NAS Infrastructure Roadmaps, Version 12.0 January 20181
Aircraft—New Entrants—Automation—Airport—Weather—Communications—Navigation—Surveillance—Airspace &
Procedures—Enterprise Services—Facilities—Human Systems Integration—Information Systems Security—Safety
APPROVED
NAS Enterprise Architecture
Infrastructure Roadmaps
Version 12.0
March 2018
NAS Infrastructure Roadmaps, Version 12.0 January 20182
Infrastructure Roadmap Legend
Aircraft Roadmaps
New Entrants Roadmaps
Automation Roadmaps
Airport Roadmaps
Weather Roadmaps
Communications Roadmaps
Navigation Roadmaps
Surveillance Roadmaps
Airspace & Procedures Roadmaps
Enterprise Services Roadmaps
Facilities Roadmaps
Human Systems Integration Roadmaps
Information Systems Security Roadmaps
Safety Roadmaps
Appendix A: Acronym List
3
4
14
23
33
39
48
57
64
72
78
84
89
98
105
111
Table of Contents
NAS Infrastructure Roadmaps, Version 12.0 January 20183
* Applies to any fill color type
** Applies to any Decision Point fill color type
###Future Baselined Decision Point; High Priority
XYZ System / Service / Support Activity
System successor
System in Draw-Down Mode
Decommission X
###Future Baselined Decision Point; Non-High Priority
### Planning Decision Point
FID### AMS (CRDR, IARD, IID, FID, BCD)
### Policy
### Strategy (JRC)
### Strategy (Other)
### Decision Point Owned by Another Roadmap
Decision Point Fill Colors
### Completed Decision Point###or
Timeline2017 2018 2019
XYZ NextGen Project (denoted by G CIP number)
Decision Point Borders**
XYZ Project
XYZ Planned (Unfunded) System/Service/Project*
XYZOperational Node / Procedure / Capability / Other Architecture Object
### Regulatory Milestone
XYZSupport Activity Owned by Another Domain
###or
Infrastructure Roadmap Legend
NAS Infrastructure Roadmaps, Version 12.0 January 20184
Change #1
Roadmap Element Change Approval Authority
Approval Authority Date
Automation(3 of 4) DP 830 (IARD)
Status changed from ‘Scheduled’ to ‘Completed’
JRC 1/17/18
Automation(3 of 4) DP 831 (IID) Waived JRC 1/17/18
Facilities(1 of 3) DP 1090 (IARD)
Status changed from ‘Scheduled’ to ‘Completed’
JRC 2/21/18
Safety(1 of 3)
Service: Airport Surface Anomaly Investigation Capability
Update acronym to ‘ASAIC’
NAS Chief Architect 3/5/18
NAS Infrastructure Roadmaps, Version 12.0 January 20185
AircraftObjective: The Aircraft roadmap presents planned advances in Airframe and Avionics in coordination with NAS NextGenimprovements.
NAS Infrastructure Roadmaps, Version 12.0 January 20186
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
GBAS Cat I Approach Avionics
GBAS Cat II/III Approach Avionics
SBAS (WAAS)Avionics
ILS Cat II/III Approach Avionics
ILS Cat I Approach Avionics
VOR Avionics
DME Avionics
TACAN Avionics
ADF Avionics
IRU Avionics
Dom
estic
PB
NO
cean
ic P
BN
Pos
ition
, Nav
igat
ion
& T
imin
g A
vion
ics
Rec
eive
rs
RNP
RNP
VNAV
RNP ARRNP 0.3
RNAV 2RNAV 1
RNP 10
RNAV
RVSM
RNAV
RNP 1
RNP 2
VNAV
RNAV
GNSS/GPS Avionics
RVSM
RNP 4 30/30
956 220
Pos
ition
, Nav
igat
ion
& T
imin
g C
apab
ilitie
sAircraft Roadmap (1 of 6)
NAS Infrastructure Roadmaps, Version 12.0 January 20187
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Traj
ecto
ry M
anag
emen
tA
/G V
oice
C
omm
s
Airborne UHF Radio
Airborne VHF RadioAirborne HF RadioSATCOM
Eqpt. & Svc.
HFDL
Airborne SATCOM
Supplemental Use of SAT Voice
Flight Management
FANS 1/A Flight
Single RTA used inflight managementOffset routes used in flight management
Integrated Nav, Comm, Surv and flight management for oceanic operations with clearance auto-load, future waypoint identification, RTA, performance contract with exception reporting, etc. used for ATC and increased capacity/efficiency
FMS
FANS 1/AFMSHF
SATCOMADS-C
ACARS Eqpt. & Service of third party (TWIP, MDCRS, AOC msg)
FANS 1/A Eqpt. & Service (FANS CPDLC & FANS ADS msg)
ACARS Eqpt. & Service of third party (TWIP, MDCRS, AOC msg)
ACARS Eqpt. & Service of third party service plus TDLS service (ATIS, PDC msg.)
FANS 1/A VDL2 Equipage: Airborne
A/G
Dat
a C
omm
unic
atio
nsD
omes
tic
Airs
pace
Lega
cyO
cean
ic A
irspa
ce
ACARS Eqpt. & Service of third party (TWIP, MDCRS, AOC msg)
527
B2 Equipage: AirborneDataComm Security
NGSS Eval.
Aircraft Roadmap (2 of 6)
NAS Infrastructure Roadmaps, Version 12.0 January 20188
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
1115
Saf
ety
Enh
ance
men
ts
ADS-B In
Sur
veill
ance
Mode 3/A/C Transponder
Mode S Transponder
ADS-B Out Avionics
TIS-B
TCAS
TAWS
ELT
FIM
ITP
TSAA
ADS-B InCAVS
ACAS X – Segment 1
ACAS X – Segment 2
955
954
950 ACAS-X951
967
841
FIS-B ASSAP
CDTI
TEST
1114
1113
Aircraft Roadmap (3 of 6)
NAS Infrastructure Roadmaps, Version 12.0 January 20189
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Auto-Pilot
Auto-Throttle
Moving Map
CDTI
HUD
EFVS
MDCRS
Wea
ther
S
enso
rsLo
w V
isib
ility
Ops
SVS
SMGCS
EFB
Dis
play
sC
ontro
lsN
ew A
irfra
mes
an
d P
ropu
lsio
n
SVGS
UAS 966
Aircraft Roadmap (4 of 6)
NAS Infrastructure Roadmaps, Version 12.0 January 201810
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Safe
ty &
Sec
urity
Enha
ncem
ents LED Lamp
Development239
AIS
Dat
a Li
nk
RTC
A SC
-206
EDR MOPS
RTC
A SC
-214
SVA-ASA, Synthetic Vision System - Aircraft State Awareness
DO-XXX Guidelines for In Situ EDR Algorithm Performance
DO-358A MOPS for FIS-B with UAT
DO-224E Signal-in-Space MASPS for Advanced VHF Digital Data Comm.
DO-281C MOPS for Aircraft VDL Mode 2
DO-281D MOPS for Aircraft VDL Mode 2
DO-224D Signal-in-Space MASPS for Advanced VHF Digital Data Comm.
RTC
A SC
-222
Revised DO-262C with Technique Specific Normative Appendix from Iridium
Revised DO-343A with System Specific Attachment from Iridium
Human Factors LVO SMGCS Infrastructure Research – Phase 11040
RTCA SC-233, Addressing Human Factors / Pilot Interface Issues for Avionics
ATC UAS Lost Link Operations
Human Error Prevention & Mitigation Strategies for TBO Concepts that May Rely on Defining Waypoints (Lat/Lon) in ½ Degrees
FAA System Safety Guidance: Development of Feasible Human Error Assessment Method Alternatives1131
Enhanced Helicopter Vision Systems: Human Factors Examination of Heads-Up/Head-Worn Display Technologies and Concepts
1135 Human Factors Requirements for the Use of EFVS During Takeoff at Airports with Reduced and/or Degraded NAS Infrastructure
1044Human Factors Recommendations for Conducting Low Visibility Flight Operations in Transport Category Aircraft Using SVGS Information on HDDs and HUDs
Evaluation of Flight Deck System Alternatives to Mitigate Aircraft Energy State Awareness Risks
1043
1042
Hum
an
Perf
orm
ance
1130
1134
Aircraft Cybersecurity Initiative (ACI) R&D
Aircraft Roadmap (5 of 6)
NAS Infrastructure Roadmaps, Version 12.0 January 201811
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031R
TCA
SC
-147
TC
AS
& S
C-1
86 A
DS
-B P
NT
Future Collision Avoidance Systems
A-IM SPR Interoperability
ACAS-Xa, ACAS-Xo MOPS
Surv
eilla
nce
ACAS-Xu MOPS 1001
Advanced FIM MOPS
841
1113
1114
UAS
SC-2
28
Small UAS AW AC Developed
Com
man
d an
d C
ontro
l (C
2)A
irwor
thin
ess
Identify and Standardize Unique UAS Airworthiness (AW) Requirements (beyond sUASRule)
962
963966
961
957
BVLOS C2 Frequency and Management and Allocation Programs
BVLOS C2 Spectrum Management Framework and Allocation Requirements Defined
Aircraft Roadmap (6 of 6)
NAS Infrastructure Roadmaps, Version 12.0 January 201812
Identifier DescriptionAC-01 The roadmap identifies four phases
a) CONOPs development and R&D in required areasb) Standards developmentc) AVS Approvald) ATC Procedure developmente) Deployment. After the standards process is complete, and manufacturers have developed,
integrated, fully tested and made new avionics available, aircraft, engines and fuels available, an additional 7 to 10 years is needed to achieve wide scale equipage of a new capability
1. Different aircraft are expected to equip with different equipment. This roadmap does not currently distinguish between aircraft types.
AC-02 The aircraft roadmap includes environment research areas and assumptions and linkage to Mission Support EA.
AC-03 Any aircraft to include any UAS that participates in the NAS must operate in a way that is transparent to the ANSP and ATSP.
Aircraft Roadmap: Assumptions
NAS Infrastructure Roadmaps, Version 12.0 January 201813
DP # Target Date CY
High Priority
Primary Domain Type Name
220 2026 Q4 No Navigation Strategy (Other)
Decision to Cut Over to Dual Frequency / Multi-Constellation Operations Based on Completion of Dual Frequency (GPS L1 and L5) Development & Testing
239 2020 Q4 No Navigation Strategy (Other) Strategy Decision to Proceed with ALS (I) Production LED Lamps for MALSR Systems
527 2018 Q2 No Aircraft Regulatory Milestone Publication of a Proposed Set of Trajectory Management Performance Levels
841 2017 Q1 No Aircraft Strategy (Other)
Strategy Decision to Move Forward on WP2 for UAS GA Collision Avoidance (ACAS-Xu and ACAS-Xp)
950 2018 Q4 No Aircraft Regulatory Milestone ACAS-X Segment 1 MOPS
951 2019 Q4 No Aircraft Regulatory Milestone TSO ACAS-X
954 2017 Q3 No Aircraft Regulatory Milestone TSO-C151d: Terrain Awareness and Warning System (TAWS)
955 2018 Q3 No Aircraft Regulatory Milestone TSO-C126c: Emergency Locator Transmitter (ELT)
956 2022 Q4 No Aircraft Regulatory Milestone Publication of SBAS Dual-Frequency/Multi-Constellation (DFMC) MOPS
957 2018 Q4 No New Entrants Strategy (Other) C2 Protected Spectrum Management and Allocation Systems Acquisition Strategy Determined
961 2017 Q4 No Aircraft Regulatory Milestone Advisory Circular (AC) Invoked for Airborne Detect and Avoid (DAA) for UAS - Phase 1
962 2019 Q3 No Aircraft Regulatory Milestone
Minimum Operational Performance Standards (MOPS) for UAS Detect and Avoid (DAA) - Phase 2 (SC-228)
963 2018 Q1 No Aircraft Regulatory Milestone Advisory Circular (AC) Invoked for Command and Control for UAS Operations
966 2019 Q3 No Aircraft Regulatory Milestone Satellite UAS Command and Control MOPS (SC-228)
967 2020 Q1 No Aircraft Regulatory Milestone ADS-B Out Equipage Rule Implemented
1001 2022 Q2 No Aircraft Regulatory Milestone TSO ACAS-Xu
1040 2017 Q3 No Human Systems Integration
Strategy (Other) Decision on the Implementation Strategy of Human Factors LVO SMGCS Guidelines – Phase 1
1042 2017 Q3 No Human Systems Integration
Strategy (Other) Decision on the Implementation Strategy of ATC UAS Lost Link Guidelines
1043 2020 Q4 No Human Systems Integration
Strategy (Other)
Decision on the Approval & Implementation Strategy of Human Factors Aircraft Energy State Display and Alerting Guidelines
Aircraft Roadmap: Decision Points (1 of 2)
NAS Infrastructure Roadmaps, Version 12.0 January 201814
DP # Target Date CY
High Priority
Primary Domain Type Name
1044 2019 Q4 No Human Systems Integration
Strategy (Other) Decision on the Implementation Strategy of Human Factors SVGS Guidelines
1113 2019 Q4 No Aircraft Regulatory Milestone Advanced FIM SPR Interoperability
1114 2019 Q4 No Aircraft Regulatory Milestone Advanced FIM MOPS
1115 2019 Q4 No Aircraft Regulatory Milestone Revisions to ADS-B MOPS
1030 2019 Q4 No Human Systems Integration
Strategy (Other)
Decision on the Approval & Implementation Strategy of HF Guidance for the Presentation of ½ Degree Waypoints to Users
1031 2021 Q1 No Human Systems Integration
Strategy (Other) Decision on the Approval and Implementation Strategy of Human Factors System Safety Guidance
1134 2020 Q4 No Human Systems Integration
Strategy (Other)
Decision on the Approval and Implementation Strategy of Human Factors Guidance for Helicopter Advanced Vision Systems
1135 2019 Q4 No Human Systems Integration
Strategy (Other)
Decision on the Approval and Implementation Strategy of Human Factors Guidance for the Use of EFVS During Departure Operations
Aircraft Roadmap: Decision Points (2 of 2)
NAS Infrastructure Roadmaps, Version 12.0 January 201815
New EntrantsObjective: The New Entrants roadmap provides a consolidated timeline of activities and investments, both active and planned, required to integrate UAS and Commercial Space into the NAS.
NAS Infrastructure Roadmaps, Version 12.0 January 201816
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
UAS Enhancements 1
ERAM Enhancements 2
Com
mun
icat
ions
NA
S D
omai
n –
Sys
tem
s &
Ser
vice
s
Auto
mat
ion
ERAM
Surv
eilla
nce
Nav
igat
ion
CRDR1098
IARD1099
IID1100
FID1101
LAANC
New Entrants Roadmap (1 of 7: UAS)
NAS Infrastructure Roadmaps, Version 12.0 January 201817
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031IS
S
NA
S D
omai
n –
Sys
tem
s &
Ser
vice
s
Airs
pace
/Pro
cedu
res
Airp
ort
Wea
ther
Safe
tyNew Entrants Roadmap (2 of 7: UAS)
NAS Infrastructure Roadmaps, Version 12.0 January 201818
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031Fa
cilit
ies
NA
S D
omai
n –
Sys
tem
s &
Ser
vice
s
Ente
rpris
e Se
rvic
esAi
rcra
ftO
ther
HSINew Entrants Roadmap (3 of 7: UAS)
NAS Infrastructure Roadmaps, Version 12.0 January 201819
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031O
pera
tiona
l Con
cept
E
xplo
ratio
n
Super 60: Shortfall Analysis for UAS and Space Operations in Class E Airspace Above 60,000 ft (Concept Exploration)
Con
cept
D
evel
opm
ent
Super 60: CONOPS for UAS and Space Operations above 60,000 ft (Concept Development)
Ope
ratio
nal C
once
pt
Val
idat
ion
Pol
icy
Ass
essm
ent
and
Dev
elop
men
tM
ajor
Tra
inin
g
Identify and Standardize Certification Requirements for Pilot/Crew
Ser
vice
s &
Infra
stru
ctur
eS
ervi
ces
All
UA
S
sUAS = small UAS mUAS = medium-sized UAS lUAS = Large UAS
UAS Concept Validation and Requirements Development
UAS Flight Information Management
Unmanned Traffic Management
Identify and Standardize Unique UAS Airworthiness(AW) Requirements (beyond sUAS Rule)
Definition of Weather Standards for UAS Flight
UAS Weather Requirements
New Entrants Roadmap (4 of 7: UAS)
NAS Infrastructure Roadmaps, Version 12.0 January 201820
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031S
tand
ards
Cer
tific
atio
n an
d D
evel
opm
ent C
omm
and
& C
ontro
l (C
2)D
etec
t and
Avo
id
(DA
A)
Develop UAS Advisory Circular
TSO Invoked for Terrestrial C2 for UAS Operations
MOPS for SATCOM C2 Data Links
UAS Command and Control C2 Link Compatibility
TSO Invoked for Detect and Avoid (DAA) for UAS Operations – Phase 1
MOPS for UAS Detect and Avoid (DAA) – Phase 2
Identify and Standardize Unique Navigation Requirements for UAS
Identify and Standardize Unique UAS Airworthiness (AW) Requirements: VLOS Urban Ops
UAS Maintenance, Modification, Repair, Inspection, Training, and Certification Considerations
UAS Navigation Performance, Accuracy, and Reliability
Small UAS Detect and Avoid Requirements Necessary for Limited Beyond Visual Line of Sight (BVLOS) Operations
961
962
963
966
Ser
vice
s &
Infra
stru
ctur
eS
ervi
ces
All
UA
SsU
AS
mU
AS
/lUA
S
sUAS = small UAS mUAS = medium-sized UAS lUAS = Large UAS
Identify and Standardize Unique UAS Airworthiness (AW) Requirements: EVLOSIdentify and Standardize Unique UAS Airworthiness (AW) Requirements: BVLOS
FAFu Semi-Automatic w/ Flight Planning Coordinator
FAFu Fully Automated Server-Based
FPC/FAFu Integration into OCDSM
OCDSM Integration with Hybrid Manned/Unmanned NAS
CPDLC for UAS NAS-wide
957
UAS FAFu Manual Assignment
FAFu Integration with FPC
PIC-ATC Ground-to-Ground Comms via NVS
New Entrants Roadmap (5 of 7: UAS)
NAS Infrastructure Roadmaps, Version 12.0 January 201821
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
SIE (SDI Phase 2)
Supp
ortin
g A
ctiv
ities
Pol
icy
Ass
essm
ent/
Dev
elop
men
t.
Ope
ratio
nal
Con
cept
E
xplo
ratio
n
Super 60: Shortfall Analysis for UAS and Space Operations in Class E Airspace Above 60,000 ft (Concept Exploration)
Con
cept
D
evel
opm
ent
Super 60: CONOPS for UAS and Space Operations above 60,000 ft (Concept Development)
Ope
ratio
nal
Con
cept
V
alid
atio
n
SVO HITL #2 - Terminal Concept Validation
Ope
ratio
nal
Res
earc
h
SVO HITL #3 - Oceanic Concept Validation
All
SV
OSe
rvic
es &
Infra
stru
ctur
eSe
rvic
es
Ope
ratio
nal
Con
cept
E
xplo
ratio
n
Space Integration Enhancements for the ATO
SVO = Space Vehicle Operations LV = Launch Vehicle RV = Reentry Vehicle
Develop methodology to assess impact to NAS users during launch and reentry operations
SDI Devel./Acquis.
Review existing policies and regulations to identify areas that may need to be examined in more detail
Conduct an in-depth review of existing policies and regulations to provide recommendations for future changes
Space Integration Enhancements 1
IARD1141
IID1142
FID1143
Space Traffic Management (STM)
Space Data Integrator (SDI) Prototype Sustain
IID1024
FID1025
IARD1145
IID1146
CRDR1144
FID1147
IARD1023
New Entrants Roadmap (6 of 7: Commercial Space)
NAS Infrastructure Roadmaps, Version 12.0 January 201822
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031Te
chni
cal C
once
pt
Val
idat
ion
Conduct Validation Activities for SVO Dynamic Debris Mitigation concept
Tech
nica
l Opp
ortu
nity
Inve
stig
atio
n
Advanced SurveillanceCapabilities
Analytical Improvements for Aircraft Hazard Area (AHA) Reduction
Tech
nica
l Dem
onst
ratio
ns a
nd P
roto
typi
ng
Develop capability for display of safety/status information on launch/reentry ops to the flight deck
All
SV
OS
ervi
ces
& In
frast
ruct
ure
SVO = Space Vehicle Operations LV = Launch Vehicle RV = Reentry Vehicle
Develop Concept for 4D Compact Envelope for Space Vehicles
Develop Operational Procedures for 4D Compact Envelope
Automate space vehicle status to allow off-nominal assessment by hazard analysis tool
Research and develop capabilities to streamline coordination process
Operator Planning Portal Assessment
Operator Launch Site Safety and Integration Assessment
Nominal LV/RV Operations Sequencing Approach Assessment
Develop FIXM 5.0 U.S. Extension Operational Input
New Entrants Roadmap (7 of 7: Commercial Space)
NAS Infrastructure Roadmaps, Version 12.0 January 201823
DP # Target Date CY
High Priority
Primary Domain Type Name
957 2018 Q4 No New Entrants Strategy (Other) C2 Protected Spectrum Management and Allocation Systems Acquisition Strategy Determined
961 2017 Q4 No Aircraft Regulatory Milestone Advisory Circular (AC) Invoked for Airborne Detect and Avoid (DAA) for UAS - Phase 1
962 2019 Q3 No Aircraft Regulatory Milestone
Minimum Operational Performance Standards (MOPS) for UAS Detect and Avoid (DAA) - Phase 2 (SC-228)
963 2018 Q1 No Aircraft Regulatory Milestone Advisory Circular (AC) Invoked for Command and Control for UAS Operations
966 2019 Q3 No Aircraft Regulatory Milestone Satellite UAS Command and Control MOPS (SC-228)
1023 2017 Q2 No New Entrants IARD Investment Analysis Readiness Decision (IARD) for Commercial Space Integration Into the NAS
1024 2018 Q4 No New Entrants IID Initial Investment Decision (IID) for Space Data Integrator (SDI) Development and Acquisition
1025 2019 Q4 No New Entrants FID Final Investment Decision (FID) for Space Data Integrator (SDI) Development and Acquisition
1098 2019 Q3 No New Entrants CRDR Concept and Requirements Definition Readiness (CRDR) Decision for UAS Enhancements 1
1099 2020 Q3 No New Entrants IARD Investment Analysis Readiness Decision (IARD) for UAS Enhancements 1
1100 2021 Q3 No New Entrants IID Initial Investment Decision (IID) for UAS Enhancements 1
1101 2022 Q4 No New Entrants FID Final Investment Decision (FID) for UAS Enhancements 1
1141 2019 Q4 No New Entrants IARD Investment Analysis Readiness Decision (IARD) for Space Integration Enhancements 1
1142 2020 Q4 No New Entrants IID Initial Investment Decision (IID) for Space Integration Enhancements 1
1143 2021 Q4 No New Entrants FID Final Investment Decision (FID) for Space Integration Enhancements 1
1144 2018 Q4 No New Entrants CRDR Concept and Requirements Definition Readiness (CRDR) Decision for Space Data Integrator (SDI) Phase 2
1145 2019 Q4 No New Entrants IARD Investment Analysis Readiness Decision (IARD) for Space Data Integrator (SDI) Phase 2
1146 2020 Q4 No New Entrants IID Initial Investment Decision (IID) for Space Data Integrator (SDI) Phase 2
1147 2021 Q4 No New Entrants FID Final Investment Decision (FID) for Space Data Integrator (SDI) Phase 2
New Entrants Roadmap: Decision Points (1 of 1)
NAS Infrastructure Roadmaps, Version 12.0 January 201824
AutomationObjective: The Automation Roadmap presents an Executive View (EV) of the current automation systems supporting the National Airspace System (NAS) and their enhancement, sustainment or replacement through major development programs and support activities. The Automation Roadmap is intended to convey the major automation program strategy and acquisition decision points as well as program execution through the In-Service Decision. The roadmap serves as a summary view of more detailed plans within each development program.
NAS Infrastructure Roadmaps, Version 12.0 January 201825
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
SDI Development/Acquisition
ERAM Sustainment 2
TBFM WP3
HOSTURET
DSR
ARTS IE/IIE
STARS
TAMR P3S1
ERAM
HADDSECG
TFMSCATMT WP4
TBFM
DBRITE X
TFM-I Field/Remote Site TR
STARS TR – TAMR P1
XXX
X
ECG Sustainment
STARS E
TBFM Tech Refresh
TBFM WP4
ERAM Enhancements 2
CATMT WP5
STARS Enhancements 2
TFM Improvements
IARD1005
IARD908
IARD971
FID983
IARD1016
FID1025
IID972
En Route Improvements
Terminal Improvements
ERAM Sustainment 3FID1010
1077
FID1011
FID910
FID346
ERAM Enhancements 3IID1014
FID1015
STARS Sustainment 3
IARD1013
TFMS Modernization Part 2
IARD903
FID904
FID1007
IID1006
STARS L
FID973
IARD1021
STARS Sustainment 4
TFM-I Core TR2
TAMR Post-ORD Enhancements
TAMR P3S2
STARS Sustainment 2IARD1078
FID1079
FID1069
IARD1119
IID1120
FID1121
CRDR1118
ERAM Sustainment 4
Automation Roadmap (1 of 4)
NAS Infrastructure Roadmaps, Version 12.0 January 201826
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
TFDM Segment 2
ATOP Enhancements WP1
ATOP
DOTS+
MEARTS
FDP2K
OFDPS
ATOP Sustainment 2
ATOP Enhancements WP2
FDIO SustainmentFDIO
ATOP Oceanic Improvements
X
XERIDS
E-IDS
IDS4 / IDS5
NIDS
ACE-IDS
X
X
Enterprise IDS
TDLS
EFSTS
SMA
Tower DCL Svcs. Segment 1
TFDM
DSP
XX
ARMT
TFDM Segment 1
FID850
IARD848
Offshore Automation Phase 1
IID388
FID389
IID913
FID914
IARD1018
E-IDS Sustainment
IARD1076
IDS-ReplacementIDS-R TR
FID198
IID1019
AEFSXXX
FID1117
IARD1116
TFDM Segment 1 Sustainment
Automation Roadmap (2 of 4)
NAS Infrastructure Roadmaps, Version 12.0 January 201827
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Common Status and Structure Data
AMMS
Future Flight Services Program (FFSP)DUAT(S)
OASIS AFSS CONUS
RMLS
AMMS Segment 2
RMLS TR
AMMS Segment 3IID695
975
ACSAIMM Segment 2
FNS
AIMM Segment 3FID122
AIMM Segment 4
NASE
CARFAGIS
NOP
PDARS
CTS
NAIMES
NASR
TFR Bldr
AISR
OEAAA
SDAT
USNS
SAMS
IARD830
X
AMMS
FID696
XX
CSS – Flight DataCRDR1072
IARD1073
IID1074
FID1075
OPSNET OPSNET ReplacementIARD979
IID980
FID981
FID208
XDVARS
FID1080
FID1081
CH 1
Automation Roadmap (3 of 4)
NAS Infrastructure Roadmaps, Version 12.0 January 201828
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Surface Tactical Flow
Flight Object
Separation Automation System Engineering
906
NextGen Oceanic Capabilities
En Route Wake Vortex Avoidance Advisor
Oceanic Separation StandardsDevelopment and Analysis
Oceanic Tactical Trajectory Management
Flight Object Exchange Service (FOXS)
Strategic Flow Management Application
Strategic Flow Management Engineering Enhancement
Information Management
Advanced Methods
Modern Procedures
Separation Management Concepts and Analysis
Non-TFDM Tower Automation Analysis
Common Trajectory Models
Automation Roadmap (4 of 4)
NAS Infrastructure Roadmaps, Version 12.0 January 201829
Identifier DescriptionAUTO-01 Net-centric Enterprise Services will replace designated existing point to point interfaces with a system
based on a Service Oriented Architecture providing enhanced data exchange, enhanced flexibility, and enhanced security for FAA Operations Personnel, and airspace users within a common information environment to support NextGen Operational Improvements.
AUTO-02 ADS-B is a necessary infrastructure element to support Trajectory Based Operations, Flexible Terminal, and High Density Terminal solution sets.
AUTO-03 Data Communication is a necessary infrastructure element to support Trajectory Based Operations, Flexible Terminal, and High Density Terminal solution sets.
AUTO-04 Operational Service Units will be responsible for JRC Final Investment Decisions.AUTO-05 Policy and standards decisions prescribing the use of hand-held devices for data messaging by General
Aviation pilots and aircraft are established.AUTO-06 Consistent security management across Data Communication, Automation and SWIM support the
evolution.AUTO-07 Human-system integration will be conducted during analysis, design, development, and testing of
Automation programs.AUTO-08 Safety analysis and considerations will be included in all applicable phases of Automation analysis,
design, development, and testing and platforms will provide data as required for safety monitoring and analysis.
AUTO-09 Automation platform designs will support environmental and energy saving initiatives.
Automation Roadmap: Assumptions
NAS Infrastructure Roadmaps, Version 12.0 January 201830
DP # Target Date CY
High Priority
Primary Domain Type Name
122 2019 Q4 No Automation FID Final Investment Decision (FID) for AIMM Segment 3
198 2023 Q2 Yes Automation FID Final Investment Decision (FID) for TFDM Segment 2
208 2018 Q4 Yes Automation FID Final Investment Decision (FID) for Future Flight Services Program (FFSP)
346 2017 Q2 Yes Automation FID Final Investment Decision (FID) for CATMT Work Package 4
388 2018 Q4 No Automation IID Initial Investment Decision (IID) for Offshore Automation Phase 1
389 2019 Q4 No Automation FID Final Investment Decision (FID) for Offshore Automation Phase 1
695 2019 Q1 No Automation IID Initial Investment Decision (IID) for AMMS Segment 1
696 2020 Q1 No Automation FID Final Investment Decision (FID) for AMMS Segment 1
830 2018 Q1 No Automation IARD Investment Analysis Readiness Decision (IARD) for AIMM Segment 3
848 2017 Q1 Yes Automation IARD Investment Analysis Readiness Decision (IARD) for ATOP Enhancements WP1
850 2018 Q4 Yes Automation FID Final Investment Decision (FID) for ATOP Enhancements WP1
903 2019 Q4 No Automation IARD Investment Analysis Readiness Decision (IARD) for TFM-I Core TR2
904 2020 Q4 No Automation FID Final Investment Decision (FID) for TFM-I Core TR2
906 2019 Q1 No Automation Strategy (Other) Strategy Decision for Tower Automation at Non-TFDM Sites
908 2017 Q2 No Automation IARD Investment Analysis Readiness Decision (IARD) for Terminal WP1
910 2019 Q1 No Automation FID Final Investment Decision (FID) for STARS Enhancements 2
Automation Roadmap: Decision Points (1 of 4)
CH 1
NAS Infrastructure Roadmaps, Version 12.0 January 201831
DP # Target Date CY
High Priority
Primary Domain Type Name
913 2018 Q2 Yes Automation IID Initial Investment Decision (IID) for Enterprise Information Display System (E-IDS)
914 2019 Q2 Yes Automation FID Final Investment Decision (FID) for Enterprise Information Display System (E-IDS)
971 2018 Q4 No Automation IARD Investment Analysis Readiness Decision (IARD) for CATMT WP5
972 2019 Q3 No Automation IID Initial Investment Decision (IID) for CATMT WP5
973 2019 Q4 No Automation FID Final Investment Decision (FID) for CATMT WP5
975 2020 Q4 No Automation Strategy (Other) Strategy Decision to Determine Future Relation Between RMLS and AMMS
979 2018 Q2 No Automation IARD Investment Analysis Readiness Decision (IARD) for OPSNET Replacement
980 2019 Q1 No Automation IID Initial Investment Decision (IID) for OPSNET Replacement
981 2020 Q1 No Automation FID Final Investment Decision (FID) for OPSNET Replacement
983 2020 Q2 No Automation FID Final Investment Decision (FID) for TBFM Tech Refresh
1005 2019 Q1 Yes Automation IARD Investment Analysis Readiness Decision (IARD) for TBFM Work Package 4
1006 2019 Q3 Yes Automation IID Initial Investment Decision (IID) for TBFM Work Package 4
1007 2020 Q2 Yes Automation FID Final Investment Decision (FID) for TBFM Work Package 4
1010 2018 Q4 Yes Automation FID Final Investment Decision (FID) for ERAM Sustainment 3
1011 2020 Q3 No Automation FID Final Investment Decision (FID) for ERAM Sustainment 4
1013 2019 Q4 Yes Automation IARD Investment Analysis Readiness Decision (IARD) for ERAM Enhancements 3
1014 2020 Q4 Yes Automation IID Initial Investment Decision (IID) for ERAM Enhancements 3
1015 2021 Q4 Yes Automation FID Final Investment Decision (FID) for ERAM Enhancements 3
Automation Roadmap: Decision Points (2 of 4)
NAS Infrastructure Roadmaps, Version 12.0 January 201832
DP # Target Date CY
High Priority
Primary Domain Type Name
1016 2019 Q1 No Automation IARD Investment Analysis Readiness Decision (IARD) for TBFM Tech Refresh
1018 2021 Q2 Yes Automation IARD Investment Analysis Readiness Decision (IARD) for TFDM Segment 2
1019 2022 Q2 Yes Automation IID Initial Investment Decision (IID) for TFDM Segment 2
1021 2019 Q4 No Automation IARD Investment Analysis Readiness Decision (IARD) for ERAM Sustainment 4
1025 2019 Q4 No New Entrants FID Final Investment Decision (FID) for Space Data Integrator (SDI) Development and Acquisition
1069 2017 Q3 No Automation FID Final Investment Decision (FID) for STARS Technology Refresh Phase 1
1072 2017 Q1 No Automation CRDR Concept and Requirements Definition Readiness (CRDR) Decision for Common Support Services -Flight Data
1073 2018 Q2 No Automation IARD Investment Analysis Readiness Decision (IARD) for Common Support Services - Flight Data
1074 2019 Q2 No Automation IID Initial Investment Decision (IID) for Common Support Services - Flight Data
1075 2020 Q2 No Automation FID Final Investment Decision (FID) for Common Support Services - Flight Data
1076 2017 Q1 Yes Automation IARD Investment Analysis Readiness Decision (IARD) for Offshore Automation System
1077 2017 Q1 No Automation Strategy (JRC) Strategy Decision for STARS Tech Refresh 2 Planning
1078 2018 Q2 Yes Automation IARD Investment Analysis Readiness Decision (IARD) for STARS Sustainment 3
1079 2020 Q2 Yes Automation FID Final Investment Decision (FID) for STARS Sustainment 3
1080 2018 Q2 No Automation FID Final Investment Decision (FID) for DVARS Segment 1 - Design
1081 2019 Q2 No Automation FID Final Investment Decision (FID) for DVARS Segment 2 - Development and Implementation
1116 2021 Q3 Yes Automation IARD Investment Analysis Readiness Decision (IARD) for ATOP Enhancements WP2
1117 2022 Q3 Yes Automation FID Final Investment Decision (FID) for ATOP Enhancements WP2
Automation Roadmap: Decision Points (3 of 4)
NAS Infrastructure Roadmaps, Version 12.0 January 201833
DP # Target Date CY
High Priority
Primary Domain Type Name
1118 2019 Q3 Yes Automation CRDR Concept and Requirements Definition Readiness (CRDR) Decision for TFMS Modernization Part 2
1119 2020 Q3 Yes Automation IARD Investment Analysis Readiness Decision (IARD) for TFMS Modernization Part 2
1120 2021 Q1 Yes Automation IID Initial Investment Decision (IID) for TFMS Modernization Part 2
1121 2021 Q3 Yes Automation FID Final Investment Decision (FID) for TFMS Modernization Part 2
Automation Roadmap: Decision Points (4 of 4)
NAS Infrastructure Roadmaps, Version 12.0 January 201834
AirportObjective: The Airport Roadmap identifies NextGen progression of services, procedures and systems in the airport environment.
NAS Infrastructure Roadmaps, Version 12.0 January 201835
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
SBAS
RVR
VOR
220
Airp
orts
Saf
ety
Airp
ort C
omm
sN
avai
ds
ELVO
FID259
ILS
DME
Runway Status Lights (RWSL)
Runway and Taxiway Edge
Lighting Systems
Land and Hold Short Lighting
Systems
Runway Centerline and Touchdown Lighting Systems
Taxiway Lighting Systems
Airp
ort L
ocat
ion
Ligh
ts
REIL
Airport Cable Loop
Airport Wireless CommunicationsSystems (AWCS)
FID74
Prec
isio
n Ap
proa
ch
ALS
Runway Safety Area –Navigation Mitigation
Runway Safety Area –Phase 2
Airport Roadmap (1 of 3)
NAS Infrastructure Roadmaps, Version 12.0 January 201836
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Sur
veill
ance
ASDE-X
ASDE-3/AMASS
ASSCRunway Incursion Reduction Program - ADTP
Wak
e S
epar
atio
nS
tand
ards
Wake Turbulence Re-categorization
WTMA
Closely Spaced Parallel Runway Operations
Wea
ther
Sen
sors
X
ASDE-X TR& Disposition
SFO
ATL FID76
XAMASS
772
WS
DS ASR-9 WSP
WSDS WP1LLWAS
WSDS SustainmentFID650
PRM E-Scan
SMGCS
AS
WO
N P
ortfo
lio
ASWON Tech Refresh
ASOS
AWOS-C
WEF/WME
C&G DASI
DME DASI
SAWS
SWS
XX
ASWON Sustainment 2FID1109
XX
ASWON Enhancements 1FID1067
Airport Roadmap (2 of 3)
NAS Infrastructure Roadmaps, Version 12.0 January 201837
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
TFDM Segment 2
Con
trol T
ower
Sys
tem
s
TDLS Tower DCL Svcs. Segment 1
TFDM
TFDM Segment 1
X
XERIDS
E-IDS
IDS4 / IDS5
NIDS
ACE-IDS
X
X
Enterprise IDS
FID914
E-IDS Sustainment
IDS-Replacement
IDS-R TR
FID198
EFSTS
SMA
DSP
XX
ARMT
AEFSXXX
Airport Roadmap (3 of 3)
NAS Infrastructure Roadmaps, Version 12.0 January 201838
Identifier DescriptionAPT-01 This roadmap will focus on airport airside and landside activities (not including inside the airport terminal),
and arrival/departure operations out to about 5 miles.APT-02 Airports are covered in general; specific airports are not described.APT-03 Initial work covers large/medium hub airports.APT-04 Key decisions are pulled from other roadmaps.APT-05 This is an initial roadmap that connects FAA infrastructure elements to airport airside infrastructure
elements, and provides a basis for future tracking of the boundary and boundary issues.APT-06 Runway extensions and new runways will affect the FAA's F & E costAPT-07 There are Non-Fed NAVAIDS and facilities located at some airports that will affect the FAA's F & E cost.
Airport Roadmap: Assumptions
NAS Infrastructure Roadmaps, Version 12.0 January 201839
DP # Target Date CY
High Priority
Primary Domain Type Name
74 2020 Q3 Yes Communication FID Final Investment Decision (FID) for FTI-2
76 2020 Q3 No Surveillance FID Final Investment Decision (FID) for Airport Surface Detection Equipment (ASDE) Sustainment
198 2023 Q2 Yes Automation FID Final Investment Decision (FID) for TFDM Segment 2
220 2026 Q4 No Navigation Strategy (Other)
Decision to Cut Over to Dual Frequency / Multi-Constellation Operations Based on Completion of Dual Frequency (GPS L1 and L5) Development & Testing
259 2020 Q3 No Surveillance FID Final Investment Decision (FID) for RWSL Sustainment
650 2020 Q3 No Weather FID Final Investment Decision (FID) for WSDS Sustainment
772 2017 Q3 No Airspace & Procedures Policy Decision to Incorporate Wake Re-Categorization (Phase 2) into Air Traffic Control Orders
914 2019 Q2 Yes Automation FID Final Investment Decision (FID) for Enterprise Information Display System (E-IDS)
1067 2027 Q4 No Weather FID Final Investment Decision (FID) for ASWON Enhancements 1
1109 2020 Q4 No Weather FID Final Investment Decision (FID) for ASWON Sustainment 2
Airport Roadmap: Decision Points (1 of 1)
NAS Infrastructure Roadmaps, Version 12.0 January 201840
WeatherObjective: The Weather Roadmap presents an Executive View (EV) of weather-related acquisition activities and the changes to these activities that exist within the Weather enterprise architecture (EA) domain (projects and programs) of the Federal Aviation Administration (FAA). The Weather Roadmap provides the evolution of the weather architecture via AMS milestones and related activities (e.g., aviation weather research, demonstrations, and other agency activities) necessary to achieve the performance objectives and capabilities to support NextGen. As a perspective of the changes in the NAS operational environment, the Weather Roadmap reflects major Weather interdependencies to support (or be supported by) other domains in the NAS enterprise architecture as depicted in NAS Roadmaps.
NAS Infrastructure Roadmaps, Version 12.0 January 201841
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031W
SD
SW
HD
E
Wx Camera – Future Segments
Wea
ther
Cha
nnel
AS
WO
N P
ortfo
lio
NEXRAD
ASR-9 WSP
PIREPS
Lightning Data
ACFT WxSensors
LIDAR
JAWS
Non-Fed AWOS
TDWR Sustainment 3
NEXRAD SLEP Phase 1
WSDS WP1LLWAS
TDWR
ASR-8
ASR-9
ASR-11
TDWR SLEP 2
Win
d S
hear
Ser
vice
Rad
ars
Sur
face
Wea
ther
O
bser
ving
Ser
vice
Non
-FA
A S
enso
rs
JAWS TRFID816
Weather Camera
NEXRAD SLEP Phase 2
WSDS SustainmentFID650
IARD815
ASWON Tech Refresh
FID814IARD
812
659
IARD997
FID998
IARD648
LIDAR SustainmentFID1107
IARD1106
ASOS
AWOS-C
WEF/WME
C&G DASI
Weather Camera – Future Segment 3
DME DASI
SAWS
SWS
XX
ASWON Sustainment 2IARD1108
FID1109
IARD893
FID894
SENSR FID1103
IID1110
XX
ASWON Enhancements 1FID1067
IID1066
IARD1065
CRDR1064
FID1015
Weather Roadmap (1 of 3)
NAS Infrastructure Roadmaps, Version 12.0 January 201842
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
IARD452 NWP WP3
NWP WP2
WARP RAMP
ITWS NFU
WARP WINS& FBWTG
Center Wx Services
ALDARS
Satellite DataServices
WMSCR
ITWS
CIWS Prototype
NWP
NWS DataServices
WIFS
ADAS/RASP
CIWS CDDS
ITWS VOLPE
XX
X
X
Dis
sem
inat
ion
Pro
cess
ing
Non
-FA
A S
ervi
ces
Non
FAA
CSS-Wx WP2
X
X
X
X
X
CREWS
X
NextGen IT Web Services
WARP EWD
ITWS Sustain. and Disposition
X
IARD448
FID341
NextGen Weather Processor (NWP) WP1
IARD144
FID143
X
Common Support Services Weather (CSS-Wx) WP1CSS-Wx
FID483
IID449
IID482
IID453
AWIPSClient
OPC Prototype X
Weather Roadmaps (2 of 3)
NAS Infrastructure Roadmaps, Version 12.0 January 201843
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Impr
oved
Icin
gC
onve
ctio
n
Establish New Verification Methods
Tran
slat
ion
Winter Weather Translation
Offshore Precip. Capability
Ceiling and Visibility Translation
Develop Translation S/W & Port into NWP WP3
Obs mprovements; evaluate sensor suitability
IARD144
CRDR1064
Relate FIP values to icing intensities
IFI Translation Demo
Wx Obs Improvement (WOI) Winter Wx Precipitation (WWP) WP1
Offshore Precip. Capability – Follow on
IARD144
TFM Convective Forecast (TCF)
Precipitation Translation
Win
d Wx Obs Improvement (WOI) Terminal Winds
Rad
ar Evaluate Multi-Function Phased Array Radar Technology (MPAR)
SENSR
Dem
o
Demo Baseline and Enhanced Capability Performance
FID341
Cei
ling
& V
is.
(C&
V)
NW
S
Improved Optimum Interpolation Schemes
Implementation of Space Wx Requirements
Wx
Mod
elin
g &
Sim
ulat
ion
Validate Wx Perf. Rqm’ts forTBFM/IMRO – Bravo Seg.
IARD452
IARD448
IARD448
Validate Wx Performance Rqm’ts for TBFM, CATMT, IMRO, SM, PBN WP5 - Charlie Segment
Validate Wx Performance Rqm’ts for CATMT - Bravo Segment
IARD144
Visibility Estimates from Weather Cams
Weather Roadmap (3 of 3)
NAS Infrastructure Roadmaps, Version 12.0 January 201844
Identifier DescriptionWX-01 Ongoing NextGen (NG) Weather functional & performance requirements validation may result in
new/emerging requirements in NextGen Weather Architecture.WX-02 Terminal Weather Sensor Sustainment:
- Terminal Weather Sensors divide into four functional divisions, A) weather radars, B) wind shear detectionsystems, C) automated surface weather observing systems, and D) other. A) includes TDWR, which will require a future Service Life Extension Program (SLEP) 3 until NextGen
replacements or SENSR can be deployed, circa 2026 - 2035. B) Includes LLWAS-RS, LLWAS-NE++, and WSP hosted on ASR-9. WSDS Work Package 1 addresses
LLWAS and WSP obsolescence issues. The follow-on WSDS Tech Refresh (TR) program will address future obsolescence issues to allow sustainment beyond 2030.
C) Includes the ASWON Portfolio which is being standardized into three systems, (ASOS / AWOS-C / SWS) that replace the legacy AWOS, AWSS, WEF/WME, and C&G DASI systems via the ASWON Tech Refresh Program. The follow-on ASWON Tech Refresh 2 Program will address future obsolescence of the ASWON portfolio systems to allow sustainment beyond 2030.
D) includes both JAWS (turbulence detection) and WHDE/LIDAR (Dry Microburst detection) systems that exist at single airports as unique systems. LIDAR is to be O&M funded.
WX-03 1) ADAS-Rehost serves as a consolidating access point for Weather observations for CSS-Wx Work Package 2 (WP2).2) WMSCR communications functionality and ADAS RASP, including ALDARS functionality, as well as WIFS, to be subsumed by CSS-Wx WP2.
WX-04 Weather information distribution from NWS will be migrated to the enterprise network-enabled capability ‘NOAA NextGen IT Web Services.’ The FAA has provided requirements to NWS for the NOAA NextGen IT Web Services.
Weather Roadmap: Assumptions (1 of 3)
NAS Infrastructure Roadmaps, Version 12.0 January 201845
Identifier DescriptionWX-05 The NAS Weather Infrastructure Portfolio incorporates R&D Research to Ops (RTO) with new weather
products/information with increased forecast accuracy/frequency to NAS Users with minimal architectural/infrastructure change. Moreover, RTO Support Activities will further augment support to NAS operational decision-making by including weather “translation” as well as “uncertainty” capabilities.
WX-06 Weather processing functions converge into NextGen Weather Processor (NWP). NWP will be implemented in several Work Packages. Initial NWP implementation (formerly called NWP WP1) provides both NWP-Terminal and NWP-Central services. NWP Enhancements 1 (formerly NWP WP2) replaces prototype CIWS functions including 0-2 hour weather capability and 2-8 hour convective (CoSPA) capability. The Weather and Radar Processor (WARP) Radar Acquisition and Mosaic Processor (RAMP) function is subsumed in initial NWP implementation, as are those of ITWS.NWP Enhancements 2 (formerly NWP WP 3) hosts Wx R&D algorithms matured since initial implementation baseline freeze including improved Convective and Translation algorithms. NWP Enhancements 2 will implement NextGen weather Far-term capabilities. CWSU meteorologists will use the AWIPS Thin Client meteorological workstation functionality to perform tasks previously performed using WARP functionality by 2020.
WX-07 Weather Publishing/Communications functionality to be provided by Common Support Services Weather (CSS-Wx WP1/WP2).
WX-08 NAS Infrastructure Portfolio will supply weather information to users at user-specified resolution, both spatially and temporally. NextGen Weather Processor (NWP) WP1 will host the first NextGen mid-term "weather translation" product, e.g., Weather Avoidance Fields (WAF) convective weather constraints to aircraft movement in NAS airspace, which will be delivered by CSS-Wx WP1. WAFs may be machine-translated into NAS operational impacts by User DSTs.
WX-09 Products developed from requirements allocated to NWS, will be accessible via CSS-Wx WP1/WP2 as they become operational.
Weather Roadmap: Assumptions (2 of 3)
NAS Infrastructure Roadmaps, Version 12.0 January 201846
Identifier DescriptionWX-10 To address emerging anti-icing regulations and to mitigate automated surface observing shortfalls at Level
A/B airports, FAA will continue to evaluate R&D opportunities in sensor and algorithm development to improve precipitation discrimination (freezing/frozen/liquid including ice pellets and drizzle). Once mature and tested to meet all FAA automated sensor requirements, in conjunction with NWS this capability will be integrated into ASOS/AWOS-C to support aircraft and airport ground anti/de-icing operations.
WX-11 Weather observation/forecast R&D will continue to be periodically evaluated to determine whether new/improved functionality should be implemented.
WX-12 FAA will transmit validated Weather Forecast Performance Requirements to NWS within nine months of having successfully completed associated supporting activity and validation in Wx Modeling & Simulation. As FAA requirements are finalized and allocated to NWS, if NWS doesn't have the current capability to meet the requirement for weather forecasts (e.g., icing, convection, or C&V), FAA R&D funding will be provided to develop algorithms to fulfill those requirements for subsequent implementation by NWS.
WX-13 Replacement of WSP hinges on approval of the FAA Spectrum Pipeline Plan submitted to OMB by the Spectrum Efficient National Surveillance Radar (or SENSR) team. Approval means the NextGenSurveillance and Weather Capability (NSWRC) will be subsumed by the SENSR Program funded by OMB through Spectrum Relocation Funds outside the CIP. A multi-agency program, SENSR control is held by DOT above the FAA JRC, but will essentially meet AMS milestones of IARD in 2018 and FID in 2021. NSWRC (at IARD) would resume in 2017 in the event SENSR is not approved. SENSR addresses outside requirements of partner Federal Agencies, well beyond weather alone.
Wx-14 New imagery channels, sounding data, and lightning data from Satellite Data Services will be baselined between 2017 Q3 and 2020 Q4. Requirements need to be identified and research conducted on integrating new weather satellite sensor data into FAA systems
Weather Roadmap: Assumptions (3 of 3)
NAS Infrastructure Roadmaps, Version 12.0 January 201847
DP # Target Date CY
High Priority
Primary Domain Type Name
143 2025 Q1 No Weather FID Final Investment Decision (FID) for NWP WP3
144 2019 Q4 No Weather IARD Investment Analysis Readiness Decision (IARD) for NWP WP2
341 2021 Q4 No Weather FID Final Investment Decision (FID) for CSS-Wx WP2 and transition of ADAS communications (and WMSCR Comms if not completed in CSS-Wx) to CSS-Wx WP2
448 2019 Q4 No Weather IARD Investment Analysis Readiness Decision (IARD) for CSS-Wx WP2 and transition of ADAS and WMSCR Comms to CSS-Wx
449 2020 Q4 No Weather IID Initial Investment Decision (IID) for CSS-Wx WP2 and transition of ADAS communications (and WMSCR Comms if not completed in CSS-Wx) to CSS-Wx WP2
452 2024 Q1 No Weather IARD Investment Analysis Readiness Decision (IARD) for NWP WP3
453 2024 Q3 No Weather IID Initial Investment Decision (IID) for NWP WP3
482 2020 Q4 No Weather IID Initial Investment Decision (IID) for NWP WP2
483 2021 Q4 No Weather FID Final Investment Decision (FID) for NWP WP2
648 2019 Q3 No Weather IARD Investment Analysis Readiness Decision (IARD) for WSDS Sustainment
650 2020 Q3 No Weather FID Final Investment Decision (FID) for WSDS Sustainment
659 2021 Q3 No Weather Strategy (JRC) Strategy Decision for Sustainment 3 on TDWR
812 2021 Q4 No Weather IARD Investment Analysis Readiness Decision (IARD) for TDWR Sustainment 3
814 2022 Q4 No Weather FID Final Investment Decision (FID) for TDWR Sustainment 3
815 2019 Q3 No Weather IARD Investment Analysis Readiness Decision (IARD) for JAWS TR
816 2020 Q3 No Weather FID Final Investment Decision (FID) for JAWS TR
893 2019 Q3 No Weather IARD Investment Analysis Readiness Decision (IARD) for Weather Camera - Future Segment 3
894 2020 Q3 No Weather FID Final Investment Decision (FID) for Weather Camera - Future Segment 3
Weather Roadmap: Decision Points (1 of 2)
NAS Infrastructure Roadmaps, Version 12.0 January 201848
DP # Target Date CY
High Priority
Primary Domain Type Name
997 2021 Q3 No Weather IARD Investment Analysis Readiness Decision (IARD) for NEXRAD SLEP Phase 2
998 2022 Q3 No Weather FID Final Investment Decision (FID) for NEXRAD SLEP Phase 2
1015 2021 Q4 Yes Automation FID Final Investment Decision (FID) for ERAM Enhancements 3
1064 2024 Q1 No Weather CRDR Concept and Requirements Definition Readiness (CRDR) Decision for ASWON Enhancements 1
1065 2025 Q3 No Weather IARD Investment Analysis Readiness Decision (IARD) for ASWON Enhancements 1
1066 2026 Q3 No Weather IID Initial Investment Decision (IID) for ASWON Enhancements 1
1067 2027 Q4 No Weather FID Final Investment Decision (FID) for ASWON Enhancements 1
1103 2021 Q4 Yes Surveillance FID Final Investment Decision (FID) for SENSR
1106 2023 Q3 No Weather IARD Investment Analysis Readiness Decision (IARD) for LIDAR Sustainment
1107 2024 Q3 No Weather FID Final Investment Decision (FID) for LIDAR Sustainment
1108 2019 Q3 No Weather IARD Investment Analysis Readiness Decision (IARD) for ASWON Sustainment 2
1109 2020 Q4 No Weather FID Final Investment Decision (FID) for ASWON Sustainment 2
1110 2020 Q1 No Weather IID Initial Investment Decision (IID) for Weather Cameras - Future Segment 3
Weather Roadmap: Decision Points (2 of 2)
NAS Infrastructure Roadmaps, Version 12.0 January 201849
CommunicationsObjective: The Communications Roadmap presents an Executive View (EV) of the current communication systems supporting the National Airspace System and their enhancement, sustainment or replacement through major development programs and support activities. The Communications Roadmap is intended to convey the major communication program strategy and acquisition decision points as well as program funding. The roadmap serves as a summary view of more detailed plans within each development program.
NAS Infrastructure Roadmaps, Version 12.0 January 201850
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
FTI
ANICS
LDRCL
RCL
BWM
DMN
NADIN MSN
X
X
Alaskan Satellite Telecom Infra. (ASTI)
216
X
ATIS
RCOM
NADIN PSN X
RCOM Command and Control Communications
X
X
FTI-2
IESP
Oth
er C
omm
unic
atio
nsTe
leco
m
ECG ECG Sustainment
FTI-2
BCD1032
IARD1082
ASTI
X
IID778
FID74
TDM-to-IP Migration1084
ASTI Sustainment
859
IARD1124
FID1125
Communications Roadmap (1 of 5)
NAS Infrastructure Roadmaps, Version 12.0 January 201851
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
TVSR II
Voic
e R
ecor
ders
Voic
e Sw
itche
s
CCS-W
VSCS
RDVS I/II
ETVS
RDVS IIA
STVS
IVSR
X
X
X
DALR
X
VSBP
VTABS
ICSS Type 3/FFSP
NVS
NVR
X
NAS Voice Recorder Program (NVRP)FID919
NVS Deployment
NVS Demo & Qual
FID984
VSCS Sustainment 3
VSCS TR Level of Effort
FID886
X
X
Communications Roadmap (2 of 5)
NAS Infrastructure Roadmaps, Version 12.0 January 201852
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
RCE Sustainment
NEXCOM Seg. 2 Phase 1
NEXCOM Seg.2 Phase 2
A/G
Voi
ce
UHF GroundRadios
VHF GroundRadios
ETR UHF/VHFTransceivers
VHFHandheld
BUEC
MDR VHFGround Radios
Interference DetectionLocation
And Mitigation
Oceanic HFVoice Service
OceanicData Link
Service
Oce
anic
Ai
r-G
roun
d
FID 784
RCF
Airport Cable Loop
RCE
861
863
Supp
ortin
gA
ctiv
ities
FID 784
Airport Cable Loop Systems Sustained Support
ED-137: Interoperability Standards for VoIP ATM Components, Telephone and Radio
CFE – Expansion
Communications Roadmap (3 of 5)
NAS Infrastructure Roadmaps, Version 12.0 January 201853
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Supp
ortin
gA
ctiv
ities
A/G
Dat
a C
omm
unic
atio
ns
Data CommSegment 1 Phase 1
(Tower Service)
B2Equipage: Airborne
Data Comm Segment 2 -Advanced Services
TDLS V11
RTCA/EUROCAE Far-Term Data CommsStandards (NextGen SATCOM)
Tower EnhancementsEn Route Enhancements
FANS 1/A and VDL2 Equipage: Airborne
FID304
ERAM(EAD 400/500/600)
FANS
Data Comm Segment 1 Phase 2 (Initial En Route Services)
Tower DCL Svcs. (TDLS V12)
Data Comm DCIS Network Services (DCNS)
Data Comm Segment 3
ERAM R3
IARD920
IID921
FID922
TDLS Enhance.(v12.x)
ERAM (EAE 100)
Data Comm DCIS Network Services (DCNS) Future
ATN-IP A/G Communication Standards Development (SC-223, ICAO, AEEC)
DataComm Network Service VDL2: GroundDCNS
IARD1033
Data Comm Segment 1 Phase 2 (Full En Route Services)
Data Comm ATN/IP GatewayData Comm ATN/IP Gateway Enhancements
Data Comm Segment 1 Phase 2 (Additional En Route Services)
FID1126
DataComm Network Service VDL2: GroundIARD1127
IID1128
FID1129
Communications Roadmaps (4 of 5)
NAS Infrastructure Roadmaps, Version 12.0 January 201854
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
NEMS
SWIM
Mes
sagi
ng In
fras
truc
ture
SWIM Segment 2B
NAS Enterprise
IAM Services
IAM Phase 1B
IAM Phase 2A
IAM Phase 2B
SWIM Segment 2C (NEMS TR and 3rd Party Provider Services)
FID1123
SWIM Segment 3
SWIM FY17 Congr Add
IARD1122
Communications Roadmap (5 of 5)
NAS Infrastructure Roadmaps, Version 12.0 January 201855
Identifier DescriptionCOMM-01 FTI will become the primary ground-based Voice/Data transport system.
COMM-02 All domestic flight safety critical A/G communications are over VHF based systems. Advisory communications (e.g. Weather, NAS Status, NOTAMS) can be supported by VHF A/G Communication or by commercial communications services through airborne access to SWIM services.
COMM-03 There is an approved transition plan for migrating real-time surveillance data directly onto FTI services in order to allow DMN decommissioning. Plan on hold awaiting SIM decision.
COMM-04 Relationship between SWIM and Communications: SWIM Dataflows all leverage NAS OPS IP service and initial SWIM Segment 2 infrastructure is being implemented with FTI.
COMM-05 NVS is expected to be the end state solution for replacing the Type III ICSS as program requirements discussions for flight services are on-going.
COMM-06 ASTI (ANICS) will not be integrated into FAA Telecommunications Infrastructure contract.
COMM-07 FIDI TR will develop IP communication protocols between automation systems (e.g. ERAM, terminal clients) which end systems will provide the investment necessary to implement required changes.
COMM-08 DataComm Segment 2 will likely move directly to FID (expected IARD and IID to be waived by JRC). JRC approved a joint IID for Segment 1 and 2 in 2008.
Communications Roadmap: Assumptions
NAS Infrastructure Roadmaps, Version 12.0 January 201856
DP # Target Date CY
High Priority
Primary Domain Type Name
74 2020 Q3 Yes Communication FID Final Investment Decision (FID) for FTI-2
216 2018 Q1 No Communication Strategy (Other) Strategy Decision to determine to sustain or replace NMR
304 2028 Q4 No Communication FID Final Investment Decision (FID) for Data Comm Segment 2
778 2019 Q2 Yes Communication IID Initial Investment Decision (IID) for FTI-2
784 2017 Q3 No Communication FID Final Investment Decision (FID) for NEXCOM Segment 2 Phase 2 in remaining Terminal and Flight Service areas
859 2017 Q4 No Communication Strategy (Other) Strategy for NAS IPv6 Enhancements
861 2022 Q2 No Communication Strategy (Other) Strategy decision to determine need for continuation of Oceanic HF Voice Services
863 2022 Q2 No Communication Strategy (Other) Strategy decision to determine need for continuation of Oceanic Data Link Services
886 2024 Q2 No Safety FID Final Investment Decision (FID) for Operational Analysis and Reporting System (OARS) Phase 5
919 2018 Q4 No Communication FID Final Investment Decision (FID) for NAS Voice Recorder Program (NVRP)
920 2030 Q1 No Communication IARD Investment Analysis Readiness Decision (IARD) for DataComm Segment 3
921 2030 Q4 No Communication IID Initial Investment Decision (IID) for DataComm Segment 3
922 2031 Q3 No Communication FID Final Investment Decision (FID) for DataComm Segment 3
984 2018 Q4 Yes Communication FID Final Investment Decision (FID) for NVS to Obtain Funding for Deployment Beyond Key Sites
1032 2017 Q2 No Communication BCD Baseline Change Decision (BCD) for Alaska Satellite Telecom Infrastructure (ASTI)
1033 2027 Q4 No Communication IARD Investment Analysis Readiness Decision (IARD) for DataComm Segment 2
1082 2018 Q2 Yes Communication IARD Investment Analysis Readiness Decision (IARD) for FTI-2
1084 2017 Q4 Yes Communication Strategy (JRC) Strategy Decision for TDM-to-IP Migration
Communications Roadmap: Decision Points (1 of 2)
NAS Infrastructure Roadmaps, Version 12.0 January 201857
DP # Target Date CY
High Priority
Primary Domain Type Name
1122 2018 Q3 Yes Communication IARD Investment Analysis Readiness Decision (IARD) for SWIM Segment 2C (NEMS TR and 3rd Party Provider Services)
1123 2019 Q1 Yes Communication FID Final Investment Decision (FID) for SWIM Segment 2C (NEMS TR and 3rd Party Provider Services)
1124 2018 Q4 Yes Communication IARD Investment Analysis Readiness Decision (IARD) for TDM-to-IP Migration
1125 2019 Q4 Yes Communication FID Final Investment Decision (FID) for TDM-to-IP Migration
1126 2020 Q4 Yes Communication FID Final Investment Decision (FID) for DataComm Segment 1 Phase 2 (Additional En Route Services)
1127 2022 Q4 No Communication IARD Investment Analysis Readiness Decision (IARD) for Data Comm ATN/IP Gateway
1128 2023 Q4 No Communication IID Initial Investment Decision (IID) for Data Comm ATN/IP Gateway
1129 2024 Q4 No Communication FID Final Investment Decision (FID) for Data Comm ATN/IP Gateway
Communications Roadmap: Decision Points (2 of 2)
NAS Infrastructure Roadmaps, Version 12.0 January 201858
NavigationObjective: The Navigation roadmap depicts the sustainment and evolution of ground-based and satellite-based navigation systems to support Performance-Based Navigation (PBN) in the NextGen environment
NAS Infrastructure Roadmaps, Version 12.0 January 201859
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
ELVO
Saf
ety
and
Enh
ance
men
ts
Navaids-Sustain, Replace, Relocate
RSA
Enhanced Low Visibility Operations Ph. 2
Runway Safety Area -Navigation Mitigation
Runway Safety Area –Phase 2
Infra
stru
ctur
e
PAPI
VASI
REIL
LDIN
ODALS
ICMS
VOT
Replace VASI with PAPI
UIC
X
X
NME
NME
IID1049
FID1050
Visual Navaids for New Qualifiers (Includes REILs & CAST PAPIs)
Navigation Roadmap (1 of 3)
NAS Infrastructure Roadmaps, Version 12.0 January 201860
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
DME
SBAS (WAAS)
VOR
LOC
NDB
GPS
TACAN
En
Rou
te /
Term
inal
/ N
on-P
reci
sion
App
roac
h
Environmental: More efficient routes using RNAV/RNP
Phase IV (2014 – 2044)
NextGen DME Support for PBN Strategy
Sustain Distance Measuring Equipment (Includes LP DME & HP DME)
VOR MON Phase 2VOR MON Phase 1
FID1070 1071
VORTAC (Includes VOR & TACAN)FID
1046
Wide Area Augmentation System (WAAS) – Ph. 4 Seg. 1
Wide Area Augmentation System (WAAS) – Ph. 4 Seg. 2956 220
GPS Civil Requirements
VOR with DME
FID1139
1140
Pre
cisi
on A
ppro
ach
Cro
ss-E
nviro
nmen
t
MB
RVR
ILS
ALS
RVR- Replacement/Establishment (Includes CAT I & CAT II/III)
Instrument Landing Systems (ILS) (Includes CAT I & CAT II/III)
Approach Lighting System Impr (ALSIP) Cont (Includes ALS I & ALS II/III)
1140
Navigation Roadmap (2 of 3)
NAS Infrastructure Roadmaps, Version 12.0 January 201861
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
LED Lamp Development 239
NextGen Navigation Engineering
GPS L5 Implementation (DoD)
L5 Dual Freq. FOC
L2 Sunset
APNT
GBAS Initial CAT III Review
1097
Navigation Roadmap (3 of 3)
NAS Infrastructure Roadmaps, Version 12.0 January 201862
Identifier DescriptionNAV-01 FAA is transitioning to a PBN centric NAS, where PBN is used for daily operations. PBN is comprised of
RNAV and RNP for en route, terminal, and approach & landing domains. This will include:a) Transition from VOR-defined routes to GNSS and DME-DME RNAV for en route and terminal.b) Transition from CAT I ILS to GNSS for approach and landing.c) Eliminate existing DME coverage gaps for en route and terminal domains to include no geographical critical DMEs.
NAV-02 NextGen implementation requires an aggressive transition to services that support Performance-Based Navigation (PBN). This requires:a) Navigation Strategy to be fully aligned with the FAA’s PBN Strategy, which will provide:
1. A clear statement regarding the need and eligibility of navigation services for airports and airspace
2. Close collaboration with the aviation stakeholders
NAV-03 Need to continue working closely with users and the avionics industry on equipage issues to support transition to a PBN-centric NASa) The PBN Strategy provides for PBN services that encourages voluntary equipage.b) Equipage will be in place to support transition to PBN
NAV-04 PBN strategy includes the need for a resilient navigation infrastructure to maintain safety, security, and capacity and preclude significant economic impact during GNSS outages. This includes:a) Maintaining a VOR MON to ensure en route and approach capabilities during GNSS disruptions for
aircraft that are unable to continue RNAV operations.b) Sustain a sufficient number of ILSs to ensure safe landings in IMC during GNSS disruptions.c) En route and terminal DME RNAV coverage will support navigation to an ILS or VOR for aircraft not
equipped with inertial capability.
Navigation Roadmap: Assumptions (1 of 2)
NAS Infrastructure Roadmaps, Version 12.0 January 201863
Identifier DescriptionNAV-05 FAA has no current plan to acquire Federal GBAS systems. GBAS installations will depend on individual
airports’ interest and investment.
NAV-06 Department of Defense will maintain a GPS constellation consistent with the Standard Positioning Service.
NAV-07 Navigation Roadmap page 2 of 3 breaks the infrastructure up by phases of flight supported. ‘Cross Environment’ applies to all phases of flight.
Navigation Roadmap: Assumptions (2 of 2)
NAS Infrastructure Roadmaps, Version 12.0 January 201864
DP # Target Date CY
High Priority
Primary Domain Type Name
220 2026 Q4 No Navigation Strategy (Other)
Decision to Cut Over to Dual Frequency / Multi-Constellation Operations Based on Completion of Dual Frequency (GPS L1 and L5) Development & Testing
239 2020 Q4 No Navigation Strategy (Other) Strategy Decision to Proceed with ALS (I) Production LED Lamps for MALSR Systems
956 2022 Q4 No Aircraft Regulatory Milestone Publication of SBAS Dual-Frequency/Multi-Constellation (DFMC) MOPS
1046 2020 Q1 No Navigation FID Final Investment Decision (FID) for VOR MON Implementation - Phase 2
1049 2018 Q2 No Navigation IID Initial Investment Decision (IID) for NAVAIDS Monitoring Equipment
1050 2019 Q2 No Navigation FID Final Investment Decision (FID) for NAVAIDS Monitoring Equipment
1070 2017 Q3 Yes Navigation FID Final Investment Decision (FID) for NextGen DME Support for PBN
1071 2022 Q3 Yes Navigation Strategy (JRC) Strategy Decision to Proceed with Segment 3 of NextGen DME Support for PBN
1097 2017 Q2 No Navigation Strategy (JRC) Strategy Decision for Ground-Based Augmentation System (GBAS)
1139 2019 Q3 No Navigation FID Final Investment Decision (FID) for Wide-Area Augmentation System (WAAS) Phase 4 Segment 2
1140 2019 Q3 No Navigation Strategy (JRC) Strategy Decision for the Supportability of VORTAC and DME Systems
Navigation Roadmap: Decision Points (1 of 1)
NAS Infrastructure Roadmaps, Version 12.0 January 201865
SurveillanceObjective: The Surveillance roadmap depicts the sustainment of legacy surveillance systems and the evolution towards the NextGen environment.
NAS Infrastructure Roadmaps, Version 12.0 January 201866
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
En R
oute
CD-2
ARSR-4
Common ARSR
X
Mode S SLEP Phase 2
FID103
MODE S
ATCBI-6
WAM
ATCBI-6 TR
DoD/DHS funded/FAA maintained
DoD/DHS funded/FAA maintained
IARD801
NBSC
FID809
SENSRSENSR IID1102
FID1103
X
X
X
Mode S SLEP Phase 3
FID1103
FID1103
FID809
1105
Surveillance Roadmap (1 of 4)
NAS Infrastructure Roadmaps, Version 12.0 January 201867
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
ASR-8
Term
inal
Mode S SLEP Phase 2
ASR-9 SLEP Phase 2ASR-9
ASR-11
ATCBI-5
MODE SLimited Replacement
CTD
MASR MASR
ASR-11 Tech Refresh, Segment 3
CV-4400
TDX-2000
FID806
IARD805
SENSRSENSRIID1102
FID1103
X
X
X
X
X
X
X
SENSRSENSRIID
1102FID
1103
FID1103
FID1103
FID1103
FID1103
ASR-9 SLEP Phase 3
Mode S SLEP Phase 3FID809
1105
1105
FID804
NSWRC
ASR-11 TR Segment 2IARD805
FID806
NBSC
TAMR P3S2
ASR-9 Sustainment 4IARD1148
FID1149
IARD1151
FID1152 ASR-8 Sustainment 2
IARD1153
FID1154 ATCBI-5 Sustainment
XFID1103
Surveillance Roadmap (2 of 4)
NAS Infrastructure Roadmaps, Version 12.0 January 201868
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Advanced Surveillance Enhanced Procedural Separation
Surf
ace
And
Appr
oach
Cro
ss-D
omai
n
PRM E-SCAN
ASDE-X
ASDE-3/AMASS
ASSC
ADS-B
FIS-B
ADS-B Baseline Services & Applications
ADS-B In Apps Flight Interval Management
IID1052
ADS-B Services & Baselines
ADS-B In Applications
Advanced Surveillance Enhanced Procedural Separation
ADS-B Baseline Services Future SegmentsFID1055
RWSLRunway Status Lights (RWSL) –Implementation
Runway Status Lights (RWSL) Sustainment
FID259
IARD1056
ADS-B Sustain Leased Services (FY21-Out)
XAMASS
TIS-B
ADS-R
1104
XSFO
ATL
ASDE-X TR & Disposition
IARD399
FID76
ADS-B Future Segments
FID1054
967
1150
ADS-B Sustain / Relocate (Gulf of Mexico)
ADS-B Phase 3
Surveillance Roadmap (3 of 4)
NAS Infrastructure Roadmaps, Version 12.0 January 201869
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Assess 1090 Spectrum Mitigation Alternatives
Evaluate Impact of Wind Turbine Radar Interference
Surveillance Portfolio Analysis
FID1055
IID1102
IID1102
FID1055
IID1102
Evaluate Multi-Function PhasedArray Radar (MPAR) Technology
IID1102
Surveillance Roadmap (4 of 4)
NAS Infrastructure Roadmaps, Version 12.0 January 201870
Identifier DescriptionSURV-01 Migration to Automatic Dependent Surveillance—Broadcast (ADS-B) as primary means of surveillance
a) Airspace rule to be in effect and backup to be in place by 2020 (compliance date)1. Existing surveillance infrastructure will remain in place until 2020
SURV-02 Backup to mitigate loss of on-board GPS positioning source requireda) Backup strategy was identified in January 2007
1. Retain all en route beacons (~150 monopulse systems with selective interrogation)2. Retain limited set of terminal beacons at Operational Evolution Partnership (OEP)/High Density
Terminals (~43 locations)b) All terminal primary radars are retained
1. Used as safety (ATC) backup2. May also be retained for aviation security and/or weather requirements
SURV-03 Surface primary radar surveillance will not be required at selected ASDE sitesa) Requires mandated equipage of all surface vehiclesb) Surface surveillance to be supported by multilateration and ADS-B at these sites
SURV-04 PRM-R, with multilateration technology, will replace PRM E-Scan
SURV-05 Department of Defense/Department of Homeland Security continues to fund LRR systems through 2025
SURV-06 Digital automation system inputs are assumed for implementation of SIM
Surveillance Roadmap: Assumptions
NAS Infrastructure Roadmaps, Version 12.0 January 201871
DP # Target Date CY
High Priority
Primary Domain Type Name
76 2020 Q3 No Surveillance FID Final Investment Decision (FID) for Airport Surface Detection Equipment (ASDE) Sustainment
103 2021 Q3 No Surveillance FID Final Investment Decision (FID) for technology refresh of beacons (ATCBI-6)
259 2020 Q3 No Surveillance FID Final Investment Decision (FID) for RWSL Sustainment
399 2018 Q3 No Surveillance IARD Investment Analysis Readiness Decision (IARD) for Airport Surface Detection Equipment (ASDE) Sustainment
801 2019 Q3 No Surveillance IARD Investment Analysis Readiness Decision (IARD) for technology refresh of beacons (ATCBI-6)
804 2018 Q1 No Surveillance FID Final Investment Decision (FID) for ASR-9 SLEP Phase 3
805 2019 Q3 No Surveillance IARD Investment Analysis Readiness Decision (IARD) for ASR-11 Technology Refresh Segment 3
806 2020 Q3 No Surveillance FID Final Investment Decision (FID) for ASR-11 Technology Refresh Segment 3
809 2018 Q4 No Surveillance FID Final Investment Decision (FID) for Phase 3 Legacy Beacon (Mode S) SLEP
967 2020 Q1 No Aircraft Regulatory Milestone ADS-B Out Equipage Rule Implemented
1052 2017 Q4 Yes Surveillance IID Initial Investment Decision (IID) for SBS - Advanced Surveillance Enhanced Procedural Separation
1054 2018 Q3 Yes Surveillance FID Final Investment Decision (FID) for SBS - Advanced Surveillance Enhanced Procedural Separation
1055 2018 Q4 Yes Surveillance FID Final Investment Decision (FID) for ADS-B Baseline Services Future Segments
1056 2019 Q3 No Surveillance IARD Investment Analysis Readiness Decision (IARD) for RWSL Sustainment
1102 2018 Q4 Yes Surveillance IID Initial Investment Decision (IID) for SENSR
1103 2021 Q4 Yes Surveillance FID Final Investment Decision (FID) for SENSR
1104 2017 Q1 No Surveillance Strategy (JRC) Strategy Decision for Runway Status Lights (RWSL) Implementation
1105 2017 Q1 No Surveillance Strategy (JRC) Strategy Decision for SENSR
Surveillance Roadmap: Decision Points (1 of 2)
NAS Infrastructure Roadmaps, Version 12.0 January 201872
DP # Target Date CY
High Priority
Primary Domain Type Name
1148 2020 Q3 No Surveillance IARD Investment Analysis Readiness Decision (IARD) for ASR-9 Sustainment 4
1149 2021 Q4 No Surveillance FID Final Investment Decision (FID) for ASR-9 Sustainment 4
1150 2019 Q4 No Surveillance Strategy (JRC) Strategy Decision for ADS-B In Applications: Advanced Interval Management (A-IM)
1151 2020 Q2 No Surveillance IARD Investment Analysis Readiness Decision (IARD) for ASR-8 Sustainment 2
1152 2021 Q4 No Surveillance FID Final Investment Decision (FID) for ASR-8 Sustainment 2
1153 2020 Q2 No Surveillance IARD Investment Analysis Readiness Decision (IARD) for ATCBI-5 Sustainment
1154 2021 Q4 No Surveillance FID Final Investment Decision (FID) for ATCBI-5 Sustainment
Surveillance Roadmap: Decision Points (2 of 2)
NAS Infrastructure Roadmaps, Version 12.0 January 201873
Airspace and ProceduresObjective: The Airspace and Procedures roadmap presents an Executive View (EV) of systems and procedures, including associated research projects, with an effect on the large-scale redesign and optimization of major airspace.
NAS Infrastructure Roadmaps, Version 12.0 January 201874
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Large Scale Metroplex Redesign
Transition to PBN Operations
National Special Activity Airspace
Program
UAS Operational Integration
Special Activity Airspace Information
Major Airspace Redesign
Metroplex Area Navigation -RNAV/RNP
Concept Development for Integrated NAS Design and Procedure Planning
Dynamic Airspace
Cleveland/DetroitMetroplex Redesign
Denver Metroplex Redesign
Las Vegas Metroplex Redesign
Florida Metroplex Redesign
Charlotte Metroplex Redesign
Southern California Metroplex Redesign
Atlanta Metroplex Redesign
Airspace & Procedures Roadmap (1 of 3)
NAS Infrastructure Roadmaps, Version 12.0 January 201875
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
AIRNAV
DADS
SAMS
USNS
CARF
SDAT
OE/AAA
TFR Bldr
ATA LAB
ASAT
CDM NET
ORS
TARGETS
NACGS
INM
IFPA TR Seg. 1
IFPA
IPDS
APTS
AIMM Segment 2
AIMM Segment 3FID122
IFPA Sustainment 2
AIMM Segment 4
FID968
APWS
BCD1004
X
X
Airspace & Procedures Roadmap (2 of 3)
NAS Infrastructure Roadmaps, Version 12.0 January 201876
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Wake Turbulence Re-categorization
Wake Turbulence Behavior Research
En Route Wake Vortex Avoidance Advisor
WT Mitigation for Single Runway Arrival
WT Mitigation for Single Runway Departure
Aircraft Design Standards -Wake
772
WAK
E SE
PAR
ATI
ON
ST
AND
AR
DS
SUPP
OR
TIN
G A
CTI
VITI
ES
WTMA
775
WT Mitigation for Arrivals - S
Closely Spaced Parallel Runway Ops
CSPR Operations – Revised Separation Standards
CSPR Operations – Paired Approach
CSPR Paired Departure Wake Mitigation
1003
En Route Wake Procedures
1138Human Factors Feasibility Assessment for Conducting En Route Lateral Offset Procedures
Airspace & Procedures Roadmap (3 of 3)
NAS Infrastructure Roadmaps, Version 12.0 January 201877
Identifier DescriptionA&P-01 Airspace Modernization Assumptions
a) Flexibility into any of the agency’s facility plansb) Future Airspace & NASA research funding is sufficient and provides favorable benefitsc) System Dependencies
1. ADS-B2. ERAM3. DataComm
A&P-02 Integrated Arrival/Departure Airspace (Big Airspace) Assumptionsa) Key Integrated Arrival/Departure Airspace enablers:
1. Extension of 3 Mile Separation & Terminal Procedures2. Integrated arrival/departure airspace configurations3. Flexible sector & bi-directional routes published4. 5 mile lateral spacing for Required Navigation Performance (RNP) enables 5 mile lateral route
spacing5. New voice system (NAS Voice System), leased circuits, and Air-Ground communications
channels to handle transition6. Cost benefits are based on creating X Integrated Arrival/Departure (Big Airspace) facilities,
covering X major metropolitan areasb) Cost analysis based on general assumptions about the concept, not on any detailed requirements
or technical solutionsc) Benefits analysis based on extrapolating results from FT simulations to other sites given traffic
forecasts and historical weather patternsd) Sites identified where large TRACON facilities exist could accommodate additional BA operational
positions with refurbishment. New buildings would be needed where no large TRACON exists.
Airspace & Procedures Roadmap: Assumptions
NAS Infrastructure Roadmaps, Version 12.0 January 201878
DP # Target Date CY
High Priority
Primary Domain Type Name
122 2019 Q4 No Automation FID Final Investment Decision (FID) for AIMM Segment 3
772 2017 Q3 No Airspace & Procedures Policy Decision to Incorporate Wake Re-Categorization (Phase 2) into Air Traffic Control Orders
775 2017 Q3 No Airspace & Procedures Policy Decision to incorporate En Route Wake Avoidance procedures into Air Traffic Control Orders
968 2017 Q2 No Airspace & Procedures FID Final Investment Decision (FID) for IFPA Tech Refresh Segment 2
1003 2018 Q3 No Airspace & Procedures
Strategy (Other)
Strategy Decision on the Implementation Approach of CSPR Paired Departure Wake Mitigation Capability
1004 2017 Q1 No Airspace & Procedures BCD Baseline Change Decision (BCD) for IFPA Tech Refresh Segment 1
1138 2020 Q1 No Human Systems Integration
Strategy (Other)
Decision on the Approval and Implementation Strategy of Human Factors Guidance for Lateral Offset Procedures
Airspace & Procedures Roadmap: Decision Points (1 of 1)
NAS Infrastructure Roadmaps, Version 12.0 January 201879
Enterprise ServicesObjective: The Enterprise Services Roadmap presents an Executive View (EV) of the evolution of existing and planned enterprise services provided by NAS systems and programs and provides an outline of the major activities, decisions, and milestones. By definition, services are capabilities that exist as processes, applications, infrastructure, or any combination. They are implemented using design principles that support and promote enterprise-wide interoperability, sharing, standardization, federation, awareness, loose coupling, granularity, modularity, abstraction, reuse, and flexibility.
NAS Infrastructure Roadmaps, Version 12.0 January 201880
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
SWIM Segment 2B
STDDS
SFDPS
NCR
TFM Data
NEMS SWIM Segment 2C (NEMS TR and 3rd Party Provider Services)
Mis
sion
Ser
vice
s
TBFM WP3
TFDM Segment 1
TBFM Service
TFDM Service
NOTAM Distribution
Service
Supp
ort S
ervi
ces Common Status and Structure Data
ACS
AIMM Segment 2
AIMM Segment 3FID122
AIMM Segment 4
CSS – Flight DataFID1075
CSS-Wx WP2FID341
Common Support Services Weather (CSS-Wx) WP1
CSS-Wx
FID1123
Enterprise Services Roadmap (1 of 4)
NAS Infrastructure Roadmaps, Version 12.0 January 201881
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
SOA
Cor
e Se
rvic
es
NAS EnterpriseData-Flow and
System Situational Awareness
Services
NAS IP Enterprise Service Monitoring
RMLSFNS-NDS
FOMS
SOA Enterprise Service Monitoring
NAS External Boundary Protection
Domain Name Service
Network/Precision Time Protocol
Adm
inis
trat
ive
Serv
ices
ISS Respond Services
ISS Recover Services
AMMSFID696
FAA Information Systems Security Cyber OperationsFAA Common Infrastructure Monitoring
NAS Cyber Operations Services
FAA Security Operations Center
ASH Cyber Intelligence
SWIM Segment 2B
NAS Enterprise IAM Services
IAM Phase 1BIAM Phase 2A
IAM Phase 2B
FTI S
ervi
ces
ISS ProtectionServices
ISS Threat Identify Services
ISS Detection Services
Critical Infrastructure CybersecurityNAS Resiliency Assessment
NAS Data Flow Monitoring
NAS Boundary Access Control
Remediation of High Priority NAS
System Vulnerabilities
Centralized NAS Software Security ManagementSecurity Enterprise Asset
ManagementNAS Cyber Management System
Tech Refresh/Expansion
Enterprise Services Roadmap (2 of 4)
NAS Infrastructure Roadmaps, Version 12.0 January 201882
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
All Cloud Services available(SaaS, PaaS, IaaS)
All Cloud Services available(SaaS, PaaS, IaaS)
FAA
Clo
ud S
ervi
ces
Con
trac
t (FC
S)
Enterprise Function and
Service
Tech
nica
l Inf
rast
ruct
ure
Co-LocationServices
NAS Government Community
Cloud Services (Test and R&D
Domains)
Co-Location Services (Rack, Power and Space) for NAS Systems
Communications Infrastructure (SOA, NESG, FNTB and FTI R&D)
NAS Program Test Platform
NextGen Testing Domain
NAS Private Cloud Services (Operational IP
Domains)
Communications Infrastructure (SOA, NESG, FNTB)
NAS Program Test Platform
NAS Program Operational Services
Tech
nica
l Inf
rast
ruct
ure
Supp
ortin
g A
ctiv
ities
Cloud Co-Location as A Service
Government Community Common Cloud Services
NAS Private Cloud Services
FCS
Stra
tegi
c Pl
anni
ng a
nd
impl
emen
tatio
n NAS Enterprise Cloud Services Guidance & Policy
FCS
Dom
ains
NAS Enterprise Cloud Services Criteria & Implementation Strategy
NAS Cloud Maintenance, Administration, and Ops (Enterprise and Program)
NAS Cloud Monitoring and Situational Awareness (Enterprise and Program)
Enterprise Services Roadmap (3 of 4)
NAS Infrastructure Roadmaps, Version 12.0 January 201883
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Tech
nica
l Inf
rast
ruct
ure
Supp
ort
Serv
ices
Flight Data Modernization
NAS
Ent
erpr
ise
Tech
nica
l Enh
ance
men
ts
Cloud Requirements and Standards for Contracted Infrastructure Services
ICAO and Other NAS Systems or Customer Requirements
NAS Programs and Systems
NAS Automation Systems
IPv6
Enh
ance
men
tsTD
M-IP
Tra
nsiti
on
Analysis for IPv6 Enhancements
859
NAS IPv6 Implementation Guidance & Policy
NAS TDM-to-IP Transition Implementation Guidance & Policy
TDM-to-IP Migration1084
1085 Enterprise Information Management
Enterprise Services Roadmap (4 of 4)
NAS Infrastructure Roadmaps, Version 12.0 January 201884
DP # Target Date CY
High Priority
Primary Domain Type Name
122 2019 Q4 No Automation FID Final Investment Decision (FID) for AIMM Segment 3
341 2021 Q4 No Weather FID Final Investment Decision (FID) for CSS-Wx WP2 and transition of ADAS communications (and WMSCR Comms if not completed in CSS-Wx) to CSS-Wx WP2
696 2020 Q1 No Automation FID Final Investment Decision (FID) for AMMS Segment 1
859 2017 Q4 No Communication Strategy (Other) Strategy for NAS IPv6 Enhancements
1075 2020 Q2 No Automation FID Final Investment Decision (FID) for Common Support Services - Flight Data
1084 2017 Q4 Yes Communication Strategy (JRC) Strategy Decision for TDM-to-IP Migration
1085 2017 Q1 No Enterprise Services
Strategy (JRC) Strategy Decision for Enterprise Information Management (EIM)
1123 2019 Q1 Yes Communication FID Final Investment Decision (FID) for SWIM Segment 2C (NEMS TR and 3rd Party Provider Services)
Enterprise Services Roadmap: Decision Points (1 of 1)
NAS Infrastructure Roadmaps, Version 12.0 January 201885
FacilitiesObjective: The Facilities roadmap depicts the legacy NAS facilities and the evolution towards the NextGen Future Facilities environment.
NAS Infrastructure Roadmaps, Version 12.0 January 201886
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
ATCT
Faci
litie
s Su
stai
nmen
t Por
tfolio
TRACONs
ARTCC
ATCT / TRACON Modernization
ARTCC & CCF Building Improvements
LRR Improvements – Infrastructure Improvements
IARD1090
Power Systems Sustained Support Power Systems Sustained Support (PS3) – Future SegmentsPower Systems
Facility SecurityRisk Management Facility Security Risk Management (FSRM) 2
Unstaffed Infrastructure Sustainment (UIS)
Fuel Storage Tank Replacement Management
Energy Management and Compliance
Mobile Assets Management Program (MAMP)
Environmental Cleanup / HAZMAT
Decommissioning – Real Property Disposition
Environmental and Occupational Safety and Health (EOSH)
CCF (4)
FAA Employee Housing & Life Safety Shelter
CH 1
Facilities Roadmap (1 of 3)
NAS Infrastructure Roadmaps, Version 12.0 January 201887
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
ATCT
New
Inve
stm
ent P
ortfo
lio
TRACONs
ARTCC
ATCT / TRACON Replacement
ATCT / TRACON Modernization
ARTCC & CCF Building Improvements
FID198
IARD1091
FID1092
Oth
er
WJHTC Technical Center Bldg & Plant SpptWilliam J. Hughes Technical Center Laboratories
Flight Program Consolidation Sustainment
MMACAeronautical Center Infrastructure Modernization
Aeronautical Center Lease
Anchorage Center Alaska Flight Service Facility Modernization (AFSFM)
FSS
Oceanic Center
Military ATC Facilities
CCF (4)
ATCSCC
NNCC
Facility Realignment – Implementation
Future Flight Service Program (FFSP)AFSS CONUS
Airborne Labs
NIEC
IFIA
NEMC
FAA Depot
ATO Flight Inspection Fleet Modernization
FID1037
OKC Flight Inspector AC
San Juan Facility Remediation
Integration, Development, & Operations Analysis Capability (NextGen Laboratories)
IARD1035
IID1036
Facilities Roadmap (2 of 3)
NAS Infrastructure Roadmaps, Version 12.0 January 201888
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
NOCC/OCC
Event Manager
AF TechNet
WMS/WRS
CAEG
MaintenanceData Terminal
National Test Equipment
Tech
nica
l Ope
ratio
ns
FPPS
EDMS
Test Bed Demo
ATA LAB
Facilities Roadmap (3 of 3)
NAS Infrastructure Roadmaps, Version 12.0 January 201889
DP # Target Date CY
High Priority
Primary Domain Type Name
198 2023 Q2 Yes Automation FID Final Investment Decision (FID) for TFDM Segment 2
1035 2019 Q3 No Facilities IARD Investment Analysis Readiness Decision (IARD) for Flight Inspection Fleet Modernization
1036 2020 Q2 No Facilities IID Initial Investment Decision (IID) for Flight Inspection Fleet Modernization
1037 2021 Q1 No Facilities FID Final Investment Decision (FID) for Flight Inspection Fleet Modernization
1090 2018 Q1 No Facilities IARD Investment Analysis Readiness Decision (IARD) for Facilities Sustainment Portfolio
1091 2018 Q3 No Facilities IARD Investment Analysis Readiness Decision (IARD) for ATCT/TRACON Replacement Portfolio
1092 2018 Q2 No Facilities FID Final Investment Decision (FID) for New York TRACON (N90) Sustainment
Facilities Roadmap: Decision Points (1 of 1)
NAS Infrastructure Roadmaps, Version 12.0 January 201890
Human Systems IntegrationObjective: The Human Systems Integration (HSI) Roadmap represents strategic air-ground human factors activities and their direct contributions to the evaluation, development, and evolution of NAS infrastructure. The HSI Roadmap depicts the integration of these activities with cross-cutting NAS infrastructure improvements to identify key human factors product transition points. The HSI Roadmap drives the execution of critical path activities by providing timely human factors inputs to NAS infrastructure investments and related programs.
NAS Infrastructure Roadmaps, Version 12.0 January 201891
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
TBFM WP4
TFDM Segment 2
TFDM Segment 2
Hum
an-S
yste
m P
erfo
rman
ce R
isk
Red
uctio
nN
extG
en A
TC /
Tech
Ops
Err
or M
anag
emen
t and
Com
plex
Sys
tem
s
Hum
an P
erfo
rman
ce a
nd S
afet
y A
ctiv
ities
Hum
an C
ente
red
Des
ign
Act
iviti
es
NextGen Far-Term ATC Human Error Condition Identification & Mitigation
STARS
ERAM
ATOP
TFMS
TBFM
ADS-B
Safety Management System (SMS) Executive Council/FAA Safety Collaboration Team (SCT) / Safety Data Analysis Team (SDAT)
926
STARS
ERAM
Human Factors SMS Support for Acquisition Programs
TFDM Segment 1
STARS Enhancements 2
FID198
ATOP Oceanic Improvements
988
Data Comm Seg. 2 -Advanced Services
TFDM Segment 1
927
CATMT WP4
CATMT WP5
FID346
FID973
FID1007
FID910
ERAM Sustainment 2
FID304
ATOP Enhancements WP1FID850
ERAM Sustainment 2
TAMR P3S2
NextGen Tech Ops Human Error Condition Identification and Mitigation
Enterprise Human Factors Development
994
FID198
Enterprise Human Factors Development
Human Systems Integration Roadmap (1 of 4)
NAS Infrastructure Roadmaps, Version 12.0 January 201892
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
TFDM Segment 2
ERAM
STARS
TBFM
Time-Based Support Tool Presentation Guidance
System Development Guidelines for the Presentation of NOTAMs to Air Traffic Controllers
Hum
an F
acto
rs in
Wor
ksta
tion
Dev
elop
men
tA
TC In
form
atio
n In
tegr
atio
n an
d U
ser C
ompr
ehen
sion
ATC
Info
rmat
ion
Pre
sent
atio
n an
d M
anag
emen
t Act
iviti
esFA
A O
rder
955
0.8
& A
MS
Pol
icy
4.7
Com
plia
nce
927
TFDM Segment 1
TAMR P3S2
ERAM Sustainment 2
1038
E-IDS
Enterprise IDS
FID914
FID198
HF
Acq
uisi
tion
Eva
luat
ion
Sup
port
HF
AM
S &
SM
S S
uppo
rt to
Em
ergi
ng P
rogr
ams
FAA Human Factors Acquisition Working Group (HFAWG)
Human Factors SMS Support for Acquisition Programs
Enterprise Human Factors Development
1041
TBFM WP4FID
1007
Human Systems Integration Roadmap (2 of 4)
NAS Infrastructure Roadmaps, Version 12.0 January 201893
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Nex
tGen
Flig
ht D
eck
Hum
an E
rror R
educ
tion
Hum
an P
erfo
rman
ce a
nd S
afet
y
Nex
tGen
Flic
htC
rew
Rea
dine
ss
Air-
Gro
und
Use
r Ada
ptat
ion
Nee
ds
Evaluation of Flight Deck System Alternatives to Mitigate Aircraft Energy State Awareness Risks
Human Factors Evaluation Plan for Interval Management CDTI Features / Requirements
FMS
1043
Human Error Prevention & Mitigation Strategies for TBO Concepts that May Rely on Defining Waypoints (Lat/Lon) in ½ Degrees
1130
FAA System Safety Guidance: Development of Feasible Human Error Assessment Method Alternatives1131
Human Factors Recommendations to Address Terminal Time-Based ATM Flight Deck HF Integration Issues
1132
Human Factors Evaluation of Flight Deck Human-System Performance Needs in a Time-Based Control Environment – En Route
TBFM WP3TBFM
ADS-BADS-B In Apps Flight Interval Management
ADS-B Future Segments
FMS
CDTI
1133
Data Comm Seg. 2 -Advanced Services
FID304
TBFM WP4FID
1007
Human Systems Integration Roadmap (3 of 4)
NAS Infrastructure Roadmaps, Version 12.0 January 201894
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
RTCA SC-233, Addressing Human Factors / Pilot Interface Issues for Avionics
1044Human Factors Recommendations for Conducting Low Visibility Flight Operations in Transport Category Aircraft Using SVGS Information on HDDs and HUDs
SVGS
Human Factors LVO SMGCS Infrastructure Research – Phase 11040
SMGCS
EFVS
1042
Nex
tGen
Airc
raft
Sys
tem
s an
d C
ontro
ls
Hum
an-S
yste
m P
erfo
rman
ce B
enef
its a
nd L
imita
tions
Nex
tGen
NA
S a
nd F
light
Cre
w P
roce
dure
s
Com
plex
ity R
educ
tion
and
Usa
bilit
y
Enhanced Helicopter Vision Systems: Human Factors Examination of Heads-Up/Head-Worn Display Technologies and Concepts
1134
HUD
1135Human Factors Requirements for the Use of EFVS During Takeoff at Airports with Reduced and/or Degraded NAS Infrastructure
ERAM
UAS
ATC UAS Lost Link Operations
1138Human Factors Feasibility Assessment for Conducting En Route Lateral Offset Procedures
EFB
Human Factors Guidance for Multi-ModalAircraft/Flight Deck Controls 1136
1137Human Factors Recommendations to Address Varying Levels of Flight Deck Information Integrity, Reliability, and Security
Human Systems Integration Roadmap (4 of 4)
NAS Infrastructure Roadmaps, Version 12.0 January 201895
Human Factors Functions NextGen Focus Areas / Activities Infrastructure Development Influences
NextGen ATC/Tech Ops Human–System Performance Risk Reduction
Human Performance and Safety• Allocation of functions between users and automation• Mitigation of human error conditions arising from the introduction of complex
systems and procedures• Definition of operational human-system performance criteria• Proactive derivation of out-year human performance and safety needs
Human Centered Design
Human Factors in Workstation Development
ATC Information Presentation & Management
• Human factors system development standards and guidelines• Mitigation of human factors controller display issues• Identification of design impacts on user cognition and design alternatives• Prioritized cross-domain information and display convergence opportunities
Human Factors Acquisition Evaluation Support
FAA Order 9550.8 & AMS Policy 4.7 Compliance
• Implementation of HF tools, processes, and requirements for inclusion in AMS• Human factors evaluation of acquisition program requirements and SMS products
NextGen Flight Deck Human Error Reduction
Human Performance and Safety • Proactively detects and responds to flight deck technology shortfalls/gaps that could increase the opportunity for human error
• Data-driven inputs to requirements, guidance, and best practices used to assess NextGen technologies/systems for human error tolerance
• Support technology design reviews, down-selection of alternatives, and FAA response to emerging flight deck human-system interface/interaction issues
NextGen Flight Crew Readiness
Air-Ground User Adaptation Needs • Identify and respond to strategic air-ground user adaptation needs to support the successful implementation, use, and acceptance of NextGen changes
• Address the impacts of emerging technologies and procedures on flightcrew task management needs
• Respond to gaps in FAA regulatory and training guidance to enable the evaluation of new NextGen pilot knowledge, skills, and abilities
NextGen Aircraft Systems and Controls
Human-System Performance Benefits & Limitations
• Evaluate human-system performance benefits & limitations of emerging flight deck technologies, systems, and controls
• Respond to HF issues that may arise when combining NextGen aircraft changes with legacy technologies, systems, controls & their respective mode(s) of operations
• Close regulatory & guidance material gaps that do not address new aircraft equipment, functions, & procedures required for NextGen
NextGen NAS & Flight Crew Procedures
Complexity Reduction and Usability • Mitigate operational integration issues that could result from the implementation of NextGen NAS procedures & advanced flight deck separation management concepts
• Assess the feasibility of NextGen procedure design alternatives and potential impacts to human performance
10431130 1131
1132 1133
11351044 11361040 1134
11381042
926 988994
927
1038 1041927
1137
Human Systems Integration Roadmap Summary
NAS Infrastructure Roadmaps, Version 12.0 January 201896
Identifier DescriptionHSI-01 The execution of program- and project-specific human factors activities are not represented in the HSI
Roadmap.
HSI-02 Human factors integration points represent an identified opportunity for acquisition and procedure development programs to apply specific human factors products.
HSI-03 Human factors integration points represent the final opportunity for acquisition and procedure development programs to apply specific human factors products.
HSI-04 Acquisition and procedure development programs will coordinate with ANG-C1 throughout AMS and other processes to identify and address human factors opportunities.
HSI-05 ANG-C1 will coordinate across programs to identify and address NAS-wide human factors opportunities.
Human Systems Integration Roadmap: Assumptions
NAS Infrastructure Roadmaps, Version 12.0 January 201897
DP # Target Date CY
High Priority
Primary Domain Type Name
198 2023 Q2 Yes Automation FID Final Investment Decision (FID) for TFDM Segment 2
304 2028 Q4 No Communication FID Final Investment Decision (FID) for Data Comm Segment 2
346 2017 Q2 Yes Automation FID Final Investment Decision (FID) for CATMT Work Package 4
850 2018 Q4 Yes Automation FID Final Investment Decision (FID) for ATOP Enhancements WP1
910 2019 Q1 No Automation FID Final Investment Decision (FID) for STARS Enhancements 2
914 2019 Q2 Yes Automation FID Final Investment Decision (FID) for Enterprise Information Display System (E-IDS)
926 2017 Q1 No Human Systems Integration
Strategy (Other)
Decision on the Implementation Strategy of Mid-Term ATC Human Performance Safety Requirements into the NextGen Safety Process
927 2017 Q1 No Human Systems Integration
Strategy (Other) Decision on the Implementation Strategy of NextGen ATC Alarms, Alerts, and Notification Guidance
973 2019 Q4 No Automation FID Final Investment Decision (FID) for CATMT WP5
988 2021 Q1 No Human Systems Integration
Strategy (Other)
Decision on the Implementation Strategy of Post-Bravo ATC Human Performance Safety Requirements into the NextGen Safety Process
994 2017 Q3 No Human Systems Integration
Strategy (Other)
Decision on the Implementation Strategy of Mid-Term and Post-Bravo Tech Ops Human Performance Safety Requirements into the NextGen Safety Process
1007 2020 Q2 Yes Automation FID Final Investment Decision (FID) for TBFM Work Package 4
1038 2017 Q2 No Human Systems Integration
Strategy (Other)
Decision on the Implementation Strategy of System Development Guidelines for the Presentation of NOTAMs to Air Traffic Controllers
1040 2017 Q3 No Human Systems Integration
Strategy (Other) Decision on the Implementation Strategy of Human Factors LVO SMGCS Guidelines – Phase 1
1041 2017 Q3 No Human Systems Integration
Strategy (Other) Decision on the Implementation Strategy of Time Based Support Tool Presentation Guidance
1042 2017 Q3 No Human Systems Integration
Strategy (Other) Decision on the Implementation Strategy of ATC UAS Lost Link Guidelines
1043 2020 Q4 No Human Systems Integration
Strategy (Other)
Decision on the Approval & Implementation Strategy of Human Factors Aircraft Energy State Display and Alerting Guidelines
1044 2019 Q4 No Human Systems Integration
Strategy (Other) Decision on the Implementation Strategy of Human Factors SVGS Guidelines
Human Systems Integration Roadmap: Decision Points (1 of 2)
NAS Infrastructure Roadmaps, Version 12.0 January 201898
DP # Target Date CY
High Priority
Primary Domain Type Name
1130 2019 Q4 No Human Systems Integration
Strategy (Other)
Decision on the Approval & Implementation Strategy of HF Guidance for the Presentation of ½ Degree Waypoints to Users
1131 2021 Q1 No Human Systems Integration
Strategy (Other) Decision on the Approval and Implementation Strategy of Human Factors System Safety Guidance
1132 2020 Q4 No Human Systems Integration
Strategy (Other)
Decision on the Approval and Implementation Strategy of Human Factors Guidance for Mid-Term Time-Based ATM Enhancements
1133 2023 Q4 No Human Systems Integration
Strategy (Other)
Decision on the Approval and Implementation Strategy of Human Factors Guidance for Far-Term Time-Based ATM Enhancements
1134 2020 Q4 No Human Systems Integration
Strategy (Other)
Decision on the Approval and Implementation Strategy of Human Factors Guidance for Helicopter Advanced Vision Systems
1135 2019 Q4 No Human Systems Integration
Strategy (Other)
Decision on the Approval and Implementation Strategy of Human Factors Guidance for the Use of EFVS During Departure Operations
1136 2020 Q4 No Human Systems Integration
Strategy (Other)
Decision on the Approval and Implementation Strategy of Human Factors Guidance for the Design & Evaluation of Multi-Modal Controls
1137 2020 Q1 No Human Systems Integration
Strategy (Other)
Decision on the Approval and Implementation Strategy of Human Factors Guidance for the Presentation of Flight Deck Information with Varying Levels of Reliability
1138 2020 Q1 No Human Systems Integration
Strategy (Other)
Decision on the Approval and Implementation Strategy of Human Factors Guidance for Lateral Offset Procedures
Human Systems Integration Roadmap: Decision Points (2 of 2)
NAS Infrastructure Roadmaps, Version 12.0 January 201899
Information Systems SecurityObjective: The Information Systems Security roadmap represents the evolution of existing or planned information security services and capabilities to protect NAS systems and data from the continuous cyber threat. The roadmap depicts the information security-related services from the Enterprise Services Roadmap and the supporting policy development activities, feasibility studies, and prototypes to enable the ISS capabilities.
NAS Infrastructure Roadmaps, Version 12.0 January 2018100
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Information Systems Security
ISS ProtectionServices
ISS Threat Identify Services
ISS Detection Services
Ente
rpris
e Te
chno
logy
and
Ser
vice
En
hanc
emen
ts
NAS Enterprise
IAM Services
ISS Respond Services
ISS Recover Services
FAA Information Systems Security Cyber Operations
FAA Common Infrastructure Monitoring
NAS Cyber Operations Services
FAA Security Operations Center
ASH Cyber Intelligence
Ente
rpris
e Si
tuat
iona
l Aw
aren
ess
Iden
tity
Acce
ss M
anag
emen
t
Critical Infrastructure CybersecurityNAS Resiliency Assessment
NAS Data Flow Monitoring
NAS Boundary Access Control
Remediation of High Priority NAS
System Vulnerabilities
Centralized NAS Software Security Management
SWIM Segment 2B
IAM Phase 1B
IAM Phase 2A
IAM Phase 2B
Security Enterprise Asset Management
NAS Cyber Management SystemTech Refresh/Expansion
Information Systems Security Roadmap (1 of 2)
NAS Infrastructure Roadmaps, Version 12.0 January 2018101
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
IAM Prototypes
NAS Remote Mgmt. Access Policy 873
NAS Security Software (SSW) Management Policy
IAM Enterprise Security Policies
939 940Polic
y D
evel
opm
ent
IAM Internal/External Coordination
Transition IP External Gateways to Authorized Boundary Access Points
Con
cept
Val
idat
ion
Res
earc
h, D
evel
opm
ent,
and
Inve
stig
atio
n
Analysis for IPv6 Enhancements
859
NAS ISS Architecture Development
NAS TDM-to-IP Transition Implementation Guidance & Policy
TDM-to-IP Migration
Air-Ground ISS Plan
NW Monitor Trade Study
1093
1084
874
NAS Data Flow Monitoring Prototype
Centralized NAS Software Security Management Prototype
Security Enterprise Asset Management Prototype
Remote Management Prototype
Remediation of High PriorityNAS System Vulnerabilities
Information Systems Security Roadmap (2 of 2)
NAS Infrastructure Roadmaps, Version 12.0 January 2018102
ISS Services Enterprise Data Functions/Business Services Provided Summary of Functions and Business Services
ISS Protection Services Access control and protection mechanisms
Develops and implements the appropriate safeguards to ensure delivery of critical infrastructure services. The Protect Function supports the ability to limit or contain the impact of a potential cybersecurity event.
ISS Threat Identify Services
Manage security risks and threats, and determine suitable measures to manage those risks and threats
Develops the organizational understanding to manage cybersecurity risk to systems, assets, data, and capabilities. The activities in the Identify Function are foundational for effective use of the Framework.
ISS Detection Services Event Detection Notifications
Develops and implements the appropriate activities to identify the occurrence of a cybersecurity event. The Detect Function enables timely discovery of cybersecurity events.
NAS Identity Access
Management(IAM) Services
Identity Access Management For NAS IP systems for SOA and NON-SOA IP Services
IAM provides the capabilities for managing a NAS enterprise Public Key Infrastructure (PKI), compliant with the U.S. Common Policy for the Federal PKI Trust Framework, for use by SWIM and other NAS systems. The IAM capability will provide and manage digital certificate credentials for NAS systems and applications, which can be used for strong authentication between systems, and between NAS and non-NAS entities. Certificate validation services and security token services are also available. The SWIM architecture relies heavily on the existence of this infrastructure, and the NAS enterprise relies on IAM to meet agency and NIST requirements for strong authentication. More sophisticated capabilities (centralized data access authorization) will be available in SWIM Segment 2B.
ISS Respond Services SOPs and Response directives
Develops and implements the appropriate activities to take action regarding a detected cybersecurity event. The Respond Function supports the ability to contain the impact of a potential cybersecurity event.
ISS Recover Services Contingency and Recovery Plans
Develops and implements the appropriate activities to maintain plans for resilience and to restore any capabilities or services that were impaired due to a cybersecurity event. The Recover Function supports timely recovery to normal operations to reduce the impact from a cybersecurity event.
Information Systems Security Roadmap: Service Descriptions (1 of 2)
NAS Infrastructure Roadmaps, Version 12.0 January 2018103
Service Name Service Definition
Enhanced NAS Boundary Access Control
Boundary Protection Services to improve the cyber security posture of the NAS by enhancing controls used to provide secure operational access to NAS assets from external domains; providing a layered defense-in-depth approach for accessing NAS assets via a secure gateway infrastructure. This will support operational access needs while preventing unauthorized entities and data flows from reaching the NAS critical infrastructure
Expanded NAS Data Flow Monitoring
Planned Improvement & Enhancements related to the NAS Infrastructure aimed at improving the cyber security posture via increasing situational awareness for the operational NAS cyber security monitoring capability; enables full monitoring coverage of data flows (internal and external) through implementation of cyber security sensors throughout the NAS thereby enhancing modeling and detection of anomalous data flow activities. This supports a proactive versus reactive cyber security response , fostering actions geared to minimizing potential impacts to ATC operations.
Centralized NAS Software Security Management
Improve the cyber security posture of the NAS by providing a centralized capability for security patch and malicious code protection updates; establish a standard secure method to access critical security configuration updates ;and reducing the risk of security compromise. This will support a more reliable and resilient operating NAS infrastructure.
Enhanced NAS Internal Authentication Management
This service will improve the cyber security posture of the NAS by enhancing the authentication methods for specified NAS internal users. Internal Authentication Management is identified as Phase 3 of the SWIM Identity and Access Management (IAM) capability. It will provide a centralized secure authentication capability for a defined set of NAS internal users, without affecting NAS operations, to better protect the NAS infrastructure from unauthorized access. This will support implementation of system level user controls that provide for authorized access to only those functions required to perform assigned roles and responsibilities.
System Wide Information Management (SWIM)
SWIM is scheduled to proceed in phases throughout the NextGen evolution.
Currently defined phases include SWIM segment 2A (aligns with IAM 1A & IAM 1B) and SWIM segment 2B (aligns with IAM 2)
Information Systems Security Roadmap: Service Descriptions (2 of 2)
NAS Infrastructure Roadmaps, Version 12.0 January 2018104
Identifier DescriptionISS-01 BTI 302102 (Enhanced ATM Cybersecurity Operations) capability dates are changed to reflect
funding received via NAS Resiliency Assessment.
ISS-02 The activity on Page 1 for NAS Boundary Access Control is being conducted in support of BTI 302102-01 (Enhanced NAS Boundary Access Control).
ISS-03 The activity on Page 1 for NAS Data Flow Monitoring is being conducted in support of BTI 302102-02 (Expanded NAS Data Flow Monitoring).
ISS-04 The activity on Page 1 for Centralized NAS SW Sec Mgmt is being conducted in support of BTI 302102-03 (Centralized NAS Software Security Management).
ISS-05 The activity on Page 1 for NAS Internal IAM is being conducted in support of BTI 302102-04 (Enhanced NAS Internal Authentication Management).
Information Systems Security Roadmap: Assumptions
NAS Infrastructure Roadmaps, Version 12.0 January 2018105
DP # Target Date CY
High Priority
Primary Domain Type Name
859 2017 Q4 No Communication Strategy (Other) Strategy for NAS IPv6 Enhancements
873 2019 Q3 No ISS Policy NAS Remote Management Access Policy Decision
874 2020 Q4 No ISS Policy NAS Security Software (SW) Management Policy Decision
939 2017 Q2 No ISS Policy Policy Decision to support IAM Phase 1B implementation
940 2017 Q4 No ISS Policy Policy Decision to support IAM Phase 2 implementation
1084 2017 Q4 Yes Communication Strategy (JRC) Strategy Decision for TDM-to-IP Migration
1093 2020 Q1 No ISS Policy Decision to Approve IAM Authorization Policy
Information Systems Security Roadmap: Decision Points (1 of 1)
NAS Infrastructure Roadmaps, Version 12.0 January 2018106
SafetyObjective: The Safety Roadmap reflects various aspects of the Safety Risk Management (SRM) process that support program level, concept/capability level and system level safety. It supports the execution of safety assessments on potential safety issues that span multiple FAA organizations, through cross-cutting stakeholder collaboration, and also provides FAA decision-makers with pertinent information to make risk-informed decisions. The Safety Roadmap integrates SRM elements with NAS operations and system acquisition milestones through the development of key safety assessments, procedures, guidance, policy and requirements that support the NextGen Enterprise System.
NAS Infrastructure Roadmaps, Version 12.0 January 2018107
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Aviation Safety Information Analysis and Sharing (ASIAS)
Operational Analysis and Reporting System (OARS) OARS Ph. I
OARS Ph. 5
OARS Ph. 6
Safe
ty S
yste
ms
Supp
ortin
g SM
S
FID887
FAA
Mis
sion
Sup
port
Sys
tem
s Su
ppor
ting
SMS
OARS Phase 1
FID886
FID664
Supp
ortin
gAc
tiviti
es Safety Risk Management (SMS) Executive Council/FAA Safety Collaboration Team (SCT) / Safety Data Analysis Team (SDAT)
ASIAS v3.0ASIAS v4.0
ASIAS v2.0ASIAS
HIRMT v1.5
Cross-Organizational Safety Assessment/ Integrated System Safety Assessment (ISSA)
System Safety Management Transformation (SSMT)
SSMT 1.0 ISAMSSMT 2.0 Airport Surface Anomaly Investigation Capability (ASAIC)
XSMTS
RSTS
Saf
ety
Trac
king
S
yste
ms
XCEDAR
Aut
omat
ed
Saf
ety
Dat
a To
ols
XXFALCON
TARP
ATO
Por
tal S
afet
y A
pplic
atio
ns RAP Tools
CV Tool
Processed Track Services X
Timelines are an approximation and are subject to change.
IARD1060
IARD1062
X
Business Object
XX
X1112
IID720
OARS Ph. 2FID1155
OARS Ph. 3FID1156
OARS Ph. 4FID1157
IID1061
IID1063
SSMT 2.0 Integrated Safety Assessment Model (ISAM)SSMT 2.0 Situational Investigation Tool Kit for Analysis and Rptg. (SITAR)SSMT 2.0 Wake Vortex Safety System (WVSS)
SSMT 3.0
Near-real Time Integrated Safety Modeling Capability
General Aviation and Rotorcraft Metrics/Tools DevelopmentUAS Metrics/Tools Development
Hazard-Enterprise Architecture Traceability Tool (HEATT)
CH 1
Safety Roadmap (1 of 3)
NAS Infrastructure Roadmaps, Version 12.0 January 2018108
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031Su
ppor
ting
Activ
ities
(SR
M)
Supp
ortin
g Ac
tiviti
es(S
RM
)
Safe
ty S
yste
ms
Supp
ortin
g SM
S
Inte
grat
ed S
yste
m-
of-S
yste
ms
Mod
el-
Bas
ed A
sses
smen
t
Mid
-Lev
el C
once
pt/C
apab
ility
Saf
ety
Ass
essm
ents
AM
S S
afet
y A
sses
smen
ts
(Inve
stm
ent A
naly
ses
Rea
dine
ss D
ecis
ion)
NAS Legacy & Data CoordinationAutomation, Weather, Facilities, CNS, HSI,Enterprise Services, Airport, Aircraft,Airspace & Procedures, ISS
Develop Safety Data Policy, Governance & Standards, Risk-Based Decision Making, 8000.369B, 8040.4B and 1000.37
Supp
ortin
g Ac
tiviti
es(S
RM
)
Supp
ortin
g Ac
tiviti
es
Develop Risk-Based Models
Safety Analyses to Support AMS (Safety Assessments)(Details available upon request to ANG-B3, SSMT and ASIAS in support of AMS Safety Assessments
Conduct and Maintain Service Level Safety Assessments
System Safety Management Transformation (SSMT)
Cross-Organizational Safety Assessment / Integrated System Safety Assessment (ISSA)
Operational Analysis and Reporting System (OARS) OARS Ph. I
OARS Ph. 5
OARS Ph. 6FID887
FID886
FID664
IARD1060
IARD1062
1112
IID720
OARS Ph. 2FID1155
OARS Ph. 3FID1156
OARS Ph. 4FID1157
IID1061
IID1063
Hazard Enterprise Architecture Traceability Tool (HEATT) Safety Data
Safety Management System (SMS) Executive Council/FAA Safety Collaboration Team (SCT) / Safety Data Analysis Team (SDAT)
Far-Term NextGen Integrated SRM Planning & Analysis
Air Traffic Organization Safety Risk Management/Safety Assurance
Software Assurance Policy Development to Support NextGen Systems
1059
Human Factors SMS Support for Acquisition Programs
Safety Roadmap (2 of 3)
NAS Infrastructure Roadmaps, Version 12.0 January 2018109
CY 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
926
NextGen Tech Ops Human Error Condition Identification and Mitigation
NextGen Far-Term ATC Human Error Condition Identification & Mitigation
994
Human Factors SMS Support for Acquisition Programs
Safety Management System (SMS) Executive Council/FAA Safety Collaboration Team (SCT) / Safety Data Analysis Team (SDAT)
988
FAA System Safety Guidance: Development of Feasible Human Error Assessment Method Alternatives1131
Nex
tGen
ATC
/Tec
h O
ps H
uman
Erro
r Red
uctio
n
Hum
an P
erfo
rman
ce a
nd S
afet
y A
ctiv
ities
Nex
tGen
Flig
ht D
eck
Hum
an E
rror R
educ
tion
Safety Roadmap (3 of 3)
NAS Infrastructure Roadmaps, Version 12.0 January 2018110
Safety Roadmap: AssumptionsIdentifier DescriptionSAFE-01 ASIAS is part of the FAA Mission Support EA. It is depicted on the Safety Infrastructure Roadmap for
coordination purposes since:a) It will require NAS data.b) It will provide safety data and tools for the NAS
SAFE-02 SMS Implementations for other LOBs are part of the FAA Mission Support EA. These activities are depicted on the Safety Infrastructure Roadmap for coordination purposes.
NAS Infrastructure Roadmaps, Version 12.0 January 2018111
DP # Target Date CY
High Priority
Primary Domain Type Name
664 2019 Q2 No Safety FID Final Investment Decision (FID) for Operational Analysis and Reporting System (OARS) Phase 1
720 2017 Q3 No Safety IID Initial Investment Decision (IID) for Operational Analysis and Reporting System (OARS) Phase 1
886 2024 Q2 No Safety FID Final Investment Decision (FID) for Operational Analysis and Reporting System (OARS) Phase 5
887 2026 Q4 No Safety FID Final Investment Decision (FID) for Operational Analysis and Reporting System (OARS) Phase 6
926 2017 Q1 No Human Systems Integration
Strategy (Other)
Decision on the Implementation Strategy of Mid-Term ATC Human Performance Safety Requirements into the NextGen Safety Process
988 2021 Q1 No Human Systems Integration
Strategy (Other)
Decision on the Implementation Strategy of Post-Bravo ATC Human Performance Safety Requirements into the NextGen Safety Process
994 2017 Q3 No Human Systems Integration
Strategy (Other)
Decision on the Implementation Strategy of Mid-Term and Post-Bravo Tech Ops Human Performance Safety Requirements into the NextGen Safety Process
1059 2022 Q1 No Safety Policy Decision on Software Assurance Policy Standards for NextGen programs and systems
1060 2022 Q2 No Safety IARD Investment Analysis Readiness Decision (IARD) for OARS Phase 5
1061 2023 Q2 No Safety IID Initial Investment Decision (IID) for OARS Phase 5
1062 2024 Q4 No Safety IARD Investment Analysis Readiness Decision (IARD) for OARS Phase 6
1063 2025 Q4 No Safety IID Initial Investment Decision (IID) for OARS Phase 6
1112 2017 Q3 No Safety Strategy (JRC) Strategy Decision for OARS Phase 1
1131 2021 Q1 No Human Systems Integration
Strategy (Other) Decision on the Approval and Implementation Strategy of Human Factors System Safety Guidance
1155 2020 Q4 No Safety FID Final Investment Decision (FID) for OARS Phase 2
1156 2022 Q1 No Safety FID Final Investment Decision (FID) for OARS Phase 3
1157 2023 Q2 No Safety FID Final Investment Decision (FID) for OARS Phase 4
Safety Roadmap: Decision Points (1 of 1)
NAS Infrastructure Roadmaps, Version 12.0 January 2018112
Appendix AAcronym List
NAS Infrastructure Roadmaps, Version 12.0 January 2018113
Acronym Definition Acronym Definition4D Four dimensional (x, y, z, t) ANICS Alaska NAS Interfacility Communication SystemAC Advisory Circular ANSP Air Navigation Service ProviderACARS Addressing, Communicating, and Reporting System AOC Airline Operations CenterACAS Airborne Collision Avoidance System APNT Alternative Positioning, Navigation, and TimingACE-IDS ASOS Controller Equipment-Information Display System APWS AeroNav Products Workflow SystemACI Aircraft Cybersecurity Initiative ARMT Airport Resource Management ToolACL Airport Cable Loop ARSR Air Route Surveillance RadarACS Aeronautical Common Service ARTCC Air Route Traffic Control CenterACFT Aircraft ARTS Automated Radar Terminal SystemADAS AWOS Data Acquisition System ASAT Airspace Simulation and Analysis for Terminal ProceduresADF Automatic Direction Finder ASDE Airport Surface Detection EquipmentADS-B Automatic Dependent Surveillance-Broadcast ASEPS Advanced Surveillance Enhanced Procedural SeparationADS-C Automatic Dependent Surveillance-Contract ASOS Automated Surface Observing SystemADS-R Automatic Dependent Surveillance-Rebroadcast ASR Airport Surveillance RadarAEFS Advanced Electronic Flight Strips ASSC Airport Surface Surveillance CapabilityAF Airway Facility ASTI Alaska Satellite Telecommunications InfrastructureAFSM Alaska Flight Service Modernization ASWON Aviation Surface Weather Observation NetworkAFSS Automated Flight Service Station ATC Air Traffic ControlA/G Air-to-Ground ATCBI Air Traffic Control Beacon InterrogatorAGIS Airports Geographic Information System ATCSCC David J. Hurley Air Traffic Control System Command CenterAHA Aircraft Hazard Area ATCT Airport Traffic Control TowerAIM Aeronautical Information Management ATIS Automated Terminal Information SystemAirNav Airport and Navigational Aids Database ATM Air Traffic ManagementAISR Aeronautical Information System Replacement ATO Air Traffic Organization (FAA)ALDARS Automated Lightning Detection and Reporting System ATOP Advanced Technologies and Oceanic ProceduresALS Approach Lighting System AW AirworthinessALSIP Approach Lighting System Improvement Program AWCS Airport Wireless Communications SystemsAMASS Airport Movement Area Safety System AWOS Automated Weather Observing SystemAMMS Automated Maintenance Management System BCD Baseline Change DecisionAMS Acquisition Management System BUEC Backup Emergency Communications
Appendix A, Acronym List (1 of 6)
NAS Infrastructure Roadmaps, Version 12.0 January 2018114
Acronym Definition Acronym DefinitionBVLOS Beyond Visual Line of Sight DC Data Communications or DataCommBWM Bandwidth Manager DCNS Data Communication Network SystemC2 Command and Control DHS Department of Homeland SecurityC&V Ceiling & Visibility DME Distance Measuring EquipmentCAEG Computer-Aided Engineering Graphics DMN Data Multiplexing NetworkCARF Central Altitude Reservation Function DoD Department of DefenseCAT Category DOTS+ Dynamic Ocean Track System PlusCATMT Collaborative Air Traffic Management Technologies DP Decision PointCCF Combined Control Facility DSP Departure Spacing ProgramCCS Conference Control System DSR Display System ReplacementCD Common Digitizer DUATS Direct User Access Terminal ServiceCDM NET Collaborative Decision-Making Network DVARS Data, Visualization, Analysis, and Reporting SystemCDTI Cockpit Display of Traffic Information EA Enterprise ArchitectureCFE Communication Facilities Enhancement ECG En Route Communications GatewayCIP Capital Investment Plan EDMS Electronic Document Management SystemCIWS Corridor Integrated Weather System EFB Electronic Flight BagCONOPS Concept of Operations EFSTS Electronic Flight Strip Transfer SystemCONUS Conterminous United States EFVS Enhanced Flight Vision SystemCRDR Concepts and Requirements Definition Readiness E-IDS Enterprise Information Display SystemCS Commercial Space ELT Emergency Locator TransmitterCSPR Closely Spaced Parallel Runways ELVO Enhanced Low Visibility OperationsCSS-Wx Common Support Services-Weather ERAM En Route Automation ModernizationCTD Common Terminal Digitizer ERIDS En Route Information Display SystemCTS Coded Time Source ETR Emergency TransceiverCY Calendar Year ETVS Enhanced Terminal Voice SwitchDAA Detect and Avoid EWD Enhanced WINS DisseminationDADS Digital Aeronautics Database System FAA Federal Aviation AdministrationDALR Digital Audio Legal Recorder FANS Future Air Navigation SystemDASI Digital Altimeter Setting Indicator FBWTG FAA Bulk Weather Telecommunications GatewayDBRITE Digital Bright Radar Indicator Tower Equipment FCS FAA Cloud Service
Appendix A, Acronym List (2 of 6)
NAS Infrastructure Roadmaps, Version 12.0 January 2018115
Acronym Definition Acronym DefinitionFDIO Flight Data Input/Output ICSS Integrated Communications Switching SystemFDP2K Flight Data Processing 2000 IDS Information Display SystemFFSP Future Flight Services Program IESP Integrated Enterprise Services PlatformFID Final Investment Decision IFIA International Flight Inspection Aircraft FIM Flight Interval Management IFPA Instrument Flight Procedure Automation FIP Forecast Icing Product IFR Instrument Flight RulesFIS-B Flight Information Service-Broadcast IID Initial Investment DecisionFMS Flight Management System ILS Instrument Landing SystemFNS Federal NOTAM System INM Integrated Noise ModelFOC Full Operational Capability IOC Initial Operating CapabilityFOMS Flight Operations Management System IP Internet ProtocolFPPS Facility Power Panel Schedule IPDS Instrument Procedure Development SystemFSRM Facility Security Risk Management IRU Inertial Reference UnitFSS Flight Service Station ISAM Integrated Safety Assessment ModelFTI FAA Telecommunications Infrastructure ISD In-Service DecisionFY Fiscal Year ISS Information Systems SecurityGA General Aviation ITWS Integrated Terminal Weather SystemGBAS Ground-Based Augmentation System IVSR Interim Voice Switch ReplacementGNSS Global Navigation Satellite System JAWS Juneau Airport Wind SystemGPS Global Positioning System JRC Joint Resources CouncilHADDS Host ATM Data Distribution System L5 A third civil signal on Navstar GPS (1176.45 MHz)HFDL High Frequency Data Link LAANC Low Altitude Authorization and Notification CapabilityHOST Host Computer System LDIN Lead In Light SystemHSI Human/Systems Integration LDRCL Low-Density Radio Communications LinkHUD Head-Up Display LED Light-Emitting DiodeH/W Hardware LIDAR Laser Identification Detection and RangingIAM Identity Access Management LLWAS Low-Level Windshear Alert SystemIARD Investment Analysis Readiness Decision LOC LocalizerICAO International Civil Aviation Organization LOS Line of SightICMS Integrated Control and Monitoring System LP/HP Low Power/High Power
Appendix A, Acronym List (3 of 6)
NAS Infrastructure Roadmaps, Version 12.0 January 2018116
Acronym Definition Acronym DefinitionLRR Long Range Radar NGSS Next Generation Satellite SystemLVO Launch Vehicle Operations NIDS NAS Information Display SystemMAMP Mobile Asset Management Program NIEC NextGen Integration and Evaluation CapabilityMASPS Minimum Aviation System Performance Standards (RTCA) NME NAVAIDs Monitoring EquipmentMASR Mobile Airport Surveillance Radar NMR NADIN MSN RehostMB Marker Beacon NNCC National Network Control CenterMDCRS Meteorological Data Collection and Reporting System NOAA National Oceanic and Atmospheric AdministrationMDR Multi-Mode Digital Radios NOCC National Operations Control Center MEARTS Microprocessor En Route Automated Radar Tracking System NOP National Offload ProgramMMAC Mike Monroney Aeronautical Center NOTAM Notice to AirmenMODE S Mode Select NSWRC NextGen Surveillance and Weather CapabilityMOPS Minimum Operational Performance Standards (RTCA) NVRP NAS Voice Recorder ProgramMPAR Multi-Function Phased-Array Radar NVS National Airspace System Voice SwitchNACGS National Aeronautical Charting Group System NWP NextGen Weather ProcessorNADIN MSN National Airspace Data Interchange Network Message Switched Network NWS National Weather ServiceNADIN PSN National Airspace Data Interchange Network Packet Switched Network OARS Operational Analysis and Reporting SystemNAIMES NAS Aeronautical Information Management Enterprise Systems OASIS Operational and Supportability Implementation SystemNAS National Airspace System Obs ObservationNASA National Aeronautics and Space Administration OCC Operations Control CenterNASE NAS Adaptation Services Environment ODALS Omnidirectional Approach Lighting SystemNASR National Airspace System Resource OEAAA Obstruction Evaluation/Airport Airspace AnalysisNAVAID Navigational Aid OFDPS Offshore Flight Data Processing SystemNBSC NextGen Backup Surveillance Capability Ol Operational ImprovementNCR NAS Common Reference OPC Offshore Precipitation CapabilityNDB Non-Directional Beacon Ops OperationsNEMC Network Enterprise Management Center OPSNET Operations NetworkNEMS NAS Enterprise Messaging Service ORS Obstacle Repository SystemNEXCOM Next-Generation VHF A/G Communication System PAPI Precision Approach Path IndicatorNEXRAD Next Generation Weather Radar PBN Performance-Based NavigationNextGen Next Generation Air Transportation System PDARS Performance Data Analysis and Reporting System
Appendix A, Acronym List (4 of 6)
NAS Infrastructure Roadmaps, Version 12.0 January 2018117
Acronym Definition Acronym DefinitionPh. Phase SDI Space Data IntegratorPIREPS Pilot Reports SE System EngineeringPRM Precision Runway Monitor Segmt. SegmentPS3 Power Systems Sustained Support SENSR Spectrum Efficient National Surveillance RadarQn Calendar Quarter n (n = 1-4) SFDPS SWIM Flight Data Publication ServiceR&D Research & Development SLEP Service Life Extension ProgramRCE Radio Control Equipment SMA Surface Movement AdvisorRCF Radio Communication Facility SMGCS Surface Movement Guidance and Control SystemRCL Radio Communications Link SOA Service Oriented ArchitectureRCOM NAS Recovery Communications SOCC Security Operations Control CenterRDVS Rapid Deployment Voice Switch SSMT System Safety Management TransformationREIL Runway End Identifier Lights STARS Standard Terminal Automation Replacement SystemRMLS Remote Maintenance and Logging System STDDS SWIM Terminal Data Distribution SystemRn Release n (n = 1, 2,…N) STVS Small Tower Voice SwitchRNAV Area Navigation Svc. ServiceRNP Required Navigation Performance SVGS Synthetic Vision Guidance SystemRSA Runway Safety Area SVO Space Vehicle OperationsRTCA Radio Technical Committee for Aeronautics SVS Synthetic Vision SystemRV Re-entry Vehicle S/W SoftwareRVR Runway Visual Range SWIM System-Wide Information ManagementRVSM Reduced Vertical Separation Minima SWS Surface Weather SystemRWSL Runway Status Lights TACAN Tactical Air NavigationSAA Special Activity Airspace TAMR Terminal Automation Modernization and ReplacementSAMS Special Use Airspace Management System TARGETS Terminal Area Route Generation Evaluation and Traffic SimulationSATCOM Satellite Communication Network TAWS Terrain Awareness and Warning SystemSAWS Stand-Alone Weather Sensor TBFM Time-Based Flow ManagementSBAS Satellite-Based Augmentation System TBO Trajectory-Based OperationsSBS Surveillance and Broadcast Services TCAS Traffic Alert and Collision Avoidance SystemSCT Safety Collaboration Team TCF Terminal Convective ForecastSDAT Sector Design and Analysis Tool TDLS Tower Data Link Services
Appendix A, Acronym List (5 of 6)
NAS Infrastructure Roadmaps, Version 12.0 January 2018118
Acronym Definition Acronym DefinitionTDM Time-Division Multiplexing VoIP Voice Over Internet ProtocolTDWR Terminal Doppler Weather Radar VOR VHF Omnidirectional RangeTFDM Terminal Flight Data Manager VOR MON VOR Minimum Operating NetworkTFM Traffic Flow Management VORTAC VOR with TACANTFM-I Traffic Flow Management - Infrastructure VOT VHF Omnidirectional Range TestTFMS Traffic Flow Management System VSBP Voice Switch BypassTFR Bldr Temporary Flight Restriction Builder VSCS Voice Switching and Control SystemTIS-B Traffic Information Service-Broadcast VTABS VSCS Training and Backup SystemTR Technology Refresh WAAS Wide-Area Augmentation SystemTRACON Terminal Radar Approach Control WAM Wide Area MultilaterationTSO Technical Standard Orders WARP Weather and Radar ProcessorTVSR Terminal Voice Switch Replacement WEF Wind Equipment Series FTWIP Terminal Weather Information for Pilots WINS Weather Information Network ServerUAS Unmanned Aircraft System WJHTC William J. Hughes Technical Center (FAA)UIC Universal Interlock Controller WME Wind Measuring EquipmentUIS Unstaffed Infrastructure Sustainment WMS WAAS Master StationURET User Request Evaluation Tool WMSCR Weather Message Switching Center ReplacementUSNS United States NOTAM Service WPn Work Package n (n = 1, 2, …N)UTM Unmanned Traffic Management WSDS Wind Shear Detection ServicesVASI Visual Approach Slope Indicator WSP Weather System ProcessorVHF/UHF/HF Very High Frequency/Ultra High Frequency/High Frequency WT Wake TurbulenceVLOS Visual Line of Sight WTMA Wake Turbulence Mitigation for ArrivalsVNAV Vertical Navigation Wx Weather
Appendix A, Acronym List (6 of 6)