MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013
MyOcean 2 Project ProgressJ. Dorandeu – MyOcean2 Project Manager
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013
First year of MyOcean-2:a very busy year
• A year of operations: MyOcean-2 started with the operation of MyOcean Service version 2
• A year of evolutions: Definition and specification of versions 3 and 4 (resp. April 2013 and 2014), implementation of V3
• A year of technical work: Design, development and release of V3, R&D, Product quality, Outreach, communication and training
• A year of important events: MyOcean science days, MyOcean User workshop, internal technical workshops, ECOMF strategic partnership
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013
Continuous development in operations April 2012 – April 2013
T0 T0+12
POR
POR
KOff
AOR
T0+3 T0+6
PDR
PDR
PDR
EXEC
EXEC
EXEC
Definition of V3 and V4
DWS
DWS
AccWS
Design of V3 Design of V4
Implementation of V3 V4… VaRR
V2 Operations
Brussels Cork
Barcelona
Toulouse
Madrid
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013
A deep internal involvement
• A improved decision process:– The Executive Committee Bureau (ECB: Marina, Sylvie,
Bruce, Alistair, Vincent, Joël):• Analyses the issues to be submitted to the Executive Committee ->
technical dossiers, preliminary trade-offs• Proposes decisions for the Exec. Com.• Avoids useless preliminary discussions• Some Examples: V3 and V4 requirements, WMS for all products,
without authentication, Surface fluxes in reanalyses, Wave parameters , Hindcast definition, Major accounts and Specific Core Products, Merging PUMS and QuIDs, AOR organisation
– Work structured and coordinated by cross-cutting work packages
– A more mature way of working (within the Executive Committee):
• Well known decision processes• Clear roles and responsibilities
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013
A deep internal involvement
• Specific internal work about requirements (for V3 and V4:– In depth analysis of MyOcean status and outputs– Internal consultation at the start of the project (from Kick-
Off to June 2012 in Barcelona): significant and relevant feedback from WP leaders
– A lot of important decisions taken quite quickly at the Barcelona Executive Committee meeting: user profiles, visualization, Authenticated FTP, archiving, priorities for the CIS, internal interfaces and data flows, etc…
– Same process used for evolutions and other decisions (Toulouse and Madrid Exex. Comm. Meetings).
• Preparation of the MyOcean PDR at T0+3 and T0+6 (while it was T0 + 12 in MyOcean).
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013
Reviews and meetings• External reviews (4):
– Kick-off April 2012– Initial PDR (Design review) July 2012– Final PDR October 2012– AOR-1: today and tomorrow; POR (Pre-Operation Review), PDR and VaRR
(Validation Readiness Review) on 18-19/04/2013• Internal reviews, meetings and workshops:
– Executive Committee meetings (4) : • Kick-Off, Brussels, April 2012• Barcelona, June 2012• Toulouse, October 2012• Madrid, January 2013
– Internal Reviews (Production Centres and CIS) (2 + 2):• Design Workshops: Barcelona, June 2012, Madrid, January 2013• Acceptance workshop: Madrid, January 2013
– Technical meetings (awareness, training, etc) (1):• Service Management• Product Management• Technical meeting wrt to CIS interfaces and tests
• ECOMF meetings for the preparation of the Copernicus Operational phase
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013
Other important events• MyOcean Science Days: November 2012
– Strong participation (120 people, many projects)– Observational systems, Numerical modelling, Data assimilation, validation and user related
issues– Outcomes relevant to the next phase but also to the long term operational oceanography R&D
roadmap
• MyOcean User Workshop: April 2013– Good participation– Plenary and splinter sessions and discussions– Final Round table– Main outcomes:
• actions to be decided wrt MSFD applications and users, • Expected reinforcement of the link with the downstream services (end to end value chain), • consolidation for a long term and sustainable Marine Service• More frequent or coordinated User workshops
• ECOMF Strategic partnership: the Nicosia declaration:– defines an ECOMF Strategic Partnership between the “national” institutions that deliver data
and predictions to their national or local authorities and ECOMF
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013
Review, meetings and eventsSummary
AOR
T0+3 T0+6 T0+9T0 T0+12
PDR
PDR
Va RR
Exec
Exec
Exec
PDR
POR
SCD
UWS
DWS
DWS
ACC
TecWS
Exec
KOff
ECOM
F
Executive CommitteeDesign ReviewOperation ReviewValidation Readiness ReviewAnnual Operation ReviewDesign WorkshopAcceptance WorkshopTechnical WorkshopScience DaysUser WorkshopECOMF strategic Partnership
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013
Other important events
• External meetings:– With ESA: GSC-DA (2), Sentinel-1 interfaces, OC-SST
meeting– With EUMETSAT: 2 programmatic workshops,
technical workshops and teleconferences– Project represented at EUROGOOS and ROOS
meetings– With REA and GMES projects: coordination of R&D
activities– GMES User Forum (presentation of the MyOcean
Marine Service)– Participation to many Exhibitions, Symposiums,
Workshops and other communication events…
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013
Main results:• A user driven Service• Current Service Status
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013
A User driven Service
• A single user interface: Service Desk and Web Portal• A specific project organisation:
– Collection of user requirements and engineering into Service Definition:
• User requirements, user surveys, questionnaires• User validation (beta testers), user feedback• Traceability of each system functionality to user requirements
– A Work Package dedicated to user uptake:• Downstream applications and national/regional operational
centres– Outreach, communication and training– User workshops
Véronique
Cédric
Marc
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013
A growing number of users
2009 2010 2011
Service v0
2012 2013
Service v1 Service v2
300 Service Level Agreements in April 2011
2000+ SLAsin March 2013
MyOcean2
1000 SLAs in April 2012
2000 users from1000 organisations
100 new users every month
2000 users from1000 organisations
100 new users every month
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013
An international, multi-sector response
Users in 88 different countries (26 EU members)
A fair repartition in application areas
And 67% of users using the core service in more than one sector
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013
The MyOcean Service in V3 (V3 – 23rd April 2013)
• Products and datasets simplification– 107 products (instead of 201 in V2) with no
reduction of information• Product upgrades in almost all areas• 15 new products (Global, Baltic model
forecasts, ocean Colour and InSitu observation products)
• Each Product is associated with a Product User Manual and a Quality Information Document
• New search engine, faster access to products, updated FAQs
• All products available through standard MyOcean interfaces
• All products can be visualized
DISCOVER
VIEW
DOWNLOAD
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013
Next steps
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013
Next steps
• Main activity: preparation of V4:– Final MyOcean Service version, to be operated 6
months during the project (April 2014 – Sep. 2014)– Intermediate versions for new products or system
functions (CIS) will be defined
• Reporting of the first period (May 2013)• Preparation of the post-MyOcean2 phase in
the frame of Copernicus: ECOMF
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013
Some challenges in the year to come
• Internal:– Involvement, reactivity, acting as a single entity: still needs strong
efforts: not an easy task, given the size and the structure of the project– Reduce delays in each delivery or contribution: this is one major issue
(example: integration and transition phases)– Keep enthusiasm in our “daily” tasks: this not the end of the story, but
the beginning!– Maintain our Service and System State-of-the-Art, well integrated
• Internal & External:– Prepare, develop and deliver V4 (and intermediate versions)– Take new user requirements into account (from UWS in particular)
• External:– Engage even more the users in the Service, downstream sector– Maintain and develop relationships with main providers (Space,
InSitu), European Agencies, main stakeholders– Be prepared to ECOMF... MyOcean 2 project to prepare a sustained,
Service
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013
Annual review agenda
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013
Annual Review Agenda
Time Dur.
09:00 10:00 WELCOME
09:00 00:10 Welcome by NMCI Official Cormac Gebruers
09:10 00:10 Review introduction / foreword by REA Peter Ryder
09:20 00:15 Welcome by Project Coordinator Pierre Bahurel
09:35 00:20 Project Progress Summary Joël Dorandeu
09:55 12:05 MYOCEAN2 USERS AND SERVICE PROVIDED
09:55 00:20 User Uptake WP3 Glenn Nolan
10:15 00:40 Answer to Users Needs in Service Definition and Evolution WP2 Dominique Obaton - Vincent Claverie
10:55 00:30 Coffee Break
11:25 00:20 Users Support from Service Desk, Service Management WP2 Dominique Obaton
11:45 00:20 Report on Service provided WP2 Dominique Obaton
12:05 12:35 Outreach, Communication and Training
12:05 00:30 Outreach, Communication and Training WP4 Irene Lake
12:35 01:30 Lunch
MyOcean
ANNUAL REVIEW Agenda - Day 1Tuesday 16 April 2013
Cork - National Maritime College of Ireland
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013
Annual Review Agenda
Time Dur. MyOcean
ANNUAL REVIEW Agenda - Day 1Tuesday 16 April 2013
Cork - National Maritime College of Ireland
14:05 16:55 MYOCEAN2 SYSTEM OF SYSTEMS (PART1)
14:05 00:30 MyOcean2 Central Information System WP16 Vincent Claverie
14:35 00:30 Overview of the TACs Bruce Hackett
15:05 00:20 Sea Level TAC WP12 Gilles Larnicol
15:25 00:20 Ocean Color TAC WP13 Rosalia Santoleri
15:45 00:30 Coffee Break
16:15 00:20 Ocean Sea Ice TAC WP14 Lars-Anders Breivik
16:35 00:20 In Situ TAC WP15 Sylvie Pouliquen
16:55 17:15 Closing of Annual Review - day 1
16:55 00:20 Open points - Questions - Closing of day 1 All - Joël Dorandeu
17:15 17:45 Scientific Invited paper
17:15 00:30 "Development of coupled atmosphere-wave-ocean predictions" Adrian Hines
17:45 End of Day 1
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013
Annual Review Agenda
Time Dur.
09:00 Start09:00 12:00 SCIENCE, QUALITY & ASSESSMENT
09:00 00:40 Science & Technology Evolution WP19 Emil Stanev
09:40 00:40 Product Quality WP17 Alistair Sellar
10:20 00:40 Multi-year Assessment, data reprocessing, production reanalysis
WP18 Simona Masina
11:00 00:20 Coffee Break
11:20 15:40 MYOCEAN2 SYSTEM OF SYSTEMS (PART2)
11:20 00:30 Overview of the MFC's Marina Tonani
11:50 00:20 Global MFC WP5 Eric Dombrowsky12:10 00:20 Arctic MFC WP6 Laurent Bertino
12:30 01:30 Lunch
MyOcean
ANNUAL REVIEW Agenda - Day 2Wednesday 17 April 2013
Cork - National Maritime College of Ireland
MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013
Annual Review Agenda
Time Dur. MyOcean
ANNUAL REVIEW Agenda - Day 2Wednesday 17 April 2013
Cork - National Maritime College of Ireland
14:00 00:20 Baltic MFC WP7 Vibeke Huess / Ole Krarup Leth
14:20 00:20 Atlantic NWS MFC WP8 Adrian Hines
14:40 00:20 IBI MFC WP9 Enrique Alvarez Fanjul
15:00 00:20 Med MFC WP10 Marina Tonani
15:20 00:20 Black Sea MFC WP11 Gennady Korotaev
15:40 00:30 Coffee Break16:10 16:40 ANNUAL REPORT16:10 00:30 Reporting: EC & Consortium tools, timeline WP1 Laura Cherdel16:40 17:00 BEYOND MYOCEAN
16:40 00:20 ECOMF WP1 Alain Podaire
17:00 18:00 CLOSING17:00 00:20 Open points - Questions - closing of day 2 All - J. Dorandeu
17:20 00:20 Feeback from EC Reviewers REA
17:40 00:10 Annual Meeting closure Pierre Bahurel17:50 End of meeting