27804a
JSOW Cost Reduction“Block II”
• FY06 JSOW-C unit price commitment– $85K/unit savings– Lean initiatives, out sourcing, support reductions, Class II changes
• Additional savings in FY06 / $16K savings– Single airframe, seeker mods, GEU/SAASM– 55% reduction in # of parts/fasteners
• Payload cost reduction – additional savings
• Multi-year Procurement in FY08
JSOW-C Goal: < $ 200K weapon for JSOW-C<$125K weapon for JSOW-A
PF27804a
SLAM-ER
• SLAM-ER is a Precision Air Launched Standoff Outside Area Defense (SOAD) Weapon with Man-In-The-Loop Terminal Control
– Effective Against:
• High Priority Fixed Targets » Surface Ships; In Port & At Sea
• Relocatable Targets (FY05) » Medium Hard Targets
• Moving Land Targets (Late FY05)
• Highlights
– Integration Complete on F/A-18 C/D, P-3C & S-3B
– First SLAM-ER FMS case on Contract with South Korea on F-15K
– Relocatable Target Capability to Deploy in 1st QTR FY05
– Moving Target Land Strike Capability Currently in DT/OT Test
• Completed Risk Reduction JSTARS Integration Flight on 27 July 04
• Anticipated IOC in 4th QTR FY05 with F/A-18 C/D SCS 19C
• Will be US Navy’s First ForceNet Capable SOAD Weapon Utilizing Link-16 Third Party (JSTARS, F/A-18 E/F) Targeting
The Best CEP in U.S. Navy’s Weapon InventoryAWW-13 Pod
PF27804a
SLAM-ER Moving Target CONOPsJSTARS / UAV /Hairy Buffalo /CVN GMTI
JSTARS / UAV /Hairy Buffalo /CVN GMTI Launch:
F/A-18Launch:F/A-18
AWW-13 Data Link Continuous Mid-Course Updates to SLAM-ERAWW-13 Data Link Continuous Mid-Course Updates to SLAM-ER
Link 16 / Voice Comms to Shooter / ControllerLink 16 / Voice Comms to Shooter / Controller
Link 16 SourceMid-Course Update
Link 16 SourceMid-Course Update
Pilot Target DesignationPilot Target DesignationSeeker TrackSeeker Track
Control:F/A-18
Control:F/A-18
Sensor aircraft loadstarget coordinatesonto Link 16
Sensor aircraft loadstarget coordinatesonto Link 16
• Missile Software Dev Completed – SSV 2.0• F/A-18 OFP 19C, IOC 4th Qtr 05• T&E on-going
PF27804a
Joint Air to Surface Standoff Missile (JASSM)
• Program executing to PB-05 (FY09 IOC)
– Working to FY08 IOC
• USN requirements views JASSM as redundant
• POM06 zeros JASSM budget
– Redundancy / cost issue
• Integration
– FA-18E/F, procurement quantity 453 total
• JASSM AsUW study completed
– Air and Ship-launch (VLS) viable
– Out briefings TBA
PF27804a
Small Diameter Bomb (SDB) Increment II
• Current Funding
– DoN funding for SDB Increment II addresses:
• Analysis of technical solutions to Draft CDD Requirements
- Multi-Mode Seeker Solutions
- Datalink Solutions
• Pre-Integration Risk Reduction
- Aircraft Compatibility
- Shipboard Suitability
– DoN funding does not support:
• Joint USN/USAF Development Participation
• DoN Aircraft Integration
PF27804a
Dual Mode Weapon
• Requirement
– Time Sensitive Targeting
– Mission Flexibility
• Capability Assessment
– Raytheon / Lockheed Martin Demonstration
• Dual mode LGB drops to be accomplished 1st/2nd Qtr FY05
– Boeing demonstration
• Navy/AF requirements and procurement strategy discussions underway
PF27804a
Multi Purpose Bomb Rack
MPBR
Life Cycle Cost$1,173M
Life Cycle Cost $476M
COST AVOIDANCE $697M
BRU-55
BRU-41
BRU-42
BRU-33
PF27804a
Advanced Anti-radiation Guided Missile (AARGM)
• COUNTER SHUTDOWN ACTIVE MILLIMETER WAVE GUIDANCE
• EXPANDED THREAT COVERAGE– ENHANCED ANTI-RADIATION HOMING RECEIVER
• NETTED TARGETING– REAL-TIME INTEL FEED VIA INTEGRATED
BROADCAST SYSTEM PRIOR TO LAUNCH– WEAPON IMPACT ASSESSMENT TRANSMITTED
PRIOR TO DETONATION• GEOSPECIFICITY
– GPS/POINT-TO-POINT WEAPON– IMPACT AVOIDANCE ZONES/MISSILE IMPACT
ZONES • MULTI-SPECTRAL GUIDANCE
– ARH, MMW, GPS
Missions and Requirements
FY 03 04 05 06 07 08 09 10
DT B1
OA
LRIP
SCHEDULE
MS BSDR PDR CDR
OT IIB
MS C
FRPIOCFRP
DT B2
Acquisition Strategy• ACAT IC SD&D PROGRAM• CPIF CONTRACT AWARDED 19 JUNE 2003 TO ATK
MISSILE SYSTEMS CO, WOODLAND HILLS, CA• BASELINE SDD PLATFORM F/A-18 C/D• PARALLEL PATH F/A-18 E/F AND EA-18G• TOTAL PRODUCTION QUANTITY - 1750 • (RELATED PR07 ISSUES NOT INCLUDED BELOW:
JMPS UPC, IM WARHEAD AND ROCKET MOTOR)
PF27804a
Joint Common Missile
BASIC HELLFIRE
INTERIM HELLFIRE
LONGBOW HELLFIRE
HELLFIRE II
TOW 2A
MAVERICK
BRIMSTONE
Max Diameter W/Wings: 12.8 InchesMax Length: 70 InchesMax Weight: 108 LbsWarhead/Payload: Multi-Purpose Tandem Warhead; Shaped Charge Penetrating, Blast-fragmentation
Max Diameter W/Wings: 12.8 InchesMax Length: 70 InchesMax Weight: 108 LbsWarhead/Payload: Multi-Purpose Tandem Warhead; Shaped Charge Penetrating, Blast-fragmentation
JOINT COMMON MISSILE
STATUS & ISSUESMISSIONS & REQUIREMENTS
• PHASE: SD&D INCREMENT 1 PHASE 1 (RISKREDUCTION PHASE)
• FY05 INVENTORY/OBJECTIVE: 0 / 33,000
• NEXT MAJOR MILESTONE: MS C, 3QFY08• ISSUES: Technical Risks To Be Assessed At The
Conclusion Of Phase 1
• PROVIDES ROTARY/FIXED WING AIRCRAFT ENHANCED TARGETING CAPABILITIES, INCREASED LETHALITY, AND EXTENDED RANGE, IN BOTH FIRE-AND-FORGET AND PRECISION POINT TARGETING MODES, AGAINST MOVING AND SHORT DWELL RE-LOCATABLE TARGET SET IN ADVERSE WEATHER AND OBSCURED BATTLEFIELD CONDITIONS
- MULTI-MODE SEEKER (IIR, SAL, MMW)
- LOCK ON BEFORE LAUNCH & LOCK ON AFTER LAUNCH
• ARMY – LEAD, COPERATIVE PROGAM WITH UK
• IOC’S:
- AH-1Z & F/A-18E/F: 4QFY09
- MH-60R: 4QFY10
PF27804a
Medium Range Air-to-Air MissilesAIM-120 AMRAAM & AIM/RIM-7 SPARROW
MISSIONS & REQUIREMENTS MISSION: MEDIUM RANGE AIR DOMINANCEAIM-120 AMRAAM• AIR AND SURFACE LAUNCH / ALL ASPECT LOOK-DOWN,
SHOOT-DOWN ACTIVE RADAR MISSILE• LAUNCH AND LEAVE / MULTIPLE & CLUSTERED TARGETS• EXPANDED NO-ESCAPE ZONES / ENHANCED ECCM• IN SERVICE WITH NATO AND OTHER U.S. ALLIESAIM-7 SPARROW• AIR & SURFACE LAUNCHED, SUPERSONIC MEDIUM RANGE, DAY,
NIGHT, ALL- WEATHER LOOK DOWN/SHOOT DOWN SEMI-ACTIVE RADAR MISSILE
• IN SERVICE WITH NATO AND OTHER U.S. ALLIES
PROGRAM STATUS & ISSUESAIM-120 AMRAAM• COMBAT PROVEN - COMBAT VICTORIES SCORED IN IRAQ (2),
BOSNIA (1) AND KOSOVO (6)• 4796 AMRAAMs SOLD TO INTERNATIONAL CUSTOMERS (28
COUNTRIES)• P3I PHASE III DT COMPLETE, P3I PHASE IV IN SDD PHASE• P3I PHASE 3 - CONTRACT AWARDED NOV 1998
NEXT GENERATION AMRAAM ON SCHEDULE AND BUDGET FOR CY 04 DELIVERIES
AIM-7 SPARROW• AIM-7M IOC 1982, RIM-7P 1991• OVER 15,000 IN SERVICE WORLD WIDE
AIM-120
AIM/RIM-7
Phase III - IOC FY 05 / Phase IV - IOC FY 08 +5 ROCKET MOTOR, IMPROVED WARHEAD+5 ROCKET MOTOR, IMPROVED WARHEAD
AIM-7 retires 2010, RIM-7 remains in US Surface Navy service until 2017
AIM-7M / RIM-7P
AIM-120C
PF27804a
Short Range Air-to-air MissileAIM-9 Sidewinder
MISSIONS & REQUIREMENTSAIM-9X: THE NEXT GENERATION SIDEWINDER• 5TH GENERATION INFRARED STARING FOCAL PLANE ARR
TECHNOLOGYAY
-18E/F,
• NEAR BEYOND AND WITHIN VISUAL RANGE COMBAT• EXTREMELY MANEUVERABLE HIGH OFF BORESIGHT • F/A-18C/D, F-15C/D BASELINE PLATFORMS WITH F/A
F-15E, F-16, F/A-22, F/A-35 ON THE HORIZONAIM-9M: LEGACY SIDEWINDER• COMBAT-PROVEN LAUNCH AND LEAVE• EMPLOYED BY ALL U.S. TACTICAL FIGHTER / ATTACK AIRCRAFT• IN SERVICE WITH NATO AND OTHER U.S. ALLIES
PROGRAM STATUS & ISSUESAIM-9X:• JOINT SERVICE ACAT 1C PROGRAM (NAVY LEAD)• OPEVAL COMPLETED 29 AUGUST 2003• IN 4th YEAR OF PRODUCTION• INITIAL FIELDING TO USAF, USMC, USN IS COMPLETE• MS-III FULL RATE DECISION FY04AIM-9M:• IN SERVICE SINCE 1986• OVER 9,000 IN SERVICE WORLD WIDE• TACTICAL MISSILE PROGRAM
REFURBISH / UPGRADE BUY OF MISSILES IN US INVENTORY
AIM-9X
AIM-9M
LRIP 1 AWARDLRIP 2 AWARD
LRIP 3 AWARD
LRIP 4 AWARDLOT 5 AWARD
LOT 6 AWARD
LOT 7 AWARD
AIM-9X
LOT 8 AWARD
9X MS IIIOBJECTIVE
9X MS IIITHRESHOLD
AIM-9M
9X IOC THRESHOLD9X IOC THRESHOLD
TOTAL AIM-9X BUY10,097
AIM-9M SUSTAINMENT …END OF SERVICE 2017
PF27804a
Joint Unmanned Combat Air System (J-UCAS)
J-UCAS Navy Missions and Requirements
targeting for CSG and Joint Commander
Program Status• Joint Demonstration Program Started in FY04
– JUCAS Office (DARPA)– All AF and Navy funding consolidated– X-45 (Boeing) ; X-47 (NGC)– Common Operating System (COS) provides C4I and
control system commonality – Operational Assessment: Phase I FY07-09 (Strike);
Phase 2 – FY10-12 (CV ISR)
• CV based Navy UCAS– Complements manned Strike in conducting
Time Sensitive Operations• Persistent, penetrating ISR and strike capability
– Surveillance, reconnaissance, and precision
•SAR/GMTI, ESM, EO/IR, JDAM (desired)– Growth to full wep, Strike and SEAD capability
•Small Diameter Bomb, Adv HARM, etc– Multi-sensor precision targeting, precision
geo-location, battle damage assessment
PF27804a
Joint Mission Planning System (JMPS)
MISSIONS & REQUIREMENTS
• CO-DEVELOPMENT EFFORT BETWEEN NAVY/MARINE CORPS, AIR FORCE, ARMY AND SOCOM TO DEVELOP MODERN TACTICAL MISSION PLANNING SYSTEM
• GOAL TO IMPROVE INTEROPERABILITY THROUGH EXTENSIVE MULTI-SERVICE COMMONALITY AND COE / JTA COMPLIANCE
• JMPS WILL EVENTUALLY REPLACE OVER A DOZEN LEGACY MISSION PLANNING SYSTEMS & PROVIDE MISSION PLANNING SUPPORT TO ALL DOD AVIATION PLATFORMS
• PLANS AND/OR DEVELOPMENT IN WORK TO SUPPORT NEW PLATFORMS AND WEAPONS INCLUDING JSF, MMA, UAVS, JASSM, JCM, AARGM AND SDB
PROGRAM STATUS AND ISSUES
• SCHEDULED TO IOC WITH NAVY/MARINE CORPS IN FY05, REPLACING TAMPS AND THE AV-8B MSS SUPPORTING F/A-18, E-2C, AV-8B, JSOW, JDAM, EGBU, SLAM-ER, AND HARM
• WILL SUPPORT V-22 AND EA-6B BEGINNING IN FY05
• CURRENT PROGRAM ISSUES: DEPENDENCY ON ROLL-OUT OF GCCS VERSION 4.X AGGRESSIVE SCHEDULE TO COMPLETE IN TIME TO SUPPORT
F/A-18 H2E + /19c SCS
SCHEDULE
MSCOAMSB
FISCAL YEAR 98 99 00 01 02 03 04 05
QUARTER I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV
MILESTONES
ACQ STRATEGY
DEMOS
DEVELOPMENT
TESTING
PRODUCTION
1.1 1.2.3