C
Concess
IndepeFor Pal
the St
N
sionaire
ndent Enlanpur-State of G
B
M
FOR
Nation
L&T (A su
ngineer SSwaroopgGujarat anBOT (Ann
In
MONT
R THE M
nal Hig
Interstubsidiary
Servicesganj Secnd Rajasnuity) Ba
ndepen
THLY P
MONT
ghway
tate Roof L&T ID
s During ction of (sthan fouasis Und
ndent E
PROGR
H OF:
ys Au
ad CorDPL)
OperatioKm 340.
ur lane Her NHDP
Engine
RESS R
DECE
uthorit
rridor L
on & Ma00 to 264
Highway P Phase-
eer
REPOR
EMBER
ty of I
imited
intenanc4.00) on ConstruIII.
RT
R- 2016
India
ce PeriodNH-14 incted on
d n
Page 1
1. EXECUTIVE SUMMARY
BACKGROUND
The Government of India through Ministry of Shipping, Road Transport and Highways (MOSRT&H) entrusted
National Highways Authority of India (NHAI) with the responsibility of improving the quality highways of national
importance through NHDP in different phases. N.H.-27 was included in NHDP-Phase-II and was constructed on
BOT (Annuity) basis. The National Highways Development Project (NHDP) is a major initiative for capacity
enhancement of the highways in qualitative and quantitative terms. This project which has been implemented
recently aimed at developing Palanpur-Swaroopganj section of NH-27 located in the states of Gujarat and
Rajasthan to four lane divided carriageway including strengthening of the existing two lanes.
In order to provide smooth travel and a better level of service to the users of highway vehicular traffic, it was
decided to augment the capacity of the Palanpur–Swaroopganj section of NH-27 from Km. 601+000 in
Banaskantha district in the state of Gujarat to Km 677+000 in Sirohi district of Rajasthan state by widening the
existing 2 lanes to 4 lane divided carriageway, including strengthening of the existing 2-lanes on Build, Operate
and Transfer (Annuity) basis.
The scope of the project includes Design, Engineering, Construction, Development, Finance, Operation and
Maintenance from Km. 601.000 (Palanpur) to Km. 677.000 (Swaroopganj) of NH-27 in the states of Gujarat and
Rajasthan.
Project road starts from Palanpur which is an educational hub of Banaskantha District, during the rule of Jhalori
Nawabs, Palanpur became well known for Gujarati Gazals and Poetry. Dairy. Textile, Diamond polishing and
Marble are major industry of Palanpur. Banas Dairy is one of the largest dairy in the state. The diamond
polishing and evaluation industry across India and across and abroad is dominated by Palanpur Jain Diaspora.
The Project road starts at Km. 601+000 at Palanpur and passes through major town like Iqbalgadh, Amirgadh,
Abu Road and ends at Km. 677+000 at Swaroopganj.
M/s Larson & Tubro Interstate Road Corridor Limited is the Concessionaire and the Independent Consultant of
O & M is M/s. MSV International, Inc. Gaurgaoun. M/s Larson & Tubro Interstate Road Corridor Limited has
engaged M/s. Larson & Tubro Limited –ECC Division as their EPC contractor. The project has been completed
on 24th March, 2009 and the project highway has been placed in commercial operation with effect from 24th
March, 2009.
Page 2
1.1 Project Overview
1.1.1 Salient Features of Project �
Project Name
Independent Engineer Services During Operation & Maintenance Period For Palanpur-Swaroopganj Section of (Km 340.00 to 264.00) on NH-14 in the State of Gujarat and Rajasthan four lane Highway Constructed on BOT (Annuity) Basis Under NHDP Phase-III.
NH No. (New/ Old) NH - 14 (New NH-27) Scheme/ Phase Operation & Maintenance Phase. Mode of the Execution (BOT Toll/ BOT BOT Annuity Annuity/ EPC/ HAM/ Item Rate/ Others) No. of Lanes/ Configuration Four Laning with 1.5m Paved shoulder Length of the Project (in Km) 76.000 Km
Total Project Cost (in Cr) Total Cost :-Rs. 498 Crore No. of Bypasses (Name of Town, Length) NIL
No. of Major Bridges (Number and Location)
06 Nos. (At Km 609.500, 626.768, 638.752, 639.728, 652.735, 658.465)
No. of Toll Plazas (Number and Location)
02 No. at (i) Km. 602.750 (Khemana Toll Plaza) (ii)Km. 670.750 (Undvariya Toll Plaza)
No. of Flyovers (Number and Location) 01 Nos. (At Km 644.935)
DPR Consultant Name SNC. LAVALIN & Sheladia Associates.
Concessionaire Name (SPV & Parent M/s. L&T Interstate Road Corridor Limited. Date of Award (LOA Date) 28.03.2006 Appointed Date 24.09.2006 Concession Period 17.5 Years including Construction Period Construction Period (in Days) 912 Days O&M Period (in Days) 5475 Scheduled Date of Completion 24.03.2009 Independent Engineer M/s. MSV International Inc, USA. IE Agreement Date 01.04.2015 IE Mobilization Date 01.04.2015 Carriageway Width (Six lane/Four lane) 7.5 mtr.
Design Speed 100 Km./Hrs Service Road 39.473 Flyovers 01 Nos. Rail Over Bridge (ROB’s) 02 Nos. Major Bridge 06 Nos. Minor Bridge 20 Nos. Slab / Box Culverts 78 Nos.
Page 3
Hume Pipe Culverts 62 Nos. Bus Bays 12 Nos. (Gujarat Section 12 Nos. + Rajasthan Section 07 Nos.) Bus Shelters 36 Nos. Toll Plaza 02 Nos. Rest Area 01 Nos. Truck Lay Bye (at Km.636+350 LHS) Pedestrian Underpass 06 Nos. Vehicular Underpass 04 Nos. Cattle Crossings 06 Nos. Highway Lighting In all major intersections, Urban Areas, Toll Plaza Automatic Traffic Counter cum Classifier 02 Nos.
Emergency Communications System Every 2km both sides Variable Message Signs 06 Nos. Closed Circuit Television Cameras 08 Nos. Meteorological Stations 02 Nos.
Page 4
1.1.2 Location Map PALANPUR-SWAROOPGANJ NH-27
1.1.3 Status of Maintenance of Main Carriageway, Service Road & Paved Shoulders.
-Inspection Report of Main Carriageway,
Service Road.
Page 5
INSPECTION CARRIED OUT VS PLANNED – CIVIL (Submitted by Concessionaire)
48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 30I PAVEMENT1 Main Carriageway2 Service Roads & Approach Roads3 RoW4 Roughness measurement test5 Benkelman beam deflection test6 Expansion Joint7 Kerb
II DRAINAGE1 Lined drain2 Un‐lined drain3 Median drain4 Side drain5 Bridge Catch Basin6 Gullies and Catch Pits
III SHOULDERS, SLOPES & EARTHWORKS1 Earthen shoulder2 Pitching masonry3 Embankment/Side slope4 Shape5 Turfing6 Retaining Wall
IV ROAD FURNITURES1 Sign boards2 Gantry boards3 Hazard markers & Clusters4 Guard rails5 MBCB6 Marking7 Km stones/Hm stones8 Guard posts9 Delineators
10 Reflective stickers11 RoW Fencing & Boundary posts12 Raised Pavement Markers13 LightingV STRUCTURES 1 Super Structure2 Sub Structure3 Approch RE Wall4 Head Wall and Aprons5 Painting6 Crash Barrier7 Hand Rail8 Culverts9 Lighting (underpasses)
VI BUILDINGS1 Toll plaza ‐ Office building2 Booths & lane3 Sub centres4 Way side amenity5 Rest area6 Bus shelters7 Toilet blocks in Truck lay bay8 Lighting9 Panels
10 UPS11 Transformers12 Diesel Generator13 Invertors14 DB
VII HORTICULTURE1 Avenue plants2 Median plants3 Landscaping
Planned Visual Inspection
Carried Out Visual Inspection
Holidays
WORK OFF
S No Description of work
Page 6
PREVENTIVE MAINTENANCE PROGRESS VS. PLANNED-CIVIL
48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
A PAVEMENT1 Clearing ROW2 Clearance of embankment3 Cleaning Carriage Ways4 Sealing Cracks**
a) Covered with 6‐7 mm stone chipping @ 0.1 cum/10 sqmb) Covered with dry coarse sand surface dressing
5 Second coat of surface dressing**
6 Repair to rutted portion and edge breaking**
7 Sealing to closely spreaded cracks at scattered locations**
8 Treatment of Bleeding**
9 Providing treatment and repair to pot‐holes**a) Shallow potholes depth<75mmb) Deep potholes depth<75mmc) With ROADBOND**
10 Dense bituminous macadam**
11 Bituminous Macadam (Profile corrective course)**
12 Bituminous concrete**
13 Single course semi‐dense bituminous concrete**a) Using paying bitumen as per IS:73**
14 Patching of built up spray grout in layers**
15 Slurry seal**
16 Sealing the cracks using Emulsion**
17 Tack coat**
a) With Bituminous emulsion/cut back of specified grade
18 premix patching with stone chipping mixed with binder**a) Using straight run bitumen (3.5 to 4%) compacted thickness upto 25mm
b) Patch work using cationic bitumen emulsion rapid setting
19 Scarifying existing road surface**
20 Scarifying existing stone metal layers**
21 Mixing of distressed road pavement **a) in variable depth up to 50 mm in single passb) for depth 50‐100 mm in single passc) for depth 1000‐150 mm in single pass
22 Watch and ward on highway
23 Cleaning MBCB and Median railings**a) Metal beam crash barrierb) NJCB in median
24 Roughness measurement test25 Benkelman beam deflection testB DRAINAGE1 Cleaning road side unlined drains2 Cleaning road side lined drainsC SHOULDERS, SLOPES &
1 Blading/ grading shoulder and slopes
2 Reconstruction & regravelling of slopes/shoulders
3 Furnishing & laying turf**4 Repair to stone pitching/apronD ROAD FURNITURE MANAGEMENT
1 Maintenance of road signs & deliniatorsa) Road sign board mounted on single postb) Road sign board mounted on double post
2 Repair to road signs**a) Road sign board mounted on single postb) Road sign board mounted on double post
3 Replacing/installing delineators
4Replacing uninstalling delineators & all type of road sign
5 Reflective stickers on MBCB crash barrier
6 Fixing of distance measurement stone a) Hectometer stonesb) Kilometer stonec) 5th kilomiter stone
7 Boundary stones
8 Painting two coats on old surface
a) hectometer stones /guard rail
b) Kilometer stonesc) 5th kilomiter stone
9 Pevement marking
a) Ready mixed road marking paint
b) Hot applied thermoplastic compound
10 Painting kerb with synthitic enamel paint
11 Raised pavement marker
12 Removal of encroachment of ROW **
13 Removal of unauthorized approaches **
Sr. Description of work PREVENTIVE MAINTENANCE CARRIED OUT VS. PLANNED‐ CIVIL ‐ DECEMBER 2016
Page 7
E STRUCTURES
1Cleaning the upstream/downstream sides of C.D. works
a) Bridgesb) culverts
2 Replacing damaged/broken railing **
3
Cleaning of vent holes,weep holes,clogging of spouts,Gathering of dirt in bearing and Expansion Joints
4 Repair stone/brick masonry**5 pointing to existing pointing**6 Cement plaster & repair**
7Painting exposed concrete/mansonry portion of briedges/ CD works**a) Dry distemper of approved brand or lime
b) Enamel paint of approved brand
8 Sealing of cracks by injection through nipples **a) Cement Groutb) Epoxy Resin Grout
9 Providing guniting/Shortcretea) 25 mmb) 40 mmc) 50 mm
10 Repair to foundation**
11Applying epoxy mortar treatment over leached combed and pilled concrete**
12 Periodic maintenance of expansion joints
13Dismantling / breaking of damaged cement concrete floor**
14 Maintenance to all types of bearings
15 Providing and fixing weep holes 75 mm dia in walls**
F BUILDINGS1 15MM thick cement plaster1:5**2 Edge gola**
3 3 or more coats of oil bound distemper **
4 External walls‐ waterproofing cement paint**
5 Epoxy paint on steel work**
6 Expoxy paint on concerete work**
7 Carpenter**G HORTICULTURE1 Hoeing & Weeding 2 Trimming & Pruning3 ManuringH BUS BAYS1 Cleaning
Planned Visual InspectionCarried Out Visual InspectionHolidaysWORK OFF
Page 8
Status of Main carriageway including paved shoulder and service road:
(i) General cleaning: Concessionaire had been instructed to increase the manpower for regular cleaning
work till date Concessionaire has not taken any action to increase the manpower.
(ii) Drain : Despite of repeated reminders lined drain is not completely cleaned. The covers of drain is also damages at large number of locations. Now the Concessionaire has cleaned few locations but still large number of location are pending. Now Drain cover casting started at site.
(iii) Kerb Painting: The kerb painting is generally ok all along the Project Highway, wherever notified has been completed by Concessionaire.
(iv) Pot Holes: The surface of main carriageway is generally ok there is not pot hole in the stretch. Wherever
developed during monsoon has been attended immediately.
(v) Median Plantation: IE had prepared the Km wise list of shortfall of median plantation and issued to
Concessionaire vide IE’s letter no. MSV/O&M/PLN-SW (NH-27)/2016/289, dated 04.05.2016 and directed the Concessionaire to submit the programme accordingly Concessionaries has submitted the programme. As per the submitted programme Concessionaire had planted approximate 4000 plants in median gaps in both the sections i.e. in Gujarat and Rajasthan. Still few gaps are their which is already notified but pending.
(vi) Avenue Plantation: Avenue plantation in Gujarat section is good but in Rajasthan section Avenue plantation is not up to mark. During ongoing raining season IE had requested the Concessionaire to plan minimum 2000 plants in Rajasthan section. Concessionaire agreed to do plantation in Rajasthan section accordingly 2000 plants has been planted in this raining season.
(vii) Pedestrian Guard rail: Wherever pedestrian guard rail has been provided is being maintained in good
condition by the Concessionaire. Painting work of guard rail is in progress.
(viii) Pavement Marking : At present Concessionaire is not having in-house facility to do the pavement marking as and when required. Now Concessionaire has completed almost pending pavement marking work.
(ix) Street Lighting: Street lighting provided at VUP, flyover and on service road has been maintained as per the provision of Contract Agreement but at few locations large number of lights are non-functional which is already notified to the Concessionaire repairing of non-functional lights are also in progress but progress is not satisfactory.
(x) Road Side shoulders : Road side shoulder is maintained as per the requirement.
(xi) Road side furniture : Road side furniture like sinages, MBCB, hazard marker, Emergency calling
number sign boards etc. has been provided. Concessionaire is attending the missing/damaged sign boards as per IE’s inspection report but not attending on time.
Page 9
Service Road along Project Highway : (i) General cleaning: Concessionaire is attending the cleaning work on service road but frequency is not
maintained because of shortage of manpower and improper supervision at site. Concessionaire has assured that from end of September 2016 then November 2016 that they will increase the manpower or change the present system and will maintain the frequency but till now no action has been taken.
(ii) Pavement Marking : At few locations on service road pavement marking is peeled out which is already
notified to the Concessionaire. Now the Concessionaire has mobilized the vendor and pavement marking is in progress at notified locations.
(iii) Street lighting : Wherever lighting on service road is provided is maintained in good/working condition
by Concessionaire. Few notified non-functional lighting maintenance work is in progress. (iv) Road Surface : Surface of service road all along the Project highway is generally good/satisfactory.
Flyover and Vehicular/Pedestrian under Passes: (a) Flyover: (i) General cleaning below flyover : Concessionaire is cleaning the road surface below flyover but
frequency is not maintained. (ii) Flyover expansion joints : condition of expansion joints is good but cleaning frequency is not maintained
due to shortage of manpower and poor supervision at site.
(iii) Drainage spouts : All the spouts and cross drains are cleaned and maintained as required. However at few locations frequency is not maintained.
(b) Vehicular Under Passes: (i) General cleaning below flyover : Concessionaire is cleaning the road surface below flyover but
frequency is not maintained. (ii) Flyover expansion joints : condition of expansion joints is good but cleaning frequency is not maintained
due to shortage of manpower and improper supervision at site.
Drainage spouts : All the spouts and cross drain is cleaned and maintained as required. However at few locations frequency is not maintained.
Page 10
Monthly Site Inspection Report of Independent Engineer for the Month of December-2016
Page 11
Page 12
Page 13
Page 14
Page 15
2 . CHANGE OF SCOPE WORKS. Details of change of scope of work orders issued by NHAI is given below.
Sr. No. Proposal Details Date of First submission
to IE Current Status
COS (Rs) Amount
Expected / Actual Date of Approval
During Construction work
1
Change of scope due to Mitigation measures Balaram-Ambaji wild life Sanctuary area.
NHAI/PIU/PLN/BOT-IC/2006/D-2414, dated 24.02.2009.
Work Done 74,847,491 Work Done
2
Change of scope due to construction of NVP at Ch. No. 334+440.
NHAI/30030/EW-II BOT (Annuity) PLN/2006/1000, dated 23.12.2008.
Work Done 2,504,576 Work Done
3
Change of scope due to construction of MBCB at Undvariya Toll Plaza at ch. 270+250.
NHAI/PIU/PLN/BOT-IC/2006/D-1253, Dated 15.10.2010
Work Done 832,566 Work Done
4 Change of scope for construction of service road at Jethi Village
NHAI/PIU/PLN/BOT-IC/2006/D-1855, Dated 23.02.2011
Work Done 7,945,638 Work Done
During O&M
1
Change of scope for Enabling ETC equipment installation at Toll Plaza Khemana at Km.602+750 and Undvariya at Km.670.750.
12014/8/2014-RO-GNR/Tech./GDM/Vol.1/3484, Dated : 06.02.2015. 41,28,917
2
Change of scope for Enabling ETC equipment installation at Toll Plaza Khemana at Km.602+750 and Undvariya at Km.670.750.
12014/8/2014-RO-GNR/Tech./GDM/Vol.1/F-41, Dated : 06.02.2015 9,13,200
3
Change of scope for segregation of traffic island with other associated arrangement for ETC lane for Toll plaza Khemana and Undvariya
12014/8/2014/RO-GNR/Tech/GDM/Vol.1/F-36, Dated 1.12.2015
8,70,848
1.2.2 Obligations as per Contract 1.2.2.1 Critical obligations and constraints of
Concessionaire as per contract. 1.2.2.2 Critical obligations of Authority as per Contract 1.2.2.3 Critical pending obligations of IE as per contract
Page 16
1.2.2.1 Critical obligations and constraints of Concessionaire as per contract.
1. Improvement – This includes improvement in the existing assets as per requirement of this agreement
and safety audit if any in consultation with IC.
2. Road Maintenance –This includes routine maintenance, major maintenance, periodic preventive
maintenance, disaster maintenance and inspections.
3. Traffic management – Incident management; enforcement of regulations together with the relevant
authorities, hazard response ; information gathering and dissemination, road patrols and surveillance.
4. Safety – Accident prevention; after care; user behavior; education; enforcement; data collection and
analysis.
5. Facility Management – including periodic inspections, routine maintenance, rehabilitation and expansion
planning.
6. Road property management –Management of access, encroachment and ribbon development.
7. General responsibilities – including budgeting compliance with legal and accounting requirements and
public relations.
8. Planning of Operations and Maintenance Centre – including the basic planning comment on the detail
design and design co-ordination.
9. Maintaining public relations unit to interface with and attend to suggestion from users of the highway, the
media, Govt. agencies and other external agencies.
1.2.2.2 Critical obligations of Authority as per Contract
1. Enable access to the site, free Encumbrances, in accordance with this Agreement.
2. Permit peaceful use of the site by the Concessionaire as license under and in accordance with the
provisions of this Agreement without any let or hindrance from NHAI or persons claiming through or
under it;
3. Make reasonable endeavors in not allowing or placement of barriers by Government of Gujarat and
Rajasthan or any Governmental Agency on the Project Highway except on account of any law and order.
4. Enter into state support Agreement with the Concessionaire and the Government of Gujarat and
Rajasthan.
5. Assist the Concessionaire in obtaining police assistance from government of Gujarat and Rajasthan
against payment of prescribed costs and charges, if any, for traffic regulation, patrolling and provision of
security on the highway.
Page 17
6. Observe and comply with its obligations set forth in this Agreement.
7. Take all necessary steps towards accomplishment of acquisition of additional land. NHAI shall bear the
cost of additional land.
8. Coordinate with Government of Gujarat and Rajasthan authorities for completing the legal requirements
and maintaining law and order during removal of encroachment by the Concessionaire.
9. Bear all expenses as per the demand note raised by the concerned government or other concerned
agencies in respect of shifting of all types of utility services, environmental clearance, tree cutting,
compensatory afforestation and rehabilitation and reselltlement. However responsibility for shifting
approval etc. rests with the Concessionaire.
1.2.2.3 Critical obligations of IE as per contract
Maintenance shall include cleaning, replacement of equipment /consumables, roadside faculties, horticulture
maintenance and repairs to equipment, pavements, bridges, structures, HTMS and other civil works.
Maintenance shall not include the extension of any existing pavements, bridges, structures and other civil
works unless part of Project highway.
1. Review work plan and schedules of various operation and maintenance activities.
2. Review operation and maintenance manual prepared by the Concessionaire.
3. Review the performance of operation and maintenance (O&M) activities including equipment , service,
operation and safety, toll plazas and fees collection system (only for BOT project) landscaping,
environmental issues and way side amenities.
4. To mediate and assist in resolving disputes between NHAI and Concessionaire during O&M stage.
5. Initiate necessary action to undertake maintenance obligations of the Concessionaire at risk and cost of
the Concessionaire in the event of his failure to carry out O&M.
6. Undertake audit of the traffic using the Project Highway at least once a month.
7. Review and inspect the Project highway at least once a month during the O&M period and issue an
Inspection report of such inspections.
8. Review the accident record on the project highway and suggest remedial measures.
Page 18
1.3.2 Project Milestones :
Project Milestones
Description (days from appointed
date)
Panned Actual Delay (No. of months)
Current Status
Physical Progress
(%)
Scheduled date
Physical Progress
(%)
Revised Date
Milestone I
NOT APPICABLE Milestone II
Milestone III
Page 19
1.3.2 KEY PLAN :
Page 20
1.4.1 Detailed scope of work & physical progress by component:
ThisMonthDec-16
Cleaning of Roada) Main Carriageway 912 506 70 576b) Service Road 473.580 246.93 35 281.93c) Underpasses 192 104 16 120d) Major and Minor Junctions 1032 604 86 690
e) Bus Shelters (18 Location - 34 Nos) 1632 970 128 1098
f) Bus Byes (11Locations- 21 Nos.) 1008 588 84 672Cleaning of Road Property
a) Road Sign Boards mounted on single post 1886 1886 0.0 1886
b) Road Sign Boards mounted on double post 436 436 0 436
c) Overhead Gantry road sign boards 8 0 0 0d) Variable message sign boards 12 0 0 0e) Cantilever Sign boards 8 0 0 0f) Metal Crash Barrier by detergent and water 66550 0 0 0
g) Pedestrian Guard Rail 5760 0 0 0h) Toll Plaza Structure 4 0 0 0Cleaning of Undesirable Vegetation 228 133 19 152Cleaning of Structures a) Major Bridges 12 3 3 6b) Minor Bridges 40 20 7 27c) ROB No 4 0 0 0d) Fly Over No 2 1 0 1e) Box Culverts 144 72 0 72 f) Pipe Culverts 124 62 0 62 g) Slab Culverts 12 6 2 8Cleaning of Drainsa) Unlined / Kaccha Drains 0 0 0 0
b) Lined / Pucca (Covered + Open) Drains 31.974 10 5 15
Cleaning & Maintenance of Toll Plaza Area 24 13 2 15
Plantation Maintenance 12 7 1 8Drinking Water Supply 24 13 2 15Highway Lighting Maintenance 12 5 1 6
2.1 12 7 1 8
2.2 12 7 1 8
2.3 12 7 1 8
4.2 OPERATION AND MAINTENANCE PROGRESS UPDATE
Monthly
1.5
1.4
No
Target For Year
2016-17
Rm
1.2
Monthly
Km
NoNo
1.8 Monthly
1.6
Km
Medical Aid Post Monthly
Vehicle Rescue Post Monthly
Monthly
1.7 Monthly
1.9
Traffic Aid Post
No
No.
NoNo
1.3 Km
Rm
No
No
No
No
Km
No1.1
Km
No
No
No
Entity wise progress of work is cumulatively added and shown under for the month of DECEMBER - 2016
Schedule 1. Road Routine Maintenance
Sr.No. Description Unit
Achievement of O&M Up to
Previous Month
Up to This Month
Short falls if any
Page 21
1.5.3 Wild Life
S.no. Type of Forest
Area Stretches (Old Km.)
Stretches (New Km.)
1 Reserve forest. (Rajasthan)
a) 292+450 to 292+700=0.250 Km. b) 294+360 to 294+780= 0.360 Km. c) 293+520 to 293+880= 0.360 Km. d) 281+000 to 282+000= 1.00 km G. Total = 1.97 Kms
a) 648+550 to 648+300=0.250 Km. b) 646+640 to 646+220= 0.360 Km. c) 647+480 to 647+120= 0.360 Km. d) 660+000 to 659+000= 1.00 km
G. Total = 1.97 Kms
Reserve forest. (Gujarat)
a) 307+265 to 308+550 =1.285 Km b) 321+630 to 321+900=0.27 Km c) 331+000 to 331+430=0.43 Km
G. Total = 1.985 Kms
a) 633+735 to 632+450 =1.285 Km b) 619+730 to 619+100=0.27 Km c) 610+000 to 609+570=0.43 Km
G. Total = 1.985 Kms
3 Balaram Wildlife Sanctuary
a) 321+145 to 321+330= 0.185 Km b) 331+430 to 333+080= 1.65 Km
G.Total= 1.835 Kms
a) 619+855 to 619+670= 0.185 Km b) 609+570 to 607+920= 1.65 Km
G.Total= 1.835 Kms
Page 22
1.8 Mobilization Resources
ORGANIZATION CHART OF MSV International, INC (IE)
Pavement Specialist Mr. Col. R. N Malhotra
Road Safety Expert Mr. Sameer Sharma
Traffic & Transportation EngineerMr. Abhishankar Parasher
Quality cum Material Engineer Mr. Ramani Arvind Kumar G
Bridge/ Structural Engineer Mr. Rajesh Kumar Verma
Highway Maintenance Engineer-II Mr. Ram Singh Verma
HTMS/ Toll Expert Mr. S.K.Yadav
TEAM LEADER CUMSENIOR HIGHWAY ENGINEER
Mr. Tarsem singh
Ass. Highway Maintenance Engineer-II Mr. Rajendra Prasad Sharma
Highway Maintenance Engineer-I MR. Mukesh Kumar
Ass. Highway Maintenance Engineer-I Mr. Gajraj Singh
CAD Expert TBN
Electrical Engineer TBN
Quantity Surveyor TBN
Horticulture Expert Mr.Udaybhan Singh
Page 23
INDEPENDENT CONSULTANT STAFF MOBILIZATION
Sr. No. Name Position Date of
Joining Man Month
Professional Staff
1 Mr. Tarsem singh Team Leader 01.05.2015 36
2 Mr. D.K.Pandey/Mr. Mukesh Kumar
Highway maintenance Engineer-I 06.04.2015 36
3 Mr. Ram Singh Verma Highway maintenance Engineer-II 01.04.2015 36
4 Mr. Ramani Arvind Kumar G
Quality cum Material Expert 08.09.2015 Intermittent
5 Mr. Col. R. N Malhotra Pavement Specialist 06.06.2015 Intermittent
6 Mr. Sameer Sharma Road safety expert 16.07.2016 Intermittent
7 Mr. Rajesh Kumar Verma Bridge structural Engineer 14.05.2016 Intermittent
8 Mr. Abhishankar Parasher Traffic & Transportation Expert 24.04.2015 Intermittent
9 Mr. S.K.Yadav HTMS/Toll expert 04.01.2016 Intermittent
Sub-Professional Staff
1 Mr. Pranav Patel/ Mr. Rajendra Prasad Sharma
Assistant Highway Maintenance Engineer 01.12.2015 36
2 Mr.Udaybhan Singh Horticulturist Expert 01.09.2015 Intermittent
3 Mr. R. Ravi Quantity Surveyor 02.05.2016 Intermittent
Support Staff
1 Mr. Kinjal Prajapati/Mr. Jimit Mevada Tec Supervisor –I 01.04.2015 36
2 Mr.Arjun Kumar/Mr. Abdul Hannun Tec Supervisor –II 02.04.2015 36
3 Mr.Premal Prajapati/Mr. Bhavesh parmar Tec Supervisor –III 02.04.2015 36
4 Mr. Bhagirath Chauhan/Mr. Shahbaz Shershiya Tec Supervisor IV 01.04.2015 36
5 Mr. Mehul Parmar Lab Assistant 01.04.2015 36
6 Mr. Ganesh Mohapatra/Mr. Vikash Gautam Office Manager 01.04.2015 36
7 Mr. Devendra Chauhan Account cum Cashier 01.04.2015 36
9 Mr. Vijay Desai/Ms. Vaishali Modi/Mr. Sanjay Kumar Steno cum Computer Operator 02.04.2015 36
11 Mr. Yogesh Sutariya/Mr. Paresh Bariya Office Boy-1 01.04.2015 36
12 Mr. Prakash parmar/Mr. Sagar Rana Office Boy-2 02.04.2015 36
Page 24
ORGANIZATION CHART OF L&T Intestate Road Corridor Ltd. (Concessionaire)
Project Head
Mr. S.Elangovan
O & M
Electrical Engineer Mr. Tejas Kate
Asst. Route Operation Manager-
-
Engineer SystemMr. Kanan
Ass. Manager A/c of AdminMr. M.Murga Perunal
Sr. Engineer MaintenanceMr. Sapan Kumar Das
Route SupervisorMr. Kundan Kumar Gautam
Route SupervisorMr. Hitendra Joshi
Engineer Toll SystemMr. Mukesh Kumar Naraniya
Accounts & Admin Executive -
Sr. Engineer MaintenanceMr. Mahendra Pal Chimpa
Page 25
Details Amount (Rs. In Lacs)Canara Bank
Receipts
Opening Balance 11.57
-
Share Capital -
Term Loans -
Annuity -
Non -Convertible Debentures -
Other Receipts 0.14
Capital Gain 14.33
Interest Income -
Closure of Investment/Deposits 185.67
Other Transfers -
-
Total 211.71
Payments -
Payment to Creditors 99.35
Interest on loans/Hedging cost/NCD -
Loan / NCD Repayment -
Investment/Deposits 100.00
Other Project Expenses/Taxes -
Total 199.35
Closing Balance 12.36
Concessionaire : L&T Interstate Road Corridor Ltd.
DETAILS OF ESCROW ACCOUNT
(AS PER SCHEDULE 'XB2'OF CONCESSION AGREEMENT)For the month of December-2016
1.9.2 Escrow details
Page 26
1.11 Pen Pictures on safety features
Sr. No. Particular Unit Quantities
1 Equipment
1) Emergency Call Box No 70
2) Closed Circuit Television No 8
3) Variable Message Signs No 6
4) Meteorological Communication System No 2
5) Automatic Traffic Counter Classifier No 2
6) Message Data System No 2
2 Sign Boards Details
1) Mandatory / Regulatory No 85
2) Informatory / Guide No 115
3) Cautionary / Warning No 407
4) Chevron No 916
3 Metallic Beam Crash Barrier Km. 33196
4 Pedestrian Guard Rail RM 2880
5 Jumbo Bollard No 78
6 Kilo Meter Stone No 158
7 Hectometer Stone No 608
8 ROW/Boundary Pillar No 613
9 5th Kilo Meter Stone No 30
10 Cat Eyes No 9324
11 Delineators No 2311
12 Median Opening No 39
13 Median Opening Blinkers No 01
14 Thermoplastic Road Marking RM 456
15 Service Road Marking RM 39.473
16 ROW Fencing RM 2901
17 Highway Lights No 1460 Nos.
18 High-MAST Electrical pole No 12
2 O&M All communication and control & Administration Systems Communication 2.1 Details of Correspondence From NHAI and Concessionaire To IE 2.2 Details of Correspondence From IE To NHAI and Concessionaire Control 2.3 Highway Traffic Management System 2.4 Emergency service locations along project highway
Page 27
2.1 Details of Correspondence From NHAI and Concessionaire To IE
Month: December : 2016
Sr. No.
Document Date
Date of Receipt Agency Subject
1 29.11.2016 02.12.2016 NHAI Likely resumption / restart of toll plaza operations on NHs w.e.f. 01.12.2016 (Midnight) / 02.12.2016 (00 hrs.) & Duties of IE / Concessionaire staff at toll plaza.
2 30.11.2016 02.12.2016 NHAI Likely resumption / restart of toll plaza operations on NHs w.e.f 02.12.2016 (midnight) / 03.12.2016 (00.00 hrs.) & Duties of IE / Concessionaire staff at toll plaza
3 01.12.2016 02.12.2016 NHAI Likely resumption / restart of toll plaza operations on NHs w.e.f. 02.12.2016 (midnight) / 03.12.2016 (00 hrs.).
4 01.12.2016 02.12.2016 NHAI
Likely resumption / restart of toll plaza operations on NHs w.e.f 02.12.2016 (midnight) / 03.12.2016 (00.00 hrs.) :- Establishing of the supplementary arrangement (V12 POS/PPI at toll plaza for smooth connection of user fee) :- Video conference chaired by CHAIRMAN, NHAI on 30.11.2016 at 3:00 PM.
5 01.12.2016 02.12.2016 L&T Monthly black spot status of November-2016
6 01.12.2016 05.12.2016 NHAI Duty Roaster Chart for compliance for smoothly running of tolling operation at toll plaza w.e.f. 02.12.2016 (midnight) / 03.12.2016 (00.00 hrs.)
7 02.12.2016 05.12.2016 NHAI
Monitoring of progress report of Toilets, Hoardings and Dustbins at fee plazas under Swatch Bharat Mission (Postpones of meeting from 03.12.2016 to 10.12.2016) :-A meeting to review dedicated ETC lane and SBM at RO Office Gandhinagar on 10.12.2016 at 12.00hrs.
8 28.11.2016 05.12.2016 NHAI Requesting for Completion Certificate.
9 02.12.2016 05.12.2016 NHAI Opinion of NHAI on Survey No.344-area 19790.00 for Small Centre purpose Village:Chitrasani, Taluka:Palanpur,District:Banaskantha.
10 05.12.2016 06.12.2016 L&T Submission of fortnight ending Report in Prescribed format A,B,C.
11 05.12.2016 06.12.2016 L&T Submission of Monthly progress Report (O&M) November 2016
12 05.12.2016 06.12.2016 L&T O&M Inspection Report for the month of October 2016 under Clause 19.2 of CA-Reg
13 03.12.2016 06.12.2016 NHAI Collection of small denomination change in Rs.100 -, Rs.50 -, Rs.20 -,Rs.10 - & Rs.5/- Notes / coins from religious places in the State of Gujarat:-Ensuring smooth operations of user fee collection at fee plazas
14 05.12.2016 06.12.2016 L&T Kilometer wise Plan of Safety provisions-Reg.
15 05.12.2016 06.12.2016 L&T Hill slope protection work at Km.646+500 and Km.648+000-Reg
16 09.12.2016 10.12.2016 L&T O&M inspection report for the month of October 2016 compliance-Reg
17 09.12.2016 10.12.2016 L&T Likely resumption/restart of toll plaza operations on NHs / smoothly running of tolling operation-Reg
18 10.12.2016 13.12.2016 L&T Visibility issue on VUP at Km.659+200 by Distt. Administration-Reg
Page 28
19 10.12.2016 13.12.2016 L&T Notice for Road Safety Provision and Safety Furniture in the Project highway already notified-Reg
20 12.12.2016 13.12.2016 L&T Reimbursement of (50%) IE expenses as per Contract Provision for the month of September.2016-Reg
21 12.12.2016 13.12.2016 L&T Reimbursement of (50%) IE expenses as per Contract Provision for the month of October.2016-Reg
22 12.12.2016 13.12.2016 L&T The District Transport Officer, Abo Road letter-Reg.
23 12.12.2016 13.12.2016 L&T Representation from Shri Bhikhabhai H. Patel regarding approach road from National Highway-Reg
24 12.12.2016 13.12.2016 L&T Proposal for permission for access to proposed Retail Outlet / Proposal for conversion of Agriculture land to Non Agriculture Purpose-Reg
25 07.12.2016 13.12.2016 Undavariya Toll Plaza
Undavariya Fee Plaza at KM. 270.250 for the section from Km.264.00 to Km.295.00 (Aburoad to Pindwara) of MH-14 in the state of Rajasthan.
26 09.12.2016 13.12.2016 NHAI ETC Implementation-Compliance by toll operations before launch of Phase-II of Electronic Toll Collection
27 12.12.2016 13.12.2016 NHAI Provision of dustbins / toilets / hoardings at toll plazas.
28 13.12.2016 14.12.2016 L&T Observations on bridge inspection report-Reg.
29 05.12.2016 15.12.216 NHAI Permission for access to proposed Retail Outlet abutting on NH-27 at Km 624.505 (between Km 624.485 to Km 624.585), Survey No.124 (Old-10P1/P1/P2) RHS at Village: Dhanpura, Taluka-Amirgadh,District-Banaskantha in the state of Gujarat.
30 08.12.2016 16.12.2016 NHAI Likely resumption / restart of toll plaza operations on NHs w.e.f. 01.12.2016 (Midnight) / 02.12.2016 (00 hrs.) & Duties of IE / Concessionaire staff at toll plaza.
31 16.12.2016 17.12.2016 L&T Likely resumption / restart of toll plaza operations on NHs w.e.f 02.12.2016 (midnight) / 03.12.2016 (00.00 hrs.) & Duties of IE / Concessionaire staff at toll plaza
32 19.12.2016 19.12.2016 L&T Likely resumption / restart of toll plaza operations on NHs w.e.f. 02.12.2016 (midnight) / 03.12.2016 (00 hrs.).
33 18.12.2016 20.12.2016 L&T
Likely resumption / restart of toll plaza operations on NHs w.e.f 02.12.2016 (midnight) / 03.12.2016 (00.00 hrs.) :- Establishing of the supplementary arrangement (V12 POS/PPI at toll plaza for smooth connection of user fee) :- Video conference chaired by CHAIRMAN, NHAI on 30.11.2016 at 3:00 PM.
34 19.12.2016 20.12.2016 L&T Monthly black spot status of November-2016
35 19.12.2016 20.12.2016 L&T Duty Roaster Chart for compliance for smoothly running of tolling operation at toll plaza w.e.f. 02.12.2016 (midnight) / 03.12.2016 (00.00 hrs.)
36 20.12.2016 21.12.2016 L&T
Monitoring of progress report of Toilets, Hoardings and Dustbins at fee plazas under Swatch Bharat Mission (Postpones of meeting from 03.12.2016 to 10.12.2016) :-A meeting to review dedicated ETC lane and SBM at RO Office Gandhinagar on 10.12.2016 at 12.00hrs.
37 21.12.2016 21.12.2016 NHAI Requesting for Completion Certificate.
38 21.12.2016 22.12.2016 NHAI Opinion of NHAI on Survey No.344-area 19790.00 for Small Centre purpose Village:Chitrasani, Taluka:Palanpur,District:Banaskantha.
Page 29
39 22.12.2016 23.12.2016 NHAI Submission of fortnight ending Report in Prescribed format A,B,C.
40 28.12.2016 28.12.2016 NHAI Immediate relief to be provided to Auctioned toll plaza, toll collecting
agency appointed in Undvariya toll plaza (M/s. Skylark Securities Pvt. Ltd) at Km.270.250 for the section from Km.264.000 to Km. 295.000 (Aburoad to Pindwara) of NH-14 in the state of Rajasthan -reg.
41 28.12.2016 28.12.2016 NHAI Immediate relief to be provided to Auctioned toll plaza, toll collecting
agency appointed in Khemana toll plaza (M/s, Welcome Infratoll(JV) at Km.339.000 for the section from Km.340.000 to Km. 295.000 (Palanpur/Khemana to Aburoad) of NH-14 in the state of Gujarat -reg.
2.2 Details of Correspondence From IE To NHAI and Concessionaire. Month: December : 2016
Sr. No.
Outward No.
Date of Receipt/ Dispatch
Agency Reference Detail Subject
1 449 02.12.2016 L&T O&M inspection report for the month of October 2016 compliance, reg.
2 450 02.12.2016 L&T L&T-248 Minutes of status review meeting held on 17th November 2016 in IE’s office, reg.
3 451 06.12.2016 NHAI D-5868 Weekly Night inspection report of Project Highway to check the functionality of illumination system by IE.
4 452 10.12.2016 NHAI Monthly O&M Report for the Month of November - 2016.
5 453 13.12.2016 L&T Joint Site Inspection.
6 454 14.12.2016 NHAI D-6042 Salient features of Project Highway for completion certificate to LASA.
7 455 14.12.2016 NHAI SO-3989 Issue raised by DTO regarding clearing of Accidental vehicles and providing ambulance to injured-reg.
8 456 15.12.2016 NHAI SO-3998 Opinion of NHAI on Survey no.344 –area 19790.00 for Small Centre purpose Village: Chitarsani, Taluka: Palanpur, District: Banaskantha.
9 457 19.12.2016 NHAI D-5868 Weekly Night inspection report of Project Highway to check the functionality of illumination system by IE.
10 458 19.12.2016 L&T SO-4004 Choking of canal pipe crossing near Tehsil Office Swaroopganj-reg.
11 459 19.12.2016 L&T L&T-263 Road safety provisions and safety furniture in the Project Highway already notified-reg.
13 460 20.12.2016 L&T O&M Inspection Report for the month of December 2016 under Clause 19.2 of CA.
16 461 21.12.2016 NHAI SO-3987 2nd RA Invoice for upgradation of existing Infrastructure at Toll Plaza for providing ETC facility in one lane on each side of Toll Plaza of NH-27 under CoS.
17 462 26.12.2016 NHAI D-5868 Weekly Night inspection report of Project Highway to check the functionality of illumination system by IE.
18 463 26.12.2016 L&T L&T-273 Comments/Observation on Fortnight ending report for the period 01.12.2016 to 15.12.2016.
19 464 26.12.2016 L&T Notice under Clause 18.12 of Concession Agreement for
Page 30
deficiencies/damages and non-compliance of O&M requirements already notified to you. (November 2016).
20 465 27.12.2016 L&T L&T-269 Observations on bridge inspection report-reg.
21 466 30.12.2016 L&T O&M inspection report for the month of November 2016 compliance, reg.
22 467 30.12.2016 NHAI D-6199
Immediate relief to be provided to Auctioned toll plaza, toll collecting agency appointed in Khemana toll plaza (M/s, Welcome Infratoll(JV) at Km.339.000 for the section from Km.340.000 to Km. 295.000 (Palanpur/Khemana to Aburoad) of NH-14 in the state of Gujarat -reg.
23 468 30.12.2016 NHAI D-6198
Immediate relief to be provided to Auctioned toll plaza, toll collecting agency appointed in Undvariya toll plaza (M/s. Skylark Securities Pvt. Ltd) at Km.270.250 for the section from Km.264.000 to Km. 295.000 (Aburoad to Pindwara) of NH-14 in the state of Rajasthan -reg.
24 469 30.12.2016 L&T Celebration of 28th “Road Safety Week” from 9th January to 15th January 2017.
2.3 HIGHWAY TRAFFIC MANAGEMENT SYSTEM (HTMS) The project Highway has been provided HTMS to collect information about traffic and incident management as listed below. 1. Emergency communication system : Emergency communication system in the form of call boxes (ECS’s) is installed at the spacing of 2 km. on either side of the highway for both direction of travel and connected to the control centre through the transmission system of optical fiber cable and copper cables with suitable interfacing control centers is located at toll plaza so that any user making emergency call from ECB’s can be provided the assistance of Ambulance, crane and highway patrol unit to callers locations. 2. Mobile Communication system : Mobile communication system is provided on Ambulances, cranes and patrolling vehicles for faciliting speedy communications even when they are on move. 3. Variable Message Sign system : Variable message sign is provided at 6 locations to guide and forewarm the users absent the traffic and weather conditions on highways. These messages are varied from control centres based on the data received though servillance system. 4. Meteorological Data System : Meteorological data system is provided at 100 locations to provide weather information on temperature, wind speed, humidity and visibility. 5. Automatic Traffic Counter-cum-classifier System : Automatic traffic counter cum classifier is installed at two locations for traffic data collection and monitoring. 6. CCTV Surveillance System : For the close circuit TV surveillance, video cameras is installed at following major junctions and two mid sections for visual information collection and distance surveillance system.
Sr. No Location km. (Chainage) 1 Km. 609+850 2 Km. 617+771 3 Km. 629+140 4 Km. 640+480 5 Km. 645+017 6 Km. 659+240 7 Km. 672+400 8 Km. 674+405
Page 31
Video camera has been installed at all major intersection as per concession agreement for visual information collection and distance surveillance system. Traffic management shall be undertaken during scheduled and unscheduled maintenance activities and also during any Emergency. The Concessionaire has to attend to safety of the road users as well as the workers simultaneously throughout the concession period. It are a vital activity during unforeseen and/or emergency situations or administrative reasons. Concessionaire has provided following resources for Highway traffic management as per Concession Agreement. Route Service
Sr. No. Vehicle Registration No. Located at
Chainage (Area Covered)
Remark
From TO
1 Ambulance GJ-02-XX-2383-(Force) Rajasthan Section 634+600 677+000 GJ-02-XX-2319-(Force) Gujarat Section 601+000 634+600
2 Crane RJ-24-EA-0170-(Eicher) Rajasthan Section 634+600 677+000 RJ-24-EA-0171-(Eicher) Gujarat Section 601+000 634+600
3 Route Patrol RJ-24-FA-0020-(Tavera) Rajasthan Section 634+600 677+000 RJ-24-FA-0021-(Tavera) Rajasthan Section 634+600 677+000 RJ-24-FA-0023-(Tavera) Gujarat Section 601+000 634+600
Traffic management will be called for during unscheduled activities such as • Emergency situation arising on account of (a) force majeure (b) Accident/incident of the project highway. • Special repairs required on account of failure of an element of the Project Highway. • Default of the concessionaire with respect to an operational activity on the project highway.
Work program schedule shall be prepared such that diversion roads for the main traffic are minimized, and all the times minimum 8.75 m carriageway on each side and service road is available and utilized to the maximum extent possible. Measures shall be taken that the traffic is guided from closed lane onto the operating lane without its conflict with the traffic from the opposite direction. in case of unscheduled activities mentioned above, an emergency traffic management for the affected reach of the highway shall be prepared and implemented in consultation with the IC immediately. This emergency traffic management plan shall take into account the various requirements spelt out in the CA as well as in this schedule. Adequate safety during night time shall be ensured by providing mobile emergency lighting units with electrically flashing/illuminated warning signs important locations finalized in consultation with IC. Traffic management plan shall be based on the following operational parameters.(1) The existing divided carriageways & service road shall be utilized to the maximum extent possible.(2) At major intersections all traffic turning movements will be allowed at MOST of the times.(3) All short and long term temporary road diversions shall be proposed for approval of IC.(4)Adequate advance warning and information signs shall be incorporated in the traffic management plan in accordance with IRC/MORTH standards and specifications. Traffic management for widening of existing minor bridges/culverts shall be carried out without diversion of traffic. Construction of missing stretches of service road shall be carried out without any conflict with traffic on existing carriageway and service roads. Lane closure involves traffic management in the affected reach of the highway and shall be time bound activity and O_M Manual has to incorporate it accordingly. For the safety of construction workers as well as the traffic, a physical separation of 1.5 m between work area and the highway traffic shall be maintained.
Page 32
2.4 EMERGENCY SERVICE LOCATIONS ALONG PROJECT HIGHWAY.
A. Major Hospitals & Ambulance Services Sr. No. Description Contact No
Gujarat State 1 Govt. Civil Hospital, Palanpur 02742-254704
2 Female Hospital 02742-253793, 259060
3 Jee Children Hospital 02742-253199 4 Lilavati Hospital 02742-247879
5 M. V. Zaveri Hospital 02742-246304, 246904
6 Medani Eye Hospital 02742-232806 7 Eye Hospital (STMK SJ & SMM) 02742-252353 8 Primary Health Centre 02742-284100 9 24 Hours Ambulance Helpline 108 10 Nagarpalika 102, 02742-258351
11 Pethani Blood Bank 02742-246914, 246304
12 Mission Life India 9824506000, 9825006000
13 Ganeshpura Yuvak Mandal 9426065799
14 Sab Vahini (Hindu Chetana) 9377441000, 9824428793
Rajasthan State
1 Dr. Vikrant Sexena (Medical Officer) 9829234134 Govt. Hosptal (Abu Road) 2 24 Hrs. Ambulance Helpline 9414006886 3 Globle Hospital, Abu Road 02974-228600 4 Ambulance, Lines Club 9413851767
5 Himanshu Gupta (Incharge) 9784742923 Primary Health Centre, Rohira
6 Dr. Dinesh Bhairwa (Incharge) 02971-243096 Primary Health Centre, Swaroopganj 9413125178
7 Ambulance-Swaoopganj (Manav Seva Samiti) 9680466699 Mr. Nimba Ram & Mr. Kishor Singh 9413000453
B. Police stations Sr. No. Description Contact No
Gujarat State 1 Palanpur Taluka Police Station 02742-254300 2 Mr. Parmar (PI) 9426048828 3 Palanpur City Police Station 02742-252433 4 Mr. M. A. Choudhary (P.S.I.) 9825108535
5 City Police Station 02742-257334, 252433
Page 33
6 Taluka DSP Office 02742-252600
7 Iqbalgadh Police Choki 02742-235233, 232235
8 Chitrasani Police Choki 02742-284233 9 Amirgadh Police Station 02742-232233 10 Mr. C. K. Patel 9879798844 Rajasthan State 1 Swaroopganj Police Station 02971-226222 2 Control Room 02972-222100 3 Mr. Kailash Dan Charan (SHO) 9414674869 4 Mr Narpat Sing (ASI) 9413000425 5 Mr. Amra Ram (ASI) 9413495970 6 Rohira Police Station 02971-254629 7 Mr. Bhabhut Singh (SHO) 9414152445 8 Sadar Police Station (Abu Raod) 02974-228028 9 Mr. Devram Choudhary (PI) 9414365176 10 City Police Station (Abu Road) 02974-222100 11 Mr. Hari Kishan Gaur 9414275267 12 Mr. Hingla Jadan Barahath (SP, Sirohi Dist.) (O) 02972-220718
13 Mr. Prem Shankar Meena 02974-238973 (Dy. SP, Sirohi District) (O) 9461051166
14 RIICO Police Choki, Aburoad 9414533501 15 Mr. Bagada Ram Vishnoi (SI) 9414720550 C. Police Highway Patrol Units Sr. No. Description Contact No
Gujarat State
1 Mr. B. P. Chabra (S.I) 9426278627 District Highway Patrolling Police, Palanpur
2 Mr. Makvana (P.S.I.) Day Shift 9825327766 Unjha to Amirgadh Patrolling
3 Mr. Ayub Khan (P.S.I.) Night Shift 9723569552 Unjha to Amirgadh Patrolling D. Fire Stations Sr. No. Description Contact No
Gujarat State 1 Municipality Fire Station, Palanpur 101, 02742-257372
Rajasthan State
1 Mr. Dilip Mathur (Incharge) 9414804015
Fire Station, Aburoad (R) 02971-294167
2 Mr. Dinesh Pandya & Mr. Girdhari 9785455559, 9785455561
Fire Brigade-J.K. Cement (Swaroopganj) 9785455574 E. Crane and Towing Services
Page 34
Sr. No. Description Contact No
Gujarat State
1 National Crane Services, Palanpur 9925311147, 9913693091
2 Amar Crane Services, Palanpur 02742-252786,
9824250956, 9924928298
Rajasthan State
1
Mr. Sandip Jaiswal, Krishna Crane 9414154200
Mr. Sonu, Krishna Crane 9460880697, 9468672574
Shri Krishna Crane Services, Aburoad
2 Mr. Ritesh Goyal, Royal Crane Services, Aburoad 9828387576, 9414374955
3 Mr. Sama Ram Choudhary 9351118830 4 Baba Ram Dev Crane Services 9001216122 F. Tours and Travels Services Sr. No. Description Contact No
Gujarat State 1 Mr. Bhikhabhai (Jai Gog Maharaj, Palanpur) 9898736318 2 Mr. Vinod Jadhav, Palanpur 9428558839 G. Animal Hospital Rajasthan State 1 Dr. Balwant Singh 9414154171
2 Dr. Amit Choudhary 9414291400 Mannpur, Nr. Jain Mandir, NH Road, Aburoad Incident Management Vehicles provided by Concessionaire
Sr. No. Vehicle Registration No. Located at
Chainage (Area Covered)
From TO
1 Ambulance GJ-02-88-2383-(Force) Rajasthan Section 634+600 677+000 GJ-02-88-2319-(Force) Gujarat Section 601+000 634+600
2 Crane RJ-24-EA-0170-(Eicher) Rajasthan Section 634+600 677+000 RJ-24-EA-0171-(Eicher) Gujarat Section 601+000 634+600
3 Route Patrol RJ-24-FA-0020-(Tavera) Rajasthan Section 634+600 677+000 RJ-24-FA-0021-(Tavera) Rajasthan Section 634+600 677+000 RJ-24-FA-0023-(Tavera) Gujarat Section 601+000 634+600
3. Compliance of maintenance obligation as per contract 3.1 Work Progress Photographs 3.2 Submission of toll traffic report 3.3 Accident Data 3.4 Route Petrol Details
Page 36
3.1 WORK PROGRESS PHOTOGRAPHS (December - 2016)
KM: 611/2 RHS Side M.B.C.B
KM: 627/2 RHS M.B.C.B Fixing
KM: 602.700 RHS Toilet Facility sign board fixing
KM: 602.800 RHS Toilet Facility sign board fixing
Page 37
KM: 602.700 RHS No parking sign board fixing
KM: 602.550 Median Available facility sign board fixing
KM: 623.000 to 623.200 RHS Road Crack Filling
KM: 602.800 RHS No parking sign board fixing
KM: 603.1000 Median Available facility sign board fixing
Page 38
KM: 616/3 HPC Stone fixing
KM: 605.400 RHS Damaged Delineator re fixed
Median Cleaning Km. 648.150 To 648.350 ROW Bush Cutting At Ch. 656.300 To 656.500 (LHS)
Page 39
3.2 Submission of toll traffic report
Page 40
3.3 Accident Data
�
Performa - 1
(1) Stretch :-Palanpur to Swroopganj (2) Stretch Chainage:-601 Km to 677 Km (3) State Gujrat and Rajasthan (4) District :- Banaskanta and Sirohi (5) Police Station:- Palanpur, Amirgarh
'A' 'B' 'C' 'D' 'E' 'F' 'G' 'H'
Accident Location
Nature of Accident
Classification of Accident Causes Road
FeaturesRoad
Condition
Intersection Type and Control
Weather Condition Fatal Gravious Minor Non injured Detection Time Response Time
1 02.12.2016 11:00 PM 635.400KM, MCW, RHS 3 2 2 4 4 No
Intersection 1 Trailer (MAV more than 3 axle) 0 1 1 0 No
RPV, Ambulance & Pvt,Tow
Truck
RPV :- 11.00 PM Tow Truck :- 11.00 PM Ambulance :- 11.00 PM Pvt crane :- 11.30 PM
RPV :- 11.20 PM Tow Truck :- 11.30 PM Ambulance :- 11.25 PM Pvt crane :- 11.45 PM
2 05.12.2016 10:45 AM 613.850 KM, MCW, RHS
1 3 4 4 4 No Intersection
1 Maruti Car(CJV) 0 0 1 0 No RPV, Tow Truck
RPV :- 10.45 AM Tow Truck :- 10.50 AM
RPV :- 10.46 AM Tow Truck :- 11.15 AM
3 07.12.2016 4:30 PM 668.450 KM, MCW, RHS 4 4 1 4 4 No
Intersection 1 New Tractor(Tractor) 0 0 0 2 NoRPV, Tow Truck &
Police
RPV :- 04.30 PM Tow truck :- 04.40 PM Police :- 04.38 PM
RPV :- 04.31 PM Tow truck :- 04.48 PM Police :- 04.49 PM
4 10.12.2016 5:25 PM 661.100 KM, OTH, RHS
1 4 4 4 4 No Intersection
1 Tractor Trolley(Tractor)
0 0 0 2 No RPV & Tow Truck
RPV :- 05.45 PM Tow Truck :- 05.47 PM
RPV :- 05.46 PM Tow Truck :- 06.00 PM
5 15.12.2016 11:10 AM 642.600 KM, OTH, RHS
8 Single vehicle
4 3 4 4 No Intersection
4 Trailer (MAV more than 3 axle)
0 0 0 2 No RPV, & Hydra
RPV :- 11.10 AM Hydra :- 11.15 AM
RPV :- 11.11 AM Hydra :- 11.46 AM
6 17.12.2016 7:05 PM 631.200 KM, MCW, RHS
1 4 4 4 4 No Intersection
1 WagonR Car(CJV) 0 0 0 1 No RPV, Tow Truck
RPV :- 07.05 PM Tow Truck :- 07.10 PM
RPV :- 07.05 PM Tow Truck :- 07.10 PM
7 21.12.2016 6:30 AM 671.400 KM, MCW, LHS 1 2 3 4 4 No
Intersection 1 Xylo Car(CJV) 0 1 1 0 No
RPV, Ambulance
& Tow Truck
RPV :- 06.30 PM Ambulance :- 06.30 PM Tow Truck :- 06.45 PM
RPV :- 06.35 PM Ambulance :- 06.35 PM Tow Truck :- 06.55 PM
8 23.12.2016 10:20 AM 643.450 KM, MCW, RHS
1 4 4 4 4 No Intersection
1 Truck(Truck-3 Axle) 0 0 0 2 No RPV & Hydra
RPV :- 10.20 AM Hydra :- 10.25 PM
RPV :- 10.25 AM Hydra :- 10.35 PM
9 26.12.2016 5:30 PM 635.400 KM, MCW, RHS 3 1 2 4 4 No
Intersection 1 Truck(MaV more than 3 Axle) 1 1 0 0 No
RPV, Ambulance & Pvt,Tow
Truck
RPV :- 05.30 PM Ambulance :- 05.30 PMTow Truck :- 05.40 PM Pvt crane :- 06.15 PM
RPV :- 05.50 PM Ambulance :- 05.55 PMTow Truck :- 06.10 PM Pvt crane :- 06.40 PM
10 27.12.2016 03.30 AM 661.700 KM, OTH, RHS 1 1 4 4 4 No
Intersection 1 Luxury Bus 1 1 0 0 No
RPV, Ambulance,Tow Truck &
Police
RPV :- 03.30 AM Ambulance :- 03.31 AMTow Truck :- 03.45 AM Hydra :- 04.15 AM
RPV :- 03.50 AM Ambulance :- 03.42 AMTow Truck :- 04.00 AM Hydra :- 05.00 AM
Total 2 4 3 9A: Urban/Rural and Details of Surrounding LanduseB 1- Overturning, 2-Head on collision, 3-Rear End Collision, 4-Collision Brush/Side Wipe, 5-Right Turn Collision, 6-Skidding, 7-Right Turn Collission, 8-Others (Pl. Specific)C 1-Fatal, 2-Grievious injury, 3-Minor Injured, 4-Non injuryD 1-Drunken, 2-Overspeeding, 3-Vehicle out of control, 4-Fault of driver of motor vehicle/driver of other vehicle/cyclist/pedestarian/passenger, 5-Defect in mechanical condition of motor vehicle/road conditionE 1-Single lane, 2-Two lane, 3-Three lanes or more without central divider (median), 4-Four lanes or more with central dividerF 1-Straight road, 2-Slight Curve, 3-Sharp Curve, 4-Flat Road, 5-Gentle incline, 6-Steep incline, 7-Hump, 8-DipG 1-T-Junction, 2-Y-Junction, 3-Four arm junction, 4-Staggered junction, 5-Junction with more than 4 arms, 6-Roundabout junction, 7-Manned Rail crossing, 9-Unmanned Rail crossingH 1-Fine, 2-Mist/Fog, 3-Cloudy, 4-Light rain, 5-Heavy rain, 6-Hail/sleet, 7-Snow, 8-Strong Wind, 9-Dust Storm, 10-Very Hot, 11-Very Cold, 12-Other extraordinary weather condition
Time of Acc. (am/pm) Vehicle Responible
No. of Affected PersonsNo. of
animals killed if any
Help Provided by
Ambulance/Patrol Vehicle/Crane
Response time of Agencies
National Highways Authority of IndiaName of PIU/CMU's:-Palanpur
Abu Road, Rohira & Swaroopganj
National Highway No. 27 Accident Data of December 2016
S. No. Date
Page 41
2.2 ACCIDENT PHOTOGRAPHS MONTH : December-2016
05.12.16 Km.613+850 RHS
17.12.16 Km.631+200 RHS
02.12.2016 635.400 RHS
Page 42
10.12.2016 661+10 RHS
07.12.2016 668.450 RHS
15.12.2016 642.600 RHS
Page 43
23.12.2016 643.450 RHS
26.12.2016 635.400 RHS
27.12.2016 661.700 LHS
Page 44
3.4 Route Petrol Details
Route vehicles Km. of December 2016 Generated through Vehicle log book
Sr.No. Vehicle No. Section Date Start Time Date End Time Total KM
1 RJ 24 FA 0020 Gujarat 01‐Dec‐16 7:00 AM 02‐Nov‐16 6:59 AM 312 2 RJ 24 FA 0020 Gujarat 02‐Dec‐16 7:00 AM 03‐Nov‐16 6:59 AM 304 3 RJ 24 FA 0020 Gujarat 03‐Dec‐16 7:00 AM 04‐Nov‐16 6:59 AM 366 4 RJ 24 FA 0020 Gujarat 04‐Dec‐16 7:00 AM 05‐Nov‐16 6:59 AM 293 5 RJ 24 FA 0020 Gujarat 05‐Dec‐16 7:00 AM 06‐Nov‐16 6:59 AM 299 6 RJ 24 FA 0020 Gujarat 06‐Dec‐16 7:00 AM 07‐Nov‐16 6:59 AM 292 7 RJ 24 FA 0020 Gujarat 07‐Dec‐16 7:00 AM 08‐Nov‐16 6:59 AM 315 8 RJ 24 FA 0020 Gujarat 08‐Dec‐16 7:00 AM 09‐Nov‐16 6:59 AM 292 9 RJ 24 FA 0020 Gujarat 09‐Dec‐16 7:00 AM 10‐Nov‐16 6:59 AM 307 10 RJ 24 FA 0020 Gujarat 10‐Dec‐16 7:00 AM 11‐Nov‐16 6:59 AM 305 11 RJ 24 FA 0020 Gujarat 11‐Dec‐16 7:00 AM 12‐Nov‐16 6:59 AM 321 12 RJ 24 FA 0020 Gujarat 12‐Dec‐16 7:00 AM 13‐Nov‐16 6:59 AM 288 13 RJ 24 FA 0020 Gujarat 13‐Dec‐16 7:00 AM 14‐Nov‐16 6:59 AM 312 14 RJ 24 FA 0020 Gujarat 14‐Dec‐16 7:00 AM 15‐Nov‐16 6:59 AM 285 15 RJ 24 FA 0020 Gujarat 15‐Dec‐16 7:00 AM 16‐Nov‐16 6:59 AM 304 16 RJ 24 FA 0020 Gujarat 16‐Dec‐16 7:00 AM 17‐Nov‐16 6:59 AM 300 17 RJ 24 FA 0020 Gujarat 17‐Dec‐16 7:00 AM 18‐Nov‐16 6:59 AM 323 18 RJ 24 FA 0020 Gujarat 18‐Dec‐16 7:00 AM 19‐Nov‐16 6:59 AM 295 19 RJ 24 FA 0020 Gujarat 19‐Dec‐16 7:00 AM 20‐Nov‐16 6:59 AM 301 20 RJ 24 FA 0020 Gujarat 21‐Dec‐16 7:00 AM 22‐Nov‐16 6:59 AM 314 21 RJ 24 FA 0020 Gujarat 22‐Dec‐16 7:00 AM 23‐Nov‐16 6:59 AM 282 22 RJ 24 FA 0020 Gujarat 23‐Dec‐16 7:00 AM 24‐Nov‐16 6:59 AM 302 23 RJ 24 FA 0020 Gujarat 24‐Dec‐16 7:00 AM 25‐Nov‐16 6:59 AM 286 24 RJ 24 FA 0020 Gujarat 25‐Dec‐16 7:00 AM 26‐Nov‐16 6:59 AM 299 25 RJ 24 FA 0020 Gujarat 26‐Dec‐16 7:00 AM 27‐Nov‐16 6:59 AM 283 26 RJ 24 FA 0020 Gujarat 27‐Dec‐16 7:00 AM 28‐Nov‐16 6:59 AM 302 27 RJ 24 FA 0020 Gujarat 28‐Dec‐16 7:00 AM 29‐Nov‐16 6:59 AM 302 28 RJ 24 FA 0020 Gujarat 29‐Dec‐16 7:00 AM 30‐Nov‐16 6:59 AM 304 29 RJ 24 FA 0020 Gujarat 30‐Dec‐16 7:00 AM 01‐Dec‐16 6:59 AM 288 30 RJ 24 FA 0020 Gujarat 31‐Dec‐16 7:00 AM 01‐Dec‐16 6:59 AM 326 9102
Sr. Vehicle No. Section Date Start Time Date End Time Total KM
1 RJ 24 FA 0021 Rajasthan 14‐Dec‐16 7:00 AM 15‐Nov‐16 6:59 AM 356 2 RJ 24 FA 0021 Rajasthan 15‐Dec‐16 7:00 AM 16‐Nov‐16 6:59 AM 389 3 RJ 24 FA 0021 Rajasthan 16‐Dec‐16 7:00 AM 17‐Nov‐16 6:59 AM 356 4 RJ 24 FA 0021 Rajasthan 17‐Dec‐16 7:00 AM 18‐Nov‐16 6:59 AM 357 5 RJ 24 FA 0021 Rajasthan 18‐Dec‐16 7:00 AM 19‐Nov‐16 6:59 AM 355
Page 45
6 RJ 24 FA 0021 Rajasthan 19‐Dec‐16 7:00 AM 20‐Nov‐16 6:59 AM 364 7 RJ 24 FA 0021 Rajasthan 20‐Dec‐16 7:00 AM 21‐Nov‐16 6:59 AM 356 8 RJ 24 FA 0021 Rajasthan 21‐Dec‐16 7:00 AM 22‐Nov‐16 6:59 AM 358 9 RJ 24 FA 0021 Rajasthan 22‐Dec‐16 7:00 AM 23‐Nov‐16 6:59 AM 356 10 RJ 24 FA 0021 Rajasthan 23‐Dec‐16 7:00 AM 24‐Nov‐16 6:59 AM 180 11 RJ 24 FA 0021 Rajasthan 28‐Dec‐16 7:00 AM 29‐Nov‐16 6:59 AM 358 12 RJ 24 FA 0021 Rajasthan 29‐Dec‐16 7:00 AM 30‐Nov‐16 6:59 AM 373 13 RJ 24 FA 0021 Rajasthan 30‐Dec‐16 7:00 AM 01‐Dec‐16 6:59 AM 355 14 RJ 24 FA 0021 Rajasthan 31‐Dec‐16 7:00 AM 01‐Dec‐16 6:59 AM 358
4871
Sr. Vehicle No. Section Date Start Time Date End Time Total KM
1 RJ 24 FA 0023 Rajasthan 01‐Dec‐16 7:00 AM 02‐Nov‐16 6:59 AM 381 2 RJ 24 FA 0023 Rajasthan 02‐Dec‐16 7:00 AM 03‐Nov‐16 6:59 AM 359 3 RJ 24 FA 0023 Rajasthan 03‐Dec‐16 7:00 AM 04‐Nov‐16 6:59 AM 357 4 RJ 24 FA 0023 Rajasthan 04‐Dec‐16 7:00 AM 05‐Nov‐16 6:59 AM 357 5 RJ 24 FA 0023 Rajasthan 05‐Dec‐16 7:00 AM 06‐Nov‐16 6:59 AM 357 6 RJ 24 FA 0023 Rajasthan 06‐Dec‐16 7:00 AM 07‐Nov‐16 6:59 AM 357 7 RJ 24 FA 0023 Rajasthan 07‐Dec‐16 7:00 AM 08‐Nov‐16 6:59 AM 397 8 RJ 24 FA 0023 Rajasthan 08‐Dec‐16 7:00 AM 09‐Nov‐16 6:59 AM 276 9 RJ 24 FA 0023 Rajasthan 09‐Dec‐16 7:00 AM 10‐Nov‐16 6:59 AM 356 10 RJ 24 FA 0023 Rajasthan 10‐Dec‐16 7:00 AM 11‐Nov‐16 6:59 AM 374 11 RJ 24 FA 0023 Rajasthan 11‐Dec‐16 7:00 AM 12‐Nov‐16 6:59 AM 357 12 RJ 24 FA 0023 Rajasthan 12‐Dec‐16 7:00 AM 13‐Nov‐16 6:59 AM 381 13 RJ 24 FA 0023 Rajasthan 13‐Dec‐16 7:00 AM 14‐Nov‐16 6:59 AM 358 14 RJ 24 FA 0023 Gujarat 20‐Dec‐16 7:00 AM 21‐Nov‐16 6:59 AM 300 15 RJ 24 FA 0023 Rajasthan 24‐Dec‐16 7:00 AM 25‐Nov‐16 6:59 AM 358 16 RJ 24 FA 0023 Rajasthan 25‐Dec‐16 7:00 AM 26‐Nov‐16 6:59 AM 366 17 RJ 24 FA 0023 Rajasthan 26‐Dec‐16 7:00 AM 27‐Nov‐16 6:59 AM 303 18 RJ 24 FA 0023 Rajasthan 27‐Dec‐16 7:00 AM 28‐Nov‐16 6:59 AM 357 6351
Sr. Vehicle No. Section Date Start Time Date End Time Total KM
1 RJ 24 EA 0170 Rajasthan 01‐Dec‐16 7:00 AM 02‐Nov‐16 6:59 AM 111 2 RJ 24 EA 0170 Rajasthan 02‐Dec‐16 7:00 AM 03‐Nov‐16 6:59 AM 58 3 RJ 24 EA 0170 Rajasthan 03‐Dec‐16 7:00 AM 04‐Nov‐16 6:59 AM 68 4 RJ 24 EA 0170 Rajasthan 04‐Dec‐16 7:00 AM 05‐Nov‐16 6:59 AM 4 5 RJ 24 EA 0170 Rajasthan 05‐Dec‐16 7:00 AM 06‐Nov‐16 6:59 AM 9 6 RJ 24 EA 0170 Rajasthan 06‐Dec‐16 7:00 AM 07‐Nov‐16 6:59 AM 4 7 RJ 24 EA 0170 Rajasthan 07‐Dec‐16 7:00 AM 08‐Nov‐16 6:59 AM 20 8 RJ 24 EA 0170 Rajasthan 08‐Dec‐16 7:00 AM 09‐Nov‐16 6:59 AM 6 9 RJ 24 EA 0170 Rajasthan 09‐Dec‐16 7:00 AM 10‐Nov‐16 6:59 AM 5 10 RJ 24 EA 0170 Rajasthan 10‐Dec‐16 7:00 AM 11‐Nov‐16 6:59 AM 23 11 RJ 24 EA 0170 Rajasthan 11‐Dec‐16 7:00 AM 12‐Nov‐16 6:59 AM 22
Page 46
12 RJ 24 EA 0170 Rajasthan 12‐Dec‐16 7:00 AM 13‐Nov‐16 6:59 AM 4 13 RJ 24 EA 0170 Rajasthan 13‐Dec‐16 7:00 AM 14‐Nov‐16 6:59 AM 4 14 RJ 24 EA 0170 Rajasthan 14‐Dec‐16 7:00 AM 15‐Nov‐16 6:59 AM 91 15 RJ 24 EA 0170 Rajasthan 15‐Dec‐16 7:00 AM 16‐Nov‐16 6:59 AM 59 16 RJ 24 EA 0170 Rajasthan 16‐Dec‐16 7:00 AM 17‐Nov‐16 6:59 AM 5 17 RJ 24 EA 0170 Rajasthan 17‐Dec‐16 7:00 AM 18‐Nov‐16 6:59 AM 4 18 RJ 24 EA 0170 Rajasthan 18‐Dec‐16 7:00 AM 19‐Nov‐16 6:59 AM 4 19 RJ 24 EA 0170 Rajasthan 19‐Dec‐16 7:00 AM 20‐Nov‐16 6:59 AM 5 20 RJ 24 EA 0170 Rajasthan 20‐Dec‐16 7:00 AM 21‐Nov‐16 6:59 AM 4 21 RJ 24 EA 0170 Rajasthan 21‐Dec‐16 7:00 AM 22‐Nov‐16 6:59 AM 4 22 RJ 24 EA 0170 Rajasthan 22‐Dec‐16 7:00 AM 23‐Nov‐16 6:59 AM 4 23 RJ 24 EA 0170 Rajasthan 23‐Dec‐16 7:00 AM 24‐Nov‐16 6:59 AM 78 24 RJ 24 EA 0170 Rajasthan 24‐Dec‐16 7:00 AM 25‐Nov‐16 6:59 AM 9 25 RJ 24 EA 0170 Rajasthan 25‐Dec‐16 7:00 AM 26‐Nov‐16 6:59 AM 5 26 RJ 24 EA 0170 Rajasthan 26‐Dec‐16 7:00 AM 27‐Nov‐16 6:59 AM 86 27 RJ 24 EA 0170 Rajasthan 27‐Dec‐16 7:00 AM 28‐Nov‐16 6:59 AM 0 28 RJ 24 EA 0170 Rajasthan 28‐Dec‐16 7:00 AM 29‐Nov‐16 6:59 AM 5 29 RJ 24 EA 0170 Rajasthan 29‐Dec‐16 7:00 AM 30‐Nov‐16 6:59 AM 4 30 RJ 24 EA 0170 Rajasthan 30‐Dec‐16 7:00 AM 01‐Dec‐16 6:59 AM 4 31 RJ 24 EA 0170 Rajasthan 31‐Dec‐16 7:00 AM 01‐Dec‐16 6:59 AM 15 724
Sr. Vehicle No. Section Date Start Time Date End Time Total KM
1 RJ 24 EA 0171 Gujarat 01‐Dec‐16 7:00 AM 02‐Nov‐16 6:59 AM 20 2 RJ 24 EA 0171 Gujarat 02‐Dec‐16 7:00 AM 03‐Nov‐16 6:59 AM 5 3 RJ 24 EA 0171 Gujarat 03‐Dec‐16 7:00 AM 04‐Nov‐16 6:59 AM 52 4 RJ 24 EA 0171 Gujarat 04‐Dec‐16 7:00 AM 05‐Nov‐16 6:59 AM 0 5 RJ 24 EA 0171 Gujarat 05‐Dec‐16 7:00 AM 06‐Nov‐16 6:59 AM 46 6 RJ 24 EA 0171 Gujarat 06‐Dec‐16 7:00 AM 07‐Nov‐16 6:59 AM 20 7 RJ 24 EA 0171 Gujarat 07‐Dec‐16 7:00 AM 08‐Nov‐16 6:59 AM 5 8 RJ 24 EA 0171 Gujarat 08‐Dec‐16 7:00 AM 09‐Nov‐16 6:59 AM 55 9 RJ 24 EA 0171 Gujarat 09‐Dec‐16 7:00 AM 10‐Nov‐16 6:59 AM 5 10 RJ 24 EA 0171 Gujarat 10‐Dec‐16 7:00 AM 11‐Nov‐16 6:59 AM 43 11 RJ 24 EA 0171 Gujarat 11‐Dec‐16 7:00 AM 12‐Nov‐16 6:59 AM 11 12 RJ 24 EA 0171 Gujarat 12‐Dec‐16 7:00 AM 13‐Nov‐16 6:59 AM 10 13 RJ 24 EA 0171 Gujarat 13‐Dec‐16 7:00 AM 14‐Nov‐16 6:59 AM 61 14 RJ 24 EA 0171 Gujarat 14‐Dec‐16 7:00 AM 15‐Nov‐16 6:59 AM 12 15 RJ 24 EA 0171 Gujarat 15‐Dec‐16 7:00 AM 16‐Nov‐16 6:59 AM 2 16 RJ 24 EA 0171 Gujarat 16‐Dec‐16 7:00 AM 17‐Nov‐16 6:59 AM 29 17 RJ 24 EA 0171 Gujarat 17‐Dec‐16 7:00 AM 18‐Nov‐16 6:59 AM 114 18 RJ 24 EA 0171 Gujarat 18‐Dec‐16 7:00 AM 19‐Nov‐16 6:59 AM 4 19 RJ 24 EA 0171 Gujarat 19‐Dec‐16 7:00 AM 20‐Nov‐16 6:59 AM 20 20 RJ 24 EA 0171 Gujarat 20‐Dec‐16 7:00 AM 21‐Nov‐16 6:59 AM 56 21 RJ 24 EA 0171 Gujarat 21‐Dec‐16 7:00 AM 22‐Nov‐16 6:59 AM 17 22 RJ 24 EA 0171 Gujarat 22‐Dec‐16 7:00 AM 23‐Nov‐16 6:59 AM 5
Page 47
23 RJ 24 EA 0171 Gujarat 23‐Dec‐16 7:00 AM 24‐Nov‐16 6:59 AM 19 24 RJ 24 EA 0171 Gujarat 24‐Dec‐16 7:00 AM 25‐Nov‐16 6:59 AM 4 25 RJ 24 EA 0171 Gujarat 25‐Dec‐16 7:00 AM 26‐Nov‐16 6:59 AM 5 26 RJ 24 EA 0171 Gujarat 26‐Dec‐16 7:00 AM 27‐Nov‐16 6:59 AM 4 27 RJ 24 EA 0171 Gujarat 27‐Dec‐16 7:00 AM 28‐Nov‐16 6:59 AM 4 28 RJ 24 EA 0171 Gujarat 28‐Dec‐16 7:00 AM 29‐Nov‐16 6:59 AM 45 29 RJ 24 EA 0171 Gujarat 29‐Dec‐16 7:00 AM 30‐Nov‐16 6:59 AM 5 30 RJ 24 EA 0171 Gujarat 30‐Dec‐16 7:00 AM 01‐Dec‐16 6:59 AM 4 31 RJ 24 EA 0171 Gujarat 31‐Dec‐16 7:00 AM 01‐Dec‐16 6:59 AM 34 716
Sr. Vehicle No. Section Date Start Time Date End Time Total KM
1 GJ 02 XX 2318 Gujarat 01‐Dec‐16 7:00 AM 02‐Nov‐16 6:59 AM 22 2 GJ 02 XX 2318 Gujarat 02‐Dec‐16 7:00 AM 03‐Nov‐16 6:59 AM 5 3 GJ 02 XX 2318 Gujarat 03‐Dec‐16 7:00 AM 04‐Nov‐16 6:59 AM 119 4 GJ 02 XX 2318 Gujarat 04‐Dec‐16 7:00 AM 05‐Nov‐16 6:59 AM 19 5 GJ 02 XX 2318 Gujarat 05‐Dec‐16 7:00 AM 06‐Nov‐16 6:59 AM 5 6 GJ 02 XX 2318 Gujarat 06‐Dec‐16 7:00 AM 07‐Nov‐16 6:59 AM 5 7 GJ 02 XX 2318 Gujarat 07‐Dec‐16 7:00 AM 08‐Nov‐16 6:59 AM 5 8 GJ 02 XX 2318 Gujarat 08‐Dec‐16 7:00 AM 09‐Nov‐16 6:59 AM 9 9 GJ 02 XX 2318 Gujarat 09‐Dec‐16 7:00 AM 10‐Nov‐16 6:59 AM 5 10 GJ 02 XX 2318 Gujarat 10‐Dec‐16 7:00 AM 11‐Nov‐16 6:59 AM 62 11 GJ 02 XX 2318 Gujarat 11‐Dec‐16 7:00 AM 12‐Nov‐16 6:59 AM 4 12 GJ 02 XX 2318 Gujarat 12‐Dec‐16 7:00 AM 13‐Nov‐16 6:59 AM 33 13 GJ 02 XX 2318 Gujarat 13‐Dec‐16 7:00 AM 14‐Nov‐16 6:59 AM 26 14 GJ 02 XX 2318 Gujarat 14‐Dec‐16 7:00 AM 15‐Nov‐16 6:59 AM 0 15 GJ 02 XX 2318 Gujarat 15‐Dec‐16 7:00 AM 16‐Nov‐16 6:59 AM 5 16 GJ 02 XX 2318 Gujarat 16‐Dec‐16 7:00 AM 17‐Nov‐16 6:59 AM 5 17 GJ 02 XX 2318 Gujarat 17‐Dec‐16 7:00 AM 18‐Nov‐16 6:59 AM 4 18 GJ 02 XX 2318 Gujarat 18‐Dec‐16 7:00 AM 19‐Nov‐16 6:59 AM 15 19 GJ 02 XX 2318 Gujarat 19‐Dec‐16 7:00 AM 20‐Nov‐16 6:59 AM 5 20 GJ 02 XX 2318 Gujarat 20‐Dec‐16 7:00 AM 21‐Nov‐16 6:59 AM 45 21 GJ 02 XX 2318 Gujarat 21‐Dec‐16 7:00 AM 22‐Nov‐16 6:59 AM 8 22 GJ 02 XX 2318 Gujarat 22‐Dec‐16 7:00 AM 23‐Nov‐16 6:59 AM 4 23 GJ 02 XX 2318 Gujarat 23‐Dec‐16 7:00 AM 24‐Nov‐16 6:59 AM 23 24 GJ 02 XX 2318 Gujarat 24‐Dec‐16 7:00 AM 25‐Nov‐16 6:59 AM 5 25 GJ 02 XX 2318 Gujarat 25‐Dec‐16 7:00 AM 26‐Nov‐16 6:59 AM 5 26 GJ 02 XX 2318 Gujarat 26‐Dec‐16 7:00 AM 27‐Nov‐16 6:59 AM 5 27 GJ 02 XX 2318 Gujarat 27‐Dec‐16 7:00 AM 28‐Nov‐16 6:59 AM 5 28 GJ 02 XX 2318 Gujarat 28‐Dec‐16 7:00 AM 29‐Nov‐16 6:59 AM 5 29 GJ 02 XX 2318 Gujarat 29‐Dec‐16 7:00 AM 30‐Nov‐16 6:59 AM 57 30 GJ 02 XX 2318 Gujarat 30‐Dec‐16 7:00 AM 01‐Dec‐16 6:59 AM 5 31 GJ 02 XX 2318 Gujarat 31‐Dec‐16 7:00 AM 01‐Dec‐16 6:59 AM 5 525
Page 48
Sr. Vehicle No. Section Date Start Time Date End Time Total KM
1 GJ 02 XX 2483 Rajasthan 01‐Dec‐16 7:00 AM 02‐Nov‐16 6:59 AM 5 2 GJ 02 XX 2483 Rajasthan 02‐Dec‐16 7:00 AM 03‐Nov‐16 6:59 AM 80 3 GJ 02 XX 2483 Rajasthan 03‐Dec‐16 7:00 AM 04‐Nov‐16 6:59 AM 10 4 GJ 02 XX 2483 Rajasthan 04‐Dec‐16 7:00 AM 05‐Nov‐16 6:59 AM 22 5 GJ 02 XX 2483 Rajasthan 05‐Dec‐16 7:00 AM 06‐Nov‐16 6:59 AM 17 6 GJ 02 XX 2483 Rajasthan 06‐Dec‐16 7:00 AM 07‐Nov‐16 6:59 AM 8 7 GJ 02 XX 2483 Rajasthan 07‐Dec‐16 7:00 AM 08‐Nov‐16 6:59 AM 12 8 GJ 02 XX 2483 Rajasthan 08‐Dec‐16 7:00 AM 09‐Nov‐16 6:59 AM 10 9 GJ 02 XX 2483 Rajasthan 09‐Dec‐16 7:00 AM 10‐Nov‐16 6:59 AM 6 10 GJ 02 XX 2483 Rajasthan 10‐Dec‐16 7:00 AM 11‐Nov‐16 6:59 AM 5 11 GJ 02 XX 2483 Rajasthan 11‐Dec‐16 7:00 AM 12‐Nov‐16 6:59 AM 5 12 GJ 02 XX 2483 Rajasthan 12‐Dec‐16 7:00 AM 13‐Nov‐16 6:59 AM 5 13 GJ 02 XX 2483 Rajasthan 13‐Dec‐16 7:00 AM 14‐Nov‐16 6:59 AM 5 14 GJ 02 XX 2483 Rajasthan 14‐Dec‐16 7:00 AM 15‐Nov‐16 6:59 AM 5 15 GJ 02 XX 2483 Rajasthan 15‐Dec‐16 7:00 AM 16‐Nov‐16 6:59 AM 6 16 GJ 02 XX 2483 Rajasthan 16‐Dec‐16 7:00 AM 17‐Nov‐16 6:59 AM 5 17 GJ 02 XX 2483 Rajasthan 17‐Dec‐16 7:00 AM 18‐Nov‐16 6:59 AM 5 18 GJ 02 XX 2483 Rajasthan 18‐Dec‐16 7:00 AM 19‐Nov‐16 6:59 AM 9 19 GJ 02 XX 2483 Rajasthan 19‐Dec‐16 7:00 AM 20‐Nov‐16 6:59 AM 29 20 GJ 02 XX 2483 Rajasthan 20‐Dec‐16 7:00 AM 21‐Nov‐16 6:59 AM 5 21 GJ 02 XX 2483 Rajasthan 21‐Dec‐16 7:00 AM 22‐Nov‐16 6:59 AM 45 22 GJ 02 XX 2483 Rajasthan 22‐Dec‐16 7:00 AM 23‐Nov‐16 6:59 AM 5 23 GJ 02 XX 2483 Rajasthan 23‐Dec‐16 7:00 AM 24‐Nov‐16 6:59 AM 52 24 GJ 02 XX 2483 Rajasthan 24‐Dec‐16 7:00 AM 25‐Nov‐16 6:59 AM 10 25 GJ 02 XX 2483 Rajasthan 25‐Dec‐16 7:00 AM 26‐Nov‐16 6:59 AM 5 26 GJ 02 XX 2483 Rajasthan 26‐Dec‐16 7:00 AM 27‐Nov‐16 6:59 AM 128 27 GJ 02 XX 2483 Rajasthan 27‐Dec‐16 7:00 AM 28‐Nov‐16 6:59 AM 0 28 GJ 02 XX 2483 Rajasthan 28‐Dec‐16 7:00 AM 29‐Nov‐16 6:59 AM 12 29 GJ 02 XX 2483 Rajasthan 29‐Dec‐16 7:00 AM 30‐Nov‐16 6:59 AM 93 30 GJ 02 XX 2483 Rajasthan 30‐Dec‐16 7:00 AM 01‐Dec‐16 6:59 AM 151 31 GJ 02 XX 2483 Rajasthan 31‐Dec‐16 7:00 AM 01‐Dec‐16 6:59 AM 10
765