National Electrification Planning for Myanmar (NEP): N a tional Geospatial, Least-Cost Elec t rifi c a tion Plan. Columbia University, Earth Institute Vijay Modi, Director Edwin Adkins, Presenter Sustainable Engineering Laboratory With thanks to: Resources and Environment Myanmar (Yangon). - PowerPoint PPT Presentation
Citation preview
National Electrification Planning for Myanmar (NEP):
National Geospatial, Least-Cost Electrification Plan
1
Columbia University, Earth InstituteVijay Modi, Director
Edwin Adkins, PresenterSustainable Engineering Laboratory
With thanks to: Resources and Environment Myanmar (Yangon)
+
2
Approach1. Collect input data
• populated places, MV grid lines, and numerous modeling parameters
2. Use algorithm to plan least-cost electrification system• grid, mini-grid, off-grid (solar home systems)
3. Plan the sequence of grid roll-out in phases
Objective: Least-cost electrification planning ensures that we maximize the results with limited resources. Sequencing tells where and when to prioritize the work.
Populated places
Grid lines Select least-cost technology
Plan Roll-Out (5 Phases)
Approach
4
Population Data Sources 1. Ministry of Livestock, Fisheries and Rural Development (DRD)
- Village Level Population Data, 2001
2. Ministry of Home Affairs, General Administration Department (GAD)- Additional population data for villages, cities and towns (2013)
3. Central Statistical Organization (CSO)– Rural and Urban Total Population and growth rates
4. Myanmar Information Management Unit (MIMU) - Geo-location of all villages by State (but no population data)
When combined these sources provided:- 64,000 points for villages- 300 points for cities and towns- rural and urban growth rates, by year, for each state / region
5
Important Caveat
• The source data for populated places has an inherent uncertainty, and the upcoming census data will help improve the modeling results in the future updates.
• This uncertainty limits the precision of any analysis, and values in this report should be regarded as the best estimates given this underlying data limitation.
6
• Data tables were collected in digital and hardcopy from DRD, GAD, MIMU• Population Growth Rates were taken from CSO publication (2011)• Together these created one geo-located dataset with villages, towns and cities with
population for a common year (2011)
DRD GAD
CSO
MIMU
Obtaining and Preparing Population Data
7
ESE and YESB supplied hundreds of maps in jpeg, pdf and other formats for state,
district and township level MV lines. (samples above for Bago)
These were geo-referenced and digitized to create GIS files.
(Bago Region MV file created by Resources and Environment
Myanmar, Yangon).
Medium Voltage (MV) grid lines
8
Model Parameters
– ESE provided:• Costs for LV (400 V) and MV (11kV, 33 kV) grid lines
– ~US$20,000-22,000 per km
• Sizes and costs of generators and transformers used• Cost of diesel fuel
– 4,400 – 4,900 kyat (US$1.10 - 1.22/liter) varying by state
• Electricity demands for residential sector (households)– 1,000 kWh per Household, per year
– Castalia estimated the future “bus-bar” cost of power: • 130 kyat (13 US cents) per kWh
– More than 70 other parameters were obtained from discussion with utilities and local investigation, in some cases compared with international values.
9
• Our model receives inputs described previously: – Settlements, MV grid lines, and many parameters
• … and an algorithm estimates demand and all costs (initial and recurring), and identifies which settlements will most cost-effectively be served by different electrification technologies over the long term: – grid connection, – mini-grids (such as diesel or hybrid) or – off-grid (such as solar home systems).
Populated Places
Social Infrastructure
Existing Grid
Settlements Existing Grid Model Results
Using software to plan a “least-cost” electricity system
10
Final Step: Sequenced roll-out
• MV grid extension is divided into 5 equal phases.
• Sequencing prioritizes new lines that serve the highest demands with the shortest MV line extension.
• Earlier Phases (1 & 2) reach larger, closely spaced settlements.
• Later Phases (4 & 5) reach the smallest, most remote settlements.
12
Two-pronged Approach: Grid and Off-grid Rollout Plan
1) Grid extension will reach some states later in grid roll-out, and these connections will cost substantially more per household
2) For those areas where grid will arrive late, an off-grid “pre-electrification” option can provide non-grid electricity service in the short- and medium-term
3) Over the long-term, grid extension is the most cost-effective option for the overwhelming majority of households
20
Note: This map shows all settlement points the same size (regardless of population), overstating electrification with non-grid options (mini-grid and off-grid / solar home systems)
Least-Cost Recommendation for 2030
• By 2030, the majority is grid connections
• This will be 7.2 million households
• Total cost is estimated at US $5.8 billion (US$800 per connection, average)
• This will be in addition to investments needed for generation & transmission
14
States / Regions Total Unelectrified totalAyeyarwady 5,530,000 4,920,000 1,080,000 >99% 0 <1% 0 <1% 1,082,000Bago 5,960,000 4,530,000 690,000 >99% 60 <1% 0 <1% 688,200Chin 510,000 430,000 110,000 >99% 330 <1% 410 <1% 112,600Kachin 1,260,000 920,000 120,000 >99% 250 <1% 280 <1% 116,100Kayah 260,000 150,000 30,000 >99% 80 <1% 0 <1% 27,060Kayin 1,590,000 1,370,000 380,000 >99% 80 <1% 30 <1% 379,600Magway 5,200,000 4,310,000 810,000 >99% 130 <1% 0 <1% 811,400Mandalay 6,740,000 4,250,000 720,000 >99% 10 <1% 0 <1% 721,700Mon 2,680,000 1,820,000 260,000 >99% 30 <1% 40 <1% 258,200Nyapitaw 650,000 200,000 100,000 >99% 0 <1% 0 <1% 98,220Rakhine 4,300,000 4,040,000 980,000 >99% 50 <1% 0 <1% 977,400Sagaing 5,830,000 4,490,000 910,000 >99% 630 <1% 20 <1% 909,600Shan 5,990,000 4,490,000 500,000 ~99% 1,100 <1% 1,100 <1% 511,300Tanintharyi 1,220,000 1,110,000 330,000 >99% 30 <1% 0 <1% 325,400Yangon 6,610,000 1,720,000 210,000 >99% 0 <1% 0 <1% 208,000
National Total 54,320,000 38,740,000 7,220,000 >99% 2,700 <1% 1,900 <1% 7,230,000
Population Long-Term System Recommendation(EI Est., round to 10,000) Households and Percent
grid
Number of households (estimated in each state) that will need to be connected
Caution: estimates and not primary census data. So +/- 10% variation would be not unexpected
15
Grid is recommended (long-term) for all but the smallest villages
Off-grid (solar home systems)
and mini-grids are recommended
only for the smallest
settlements
Number of households per village
2.5-3.0 GW of new generation capacity will be needed only for modest, residential needs
More will certainly be needed for commercial, industrial, and other demands.
This is approximately doubling current generation (~2.7 GW)
16
State New Proposed Connections Capacity (MW)
Ayeyarwady 1,082,000 395Bago 688,000 251Chin 112,000 41Kachin 115,000 42Kayah 27,000 10Kayin 379,000 139Magway 811,000 296Mandalay 722,000 264Mon 258,000 94Nyapitaw 98,000 36Rakhine 977,000 357Sagaing 909,000 332Shan 504,000 184Tanintharyi 325,000 119Yangon 208,000 76Total 7,216,000 2,636
Generation Capacity Needs
17
State / Region
Number of Household Grid
Connections Proposed
MV Length Proposed
(km)
Generation Capacity Proposed
(MW)Ayeyarwady 1,082,000 8,300 395Bago 688,000 4,700 251Chin 112,000 3,200 41Kachin 115,000 2,000 42Kayah 27,000 560 10Kayin 379,000 2,900 139Magway 811,000 6,400 296Mandalay 722,000 4,400 264Mon 258,000 1,300 94Nyapitaw 98,000 670 36Rakhine 977,000 5,000 357Sagaing 909,000 7,800 332Shan 504,000 11,000 184Tanintharyi 325,000 2,300 119Yangon 208,000 1,600 76Grand Total 7,216,000 62,000 2,636
Medium-Voltage (MV) Extension
Ayeya
rwad
yBag
oChin
Kachin
Kayah
Kayin
Magway
Mandala
yMon
Nyapita
w
Rakhine
Saga
ingSh
an
Taninthary
i
Yango
n -
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
10,000
11,000
Length of MV Required by States
MV
Dist
ance
(km
)
The amount of new MV line needed varies greatly by state / region.
Shan state is estimated to need the most new MV line overall and the most per household.
18
2) Grid extension will reach some states later in grid roll-out, and these
connections will cost substantially more per household
(This applies primarily to Chin, Shan, Kachin and Kayah, and to a lesser extent
Kayin, Sagaing, Tanintharyi.)
19
Recommended sequencing of Grid Roll-out proceeds from low-cost to high-cost connections
• Dense areas require less MV per connection and will be connected first
• Remote communities require more and will be connected later
• Chin, Shan, Kachin and Kayah have highest cost per connection, thus to be connected in the final phases
Connected earlier
Connected later
• Phasing by equal MV distance
MV Line Cost Rises Dramatically in the Final Phase
• Grid roll-out has five phases, each with equal MV distance.• Most households will be connected in the initial phases at lower cost per connection. • In later phases, as grid reaches remote communities, the length of MV line needed per
household increases. • The MV line investment rises dramatically in Phase 5 raising connection costs as well.
21
The most MV line per household, and the highest costs of grid extension, are estimated in 4 states:
Chin, Kachin, Kayah, Shan(and somewhat in Kayin, Sagaing and Tanintharyi)
Met
ers
MV
per H
H
22
3) For those areas where grid will arrive late, a “pre-electrification” option
can provide non-grid electricity service in the short term
23
• Remote areas will be reached in the latest phases (perhaps waiting for 10-15 years)
• Other technologies can meet needs in the short term. We call this “pre-electrification”
• Pre-electrification options would be lower service standards for basic needs– Initial costs are lower than grid (~20-50% less) – More important, roll-out would be faster
“Off-grid Pre-electrification”: the need
• Consider the last 3-4% of settlements for pre-electrification-- 5,000 communities-- 250,000 households
• Pre-electrification communities shown in purple
• Shan, Chin, Kayah and Kachin States represent major areas for pre-electrification
• Which system is best (solar home system versus mini-grid) depends on the size of the settlement
14
Recommendations for a Off-grid, Pre-electrification Plan
25
Important Caveat
• The issue of how many households and communities should be targeted for “pre-electrification” is more of a policy decision than a technical decision.
• The technical geo-spatial analysis presented here describes how costs increase for electrification of communities due to high MV costs per household.
• However, it does not determine the cost limit above which households should be targeted for “pre-electrification” rather than grid.
26
• Solar home systems– for smaller settlements (<50 HHs)– may provide 75-175 kWh/yr for lighting/ICT/TV – US $400-500 / household system
• (These are international prices. Local prices may be lower, and quality can vary.)
• Mini-grids – solar, hybrid, diesel, or micro-hydro where available– typically best for larger settlements (>50 HHs)– 200-250 kWh/yr : lighting/ICT/TV & fan/small fridge– US$1,400/HH – Cost is somewhat high, but saves on distribution
investment later if built to grid standard
“Pre-electrification” Technology Options
27
Settlement Size(in # HHs)
Number of Pre-
electrificat1) <=10 830
2) 11 - 20 13,6163) 21 - 50 78,9024) 51 - 100 85,145
5) 101 - 250 49,8076) 251 - 500 13,020
7) 501 - 1,000 3,4228) >1,000 5,112
One pre-electrification option-- targeting 250,000 HHs in the first 10 years
Solar home systems for ~95,000 HHs in small villages (<50 HHs)
Mini-grids for ~155,000 HHs in larger villages (>50 HHs)
Number of households per village
250,000 “pre-electrification” households by State / Region
28
29
Pre-electrification Cost summary 250K
Households targeted for SHS 93,000Total Initial Costs $47,500,000
HHs targeted for mini-grids 156,000
Total Initial Costs $219,000,000
Grand Total: Households 250,000Grand Total: Costs $266,500,000
Overall Ave per HH Costs $1,070