MYANMAR COUNTRY REPORT FOLLOW – UP WORKSHOP ON ENERGY EFFICIENCY AND CONSERVATION PRESENTER : SOEMYINT GENERAL MANAGER NO.1 LPGEXTRACTION FACTORY MINBU , MAGWAY DIVISION MYANMAR
MYANMAR COUNTRY REPORT FOLLOW – UP WORKSHOP ON ENERGY EFFICIENCY AND CONSERVATION PRESENTER : SOEMYINT GENERAL MANAGER NO.1 LPGEXTRACTION FACTORY MINBU,
MYANMAR COUNTRY REPORT FOLLOW UP WORKSHOP ON ENERGY EFFICIENCY
AND CONSERVATION PRESENTER : SOEMYINT GENERAL MANAGER NO.1
LPGEXTRACTION FACTORY MINBU, MAGWAY DIVISION MYANMAR
Slide 2
MYANMAR LOCATION: BORDERS WITH - CHINAIN THE NORTH AND
NORTH-EST - LAOSIN THE EAST - THAILAND IN THE SOUTH-EAST - INDIA
THE WEST - BANGLADESH IN THE WEST. COASTLINE: IN THE NORTH WEST IS
INDIAN OCENA AND MYANMARS COASTLINE EXTENDS FROM WHERE MYANMAR AND
BANGLADESH MEET, DOWNSOUTHWARDS ENDING IN THE SOUTHERN EXTREMITY
WHERE MYANMAR AND THAIL AND MEET MAKING A VERY LONG COASTLINE OF
OVER 2000 KIL OMETERS. AREA: 680,000 SQUAREKILOMETERS. POPULATION:
52 MILION ( IN 2003 )
Slide 3
1.Introsuction Natural Resources Natural Gas Crude Oil Coal
Hydro Power etc.
Slide 4
Ministry of Energy Emphasis on : - Energy conseryation -
Efficient utilization of energy - Sustainable economic growth
Slide 5
2. Energy Conservation Activities in Fertilizer Plant of
Myanmar
Slide 6
Myanma Petrochemical Enterprise Urea Fertilizer Plant Sa Le (A)
:205 mtpd Sa Le (B) :260 mtpd Kyunchaung:270 mtpd Kyawzwa:600
mtpd
Slide 7
Efficiencies become decreasing Production losses and energy
wastes Kyawzwa fertilizer factory - Joint implementation with
Chiyoda Corp. - Supported by NEDO, METI of Japan
Slide 8
3. Joint Implementation of Model Project On Energy Conservation
in Fertilizer Plant. MoU between NEDO,Japan and MPE on 30 July,
2000 Agreement on implementation document between Chiyoda,Japan and
MPE on 29 September, 200
Slide 9
4.Plant Situation before Energy Conservation Technology
Application
Slide 10
Reforming - High diff.Pressure in feed/steam super heater -High
diff.Pressure in process gas cooler -High residual methane at 2ry
reformer -High HT temperature CO2 removal -Absorption capacity of
CO2 becomes weak
Slide 11
Ammonia - Oil contamination in syn, gas & CO2 gas comp.out
let - Ammonia prosuction rate decreasing - Waste Heat Boiler steam
production decreasing
Slide 12
Urea -Performance of urea synthesis not enough - Potential
recoverable energy not enough -Performance of liquid distribution
in stripper not enough -Overall energy consumption was high
Slide 13
5. Energy Conservation Technology A.Ammonia plant
1.1Optimization of wste heat recovery system in ammonia / urea
plant 1.2Energy recovery in CO2 removal section of ammonia plant
1.3Ammonia converter revamping and improve operating condition
1.4Hydrogen recovery in the purge gas from ammonia synthesis
loop
Slide 14
A.Ammonia plant 1.1Optimization of waste heat recovery system
in ammonia/urea plant 1.2Energy recovery in CO2 removal section of
ammonia plant 1.3Ammonia converter revamping and improve operating
condition 1.4Hydrogen recovery in the purge gas from ammonia
synthesis loop
Slide 15
B. Urea plant. Improvement of performance of urea reactor and
stripper in urea plant
Slide 16
Ammonia Plant sr,. No Description Energy Reduction 6 7 8 9 10
Redesign and replace Feed/Steam Superheater (03 Boo2Eo2) Install
Expansion Turbine (05MT01)in CO2 Removal System Replace the packing
in CO2 removl System with high efficiency type Replace ammonia
converter catalyst with high efficiency type Replace WHB (08
E001)and Hot Heat Exchanger (08E002)in ammonia Syn loop
0.1Gcal/T.NH3
Slide 17
6.Contribution of Each Energy Saving Items Ammonia Plant Sr. No
Description Energy Reduction 1234512345 Replace inner riser pipe of
Sec.Reformer to stop leakage Install oil eliminator to catch oil
entrained from Syn. Gas compressor Relace NH3 converter internal
and NH3 Syn. Catalyst Replace WHB (08 E001) and Hot Heat Exchanger
(08E002)in ammonia Syn loop Install H2 recovery unit (Membrane
type) 1.5Gcal/T.NH3 70%
Slide 18
Ammonia Plant Sr. No Description Energy Reduction 11 12
Redesign and replace Process Gas Cooler (03-E001 ) Replace Gas
Cooler ( 05-E001) (04-E002) Total Energy Saving for Ammoinia Plant
0.5Gcal/T.NH3 2.1Gcal/T.NH3
Slide 19
Urea Plant Sr. No Description Energy Reduction 1234512345
Replace internal trays in urea rector with high efficiency type
Install Ammonia Feed Preheater (33E110) to recover heat from the
steam condensate by heat exchange with feed Ammonia Install
Evaporator 1 st stage Preheater (33-E401B) Replace internal trays
in urea reactor with High efficiency type Replace internal
distribution system of HP Stripper 0.4~1.2t/h 0.02~0.06Gcal/T.ure a
0.6 t/h 0.03 Gcal/T-urea 0.23Gcal/T-urea
Slide 20
Conclusion 11 Technologies6 Technologies for for Ammonia Plant
Urea plant Ammonia Plant 12.26 Gcal/t-NH39.67 Gcal/t-NH3 Urea Plan
8.32 Gcal/t-Urea6.58 Gcal/t Urea Equivalent to Crude Oil Energy
Conservation Apprx.25,800 t-crude oil/year F/S Report :20.6%
Expected 20.9 %Apprx.26,300t-crude oil/year
Slide 21
Energy Efficiency Programs By Sector Industry -As Kyawzwa
Fertilizer Factory Building -Natural Light -LPG For Cooking -Hydro,
Bio, Wind Transportation- LPG, CNG Conclusion Follow-up Workshop
Very Effective - Positive Improvement Renewable Energy Training
Course Thank You.
Slide 22
Country : Myanmar Name : (1) Mr. Soe Myint (2) Mr.Nyo Win
Selection of Two Lecture Courses 1. Energy Efficiency Program. -
Industry 2. Renewable Energy Program - Bioenergy
Slide 23
Ministers Office Minister Deputy Minister Department of
Hydroelectric PowerDepartment of Electric PowerMyanma Electric
Power Enterprise Power Generation, Distribution Planning and New
Project Planning Economic Planning General Administration and Human
Resources Planning Administration Planning & Works Material
Planning Finance Machinery Electrical & Mechanical Installation
Construction 1 Construction 2 ... Construction 7 Investigation
Design & Technology Maintenance Transmission and Distribution
Planning Hydropower Generation Thermal Power Generation Material
Planning Administration Finance Organization Chart for Ministry of
Electric Power
Slide 24
Installed Capacity (MW) as of May 2005 Grid
SystemIsolatedTotalPercentage Installed Capacity 1619.97
105.231725.20100.00% Hydroelectric712.0033.68745.6843.22% Gas
Turbine550.1010.90561.0032.52% Steam Turbines332.90- 19.30%
Diesel24.97*60.6585.624.96% (* Stand by)
Slide 25
Total Units Sold for the Year 2004-2005 Units Sold (mill kWh)
Industry1548.641 Domestic 1661.210 Bulk 604.325 Others 87.200 Total
3901.376
Slide 26
Total Units Generated for the Year 2004-2005 (P.A) Units
Generated (mill kWh) Hydro2202.01 Steam 427.16 Gas2739.42
Diesel33.04 Total 5401.63
Slide 27
General Information 2006200720082009201020112012201320142015
Load (GWh)14714166331694017515212883024141560480195302664364 Peak
(MW) 14251554169418462012 32184445519059617357 Unit-MW
Type200420052006200720082009201020112012201320142015
Hydro531745829119813981993257635144294469463169138 Gas Turbine 532
561 538 506 Steam Turbine202212194 182 Coal0120 Generation Capacity
Demand Forecast Domestic products of natural gas and coal are used
for power generation.
Slide 28
MW Generation Vs Load
Slide 29
Transmission Facilities The major electric power stations feed
electricity into the National Grid System with 230 kV, 132 kV and
66 kV transmission lines and substations. 230 kV Transmission Line-
874 miles 132 kV Transmission Line-1165 miles 66 kV Transmission
Line-1046 miles
Generation Expansion Plan From Year 2005-2006 to 2015-2016
Sr.Project Name Location (MW)Unit Total Installed Capacity
(Division/State)(MW) Hydro 1PyuBago Division20240 2KabaungBago
Division15230 3KunBago Division20360 4YenweBago Division12.5225
5BawgataBago Division404160 6ThaukyegatBago Division503150
7ShwekyinBago Division25375 8YeywaMandalay Division197.54790
9ShweliShan State1004400 10KengtawnShan State18354 11B.H.P (3)Kayah
State24248 12MawlaikSagaing Division1004400
Slide 32
Sr.Project Name Location (MW)Unit Total Installed Capacity
(Division/State)(MW) 13NanchoMandalay Division24248
14ShwezayeSagaing Division1006600 15Upper PaunglaungMandalay
Division702140 16HutgyiKayin State758600 17Thahtay ChaungRakhine
State254100 18TanintharyiTanintharyi Division1006600
19TamanthiSagaing Division30041200 20BilinMon State704280
21TasangShan State711107110 Generation Expansion Plan From Year
2005-2006 to 2015-2016
Slide 33
Transmission Expansion Plan From Year 2005-2006 to 2015-2016
Sr.FromToVoltage (kV)Circuitmile 1YeywaShwezaryan2302,TB24
2YeywaMeikhtila2302,TB95 3YeywaKyaukse2302,TB30
4ShwezaryanKyaukse2302,TB25 5KyaukseMeikhtila2302,TB65
6MeikhtilaTaungdwingyi2301,TB105 7KyaukseMonywa2301,TB100
8ShwezaryanMeikhtila2302,TB95 9ShwezaryanAungpinle230116
10MeikhtilaThazi230116 11ShwedaungTaungoo2301,TB60
12KunTaungoo-Bago23016 13ThaukyegatTaungoo2301,TB25
14Taungoo-KyauktagaKamanat2301,TB150 15BawgataKyauktaga2301,TB20
16ShwekyinKyauktaga230140 17KamanatThanlyin2301,TB60
Slide 34
Sr.FromToVoltage (kV)Circuitmile 18ThanlyinThaketa2301,TB12
19MyauntagaShwedaung-Hlawga23016 20MyauntagaHlaingtharya2301,TB25
21HlaingtharyaYekyi2301,TB85 22HlaingtharyaBayintnaung2301,TB10
23ShweliMansan (Nammatu)2302,TB60 24Mansan
(Nammatu)Shwezaryan2302,TB60 25PyuTaungoo-Kamanat23016
26KyaukseMonywa2301135 27KyunchaungChauk132127
28ThaziMyinchan132170 29B.H.P(3)Lawpita13216
30ThatonMawlamyaing132160 31KengtawnLoilin132160
32MeikhtilaTaungoo5001145 33TaungooKamanat5001150
34HutgyiThaton2302110 Transmission Expansion Plan From Year
2005-2006 to 2015-2016
Slide 35
Sr.FromToVoltage (kV)Circuitmile 35HutgyiThailand2301
36KalewaMonywa2301100 37Upper PaunglaungPyinmana230115
38HlawgaShwedaung2301,TB146 39ShwedaungThahtay Chaung230190
40ShwezayeGantgaw2301100 41GantgawMatupi230160
42ShwezayeMonywa230220 43MonywaChauk2301100 44TasangMinesat132150
45TasangKengtawn132145 46TasangKengton1321150 47KalewaTamu132180
48MonywaYe U132150 49Ye UKantbalu132150 NanchoUpper-paunglaung2301
51TamanthiIndia5001 Transmission Expansion Plan From Year 2005-2006
to 2015-2016
Slide 36
Sr.FromToVoltage (kV)Circuitmile 52TamanthiShwebo5001270
53ShweboMeikhtila5001175 54TasangTaungoo5001220
55TasangThailand5001 56Tasang-(Pinlaung-Kalaw-)Meikhtila5001250
57TamanthiMyitkyina2301120 58ShweboMonywa230165
59TanintharyiDawei2302140 60DaweiThaton2302220
61BilinKamanat-Thaton230110 62MyitkyinaPutao1321150
63DaweiYe1321100 64TanintharyiKawthaung1321200 Transmission
Expansion Plan From Year 2005-2006 to 2015-2016
Slide 37
Cross Border Trading Parties-DHP & EGAT Plc Type of
Generation-Hydro Status-MOU was signed on 30 May, 2005 and under
Feasibility Study Hydropower Development Projects on Thanlwin &
Tanintharyi River Basins Power utilization-partly for local partly
for export to Thailand
Slide 38
Cross Border Trading Parties-DHP, MDX & other Interested
Parties Type of Generation-Hydro Status-Feasibility Study completed
-Under negotiation to form JV Tasang Hydropower Project (10 x 711
)MW Power utilization-partly for local partly for export to
Thailand
Slide 39
MYANMA ELECTRIC POWER ENTERPRISE NATIONAL GRID SYSTEM PLAN IN
FUTURE