N6247311R40010012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated PreBid RFIs and Answers 1 RFI # 1: Can we get Attachment B (List of Existing Equipment by Bldg) for reference only? Answer # 1: Enclosed find the original version of Attachment B, dated June 2011; Note the latest revision to the RFP was made August 2013. Some of the information contained in Attachment B is out of date and the Government does not guarantee the accuracy of the information. Therefore, Attachment B and all information contained therein is provided for reference only. RFI # 2: Can we utilize a triple hat on this project? (i.e. one – CQC/Superintendent/SSHO)? Answer # 2: The Quality Control Manager (CQC) and Safety Officer (SSHO) duties shall not be performed by the same person. The Quality Control Manager duties shall be performed by a person who is dedicated to that role only. The Superintendent and Safety Officer duties may be performed by the same person if that person is fully qualified for both roles. RFI # 3: What qualification a SSHO/Super must have in order to become the competent person in the field related to lead and asbestos work? Just in case we need to core drill a wall that is lead painted or work in the vicinity of asbestos insulation. Answer # 3: A competent person for Lead and Asbestos work shall be provided by the contractor for any building that has been identified where Lead or Asbestos will be impacted in the field. In order to be considered a competent person for work involving Lead, a person must be certified by the Environmental Protection Agency (EPA) as a Risk Assessor. In order to be considered a competent person for work involving Asbestos, a person must be certified in the State of Arizona as an Asbestos ContractorSupervisor. RFI # 4: Will the base provide utility locate services near each King Fisher transmitter poles? Answer # 4: The locating and marking of underground utilities are the responsibility of the contractor. For further clarification refer to Part 2, Paragraph 17; Part 2, Paragraph 34.m; Part 2, Paragraph 34.n. RFI # 5: Please confirm that one DACR will be located in Bldg 916 and the other in Bldg 404. Answer # 5: Both will be located in Building 916. RFI # 6: What is the current UPS (uninterrupted power supply) size and capacity? Answer # 6: Provide a UPS as required per RFP. RFI # 7: Who will deprogram the King Fisher receiver once building are brought on line to the new receiver?

N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

N62473‐11‐R‐4001‐0012                YU1125M Replace Fire Alarm Reporting System, MCAS Yuma  

Consolidated Pre‐Bid RFIs and Answers  

1  

RFI # 1:  Can we get Attachment B (List of Existing Equipment by Bldg) for reference only? 

 

Answer # 1: Enclosed find the original version of Attachment B, dated June 2011; Note the latest 

revision to the RFP was made August 2013.  Some of the information contained in Attachment B is out 

of date and the Government does not guarantee the accuracy of the information.  Therefore, 

Attachment B and all information contained therein is provided for reference only. 

 

RFI # 2: Can we utilize a triple hat on this project?  (i.e. one – CQC/Superintendent/SSHO)? 

 

Answer # 2:  The Quality Control Manager (CQC) and Safety Officer (SSHO) duties shall not be performed 

by the same person.  The Quality Control Manager duties shall be performed by a person who is 

dedicated to that role only.  The Superintendent and Safety Officer duties may be performed by the 

same person if that person is fully qualified for both roles.   

 

RFI # 3: What qualification a SSHO/Super must have in order to become the competent person in the 

field related to lead and asbestos work?  Just in case we need to core drill a wall that is lead painted or 

work in the vicinity of asbestos insulation. 

 

Answer # 3:  A competent person for Lead and Asbestos work shall be provided by the contractor for 

any building that has been identified where Lead or Asbestos will be impacted in the field.  In order to 

be considered a competent person for work involving Lead, a person must be certified by the 

Environmental Protection Agency (EPA) as a Risk Assessor.  In order to be considered a competent 

person for work involving Asbestos, a person must be certified in the State of Arizona as an Asbestos 

Contractor‐Supervisor.   

 

RFI # 4: Will the base provide utility locate services near each King Fisher transmitter poles? 

 

Answer # 4:  The locating and marking of underground utilities are the responsibility of the contractor.  

For further clarification refer to Part 2, Paragraph 17; Part 2, Paragraph 34.m; Part 2, Paragraph 34.n.  

 

RFI # 5: Please confirm that one DACR will be located in Bldg 916 and the other in Bldg 404. 

 

Answer # 5:  Both will be located in Building 916. 

 

RFI # 6: What is the current UPS (uninterrupted power supply) size and capacity? 

 

Answer # 6:  Provide a UPS as required per RFP.  

 

RFI # 7: Who will de‐program the King Fisher receiver once building are brought on line to the new 

receiver? 

Page 2: N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

N62473‐11‐R‐4001‐0012                YU1125M Replace Fire Alarm Reporting System, MCAS Yuma  

Consolidated Pre‐Bid RFIs and Answers  

2  

 

Answer # 7:  The King Fisher receiver will be de‐programmed by the Contractor.   

 

RFI # 8: Can you provide us with vendor information for the current software being used by dispatch? 

 

Answer # 8:  New CAD software is required per RFP.  New CAD software will be provided by the 

Contractor and is to meet the requirements of the RFP and be compatible with MCAS Yuma 

requirements. 

 

RFI # 9: Do we need to have engineered drawings for building that are to replace FACP only? 

 

Answer # 9:  Engineered drawings are required for the entire scope of work encompassed in this 

project.   

 

RFI # 10: Bldg 3216 has a King Fisher Panel currently installed, recommend re‐classifying this building for 

new FACP with DACT. 

 

Answer # 10:  Change RFP requirement to new FACP with DACT.  

 

RFI # 11: Bldg 3216 does not have existing phone lines.  Please provide location where we can access 

them.   

 

Answer # 11: Phone lines are available in a Communications manhole approximately 150 feet from 

Building 3216.  The Contractor is to provide all labor, materials and equipment for bringing the phone 

lines from this location to Building 3216.        

 

RFI # 12: Bldg 95 – The existing panel is an addressable Notifier FACP and is fully functional, should this 

be a DACT only addition?  

 

Answer # 12:  Change RFP requirement to DACT only addition.  

 

RFI # 13: Does Bldg 1505 have existing phone lines?  If not, where can we acquire them? 

 

Answer # 13: Building may have phone lines.  However, the Contractor is responsible for providing new 

phone lines to the facility or using an alternate means of communication.  If an alternate means is used 

it must be approved by the Government and must comply with all Government regulations.  The nearest 

phone conduit lines are located approximately 1200 feet South of Bldg 1505.  The nearest phone line 

splice is located approximately 2400 feet from Bldg 1505.  For bidding purposes the Contractor is to 

provide all labor, materials and equipment to connect Bldg 1505 to the telephone ssystem.    

 

Page 3: N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

N62473‐11‐R‐4001‐0012                YU1125M Replace Fire Alarm Reporting System, MCAS Yuma  

Consolidated Pre‐Bid RFIs and Answers  

3  

RFI # 14: FACPs in Bldg 634 and 635 do not have integrated DACTS?   

 

Answer # 14:  Change RFP requirement to provide external DACT.  

 

RFI # 15: If you are prescribing a new addressable FACP at Bldg 720, the existing 120V smoke detectors 

will need to be replaced with 24V addressable smokes, which will require a complete system upgrade 

with engineered drawings. Can you please clarify? 

 

Answer # 15:  Existing smoke detectors (SDs) not connected to Fire Alarm Control Panel (FACP) do not 

need to be replaced with new SDs on new FACP.  

 

RFI # 16: If you are prescribing a new addressable FACP at Bldg. 724, the existing 120V smoke detectors 

will need to be replaced with 24V addressable smokes, which will require a complete system upgrade 

with engineered drawings. Can you please clarify? 

 

Answer # 16:  Existing smoke detectors (SDs) not connected to Fire Alarm Control Panel (FACP) do not 

need to be replaced with new SDs on new FACP.  

 

RFI # 17: Bldg 888, do we need to demo existing King Fisher cabinet?  It currently houses monitor 

modules for the existing fire alarm system.   

 

Answer # 17:  Provide work as described in RFP; relocate monitor modules to a suitable location as 

needed 

 

RFI # 18: Will engineered drawings be require for Bldgs 1083 and 1084? 

 

Answer # 18: Yes, engineered drawings are required for all buildings and all scope of work under this 

project. 

 

RFI # 19: Bldg 1085 is broken into two sections – 1.) Addition and 2.) Old Main.  The old section of this 

building is tied into the existing Notifier panel within the Addition through modules.  Is it the intent to 

replace the existing Notifier panel and upgrade all old devices within the old section of the CDC?  If so, 

will engineered drawings be required?  The old section should be considered a new fire alarm system to 

be integrated with the FACP in the CDC addition. 

 

Answer # 19:  Yes. Drawings required.  

 

RFI # 20: Are there any existing UG conduit connecting Bldg 1521 and Bldg 1522, and Bldg 1521 and Bldg 

1523? 

 

Page 4: N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

N62473‐11‐R‐4001‐0012                YU1125M Replace Fire Alarm Reporting System, MCAS Yuma  

Consolidated Pre‐Bid RFIs and Answers  

4  

Answer # 20:  Underground conduit should be present connecting these buildings.  However, Contractor 

is responsible for providing new conduit and new wire as needed to provide the scope of work required 

in the RFP.  Provide all labor, materials and equipment to complete the scope of work in RFP. 

 

RFI # 21: For King Fisher Pole demolition, are we to abandon the wire in place?    

 

Answer # 21:  If wire or conduit is above ground and readily evident it shall be removed. 

 

RFI # 22: For King Fisher Pole demolition, how far below grade will we be required to demo these 

poles/existing foundations?   

 

Answer # 22:  The poles and existing foundations (pedestals) shall be removed in their entirety. 

 

RFI # 23: What is the government’s expectation for information transmitted to base wide, are they 

expecting to receive Alarm, Trouble & Supervisory signals or are they expecting to receive points from 

the FACP?   

 

Answer # 23:  External DACTs will be alarm, trouble, and supervisory. Integrated DACTS should report 

points.  

 

RFI # 24: Per the RFP there is no Price Schedule Sheet, will one be provided for this project?  Answer # 24:  Refer to Part 1 and provide bid in company letterhead.    RFI # 25: May the Quality Control Manager assume the responsibilities of the Superintendent and or the SSHO on this project?  Answer # 25:  No.  Refer to Answer for RFI # 2 above.  RFI # 26: Part three, paragraph 20101.1 General Demolition states that all buildings outside of the 40 already tested will be required to be tested for ACM and LBP where selective demolition will occur. Who will be responsible for testing these areas, the Government or the Contractor?  Answer  #  26:  RFP  Attachment  A  (Hazardous  Material  Reports  of  40  Buildings)  was  provided  for reference and  information only,  it  is considered to be obsolete from a hazardous material perspective.  MCAS Yuma provided a  list of buildings  that do not present a  Lead or Asbestos hazard,  this  list was provided at the site visit  in a CD.   The buildings that do not present a Lead or Asbestos hazard do not need  to be  tested.   All other buildings  are  required  to be  tested.    Testing will be performed by  the Government, MCAS Yuma Environmental Department.  The Contractor is to submit a request for testing of the facilities according to the phasing of work.   The requests for testing are to be provided far ahead of the actual work.  Also, the Contractor is responsible for providing a design that shows what portions of the facilities will be disturbed.  

Page 5: N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

N62473‐11‐R‐4001‐0012                YU1125M Replace Fire Alarm Reporting System, MCAS Yuma  

Consolidated Pre‐Bid RFIs and Answers  

5  

RFI # 27: Part three, paragraph 20101.1 General Demolition states alternately, the contractor may treat all materials  in  the  area  of  demolition  as  it  is ACM.  In  this  case,  the  contractor will  be  required  to perform all work by certified personnel. Per  this statement all demolition areas will be considered  to have ACM and will need to be removed by a certified person and priced accordingly, is this correct?  Answer # 27:   MCAS Yuma also provided a list of buildings that DO present a Lead or Asbestos hazard, this  list was also provided at  the site visit  in a CD.   The Contractor should have on staff a Competent Person  for  Lead  and  Asbestos work.    Refer  to  Answer  for  RFI  #  3  for  Competent  person  credential requirements.    Since  the  buildings  have  been  deemed  to  pose  a  hazard  all  required work  in  these facilities could be overseen by a Competent person who directs  the work  to protect  the workers and occupants of the facility, and in accordance with all local, State and Federal requirements.     RFI # 28: This project is in phases can we work on multiple buildings at a time as long as those buildings are in the phase we are work on?  Answer # 28: Yes, as long as the requirements of the RFP are met.  RFI # 29: The Arizona Department of Revenue stated that the Arizona Privileged Transaction Tax of 5% of 65% of the total gross receipts applies to this contract. Is this correct?  Answer # 29:  Taxes are the sole responsibility of the Contractor.  RFI # 30: After reviewing Part 6 of the RFP there are plan sheets missing for buildings 78, 80, 83, 1248, 1250, 427, 1012, 1257, 410, 6001, 404, 406a, and 1071. Are  there plan  sheets available  showing  the telephone runs for these buildings?  Answer # 30: Plan sheets are available for the following facilities which have been built within the last 5 years: 78 (Hangar), 80 (Hangar), 83 (IMA Facility), 1248 (ISMT Facility), 1250 (Communications Building), 1012  (Communications Hut, East of Water Tanks), 1257  (Storage Building, Van Pad Complex), 410  (JSF Simulator Bldg), 406a  (MAWTS Addition  to Bldg 406), 1071  (Child Development Center Annex).   Plans are also available for Bldg 6001 (Camp Billy Machen, Administration & Berthing Bldg).  Plans may not be available for Buildings 427 (Communications Hut) and 404  (Fire Alarm Shops Building).   The plans that are available will be provided to the Contractor after award.  RFI # 31: Is a DOR (Fire Protection Engineer) required for the approval of the fire alarm drawings? 

 

Answer # 31: Yes.  

RFI # 32: If a DOR (Fire Protection Engineer) is required for the approval of the fire alarm drawings, is a 

NICET LEVEL 3 stamp/signature on the fire alarm drawings also required? 

 

Answer # 32: Yes.  

RFI # 33: Can the QC, Site Safety Officer, and Superintendent t be the same individual? 

 

Page 6: N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

N62473‐11‐R‐4001‐0012                YU1125M Replace Fire Alarm Reporting System, MCAS Yuma  

Consolidated Pre‐Bid RFIs and Answers  

6  

Answer # 33: No.  See the Answer to RFI # 2 above.  

RFI # 34: Is it acceptable to work 4 ten‐hour days? 

 

Answer # 34: Yes.  However, work schedule will have to be approved by the ROICC.  RFI # 35: Will final testing only be required to the new reporting software at MCAS Yuma? 

 

Answer # 35: Final testing will be required on all new work.  

 

RFI # 36: Will any scope of work be required at the Regional Operations Center (ROC), located in San 

Diego, CA?  If so, please define the scope of work requirements. 

 

Answer # 36: No.  Additional scope for Regional Operations Center in San Diego is not applicable.  

 

RFI # 37: If phased testing / acceptable occurs, will the warranty period also reflect this schedule? 

 

Answer # 37: No, the warranty period will begin at contract completion. 

 

RFI # 38: Will the two (2) dedicated phone lines (in the telephone room) be labeled and tagged for 

contractor use prior to the start of construction? 

 

Answer # 38:  The Contractor will be required to submit a request to MCAS Yuma Base Telephone for all 

the number of lines and the buildings where phone lines are required.  Base Telephone will then provide 

the phone lines and tag the lines.   

 

RFI # 39: Please confirm that only an alarm, trouble, and supervisory signal will be required to transmit 

from the FACP to DACT. 

 

Answer # 39: External DACTs will be alarm, trouble, and supervisory. Integrated DACTS should report 

points.  

 

RFI # 40: Do buildings 204, 404, and 917 have fire sprinklers? 

 

Answer # 40:  No. 

 

RFI # 41: Please provide size and quantity of the air handling unit s for buildings 204, 404, and 917 (this 

is required for duct detector installation/design). 

 

Answer # 41:  For bidding purposes assume 2 duct smoke detectors (DSDs) per building.  

 

Page 7: N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

N62473‐11‐R‐4001‐0012                YU1125M Replace Fire Alarm Reporting System, MCAS Yuma  

Consolidated Pre‐Bid RFIs and Answers  

7  

RFI # 42: Will accurate AUTOCAD files be provide for all buildings to the successful contractor? 

 

Answer # 42:  AutoCAD floor plans will be provided for most buildings, approximately 85%.  The balance 

of the building floor plans will have to be provided by the Contractor so that work can be accomplished.     

 

RFI # 43: Will accurate AUTOCAD files be provided for buildings 204, 404, and 917 to the successful 

contractor? 

 

Answer # 43:  AutoCAD floor plans are available for Building 204 and 917.  AutoCAD floor plans for 

Building 404 will have to be provided by the Contractor to accomplish the scope of work. 

 

RFI # 44: In regards to the 43 Buildings that require installation of new FACPs with integrated DACTS – 

will a detailed fire alarm drawing be required showing load calculations and voltage drop requirement of 

the NEW PANEL and EXISTING field fire alarm devices? 

 

Answer # 44:  Battery calculations required to meet 48 hr/10 min requirement.  

 

RFI # 45: In regards to the 43 Buildings that require installation of new FACPs with integrated DACTS ‐ 

will testing of the entire fire alarm system be required?  Will the Fire Protection Engineer be required to 

witness this test? 

 

Answer # 45:  Yes. Yes. 

 

RFI # 46: In regards to the 43 Buildings that require installation of new FACPs with integrated DACTS – 

please confirm that all smoke detectors are to be replace?  If they are to be replaced, can an overall 

quantity of smoke detectors be provided to estimate cost accurately? 

 

Answer # 46:  Yes. Smoke detectors need to be compatible with new FACP.  

 

RFI # 47: In regards to the 43 Buildings that require installation of new FACPs with integrated DACTS – 

will new batteries for fire alarm panels and power supply panels be required? 

 

Answer # 47:  Yes 

 

RFI # 48: In regards to the 43 Buildings that require installation of new FACPs with integrated DACTS – 

are faulty field wiring and field devices required to be repaired/replaced under this scope of work?  If so, 

can the latest test and inspection reports be provided to adequately estimate the repair/replacement 

costs? 

 

Answer # 48: Any troubles on the system before commencement of work shall be documented.  

Page 8: N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

N62473‐11‐R‐4001‐0012                YU1125M Replace Fire Alarm Reporting System, MCAS Yuma  

Consolidated Pre‐Bid RFIs and Answers  

8  

 

RFI # 49: In regards to the 43 Buildings that require installation of new FACPs with integrated‐ please 

confirm that all of the EXISTING fire alarm panels are CONVENTIONAL, not ADDRESSABLE. 

 

Answer # 49: Varies. See attachment B to be provided for reference only.  

 

RFI # 50: Is the conduit between the telephone room and DACT required to be painted red? 

 

Answer # 50: Yes 

 

RFI # 51: Will voice evacuation fire alarms be required for buildings 204, 404, and 917? 

 

Answer # 51: No 

 

RFI # 52: Will any visual (LED signs at EXITS) mass notification systems be required for buildings 204, 404, 

and 917? 

 

Answer # 52: No 

 

RFI # 53: There is no CAD company that is UL compliant for UL1981 fire and berg.  Also, there is not a 

CAD company that will be fully compatible with Bosch receivers.  Please confirm that it is not the 

governments intent to get Computer Aided Dispatch Software System.  (It is possible to get a UL listed 

dispatch system similar to MCAS Miramar and all other Navy / Marine Corps installation). 

 

Answer # 53: Provide CAD system as required per RFP. 

 

RFI # 54: Please provide estimated contract value for this project. 

 

Answer # 54:  A general range is between $2 Million and $5 Million. 

 

RFI # 55: Please provide the period of performance for this project. 

 

Answer # 55:  Refer to Part 1, the period of performance is 730 days. 

 

RFI # 56: Part 1,  Item 8 of RFP calls  for proposal to provide per‐building breakdown of cost, material, 

labor and unit pricing. Based on the quantity of buildings and the award of the project being on overall 

cost, is it possible to have this requirement removed and that information be provided upon award with 

the cost loaded schedule?  

 

Page 9: N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

N62473‐11‐R‐4001‐0012                YU1125M Replace Fire Alarm Reporting System, MCAS Yuma  

Consolidated Pre‐Bid RFIs and Answers  

9  

Answer # 56:  Due to time constrains a per‐building breakdown is not required with the submittal.  It will 

be  required upon award with  the cost  loaded schedule.   However,  the Contractor should be  ready  to 

discuss details of their cost proposal prior to award. 

 

RFI # 57: RFP calls  for  two DACRs, with one being  located at  receiving station  in Building 916. Please 

provide the location of the second DACR. 

 

Answer # 57: Both will be located in Building 916.  

 

RFI # 58: During the job walk, it was mentioned that there was a list of all the buildings involved in this 

project  and  the  type of  fire  alarm  system  installed  in each.  It  is understood  that  this document was 

deemed out‐of‐date, but can it please be provided as a “Reference Only” document? 

 

Answer # 58: See Answer to RFI # 1.  Attachment B is provided for Reference Only. 

 

RFI # 59: Please confirm that mass notification will not be required for any of the buildings within this 

scope of work. 

 

Answer # 59: Correct. 

 

RFI # 60: Is there a limit to the amount of buildings that can be worked on at one time before the final 

inspections have been completed? 

 

Answer # 60: No, as long as work is performed per phases and the requirements of the RFP are met. 

 

RFI # 61:  In buildings that are specified to provide new smoke detectors that are compatible with new 

FACPs; are contractors to only replace smoke detectors connected to the existing fire alarm system or 

provide proper smoke detector coverage per current code? An example of this was a barracks that was 

walked during the site visit; each unit had 120v smoke detectors that were not connected to the existing 

fire alarm system. Current code would require this type of building to have system smoke detectors  in 

each unit. 

 

Answer  #  61: Only  replace  existing  smoke  detectors  connected  to  FACP with  new  smoke  detectors 

connected to the FACP.  

 

RFI # 62: Please confirm base technicians will provide deprogramming of existing King Fisher equipment 

as buildings are converted to the new DACTs. 

 

Answer  #  62:    Contractor  is  responsible  for  deprogramming  of  existing  King  Fisher  equipment  as 

buildings are converted to the new DACTs. 

Page 10: N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

N62473‐11‐R‐4001‐0012                YU1125M Replace Fire Alarm Reporting System, MCAS Yuma  

Consolidated Pre‐Bid RFIs and Answers  

10  

 

RFI # 63: Will CAD files of all buildings be made available to the awarded contractor? If not, can a list be 

provided for the buildings that do not have CAD files? 

 

Answer # 63:  See Answers for RFIs # 42 and 43.   

 

RFI # 64: Per Part 3 Page 7 Phase III item 35 states Camp Billy Machen, Niland, CA Building 6001 States “Reprogram existing DACT  reporting  to  San Diego Regional Dispatch Center  to  send  Signals  to MCAS Yuma Dispatch”. Is this correct?  

Answer # 64: Yes. 

 

RFI # 65: It was discussed at the job walk that Mass Notification Systems are not required for this project even though the occupancy capacities of several of buildings would normally require a combination Fire Alarm/Mass Notification system. Please confirm that MNS's are not required on this project.  Answer # 65: No Mass Notification Systems (MNS) required  RFI # 66: Please confirm that external communicators (that are UL listed to transmit fire alarm signals), are acceptable in lieu of utilizing an integral DACT that may require proprietary software (Gamewell‐FCI, Notifier, Silent Knight, EST, etc.)  Answer # 66: Provide communication as described by work type per RFP Part 3 section 1.3.   RFI # 67: Please confirm that base telephone will provide, label and clearly identify all phone lines to be utilized by the new base reporting system.  Answer # 67:  See Answer to RFI # 38.  RFI # 68: Please confirm if a new UPS is required for the receiving equipment or if the existing UPS can be connected to.  Answer # 68:  Provide a new UPS per RFP requirements and to also sustain existing load.  RFI # 69: Please confirm that the location of the redundant receiver is Bldg. 404.  Answer # 69:  Both receivers are to be located in Bldg 916.  RFI # 70: Please confirm that the base fire alarm technician will program all accounts as they are cut‐over to the new DACT system.  Answer # 70:  Contractor will program and de‐program all accounts as they are cut‐over from the existing system to the new DACT system.  RFI # 71: Please provide a list of what buildings are not sprinklered. 

Page 11: N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

N62473‐11‐R‐4001‐0012                YU1125M Replace Fire Alarm Reporting System, MCAS Yuma  

Consolidated Pre‐Bid RFIs and Answers  

11  

 Answer # 71: Many of the buildings are sprinklered.   RFI # 72: On page 10 of Part 3 Project Program, Item #38 states to "replace existing smoke detectors with new smoke detectors compatible with new smoke detectors compatible with the new FACP." It was stated during the job walk that the existing smoke detectors in BEQ 720 were 120V stand alone smoke detectors. Please confirm that the replacement of existing smoke detectors for this project only applies to smoke detectors that are currently connected to the existing fire alarm system.  Answer # 72:  See Answer for RFI # 15 and 16.  RFI # 73: On page 10 of Part 3 Project Program, Item #41 states to "Install new FACP with integrated DACT." This building is not sprinklered. Please confirm that full smoke detection is not required in buildings that are not fully sprinklered.  Answer # 73:  Adding full smoke detection is not required where it does not exist currently.   

 

 

Page 12: N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

Replace Fire Alarm Reporting System N62473-06-D-1047, Task Order 0011 Marine Corps Air Station (MCAS), Yuma, Arizona

PART SIX - ATTACHMENTS - Page 1

ATTACHMENT B Building Fire Alarm Control Panel and DACT Information Spreadsheets B-01: Project Building List B-02: Program and Test Existing FACP with Existing Internal DACT B-03: Install New Integrated DACT, Program Existing Panel B-04: Install New DACT Panel and Interface with Existing Panel B-05: Install New FACP with Internal DACT and connect to Existing Devices B-06: Install New Complete Fire Alarm System B-07: Interface or Interconnect to Other Existing Building FACP

Page 13: N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

Drawing #Building

#Bldg. Occupancy

FACU

ManufacturerFACP Model #

Addressable /

ConventionalProject Scope of Work NOTES

APP-O215 215 GSE Maintbay/Admin KingFisher KF-24-DS Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-0223 223 Paraloft/Admin KingFisher KF-24-DS Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-0228 228 Environmental/Admin KingFisher KF-24-DS Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-0321 321 Hazmat Storage/Admin Notifier NFW-50 AddressablePROGRAM & TEST EXISTING FACP W /

INTEGRATED DACT

APP-0324 324 Warehouse/Storage/Admin KingFisher KF-24-DS Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

NONE 327 Hazmat SorageTo be shared

with 328Eshared Conventional

INTERFACE DEVICES TO BUILDING #328E

FACP

APP-0328 328E Warehouse/Storage/Admin Notifier NFW2-100-2E AddressablePROGRAM & TEST EXISTING FACP W /

INTEGRATED DACT

APP-0328 328M Warehouse/Storage/AdminShared with

328Eshared Conventional

DEMO FACP - INTERFACE DEVICES TO

BUILDING #328E FACPFACP located 328E covers 328E and 328M

APP-0328 328W Warehouse/Storage/Admin Notifier NFW2-100-2E AddressableDEMO FACP - INTERFACE DEVICES TO

BUILDING #328E FACP

ALARM/TROUBLE monitored by NFW-100 @

328E

NONE 329 Hazmat SorageTo be shared

with 328Eshared Conventional

INTERFACE DEVICES TO BUILDING #328E

FACP

APP-0406 406 MAWTS-1 Admin Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

NONE 406A MAWTS-1 Applied Instructor Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

APP-0408 408 Flight Simulator/Admin Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

APP-0410 410T MAWTS-1 Admin Fire-Lite MS-4 Conventional INSTALL NEW INTEGRATED DACT

APP-0427 427 Station Telephone System Potter PFC2000RC Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-0460 460 DOSS/Admin/ Assembly Notifier NFS-320 Addressable INSTALL NEW INTEGRATED DACT

APP-0480 480 Admin/Warehouse/Armory KingFisher KF-24-DS Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-0491 491 Armory KingFisher KF-24-DS Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-0500 500 CDE/Photo/Admin KingFisher KFRTI-52 ConventionalINSTALL NEW DACT COMMUNICATOR PANEL

AND INTERFACE TO EXISITNG FACP

APP-0508 508 TACTS/Admin Notifier System 500 Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-0530 530 Warehouse/Storage/Admin Notifier NFS-320 Addressable INSTALL NEW INTEGRATED DACT

APP-0545 545 Station Gym Notifier SFP-5UD ConventionalPROGRAM & TEST EXISTING FACP W /

INTEGRATED DACT

jtesdall
Typewritten Text
ATTACHMENT B - 01 PROJECT BUILDING LIST
Page 14: N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

APP-0564 564 Auto-Hobby Shop/Office KingFisher KFRTI-52 ConventionalINSTALL NEW DACT COMMUNICATOR PANEL

AND INTERFACE TO EXISITNG FACP

APP-0570 570 MCAS Service Station KingFisher KFRTI-52 ConventionalINSTALL NEW DACT COMMUNICATOR PANEL

AND INTERFACE TO EXISITNG FACP

APP-0590 590 Commissary KingFisher KF-24-DS Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-0591 591 Veterinary Clinic KingFisher KFRTI-52 ConventionalINSTALL NEW DACT COMMUNICATOR PANEL

AND INTERFACE TO EXISITNG FACPTelco Exterior Rear S

APP-0598 598 MCCS Admin Notifier NFS-320 Addressable INSTALL NEW INTEGRATED DACT

APP-0603 603 MT/Admin/Maint Bay Notifier NFW-50 AddressablePROGRAM & TEST EXISTING FACP W /

INTEGRATED DACTKFRTI-52 in room with NFW-50

APP-0610 610 CLC-16 Admin/Maint Bay Notifier SFP-1024 Addressable INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-0633 633 MCCS Admin/Library KingFisher KFRTI-52 ConventionalINSTALL NEW DACT COMMUNICATOR PANEL

AND INTERFACE TO EXISITNG FACP

APP-0634 634 Dormitory Notifier NFS-320 AddressablePROGRAM & TEST EXISTING FACP W /

INTEGRATED DACT

APP-0635 635 Dormitory Notifier NFS-320 AddressablePROGRAM & TEST EXISTING FACP W /

INTEGRATED DACT

APP-0645 645 Business Office KingFisher KF-24-DS Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-0660 660 Dormitory Notifier AddressablePROGRAM & TEST EXISTING FACP W /

INTEGRATED DACT

DISCONTINUED FACP MODEL being replaced

under other project

FACP Exterior Mounted - KFRI in Bldg 663 - APP-0661 661 Dormitory GE (EST) Mir-tone MIR-QS- CPU2 Addressable INSTALL NEW INTEGRATED DACT KFRI Mounted in Bldg 663

APP-0662 662 Dormitory Secutron MR2100 Addressable INSTALL NEW INTEGRATED DACT MR2644 Annunciator - KFRI in Bldg 663

APP-0672 672 Station Theater KingFisher KF-24-DS Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-0673 673 Bowling Alley Notifier NFW-50 ConventionalPROGRAM & TEST EXISTING FACP W /

INTEGRATED DACTKFRI Transmitter across street @ 545

APP-0693 693 Marine Corps Exchange KingFisher KF-24-DS Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

Scheduled for Remodel before FY 2012

APP-0710 710 Dining Facility/Offices Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

APP-0711 711 Cold Storage/Offices Notifier SFP-2404 ConventionalINSTALL NEW DACT COMMUNICATOR PANEL

AND INTERFACE TO EXISITNG FACP

APP-0720 720 Dormitory Fire-Lite Sensi-scan 1000 Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

MPOE @ FACP Panel - Rm 117

APP-0722 722 H&HS HQ Offices KingFisher KFRTI-52 ConventionalINSTALL NEW DACT COMMUNICATOR PANEL

AND INTERFACE TO EXISITNG FACP

APP-0724 724 Dormitory Fire-Lite Sensi-scan 1000 Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

MPOE @ FACP Panel - Rm 119

APP-0731 731 ROICC/NAVFAC/Admin Fire-Lite MS-424A Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-0740 740 Dormitory Secutron MR2100R Addressable INSTALL NEW INTEGRATED DACT KFRI @ MPOE

APP-0850 850 Education/Admin Secutron MR2100R Addressable INSTALL NEW INTEGRATED DACT

APP-0852 852 Payroll/Legal/Admin KingFisher KF-24-DS Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP PANEL - Connected to

KFRI Transmitter on street

Page 15: N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

APP-0859 859 Dormitory Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

APP-0860 860 Dormitory Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

APP-0875 875 Comm Switch Station Potter PFC2000RC Addressable INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-0880 880 BSD/Storage/Pest Control FCI FCI-72 Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-0888 888 BSD/Maint/Admin Notifier NFS-320 Addressable INSTALL NEW INTEGRATED DACT

APP-0912 912 Dormitory Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

APP-0913 913 Dormitory KingFisher KF-24-DS ConventionalRELOCATE & INSTALL NEW FACP W /

INTEGRATED DACT

DISCONTINUED FACP MODEL

FACP EXTERIOR Mounted Outdoors

APP-0914 914 Dormitory Secutron MR2100R Addressable INSTALL NEW INTEGRATED DACT

APP-0916 916PMO

NEW DISPATCH CENTERNotifier NFS-320 Addressable

PROGRAM & TEST EXISTING FACP W /

INTEGRATED DACTNEW DISPATCH OFFICE

APP-0918 918 Dormitory Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

APP-0919 919 Dormitory Notifier NFS-320 Addressable INSTALL NEW INTEGRATED DACT EVAC FIRE VOICE 25/50 (KFRI at FACP)

APP-0920 920 Dormitory Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

APP-0930 930 Dormitory Secutron MR2100 Addressable INSTALL NEW INTEGRATED DACT MPOE 2nd Level

APP-0951 951 MWD K-9 Office KingFisher KF-24-DS Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-0952 952 Brig/Vehicle Pass Office KingFisher KF-24-DS Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-0965 965 Exchange Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

APP-0980 980 HQ/Admin KingFisher KF-24-DS Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-1020 1020 Dormitory Silent Knight Intellinight 5820XL AddressablePROGRAM & TEST EXISTING FACP W /

INTEGRATED DACT

APP-1030 1030 Telephone Office Notifier NFW2-100-2E AddressablePROGRAM & TEST EXISTING FACP W /

INTEGRATED DACT

APP-1040 1040 Dormitory Silent Knight Intellinight 5820XL AddressablePROGRAM & TEST EXISTING FACP W /

INTEGRATED DACT

APP-1050 1050 Youth Center Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

APP-1056 1056 Dormitory Secutron MR2100 Addressable INSTALL NEW INTEGRATED DACT

APP-1058 1058 Dormitory Quickstart EST Quickstart EST Addressable INSTALL NEW INTEGRATED DACT

APP-1060 1060 Dormitory Silent Knight Intellinight 5820XL AddressablePROGRAM & TEST EXISTING FACP W /

INTEGRATED DACT

APP-1071 1071 Child Development Annex Notifier NFS-3030 Addressable INSTALL NEW INTEGRATED DACT

APP-1080 1080 Military Housing Office KingFisher KFRTI-52 ConventionalINSTALL NEW DACT COMMUNICATOR PANEL

AND INTERFACE TO EXISITNG FACP

Page 16: N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

APP-1083 1083 Dos Rios Inn Notifier AFP-200 Addressable INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

Connects to KF of 1084

APP-1084 1084 Dos Rios Inn Notifier AFP-200 Addressable INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-1085 1085 Child Development Center Notifier AFP-400 Addressable INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-1088 1088 Dos Rios Inn KingFisher KFRTI-52 ConventionalINSTALL NEW DACT COMMUNICATOR PANEL

AND INTERFACE TO EXISITNG FACP

APP-1093 1093 Admin/Classroom KingFisher KFRTI-52 ConventionalINSTALL NEW DACT COMMUNICATOR PANEL

AND INTERFACE TO EXISITNG FACP

APP-1175 1175 Medical/Dental Clinic KingFisher KF-24-DS Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-1176 1176 Chapel KingFisher KF-24-DS Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-1177 1177 Chaplains Office KingFisher KF-24-DS Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-1200 1200 Consolidated Club KingFisher KFRTI-52 ConventionalINSTALL NEW DACT COMMUNICATOR PANEL

AND INTERFACE TO EXISITNG FACP

APP-1229 1229 MALS Ord Admin/Storage FCI 7200 Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL -

PROPOSED INSTALL FOR NEW NFS-320

W/DACT IN PROGRESS - VERIFY CURRENT APP-1520 1520 Trans-Receiver Site KingFisher KF-24-DS Conventional INSTALL NEW FACP W / INTEGRATED DACT

DISCONTINUED FACP MODEL

Old FACP - Standard Electric Time

APP-1521 1521 ATC Tower Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

APP-1522 1522 ATC/Radar/Admin Notifier ANNCIATOR Addressable INTERFACE FACP TO BUILDING #1521 FACP

APP-1523 1523 ATC/Admin Silent Knight SK-5208 Addressable INTERFACE FACP TO BUILDING #1521 FACP

APP-1700 1700 Ordnance Admin Office Notifier SFP-1024 Addressable INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-1708 1708 Ordnance Admin MAWTS Notifier NFS-320 Conventional INSTALL NEW INTEGRATED DACT

APP-1757 1757 Comm Switch Station Notifier RP1002 Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-3203 3203 Admin/Maint Shop KingFisher KF-24-DS Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-3211 3211 Admin/Maint Shop FCI 7200 Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-3216 3216 Domestic/Fire Pumps House KingFisher KFRTI-52 ConventionalINSTALL NEW DACT COMMUNICATOR PANEL

AND INTERFACE TO EXISITNG FACPDISCONTINUED FACP MODEL

APP-3219 3219 HQ/Admin Secutron MR2100R Addressable INSTALL NEW INTEGRATED DACT

APP-3224 3224 Admin/Warehouse/Storage Secutron MR2100R Addressable INSTALL NEW INTEGRATED DACT

APP-3231 3231 Admin/Maint Shop FCI 7200 Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-3238 3238 Admin/Storage FCI 7200 Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-3240 3240 Admin/Comm KingFisher KF-24-DS Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-3242 3242 Admin/Warehouse/Storage KingFisher KF-24-DS Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

Page 17: N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

APP-3244 3244 Admin/MT Maint Fire-Lite MS-424A Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-3245 3245 Admin/MT Maint KingFisher KF-24-DS Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-0095 95 AC Hanger Notifier AFP-400 Addressable INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

NONE 90 INTERCONNECTED TO BUILDING 97 FACP INTERCONNECTED TO BUILDING 97 FACP

APP-0097 97 AC Hanger KingFisher KFRTI-52 ConventionalINSTALL NEW DACT COMMUNICATOR PANEL

AND INTERFACE TO EXISITNG FACP

APP-0101 101 AC Hanger Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

APP-0103 103 AC Hanger Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

NONE 123 INTERCONNECTED TO BUILDING 103 FACP INTERCONNECTED TO BUILDING 103 FACP

APP-0109 109 AC Hanger Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

APP-0128 128 Test Cell Notifier NFS-320 Addressable INSTALL NEW INTEGRATED DACT

APP-0146 146 AC Hanger Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT Transmitter - RF- in Parking lot

APP-0151 151 VAL/Range Mgt/Admin Notifier NFW-50 AddressablePROGRAM & TEST EXISTING FACP W /

INTEGRATED DACT

APP-0153 153 Base Ops/Restaurant/Admin Notifier NFW2-100-2E AddressablePROGRAM & TEST EXISTING FACP W /

INTEGRATED DACT

APP-0204 204 Airframes/Weld Shop Unknown ConventionalINSTALL COMPLETE NEW FIRE ALARM

SYSTEM WITH FACP W / INTEFRATED DACT DISCONTINUED FACP MODEL

APP-0220 220 AC Hanger Notifier NFS-3030 Addressable INSTALL NEW INTEGRATED DACT

APP-0227 227 AC Hanger Viking eLan AddressableINSTALL NEW INTEGRATED DACT / MEDIA

GATEWAY2 Panels Closed Networked Linked

APP-0227 229 AC Engine Maint/Admin KingFisher KF-24-DS Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-0230 230 Parts Maint/Admin KingFisher KF-24-DS Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-0234 234 GSE Maint/Admin FCI FCI-72 Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-0240 240 AC Maint Facility Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACTTELCO LOCATED EXTERIOR OF BUILDING 40

FEET EAST.

APP-0310 310 AC Engine Test Cell Notifier NFS-320 Addressable INSTALL NEW INTEGRATED DACT

APP-0311 311 Maytag Office/Test Lab Secutron MR-2100 Addressable INSTALL NEW INTEGRATED DACT

APP-0338 338 Fuel Distribution/Office FCI 7100 Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-1505 1505 Fix Wing Hot Refuel/Admin Gamewell 7100 AddressableINSTALL NEW DACT COMMUNICATOR PANEL

AND INTERFACE TO EXISITNG FACP

APP-2324 2324 S. CALA Tower Simplex 4010 Addressable INSTALL NEW INTEGRATED DACT

APP-2327 2327 S. CALA Admin/Maint bay Notifier SFP-1024 Addressable INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

Page 18: N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

APP-1605 1605(E) Military Family Housing Harrington HS3400 AddressableINSTALL NEW DACT COMMUNICATOR PANEL

AND INTERFACE TO EXISITNG FACP

APP-1612 1612(A) Military Family Housing FCI 7100 ConventionalINSTALL NEW DACT COMMUNICATOR PANEL

AND INTERFACE TO EXISITNG FACP

APP-1616 1616(A) Military Family Housing FCI 7100 ConventionalINSTALL NEW DACT COMMUNICATOR PANEL

AND INTERFACE TO EXISITNG FACP

APP-1621 1621 Military Family Housing Harrington HS3400 AddressableINSTALL NEW DACT COMMUNICATOR PANEL

AND INTERFACE TO EXISITNG FACP

APP-1815 1815D Military Family Housing Harrington HS3400 AddressableINSTALL NEW DACT COMMUNICATOR PANEL

AND INTERFACE TO EXISITNG FACP

APP-1839 1839(A) Military Family Housing Harrington HS3400 AddressableINSTALL NEW DACT COMMUNICATOR PANEL

AND INTERFACE TO EXISITNG FACP

APP-1846 1846(E) Military Family Housing Harrington HS3400 AddressableINSTALL NEW DACT COMMUNICATOR PANEL

AND INTERFACE TO EXISITNG FACP

APP-2561 2561 Military Housing - Pool House Notifier SFP-1024 Addressable INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-5027 5027 Community Center 16th St. HousingFCI 7200 Conventional INSTALL NEW FACP W / INTEGRATED DACT DISCONTINUED FACP MODEL

APP-0917 917Fire Monitoring / Dispatch

OfficeNONE

INSTALL COMPLETE NEW FIRE ALARM

SYSTEM WITH FACP W / INTEFRATED DACT

NO FIRE ALARM - NO FIRE SPRINKLERS

APP-3262 3262 Office FIKE CyberCat - 50 Addressable INSTALL NEW INTEGRATED DACT

APP-3263 3263 Maintenance Building NONEEXISTING INTERFACE TO BUILDING #3262

FACPMPs and Strobe Speakers connected to 3262

NONE 404Fire Serving/secondary

monitoring receiverUnknown Conventional

INSTALL COMPLETE NEW FIRE ALARM

SYSTEM WITH FACP W / INTEFRATED DACT

DISCONTINUED FACP MODEL

SITE SITEExterior Pole Mounted

TransmittersKingFisher Conventional

Page 19: N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

Drawing #Buildi

ng #Bldg. Occupancy

FACU

ManufacturerFACP Model #

Addressable /

ConventionalProject Scope of Work NOTES

APP-0321 321 Hazmat Storage/Admin Notifier NFW-50 AddressablePROGRAM & TEST EXISTING FACP W /

INTEGRATED DACT

APP-0328 328E Warehouse/Storage/Admin Notifier NFW2-100-2E AddressablePROGRAM & TEST EXISTING FACP W /

INTEGRATED DACT

APP-0545 545 Station Gym Notifier SFP-5UD ConventionalPROGRAM & TEST EXISTING FACP W /

INTEGRATED DACT

APP-0603 603 MT/Admin/Maint Bay Notifier NFW-50 AddressablePROGRAM & TEST EXISTING FACP W /

INTEGRATED DACTKFRTI-52 in room with NFW-50

APP-0634 634 Dormitory Notifier NFS-320 AddressablePROGRAM & TEST EXISTING FACP W /

INTEGRATED DACT

APP-0635 635 Dormitory Notifier NFS-320 AddressablePROGRAM & TEST EXISTING FACP W /

INTEGRATED DACT

APP-0673 673 Bowling Alley Notifier NFW-50 ConventionalPROGRAM & TEST EXISTING FACP W /

INTEGRATED DACTKFRI Transmitter across street @ 545

APP-0916 916PMO

NEW DISPATCH CENTERNotifier NFS-320 Addressable

PROGRAM & TEST EXISTING FACP W /

INTEGRATED DACTNEW DISPATCH CENTER

APP-1020 1020 Dormitory Silent Knight Intellinight 5820XL AddressablePROGRAM & TEST EXISTING FACP W /

INTEGRATED DACT

APP-1030 1030 Telephone Office Notifier NFW2-100-2E AddressablePROGRAM & TEST EXISTING FACP W /

INTEGRATED DACT

APP-1040 1040 Dormitory Silent Knight Intellinight 5820XL AddressablePROGRAM & TEST EXISTING FACP W /

INTEGRATED DACT

APP-1060 1060 Dormitory Silent Knight Intellinight 5820XL AddressablePROGRAM & TEST EXISTING FACP W /

INTEGRATED DACT

APP-0151 151 VAL/Range Mgt/Admin Notifier NFW-50 AddressablePROGRAM & TEST EXISTING FACP W /

INTEGRATED DACT

APP-0153 153 Base Ops/Restaurant/Admin Notifier NFW2-100-2E AddressablePROGRAM & TEST EXISTING FACP W /

INTEGRATED DACT

jtesdall
Typewritten Text
ATTACHMENT B - 02 BUILDING LIST - REPROGRAM
Page 20: N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

Drawing #Buildi

ng #Bldg. Occupancy

FACU

ManufacturerFACP Model #

Addressable /

ConventionalProject Scope of Work NOTES

APP-0406 406 MAWTS-1 Admin Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

NONE 406A MAWTS-1 Applied Instructor Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

APP-0408 408 Flight Simulator/Admin Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

APP-0410 410T MAWTS-1 Admin Fire-Lite MS-4 Conventional INSTALL NEW INTEGRATED DACT

APP-0460 460 DOSS/Admin/ Assembly Notifier NFS-320 Addressable INSTALL NEW INTEGRATED DACT

APP-0530 530 Warehouse/Storage/Admin Notifier NFS-320 Addressable INSTALL NEW INTEGRATED DACT

APP-0598 598 MCCS Admin Notifier NFS-320 Addressable INSTALL NEW INTEGRATED DACT

APP-0661 661 Dormitory GE (EST) Mir-tone MIR-QS- CPU2 Addressable INSTALL NEW INTEGRATED DACT KFRI Mounted in Bldg 663

APP-0662 662 Dormitory Secutron MR2100 Addressable INSTALL NEW INTEGRATED DACT MR2644 Annunciator - KFRI in Bldg 663

APP-0740 740 Dormitory Secutron MR2100R Addressable INSTALL NEW INTEGRATED DACT KFRI @ MPOE

APP-0850 850 Education/Admin Secutron MR2100R Addressable INSTALL NEW INTEGRATED DACT

APP-0859 859 Dormitory Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACTAPP-0859 859 Dormitory Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

APP-0860 860 Dormitory Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

APP-0888 888 BSD/Maint/Admin Notifier NFS-320 Addressable INSTALL NEW INTEGRATED DACT

APP-0912 912 Dormitory Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

APP-0914 914 Dormitory Secutron MR2100R Addressable INSTALL NEW INTEGRATED DACT

APP-0918 918 Dormitory Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

APP-0919 919 Dormitory Notifier NFS-320 Addressable INSTALL NEW INTEGRATED DACT EVAC FIRE VOICE 25/50 (KFRI at FACP)

APP-0920 920 Dormitory Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

APP-0930 930 Dormitory Secutron MR2100 Addressable INSTALL NEW INTEGRATED DACT MPOE 2nd Level

APP-0965 965 Exchange Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

jtesdall
Typewritten Text
ATTACHMENT B - 03 BUILDING LIST - INTEGRATED DACT
Page 21: N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

APP-1050 1050 Youth Center Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

APP-1056 1056 Dormitory Secutron MR2100 Addressable INSTALL NEW INTEGRATED DACT

APP-1058 1058 Dormitory Quickstart EST Quickstart EST Addressable INSTALL NEW INTEGRATED DACT

APP-1071 1071 Child Development Annex Notifier NFS-3030 Addressable INSTALL NEW INTEGRATED DACT

APP-1521 1521 ATC Tower Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

APP-1708 1708 Ordnance Admin MAWTS Notifier NFS-320 Conventional INSTALL NEW INTEGRATED DACT

APP-3219 3219 HQ/Admin Secutron MR2100R Addressable INSTALL NEW INTEGRATED DACT

APP-3224 3224 Admin/Warehouse/Storage Secutron MR2100R Addressable INSTALL NEW INTEGRATED DACT

APP-0101 101 AC Hanger Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

APP-0103 103 AC Hanger Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

APP-0109 109 AC Hanger Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

APP-0128 128 Test Cell Notifier NFS-320 Addressable INSTALL NEW INTEGRATED DACT

APP-0146 146 AC Hanger Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT Transmitter - RF- in Parking lot

APP-0220 220 AC Hanger Notifier NFS-3030 Addressable INSTALL NEW INTEGRATED DACT

APP-0227 227 AC Hanger Viking eLan AddressableINSTALL NEW INTEGRATED DACT /

MEDIA GATEWAY2 Panels Closed Networked Linked

TELCO LOCATED EXTERIOR OF APP-0240 240 AC Maint Facility Notifier NFS-640 Addressable INSTALL NEW INTEGRATED DACT

TELCO LOCATED EXTERIOR OF

BUILDING 40 FEET EAST.

APP-0310 310 AC Engine Test Cell Notifier NFS-320 Addressable INSTALL NEW INTEGRATED DACT

APP-0311 311 Maytag Office/Test Lab Secutron MR-2100 Addressable INSTALL NEW INTEGRATED DACT

APP-2324 2324 S. CALA Tower Simplex 4010 Addressable INSTALL NEW INTEGRATED DACT

APP-3262 3262 Office FIKE CyberCat - 50 Addressable INSTALL NEW INTEGRATED DACT

Page 22: N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

Drawing #Building

#Bldg. Occupancy

FACU

ManufacturerFACP Model #

Addressable /

ConventionalProject Scope of Work NOTES

APP-0500 500 CDE/Photo/Admin KingFisher KFRTI-52 ConventionalINSTALL NEW DACT COMMUNICATOR

PANEL AND INTERFACE TO EXISITNG

APP-0564 564 Auto-Hobby Shop/Office KingFisher KFRTI-52 ConventionalINSTALL NEW DACT COMMUNICATOR

PANEL AND INTERFACE TO EXISITNG

APP-0570 570 MCAS Service Station KingFisher KFRTI-52 ConventionalINSTALL NEW DACT COMMUNICATOR

PANEL AND INTERFACE TO EXISITNG

APP-0591 591 Veterinary Clinic KingFisher KFRTI-52 ConventionalINSTALL NEW DACT COMMUNICATOR

PANEL AND INTERFACE TO EXISITNG Telco Exterior Rear S

APP-0633 633 MCCS Admin/Library KingFisher KFRTI-52 ConventionalINSTALL NEW DACT COMMUNICATOR

PANEL AND INTERFACE TO EXISITNG

APP-0711 711 Cold Storage/Offices Notifier SFP-2404 ConventionalINSTALL NEW DACT COMMUNICATOR

PANEL AND INTERFACE TO EXISITNG

APP-0722 722 H&HS HQ Offices KingFisher KFRTI-52 ConventionalINSTALL NEW DACT COMMUNICATOR

PANEL AND INTERFACE TO EXISITNG

APP-1080 1080 Military Housing Office KingFisher KFRTI-52 ConventionalINSTALL NEW DACT COMMUNICATOR

PANEL AND INTERFACE TO EXISITNG

APP-01088 1088 Dos Rios Inn KingFisher KFRTI-52 ConventionalINSTALL NEW DACT COMMUNICATOR

PANEL AND INTERFACE TO EXISITNG

APP-1093 1093 Admin/Classroom KingFisher KFRTI-52 ConventionalINSTALL NEW DACT COMMUNICATOR

PANEL AND INTERFACE TO EXISITNG

APP-1200 1200 Consolidated Club KingFisher KFRTI-52 ConventionalINSTALL NEW DACT COMMUNICATOR

PANEL AND INTERFACE TO EXISITNG

APP-3216 3216Domestic/Fire Pumps

KingFisher KFRTI-52 ConventionalINSTALL NEW DACT COMMUNICATOR

APP-3216 3216House

KingFisher KFRTI-52 ConventionalPANEL AND INTERFACE TO EXISITNG

APP-0097 97 AC Hanger KingFisher KFRTI-52 ConventionalINSTALL NEW DACT COMMUNICATOR

PANEL AND INTERFACE TO EXISITNG

APP-1505 1505 Fix Wing Hot Refuel/Admin Gamewell 7100 AddressableINSTALL NEW DACT COMMUNICATOR

PANEL AND INTERFACE TO EXISITNG

APP-1605 1605(E) Military Family Housing Harrington HS3400 AddressableINSTALL NEW DACT COMMUNICATOR

PANEL AND INTERFACE TO EXISITNG

APP-1612 1612(A) Military Family Housing FCI 7100 ConventionalINSTALL NEW DACT COMMUNICATOR

PANEL AND INTERFACE TO EXISITNG

APP-1616 1616(A) Military Family Housing FCI 7100 ConventionalINSTALL NEW DACT COMMUNICATOR

PANEL AND INTERFACE TO EXISITNG

APP-1621 1621 Military Family Housing Harrington HS3400 AddressableINSTALL NEW DACT COMMUNICATOR

PANEL AND INTERFACE TO EXISITNG

APP-1815 1815D Military Family Housing Harrington HS3400 AddressableINSTALL NEW DACT COMMUNICATOR

PANEL AND INTERFACE TO EXISITNG

APP-1839 1839(A) Military Family Housing Harrington HS3400 AddressableINSTALL NEW DACT COMMUNICATOR

PANEL AND INTERFACE TO EXISITNG

APP-1846 1846(E) Military Family Housing Harrington HS3400 AddressableINSTALL NEW DACT COMMUNICATOR

PANEL AND INTERFACE TO EXISITNG

jtesdall
Typewritten Text
ATTACHMENT B - 04 BUILDING LIST - NEW DACT PANEL
Page 23: N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

Drawing #Building

#Bldg. Occupancy

FACU

ManufacturerFACP Model #

Addressable /

ConventionalProject Scope of Work NOTES

APP-O215 215 GSE Maintbay/Admin KingFisher KF-24-DS ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-0223 223 Paraloft/Admin KingFisher KF-24-DS ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-0228 228 Environmental/Admin KingFisher KF-24-DS ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-0324 324 Warehouse/Storage/Admin KingFisher KF-24-DS ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-0427 427 Station Telephone System Potter PFC2000RC ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-0480 480 Admin/Warehouse/Armory KingFisher KF-24-DS ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-0491 491 Armory KingFisher KF-24-DS ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-0508 508 TACTS/Admin Notifier System 500 ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-0590 590 Commissary KingFisher KF-24-DS ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-0610 610 CLC-16 Admin/Maint Bay Notifier SFP-1024 AddressableINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-0645 645 Business Office KingFisher KF-24-DS ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-0660 660 Dormitory KingFisher KF-24-DS Conventional

RELOCATE & INSTALL NEW FACP W /

INTEGRATED DACT - CONNECT EXISTING DISCONTINUED FACP MODEL

APP-0660 660 Dormitory KingFisher KF-24-DS Conventional INTEGRATED DACT - CONNECT EXISTING

DEVICES

DISCONTINUED FACP MODEL

FACP Exterior Mounted - KFRI in Bldg 663 -

APP-0672 672 Station Theater KingFisher KF-24-DS ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-0693 693 Marine Corps Exchange KingFisher KF-24-DS ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICES

DISCONTINUED FACP MODEL

Scheduled for Remodel before FY 2012

APP-0710 710 Dining Facility/Offices KingFisher KF-24-DS ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-0720 720 Dormitory Fire-Lite Sensi-scan 1000 ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICES

DISCONTINUED FACP MODEL

MPOE @ FACP Panel - Rm 117

APP-0724 724 Dormitory Fire-Lite Sensi-scan 1000 ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICES

DISCONTINUED FACP MODEL

MPOE @ FACP Panel - Rm 119

APP-0731 731 ROICC/NAVFAC/Admin Fire-Lite MS-424A ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-0852 852 Payroll/Legal/Admin KingFisher KF-24-DS ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICES

DISCONTINUED FACP PANEL - Connected to

KFRI Transmitter on street

APP-0875 875 Comm Switch Station Potter PFC2000RC AddressableINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

jtesdall
Typewritten Text
ATTACHMENT B - 05 BUILDING LIST - NEW FACP/DACT - EXISTING DEVICES
Page 24: N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

APP-0880 880 BSD/Storage/Pest Control FCI FCI-72 ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-0913 913 Dormitory KingFisher KF-24-DS Conventional

RELOCATE & INSTALL NEW FACP W /

INTEGRATED DACT - CONNECT EXISTING

DEVICES

DISCONTINUED FACP MODEL

FACP EXTERIOR Mounted Outdoors

APP-0951 951 MWD K-9 Office KingFisher KF-24-DS ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-0952 952 Brig/Vehicle Pass Office KingFisher KF-24-DS ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-0980 980 HQ/Admin KingFisher KF-24-DS ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-1083 1083 Dos Rios Inn Notifier AFP-200 AddressableINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICES

DISCONTINUED FACP MODEL

Connects to KF of 1084

APP-1084 1084 Dos Rios Inn Notifier AFP-200 AddressableINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-1085 1085 Child Development Center Notifier AFP-400 AddressableINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-1175 1175 Medical/Dental Clinic KingFisher KF-24-DS ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-1176 1176 Chapel KingFisher KF-24-DS ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-1177 1177 Chaplains Office KingFisher KF-24-DS ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-1229 1229 MALS Ord Admin/Storage FCI 7200 ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICES

DISCONTINUED FACP MODEL -

PROPOSED INSTALL FOR NEW NFS-320

W/DACT IN PROGRESS - VERIFY CURRENT

STATUS OF PROJECT.

APP-1520 1520 Trans-Receiver Site KingFisher KF-24-DS ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICES

DISCONTINUED FACP MODEL

Old FACP - Standard Electric Time

APP-1700 1700 Ordnance Admin Office Notifier SFP-1024 AddressableINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

CONNECT EXISTING DEVICES

APP-1757 1757 Comm Switch Station Notifier RP1002 ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-3203 3203 Admin/Maint Shop KingFisher KF-24-DS ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-3211 3211 Admin/Maint Shop FCI 7200 ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-3231 3231 Admin/Maint Shop FCI 7200 ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-3238 3238 Admin/Storage FCI 7200 ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-3240 3240 Admin/Comm KingFisher KF-24-DS ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-3242 3242 Admin/Warehouse/Storage KingFisher KF-24-DS ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-3244 3244 Admin/MT Maint Fire-Lite MS-424A ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-3245 3245 Admin/MT Maint KingFisher KF-24-DS ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

Page 25: N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

APP-0095 95 AC Hanger Notifier AFP-400 AddressableINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-0227 229 AC Engine Maint/Admin KingFisher KF-24-DS ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-0230 230 Parts Maint/Admin KingFisher KF-24-DS ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-0234 234 GSE Maint/Admin FCI FCI-72 ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-0338 338 Fuel Distribution/Office FCI 7100 ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-2327 2327 S. CALA Admin/Maint bay Notifier SFP-1024 AddressableINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-2561 2561 Military Housing - Pool House Notifier SFP-1024 AddressableINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

APP-5027 5027 Community Center 16th St. Housing FCI 7200 ConventionalINSTALL NEW FACP W / INTEGRATED DACT -

CONNECT EXISTING DEVICESDISCONTINUED FACP MODEL

Page 26: N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

Drawing # Building # Bldg. OccupancyFACU

ManufacturerFACP Model #

Addressable /

ConventionalProject Scope of Work NOTES

APP-0204 204 Airframes/Weld Shop Unknown Conventional

INSTALL COMPLETE NEW FIRE ALARM

SYSTEM WITH FACP W / INTEFRATED

DACT

DISCONTINUED FACP MODEL

APP-0917 917

Fire Monitoring / Dispatch

Office - MOVED TO B916 -

01/2011

NO FIRE

ALARMKFRA_C NA

INSTALL COMPLETE NEW FIRE ALARM

SYSTEM WITH FACP W / INTEFRATED

DACT

NO FIRE ALARM - NO FIRE

SPRINKLERS

NONE 404Fire Servicing Shop /

secondary monitoring receiverUnknown Conventional

INSTALL COMPLETE NEW FIRE ALARM

SYSTEM WITH FACP W / INTEFRATED

DACT

DISCONTINUED FACP MODEL

jtesdall
Typewritten Text
ATTACHMENT B - 06 BUILDING LIST - NEW FIRE ALARM SYSTEM
Page 27: N62473 11 R 4001 0012 YU1125M Replace Fire Alarm Reporting ... · N62473‐11‐R‐4001‐0012 YU1125M Replace Fire Alarm Reporting System, MCAS Yuma Consolidated Pre‐Bid RFIs

Drawing # Building # Bldg. OccupancyFACU

ManufacturerFACP Model #

Addressable /

ConventionalProject Scope of Work NOTES

NONE 327 Hazmat SorageTo be shared

with 328Eshared Conventional

INTERFACE DEVICES TO BUILDING #328E

FACP

INTERFACE DEVICES TO BUILDING #328E

FACP

APP-0328 328M Warehouse/Storage/AdminShared with

328Eshared Conventional

DEMO FACP - INTERFACE DEVICES TO

BUILDING #328E FACPFACP located 328E covers 328E and 328M

APP-0328 328W Warehouse/Storage/Admin Notifier NFW2-100-2E AddressableDEMO FACP - INTERFACE DEVICES TO

BUILDING #328E FACP

ALARM/TROUBLE monitored by NFW-100 @

328E

NONE 329 Hazmat SorageTo be shared

with 328Eshared Conventional

INTERFACE DEVICES TO BUILDING #328E

FACP

INTERFACE DEVICES TO BUILDING #328E

FACP

APP-1522 1522 ATC/Radar/Admin Notifier ANNCIATOR Addressable INTERFACE FACP TO BUILDING #1521 FACP INTERFACE FACP TO BUILDING #1521 FACP

APP-1523 1523 ATC/Admin Silent Knight SK-5208 Addressable INTERFACE FACP TO BUILDING #1521 FACP INTERFACE FACP TO BUILDING #1521 FACP

NONE 90 Line Maintenance Control NONE NONE INTERCONNECTED TO BUILDING 97 FACP INTERCONNECTED TO BUILDING 97 FACP

NONE 122 Line Ops Building NONE NONE INTERCONNECTED TO BUILDING 109 FACP INTERCONNECTED TO BUILDING 109 FACP

NONE 123 Line Maintenance Control NONE NONE INTERCONNECTED TO BUILDING 103 FACP INTERCONNECTED TO BUILDING 103 FACP

APP-3263 3263 Maintenance Building NONE NONEEXISTING INTERFACE TO BUILDING #3262

FACPMPs and Strobe Speakers connected to 3262

FACP

jtesdall
Typewritten Text
ATTACHMENT B - 07 BUILDING LIST - INTERFACE TO OTHER BUILDINGS
jtesdall
Line