21
Nadcap Supplier Symposium The National Motorcycle Museum in Solihull on 25 th September 2013 The Bodycote Experience UK Perspective Gareth Armstrong Quality Manager UK Bodycote Heat Treatments Limited

Nadcap Supplier Symposium...•Check AC7004 is an acceptable QMS with both your Prime & Customer ? • Is Internationally Recognised. • Foundations built on ISO 9001:2008 usually

  • Upload
    others

  • View
    5

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Nadcap Supplier Symposium...•Check AC7004 is an acceptable QMS with both your Prime & Customer ? • Is Internationally Recognised. • Foundations built on ISO 9001:2008 usually

Nadcap Supplier Symposium The National Motorcycle Museum in Solihull on 25th September 2013

The Bodycote Experience UK Perspective

Gareth Armstrong Quality Manager UK

Bodycote Heat Treatments Limited

Page 2: Nadcap Supplier Symposium...•Check AC7004 is an acceptable QMS with both your Prime & Customer ? • Is Internationally Recognised. • Foundations built on ISO 9001:2008 usually

Agenda

Why we have Nadcap? Quality Management System Requirements A Brief Introduction to Bodycote / Relevant History Our Current Nadcap Status Challenges we Faced / What we Have Learned / Our Current Approach Benefits of Nadcap Disadvantages of Nadcap Suggested Future Opportunities & Recommendations

2

Page 3: Nadcap Supplier Symposium...•Check AC7004 is an acceptable QMS with both your Prime & Customer ? • Is Internationally Recognised. • Foundations built on ISO 9001:2008 usually

Why do we have Nadcap?

Because our Aerospace Customers Mandate it.

3

Page 4: Nadcap Supplier Symposium...•Check AC7004 is an acceptable QMS with both your Prime & Customer ? • Is Internationally Recognised. • Foundations built on ISO 9001:2008 usually

Quality System

Before you consider Nadcap you need to ensure your Quality Management System holds up.

Two Alternatives are available to you: 1 AC7004 offered by PRI 2 AS9100 (Revision C) / BS EN ISO 9100: 2009 by a Certification

Body Recognised by the I.A.Q.G.

4

• Cost Saving Opportunity • Is ideal if your business solely services direct to Aerospace Nadcap Primes. •Check AC7004 is an acceptable QMS with both your Prime & Customer ?

• Is Internationally Recognised. • Foundations built on ISO 9001:2008 usually the minimum customer requirements for none aerospace industries. • Multiple / Several / Campus / Complex Certification Structures are available for larger organisations.

Page 5: Nadcap Supplier Symposium...•Check AC7004 is an acceptable QMS with both your Prime & Customer ? • Is Internationally Recognised. • Foundations built on ISO 9001:2008 usually

Quality Management Systems are built on the principle of continuous business improvement practices to enhance your company to become successful.

Nadcap is about Technical Compliance to improve / maintain Aircraft Safety and Ensure the supply chain complies to all specified technical requirements.

Largely YES

They both have their place and separate benefits but some areas can over lap. e.g. Internal Auditing of Special Processes & Contract Review Effectiveness.

QMS and Nadcap is there a Difference?

5

Page 6: Nadcap Supplier Symposium...•Check AC7004 is an acceptable QMS with both your Prime & Customer ? • Is Internationally Recognised. • Foundations built on ISO 9001:2008 usually

Today

Bodycote is the leading provider of thermal processing services worldwide, offering subcontract:

Global Presence 6

Heat Treatment Metal Joining Surface Technology Hot Isostatic Pressing

Over 190 Specialist Facilities In 26 Countries

Page 7: Nadcap Supplier Symposium...•Check AC7004 is an acceptable QMS with both your Prime & Customer ? • Is Internationally Recognised. • Foundations built on ISO 9001:2008 usually

History

Bodycote was founded in 1923, originally a British textile company.

Bodycote sole focus switches into Metals Processing & Testing Industries from 1979 onwards.

Bodycote has rapidly expanded to present day by successful technology acquisitions and organic growth built on good customer service and a reputation for quality.

1986 Bodycote UK achieve BS 5750 the foundations that developed into today's Quality Management System BS EN ISO 9001:2008 & BS EN 9100 : 2009 on a Multiple Certificate Structure spanning 21 locations. This also today incorporates Nadcap procedures.

2003 Bodycote UK enters the Nadcap Program & drops Civil Aviation Authority registration for HT & EBW.

7

Page 8: Nadcap Supplier Symposium...•Check AC7004 is an acceptable QMS with both your Prime & Customer ? • Is Internationally Recognised. • Foundations built on ISO 9001:2008 usually

Nadcap Status

Today Bodycote (UK) has 15 Nadcap Approvals Spanning across 13 locations.

The other 8 facilities service other industries where Nadcap is not required but we do take some of the benefits learned into there daily operations.

We have experienced 116 Nadcap audits over the last 10 years.

Nadcap approvals cover 3 Special Process Commodity Groups & Specific Testing:

Heat Treatments

Fusion Welding

Coatings

8

Page 9: Nadcap Supplier Symposium...•Check AC7004 is an acceptable QMS with both your Prime & Customer ? • Is Internationally Recognised. • Foundations built on ISO 9001:2008 usually

UK Commodity Matrix – Heat Treatments

9

HEAT TREATMENTS AC7102

AC7102 / S

AC7102 / 1

AC7102 / 2

AC7102/3

AC7102 / 4

AC7102 / 5

AC7102 / 6

AC7102 / 7

AC7101 / 3

AC7101 / 4

Active Location 2013

HT Base Line

Prime Specific Brazing Aluminium Carburizing Nitriding

Hardness Testing HIP

Induction Hardening

Tensile Testing

Lab Metallographic & micro

Hardness

Cambridge YES YES YES NO NO NO YES NO NO NO NO

Chard YES YES NO NO YES YES YES NO NO NO YES

Chesterfield YES YES NO NO NO NO NO YES NO NO NO

Coventry YES YES YES NO NO NO YES NO NO NO NO

Derby YES YES NO NO NO NO NO YES NO NO NO

Hereford YES YES NO NO NO NO NO YES NO NO NO

Macclesfield YES YES NO NO YES NO YES NO NO NO YES

Rotherham YES YES NO NO NO NO YES NO NO NO NO

Skelmersdale YES YES YES NO NO NO YES NO NO NO NO

Stillington YES YES NO NO NO NO YES NO NO NO NO

Stockport YES YES YES NO NO YES YES NO NO NO YES

Woodford YES YES YES NO NO NO YES NO NO NO NO

Page 10: Nadcap Supplier Symposium...•Check AC7004 is an acceptable QMS with both your Prime & Customer ? • Is Internationally Recognised. • Foundations built on ISO 9001:2008 usually

UK Commodity Matrix – Welding & Coatings

10

EBW AC7109

AC7110

/ 3 AC7110

/ 3 S AC7110 /

12 AC7110 /

12 / S AC7110 /

13 AC7110

/ 3

Active Location 2013

Fusion Welding

Base Line

Electron Beam

Welding

EBW Prime

Specific Welder

Qualification

Welder Qualification

Prime Specific

Evaluation of Welds

Evaluation of Welds Prime

Specific

Cambridge YES YES YES YES YES YES YES Skelmersdale YES YES YES YES YES NO NO

HVOF / Plasma AC7109 AC7109

/ 1 AC7109

/ 4 AC7109

/ 5

Active Location 2013 Coatings Base Line Thermal Spray

Coatings Chemical Stripping

of Coatings Coating Evaluation &

Lab Practices

Newport YES YES YES YES

Page 11: Nadcap Supplier Symposium...•Check AC7004 is an acceptable QMS with both your Prime & Customer ? • Is Internationally Recognised. • Foundations built on ISO 9001:2008 usually

Nadcap – NCR Analysis as end 2012 (Includes both Major + Minor)

11

Site Type Total Audit NCR's NCR's per Day NCR's per Check Sheet

Cambridge W 3 1.5 0.4

Cambridge HT 1 0.3 0.3

Chard HT 4 1.0 0.7

Coventry HT 2 0.5 0.5

Derby HT 0 0.0 0.0

Macclesfield HT 2 0.7 0.4

Newport C 6 2.0 2.0

Rotherham HT 3 0.8 1.0

Skelmersdale HT 5 1.3 1.3

Skelmersdale W 1 0.5 0.2

Stillington HT 2 0.5 0.7

Stockport HT 3 0.8 0.5

Woodford HT 2 0.5 0.5

UK Average 2.6 0.8 0.6

Page 12: Nadcap Supplier Symposium...•Check AC7004 is an acceptable QMS with both your Prime & Customer ? • Is Internationally Recognised. • Foundations built on ISO 9001:2008 usually

Jan 2013 – All 10 HT & 2 W Sites Simultaneously on Merit

12

Site Type Current Status Jan 2013 Audit Frequency

Cambridge W Maintain MERIT 18 Months Cambridge HT Maintain MERIT 24 Months

Chard HT Maintain MERIT 18 Months Chesterfield HT (HIP) Approved (New) 12 Months

Coventry HT Gain MERIT 18 Months Derby HT Maintain MERIT 24 Months

Hereford HT (HIP) Approved (New) 12 Months Macclesfield HT Maintain MERIT 24 Months

Newport CT Approved 12 Months Rotherham HT Maintain MERIT 18 Months

Skelmersdale HT Maintain MERIT 18 Months Skelmersdale W Maintain MERIT 24 Months

Stillington HT Gain MERIT 18 Months Stockport HT Maintain MERIT 18 Months Woodford HT Gain MERIT 18 Months

Page 13: Nadcap Supplier Symposium...•Check AC7004 is an acceptable QMS with both your Prime & Customer ? • Is Internationally Recognised. • Foundations built on ISO 9001:2008 usually

Culture Changes for Nadcap Implementation

Suppliers Must accept all Nadcap check sheet answers are either YES or NO.

Any Ambiguity = NO = NCR The site Metallurgist or site Weld Engineer / Coatings Engineer do not

have the authority to deviate or accept any deviation from Prime Specifications no matter how trivial.

A big culture hurdle to overcome when the process house and site expert “Metallurgist” is seen as the “Processing Technical Expert” by both internal & external customers.

13

Page 14: Nadcap Supplier Symposium...•Check AC7004 is an acceptable QMS with both your Prime & Customer ? • Is Internationally Recognised. • Foundations built on ISO 9001:2008 usually

Challenges to Over come – Flow Down

The cascading of Prime Specific requirements down through the supply chain to the Special Process Provider.

The ideal situation is where all the requirements related to product and Prime Specific Quality Systems requirements flowed down like a cascade via the 1st Tiers.

Unfortunately in the real world it doesn’t often work like this and sometimes we have to educate our customers. – known as ‘Flow Up’

How? Implement a Robust Contract Review System.

14

Page 15: Nadcap Supplier Symposium...•Check AC7004 is an acceptable QMS with both your Prime & Customer ? • Is Internationally Recognised. • Foundations built on ISO 9001:2008 usually

Lesson Learned ~ Robust Contract Review

Contract Review is not Commercial: Price Checks & T & C’s or Goods Inwards Inspection.

Contract Review looks at all the technical / compliance aspects needed to meet both customer & prime specification / drawing requirements – and whether we have the capability / capacity to meet them.

Be prepared to stand by your Contract Review System until questions are answered satisfactory and in

writing from the prime / design authority (not the first tier customer), irrespective of: – Urgent Customer Delivery Requirements – Aircraft on the Ground – All associated pressures applied through the supply chain

Parts must be Right First Time & Every Time.

Apply a Zero Risk Culture to your Business.

Try to Treat all products the same: do not differentiate between Aerospace and Non-Aerospace

products at your facility, until all technical requirements are fully understood.

15

Page 16: Nadcap Supplier Symposium...•Check AC7004 is an acceptable QMS with both your Prime & Customer ? • Is Internationally Recognised. • Foundations built on ISO 9001:2008 usually

? Confused

& Frustrated

Auditor Inconsistency

Opinion Interpretation

1st Tier, 2nd Tier, 3rd Tier

etc Interpretation

Special Process Provider

Interpretation

Prime & Customer

Requirements

Clarify in Writing with the Prime or Design Authority

Before Processing.

You Need to build good Prime contacts to assist / interpret technical requirements.

16

Why have we received a audit NCR if it was acceptable at the last audit?

Page 17: Nadcap Supplier Symposium...•Check AC7004 is an acceptable QMS with both your Prime & Customer ? • Is Internationally Recognised. • Foundations built on ISO 9001:2008 usually

Lessons Learned Invest / Upgrade in the latest technology examples include: furnace autonomous control –

remove / reduce the human manual factors / de-skill through process control systems.

You need to build Strong Supplier Relationships examples: – Thermocouple Manufacturers – Equipment Manufacturers – Calibration Services – Laboratories & Test Houses

Train & Develop your People all Levels:

– Metallurgy – Pyrometry – Contract Review / Data Card Construction – Inspection / Testing / Evaluation – Root Cause & Corrective Action

Strengthen by Standardisation / Common Approach across locations – by sharing information.

17

Page 18: Nadcap Supplier Symposium...•Check AC7004 is an acceptable QMS with both your Prime & Customer ? • Is Internationally Recognised. • Foundations built on ISO 9001:2008 usually

Benefits of Nadcap

Business Security & Retention.

Enhanced Reputation for Quality & Technical Excellence.

Confidence that Process Controls are of the Highest Standard. Prestige. After 10 years we are finally starting to see, less Prime Audits and more

acceptance of just the Nadcap audit.

Higher conformance to Prime requirements.

18

Page 19: Nadcap Supplier Symposium...•Check AC7004 is an acceptable QMS with both your Prime & Customer ? • Is Internationally Recognised. • Foundations built on ISO 9001:2008 usually

Disadvantages of Nadcap

Cost of Audits Additional day to day people costs to maintain the necessary quality /

conformance level.

Potential delay in supply chain Turn Around Times to clarify requirements.

Major Drain on site Quality / Technical Resource of Time Spent.

– Preparing for audits (Perform as many Self Assessments as possible) – Participating (Team Approach) – Answering NCR’s

19

Page 20: Nadcap Supplier Symposium...•Check AC7004 is an acceptable QMS with both your Prime & Customer ? • Is Internationally Recognised. • Foundations built on ISO 9001:2008 usually

Future Opportunities & Suggestions

Mutual Supplier Benefits ~ All Subscribing Special Process Providers need to have more say & involvement into the future program – How ?.

Nadcap audits should not be scheduled by PRI at supplier meetings.

PRI should continue to offer ‘Free Training Sessions’ at Supplier

Meetings.

Heat Treatment Primes need to work towards one Global Pyrometry / Processing Standard.

Like to see Introduced a Flow Down Check Sheet for Tier Manufacturers

who purchase Special Processes to verify: – Accurate Flow down to sub special process suppliers – Adequate verification of purchased services

20

Page 21: Nadcap Supplier Symposium...•Check AC7004 is an acceptable QMS with both your Prime & Customer ? • Is Internationally Recognised. • Foundations built on ISO 9001:2008 usually

21