4
NASIR ABBAS Cell No. +966583602831 E-mail: [email protected] PROFESSIONAL OVERVIEW Having more than 09 Years of Professional experience as Mechanical Maintenance & Quality Control Engineer in Oil& Gas, Fertilizer, Petrochemical, and Power Plant & Cement/Utility Plants. I have very Good command over my technical skills and assigned professional responsibilities. QUALIFICATION 1. Passed Bachelor in Mechanical Technology from UET Lahore (2001) 2 Passed Diploma in Mechanical Technology from Govt. Institute of Technology Dera Ghazi Khan. CURRENT WORKING ERAM ENGINEERING COMPANY KHUBAR, SAUDI ARABIA SABIC SHUTDOWN YANSAB-Area Incharge (April, 2015 to May, 2015) IBN-ZAHR-Area Incharge (Feb, 2015 to March, 2015) RESPONSIBILITIES Supervise the execution work of contractor in assigned area. Coordinate with client and contractor management regarding issues (if any). Make sure work should be completed on schedule. Complete the job as per safety requirements. ARAMCO PROJECT YANBU CRUDE OIL TERMINAL - (Senior Mechanical Engineer) (July, 2013 to Dec, § 1

nasir cv.4

Embed Size (px)

Citation preview

Page 1: nasir cv.4

NASIR ABBAS Cell No. +966583602831

E-mail: [email protected]

PROFESSIONAL OVERVIEW

Having more than 09 Years of Professional experience as Mechanical Maintenance & Quality Control Engineer in Oil& Gas, Fertilizer, Petrochemical, and Power Plant & Cement/Utility Plants. I have very Good command over my technical skills and assigned professional responsibilities.

QUALIFICATION

1. Passed Bachelor in Mechanical Technology from UET Lahore (2001)2 Passed Diploma in Mechanical Technology from Govt. Institute of Technology Dera Ghazi Khan.

CURRENT WORKING

ERAM ENGINEERING COMPANY KHUBAR, SAUDI ARABIA

SABIC SHUTDOWN YANSAB-Area Incharge (April, 2015 to May, 2015)IBN-ZAHR-Area Incharge (Feb, 2015 to March, 2015)

RESPONSIBILITIES

Supervise the execution work of contractor in assigned area. Coordinate with client and contractor management regarding issues (if any). Make sure work should be completed on schedule. Complete the job as per safety requirements.

ARAMCO PROJECT

YANBU CRUDE OIL TERMINAL - (Senior Mechanical Engineer)(July, 2013 to Dec, 2014)

RESPONSIBILITIES

Prepare the method statement of RTG (RADAR TANK GAUGE) Assembly and stilling well pipe installation.

Prepare the modification plan of guide pole and structural platform. Coordination with sub-contractors. Coordination with procurement department for materials. Prepare the documents and tools & equipment’s list. Modify the guide pole and structural platform. Assembly the stilling well pipes and installation on crude oil tanks. Installation of RTG equipment at site. Attend the weekly ARAMCO progress meetings.

§1

Page 2: nasir cv.4

NASIR ABBAS Cell No. +966583602831

E-mail: [email protected]

PREVIOUS EXPERIENCE

GLOBAL PIPE COMPANY (EEW GROUP MALYSIA) Jubail, SAUDI ARABQC Engineer (Sep, 2012 to June, 2013)

RESPONSIBILITIES

Understanding the applicable procedures, work instructions, specifications and standard according to API 5L 44th Edition (LSAW Pipes)

Implementing company standards and procedures. Controlling all activities related to incoming inspection, welding inspection, in- process

inspection and final inspection for assigned projects. Ensuring the disposition of all defective products as per customer requirements. Monitoring performance of inspector, technicians and guiding them for quality objective. Reporting relatives process data and supporting the quality in-charge improvement efforts in

the quest for zero defects and minimal scrape rates. Maintain detailed technical record of all inspection and testing activities conducted on

assigned projects. Communicate the quality problems, non-conformities to management at all levels. Provide customer technical support whenever required.

DESCON ENGINEERING LIMITED PAKISTANMaintenance and Project Engineer (Nov, 2006 to Aug, 2012)

Execution / Maintenance Sectors

D.G.KHAN CEMENT COMPANY LIMITED (Waist Heat Recovery Power Plant) ENGRO CHEMICAL PAKISTAN LIMITED (Shut Down) PAKISTAN PTA LIMITED (Shut Down) BOSICOR PAKISTAN LIMITED (Shut Down) ZAM ZAMA GAS PLANT (Project Phase-2) (BHP Billiton) ZAM ZAMA GAS PLANT (Shut Down Phase-1) (BHP Billiton) 325 MW CHASHMA NUCLEAR POWER PLANT (CNPP) Shut Down (RFO-4)

RESPONSIBILITIES

Look after the troubleshooting and preventive maintenance of Power Plant (Steam turbine, boilers, Screw Conveyors, Pumps) etc.

Replacement of Heat Exchanger . To guide supervisors and junior staff during shut down activities of Crud Distillation Tower. Installation of valves, flanges & different type of supports etc. To guide supervisors and junior staff during shut down activities of Heat Exchanger, Blower

Pumps and Fans. Effective utilization of all resources during the job. Quality and quantity of job as per design specification. Complete co-ordination with the client about the job. Whole work completed as per client safety standard.

AL-GHAZI TRACTORS LIMITED (Jan, 2002 to June,

§1

Page 3: nasir cv.4

NASIR ABBAS Cell No. +966583602831

E-mail: [email protected])

Worked as an Assistant Manager in Production Department.

PERSONALS

Father’s Name : Manzoor Hussain Date of Birth : 01-03-1980Marital Status : Married Nationality : Pakistani Religion : Islam NIC No. : 32102-0963545-1Passport No. : DG1015452Passport Expiry : 20-07-2019Permanent Address : H # 255, Shahzada Sultan Ahmad Town,

Kangan Road, DG Khan, Punjab Pakistan.Home Landline Phone : +92-64-2465850

COMPUTER SKILLS

Microsoft Words Microsoft Excel Microsoft Power Point

§1