16
COMPANY PROFILE Members P.2 Specialists P.3 MSW Family P.4 Fields of Expertise P.5 Projects P.8 Social Responsibility P.11 Gallery P.12 M M B B O O N N A A S S A A U U N N D D E E R R S S & & W W I I U U M M c c c c C I V I L & S T R U C T U R A L E N G I N E E R S HISTORY Saunders and Wium was established in East London in June 1966. In 1983 a branch office was opened in Pietermaritzburg, where the name became synonymous with high quality civil engineering, particularly in the water, waste water, roads and structural fields. Mbona Saunders and Wium cc t/a MSW Consulting was established in February 2006, as the engineering team in Pietermaritzburg saw an opportunity for growth and diversification. MSW Consulting now offers a diverse range of professional services to private and public enterprises throughout the African continent and our expertise now include the important function of social facilitation (ISD). We have an in-house Quality Management Plan and are in the process of obtaining ISO 9000 certification. MISSION STATEMENT “ MSW Consulting, strive to honour our primary goal of providing the highest degree of engineering and design, through simplicity of focus and through optimizing and integrating the wealth of teamwork. “ Contact Us: Physical Address: 28 St Patrick’s Road, Scottsville, Pietermaritzburg, 3201 : P.O. Box 100293, Scottsville, Pietermaritzburg, 3209 +27 (0)33- 395 0920 +27 (0)33-395 0921 E-mail: [email protected] Website: www.mswconsulting.co.za

MSW New Company Profile€¦ · COMPANY PROFILE Members P.2 Specialists P.3 MSW Family P.4 Fields of Expertise P.5 Projects P.8 Social Responsibility P.11 Gallery P.12 MBONA SAUNDERS

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

  • COMPANY PROFILE Members P.2

    Specialists P.3

    MSW Family P.4

    Fields of Expertise P.5

    Projects P.8

    Social Responsibility P.11

    Gallery P.12

    MMBBOONNAA SSAAUUNNDDEERRSS && WWIIUUMM cccc C I V I L & S T R U C T U R A L E N G I N E E R S

    HISTORY

    Saunders and Wium was established in East London in June 1966.

    In 1983 a branch office was opened in Pietermaritzburg, where

    the name became synonymous with high quality civil

    engineering, particularly in the water, waste water, roads and

    structural fields.

    Mbona Saunders and Wium cc t/a MSW Consulting was

    established in February 2006, as the engineering team in

    Pietermaritzburg saw an opportunity for growth and

    diversification.

    MSW Consulting now offers a diverse range of professional

    services to private and public enterprises throughout the African

    continent and our expertise now include the important function

    of social facilitation (ISD). We have an in-house Quality

    Management Plan and are in the process of obtaining ISO 9000

    certification.

    MISSION STATEMENT

    “ MSW Consulting, strive to honour our primary goal of providing

    the highest degree of engineering and design, through simplicity

    of focus and through optimizing and integrating the wealth of

    teamwork. “

    Contact Us: Physical Address: 28 St Patrick’s Road, Scottsville, Pietermaritzburg, 3201 � : P.O. Box 100293, Scottsville, Pietermaritzburg, 3209 � +27 (0)33- 395 0920 � +27 (0)33-395 0921 E-mail: [email protected] Website: www.mswconsulting.co.za

  • 2

    MMBBOONNAA SSAAUUNNDDEERRSS && WWIIUUMM cccc C I V I L & S T R U C T U R A L E N G I N E E R S

    MEMBERS

    Our Members have had experience in both the public and private sector. Our Managing Member,

    Don Hodgkinson had more than 20 years experience with Umgeni Water, a leading water utility in

    South Africa, the last 5 years as Engineering Manager where he was responsible for the

    implementation of the Umgeni Water CAPEX budget which peaked at an amount of R400m

    /annum. He has experience in a wide field including the design and operation of:

    • Water treatment facilities (250 Ml/d Midmar Waterworks; 205 Ml/d Nsezi Waterworks upgrade)

    • Sludge dewatering systems (Decanter centrifuges, tubular filter press and CRSDS)

    • Design of large diameter (1600DN) high pressure (40 bar) pipelines including diversion of siphons.

    • Infrastructure assessment and water loss analyses in South Africa, Nigeria and Mozambique.

    • Infrastructure rehabilitation including concrete pipelines ~ 2900DN and pre-stressed concrete

    pipelines ~ 1900DN.

    Dennis Mbona is a respected Project management and ISD consultant who ran a successful

    consultancy practice before joining forces with MSW Consulting to provide a unique

    ISD/Engineering service to the community. Mr Mbona has a Bachelors degree in Social Science

    and his portfolio includes Managing the Social Facilitation and Marketing functions.

    Frans Klopper was employed by the Natal Provincial Administration, as trainee civil technician from

    1979 and eventually terminated his employment in 1997 as Regional Engineer for Edendale near

    Pietermaritzburg. During this period he was responsible for all municipal services, including roads,

    stormwater & sewer. He then started a civil consultancy practice which he operated successfully,

    before becoming a founder member of MSW Consulting cc.

    Justin Hemming is a professional engineering technologist who completed 9 years with the

    Department of Transport in the roads construction sector. At age 23 Justin was promoted to Chief

    Technician, where he managed the Port Shepstone Roads Construction Unit. He spent a further 3

    years with consulting engineering firms managing a variety of roads and civil contracts. In 2002 he

    joined Saunders and Wium, where he has designed and project managed numerous water

    engineering projects.

    Craig Mitchell graduated Cum Laude with a Bachelors Degree in Technology from D.I.T. in 2004. He was employed previously at KV3 Engineers where he obtained invaluable experience in a

    variety of Civil Engineering projects. In 2008 Craig joined Mbona Saunders and Wium, where he

    has designed and managed various water projects specializing in hydraulic modeling and

    transient analysis.

    Hugh Barraclough is a professional structural engineer (Summa Cum Laude) who gained three years experience in the bridge design office of KV3 Engineers, before moving to the structures

    division of BKS (Pty) Ltd for five years, responsible for the design and management of a variety of

    commercial and industrial projects in the Durban area. He then used this experience to establish

    his own structural consultancy until 2009, before joining with MSW Consulting to lead the structural

    aspects of the company.

    Claude Semple is a professional engineering technologist (Cum Laude) who completed 6 years

    with BVI Consulting, 6 years with ILISO Consulting Engineers, and a further 2.5 years as a freelance

  • 3

    MMBBOONNAA SSAAUUNNDDEERRSS && WWIIUUMM cccc C I V I L & S T R U C T U R A L E N G I N E E R S

    consultant managing a variety of civil contracts. In 2010 he joined Mbona Saunders and Wium,

    where he has project managed numerous Civil engineering projects.

    Sandra Govender is our financial and administrative manager, and a newly appointed member of

    the management team. Sandra has been involved in the Civil Engineering industry for 8 years, is

    well versed in the industries practices, in Pastal systems and tax management. Sandra is also

    managing the companies Quality Management system, for ISO 9001:2008 compliance.

    Geoff Mitchell is a qualified Civil Engineering technician, with more than 35 years (client, consulting

    and contracting) experience in a variety of Civil Engineering projects. Geoff is a Senior Contracts

    Manager/Resident Engineer who provides guidance and mentorship to the site engineers, whilst

    working very closely with the rural communities of KZN, to ensure a timely and superior end

    product.

    SPECIALISTS

    SOILS

    Leon Van Heerden completed 15 years of service with Moolman Bros Construction (LTA) as a

    Director. He then established Materials Control Laboratories (MICLAB) in 1986, thereafter joining

    Saunders & Wium in 1992 and was appointed branch manager in 1998. Mr Van Heerden has

    continued with MSW, and provides a wealth of technical and management skills.

    PROCESS & CHEMICAL ENGINEERING

    Dr. Dave Nozaic has a master’s degree in chemical engineering and has more than 30 years

    experience in the water / waste water field of engineering. He has served in both the private and

    public sector (Umgeni Water and Ethekwini Water Services) in senior technical and managerial

    positions. He is a Fellow member of the Water Institute of South Africa (WISA)

    Justin Hodgkinson is a qualified Chemical Engineer whom now heads up our waste water and

    process engineering division. He has trained under the guidance and mentorship of Dr. Nozaic for

    a no. of years.

    ENVIRONMENTAL

    Dr. J. Ridl is an Environmental Attorney, and respected University lecturer whom deals with our

    large scale project environmental planning and management processes.

    Other specialist design fields in which MSW Consulting have strong in-house and networking capability

    includes; • Pipeline rehabilitation design — Eddie current and thermal scanning. • Waste water design • Water loss management • Pipeline surge analysis • Digital terrain modeling • Operations and Maintenance of Treatment, bulk and reticulation systems. • Managing of labour based and EPWP contracts.

  • 4

    MMBBOONNAA SSAAUUNNDDEERRSS && WWIIUUMM cccc C I V I L & S T R U C T U R A L E N G I N E E R S

    THE MSW FAMILY

    With the growth of the company over the past 7 years additional technical and administrative

    staff has been employed, who have been selected from the previously disadvantaged sector.

    In addition to the permanent employees we maintain an ongoing programme of Experiential

    Training for previously disadvantaged Civil Engineering students.

    Since 2007 MSW Consulting has undertaken a commitment to the Singakwenza Ndawonye Student Training Scheme, developed by the Durban University of Technology (DUT). To date we

    have trained and mentored 14 students, all from historically disadvantaged communities. Four of

    these students are now permanent employees, whom we are funding for their Bachelors Degrees .

    The Members and employees of MSW Consulting cc have a long association with various District

    and Local Municipalities, as well as the Department of Works, Umgeni Water, Rand Water Services,

    Department of Water Affairs and the Department of Transport.

    We have associations with a wide range of specialist consultants in the structural, roads,

    geotechnical, environmental, water and waste water process design, water loss reduction, Eddie

    current and thermal scanning fields of engineering.

    We believe that, as a company, MSW Consulting is able to provide a level of service to the client

    where it is capable of designing, managing and implementing projects at any stage of the project

    cycle, bringing them to completion within budget and time. Furthermore, the projects are

    implemented in conjunction with a community involvement methodology, ensuring that projects

    are implemented holistically - socially, technically and financially.

    We believe that this holistic philosophy, coupled with the unique dynamics of our interactive and

    professional office environment; provides the client intrinsic value that far exceeds the professional

    engineering service.

  • 5

    MMBBOONNAA SSAAUUNNDDEERRSS && WWIIUUMM cccc C I V I L & S T R U C T U R A L E N G I N E E R S

    PARTICULAR FIELDS OF EXPERTISE

    MSW Consulting’s principle focus is in the fields of bulk water transfer, treatment, storage and

    distribution (including primary, secondary and tertiary (reticulation) levels), water conservation and

    demand management and infrastructure rehabilitation, and the institutional social development

    aspect of these projects.

    Bulk Water Conveyance

    We have experience with all commonly used pipe materials including µPVC, HDPE, ductile iron

    and continuously welded steel ranging in diameter from 50DN to 1900DN at operating pressures up

    to 4000kPa. We have specialist knowledge of steel pipe coating and lining materials for raw and

    potable water applications and have a sound working knowledge of corrosion mitigation

    measures including sacrificial anode and impressed current cathodic protection systems.

    We have designed fully automated raw and potable water pumping stations with installed

    capacities up to 2520 kW with pumps equipped with variable speed drives (VSD’s) all managed by

    SCADA.

    Plate 1: Mhlathuze River Pump Station: 630kW Immersible Pump Ready for Installation

  • 6

    MMBBOONNAA SSAAUUNNDDEERRSS && WWIIUUMM cccc C I V I L & S T R U C T U R A L E N G I N E E R S

    Water Treatment

    Our experience in water treatment ranges from small plants (< Ml/d) to large regional water

    treatment plants up to 205 Ml/d.

    We have extensive experience with various unit processes including clari-flocculators, pulsator

    sludge blanket type clarifiers, Dortmund clarifiers, dissolved air flotation (DAF) systems, gravity and

    pressure filtration systems and gravity sludge thickeners and mechanical dewatering systems.

    Depending upon client requirements, we are able to offer manual plants with limited levels of

    automation to fully automated plants operated using SCADA systems.

    Plate 2: Nsezi WTP Upgrade: 80 Ml/d Clari-Flocculator Under Construction

    System Rehabilitation

    MSW Consulting was appointed by the Department of Water Affairs (DWA) to develop a

    rehabilitation strategy for their Gamtoos Government Water System. The system has a capacity of

    7.5 cumec and traverses a route of some 64 kms from Kouga Dam to Loerie Dam in the Gamtoos

    Valley in the Eastern Cape. The system includes canals, 22 siphons (concrete and pre-stressed

    concrete) and 4 tunnels and covered canals. It is used primarily for irrigation of citrus produce for

    the export market and also provides some 30% of the raw water demand of the Nelson Mandela

    Municipality.

    An extensive risk analysis was carried out with a view to identifying the high risk elements of the

    system. Thermal imagery and eddy current scanning of pre-stressed concrete siphons were utilized

    to determine the integrity of system elements.

  • 7

    MMBBOONNAA SSAAUUNNDDEERRSS && WWIIUUMM cccc C I V I L & S T R U C T U R A L E N G I N E E R S

    Following the development of the rehabilitation strategy, MSW Consulting was appointed to

    implement Phases 1 & 2 of the rehabilitation works valued at some R200m. It is estimated that the

    value engineering risk assessment reduced capital expenditure by some R800m.

    Plate 3: Rehabilitation of 2400DN concrete Siphon: Fitment of Mechanical Seals

    Water Control And Demand Management (WCDM)

    MSW Consulting has successfully implemented several WCDM projects within South Africa

    including:

    • Ixopo (Sisonke DM)

    • Burgersdorp (Joe Gqabi District Municipality)

    • Ladysmith (Uthukela District Municpality): On-going

    Our approach is to use a carefully tailored combination of the proven analytical BABE (Burst And

    Background Evaluation) system coupled with a “Find and Fix” approach in order to achieve a

    rapid yet systematic solution. Where appropriate, we seek means of improving revenue collection

    as well as reducing physical water losses.

    Dysfunctional systems have been rapidly transformed to systems with acceptable water losses.

  • 8

    MMBBOONNAA SSAAUUNNDDEERRSS && WWIIUUMM cccc C I V I L & S T R U C T U R A L E N G I N E E R S

    PROJECTS

    WATER ENGINEERING PROJECTS

    PROJECT NAME DESCRIPTION CLIENT VALUE PERIOD

    Makhabeleni Operations & Maintenance Contract

    Operations and Maintenance of bulk and reticulation network.

    Umzinyathi District Municipality

    R 140 000/ month

    2008 -on

    going

    Northern Feeder Prelim design for Northern Feeder Pipeline Umgeni Water R230,000,000 1996

    Efaye Community Water Supply Scheme

    River abstraction, water treatment, pump station, rising mains, reservoirs & reticulation network

    Umgeni Water R35,000,000 1994 - 1997

    Malangeni Community Water Supply Scheme

    Pump stations, rising mains, reservoirs & reticulation network

    Ugu District Municipality

    R20,000,000 1996 - 1998

    Matimatolo/Mbulwane Regional Water Supply Scheme

    Borehole abstraction, rising mains, bulk & retic reservoirs & reticulation network

    uMgungundlovu RC/UMzinyathi DM

    R25,000,000 1998 - 2002

    Umbuba Community Water Supply Scheme

    Borehole abstraction, rising main bulk reservoir & reticulation network

    uMgungundlovu Regional Council

    R5,500,000 2003 - 2004

    Njengabantu Community Water Supply Scheme

    Borehole abstraction, rising main, reservoir & reticulation network

    UMzinyathi District Municipality

    R2,400,000 2003 - 2004

    Mooi River Water Treatment Plant Upgrade

    Upgrade of water treatment plant & pump stations to

    111l/sec, rising mains (315mm Ø), pipe jacking & suspension bridge river crossing.

    uMgungundlovu District Municipality

    R14,000,000 2003 - 2005

    Makhabeleni Regional Water Supply Scheme

    River abstraction, water treatment plant, pump stations, rising mains, reservoirs & reticulation network

    UMzinyathi District Municipality

    R118,000,000

    2004 - on

    going

    Ngcebo Regional Water Supply Scheme

    River abstraction, water treatment plant, pump stations, rising mains, reservoirs & reticulation network

    Ilembe District Municipality

    R50,000,000 2005 - on

    going

    Ntanzi & Masihambisane Community Water Supply Scheme

    Borehole abstraction, rising main, reservoir & reticulation network

    uMgungundlovu District Municipality

    R6,700,000 2005 -2008

    53 Pipeline Refurbishment of the 750mm Ø pipeline between DV Harris Water Works and Umlaas Rd

    Umgeni Water R22,000,000 2006

    Mtonjaneni 30 Ml/d Water Treatment Plant Uthungulu D M / UWP

    R40,000,000 2006 - 2009

    Gamtoos Irrigation Scheme

    Refurbishment of Hankey, Moolman Robert Scott, Patterson, Milton & Line 16 Siphons.

    DWAF R130,000,000 2006 – 2009

    Gamtoos Irrigation Scheme (Phase 2)

    Refurbishment of Bodker, Komdoma, Chigwell and De Koning.

    DWA R50,000,000 2009 – 2010

  • 9

    MMBBOONNAA SSAAUUNNDDEERRSS && WWIIUUMM cccc C I V I L & S T R U C T U R A L E N G I N E E R S

    WATER ENGINEERING PROJECTS continued

    PROJECT NAME DESCRIPTION CLIENT VALUE PERIOD

    Nsezi 90 Ml/d Water Treatment Plant upgrade to Richards Bay WTW

    Mhlathuze Water R155,000,000 2007 on

    going Ngcebo 1 (Rural Bulk Water Supply)

    WW upgrade, Bulk Rising Mains & Pump Station.

    IDM/UW R40,000,000 2009- 2011

    Ngcebo/Maphumulo (Bulk) WTW, Rising Main, Pump Stations and River Abstraction

    IDM/UW R164,000,000 2010 -

    Ngcebo 2 (Rural Retic) Water reticulation network Ilembe District Municipality

    R153,646,126 Design stage

    Ekulindeni Water Works Upgrade from 3 to 6 Ml/d Ekulindeni WTW and River Abstraction

    Gert Sibande DM

    R14,000,000 2010 -

    Kwa-Dukuza Bulk Water Supply

    Report on bulk treated water supply to Kwa-Zulu/Natal North Coast

    Ilembe D M R650,000,000 Prelim Report

    Greater Port Harcourt

    Bulk Water Supply to New Town including a 132 Ml/d Water Works, 132 Ml elevated reservoir and ductile iron bulk distribution system (900DN to 1200DN)

    Rivers State Government. (Nigeria)

    R1,600,000,000 2009-

    ROADS (The projects listed below are those undertaken through Saunders and Wium. Our staff have a

    wealth of experience in the Roads design and construction fields. Please refer to individual CV’s for

    reference to roads projects undertaken by the individual members)

    PROJECT NAME DESCRIPTION CLIENT VALUE PERIOD

    Mlamula Road (DR 659)

    Upgrade from gravel to blacktop

    uMgungundlovu District Municipality

    R4,200,000

    2006

    Emahlatini Road(DR 1524)

    Upgrade from gravel to blacktop

    uMgungundlovu District Municipality

    R3,800,000 2007

    Sinathingi Bus Route Blacktop road Umsunduzi Municipality

    R8,500,000 2004

    Inadi Road Blacktop road Umsunduzi Municipality

    R4,500,000 2005

    Forestry Roads Timber Haul Roads Sappi R10,000,000 1995-2002

    Circles & Squares (Pietermaritzburg)

    Upgrade roads using Hyson Cells

    Umsunduzi Municipality

    R2,500,000 2006

  • 10

    MMBBOONNAA SSAAUUNNDDEERRSS && WWIIUUMM cccc C I V I L & S T R U C T U R A L E N G I N E E R S

    STRUCTURAL

    MSW Consulting has the in house capacity to undertake a broad range of structural engineering within the demands of the civil infrastructure environment.

    Mr Hugh Barraclough (summa cum laude) is a professional structural engineer and experienced lecturer,

    whom heads up the structural team.

    PROJECT NAME DESCRIPTION CLIENT VALUE PERIOD

    Cedara Agricultural College

    Hazardous Waste Laboratories

    Dept. Public Works

    R24,000,000 2004

    Makhabeleni Water Supply

    Water retaining structures, (abstraction tower/bridge, filters, clarifiers, reservoirs)

    UMzinyathi District Municipality

    R98,000,000 2004 - on going

    Ngcebo Water Supply

    Water retaining structures (Reservoirs x 10)

    Ilembe District Municipality

    R38,000,000 2005

    - on going

    Maphumulo Bulk Water

    Water retaining structures

    UW/IDM R164,000,000 2010 -

    Gamtoos Rehabilitation Scheme

    Covered Canals, inlet/outlet portals

    DWA R 180,000,000 2006-

    2010

    Greater Port Harcourt

    Pump stations, water treatment

    Rivers State Gov. (Nigeria) R1,600,000,000 2009-

    ISD

    PROJECT NAME DESCRIPTION CLIENT VALUE PERIOD Ngcebo Regional Water Supply Scheme

    Rural Water Supply Scheme

    Ilembe District Municipality

    R50,000,000 2005 –

    on going

    Ngcebo 2/ Maphumulo Rural Water Supply Scheme

    Rural Water Supply Scheme

    Ilembe District Municipality

    R 153,646,126 2004-2005

    Balcom/ Kwasizabantu Rural Water Supply Scheme

    Rural Water Supply Scheme

    Ilembe District Municipality

    R 144,000,000 2013 -

    Makhabeleni Rural Water Supply Scheme

    Rural Water Supply Scheme

    Umzinyathi DM R 118,000,000 2002-

    on going

  • 11

    MMBBOONNAA SSAAUUNNDDEERRSS && WWIIUUMM cccc C I V I L & S T R U C T U R A L E N G I N E E R S

    SOCIAL RESPONSIBILITY

    Engineering is not just about technical jargon, and the bottom line. We love the industry, as at the end of

    each project, we can see the tangible results of our hard work.

    Our engineering and design principles are founded on the knowledge that we are part of a greater

    community, and must always act in the best interests of the larger community. Our strong emphasis on

    Institutional social development, community training and environmental engineering helps to ensure poverty

    alleviation and human development through responsible engineering.

    Recent social and community development initiatives include, inter alia • On the verge—An initiative to help clean up Pietermaitzburg. Originally set-up in 2010, on the verge of the

    2010 World Cup, we wanted individuals and businesses to take pride in their work place and surrounds, with a view to cleaning up their verges, gutters and surrounding neighbourhoods.

    • KwaSizabantu Mission—MSW Consulting provide financial back-up and construction supervision for the

    upgrade and repair to an existing church and living quarters in the poverty stricken Maphumulo district, on behalf of the Ilembe District Municipality.

    • Sizwe Ngwavuma Educational Trust— MSW Consulting funded the building of sports facilities for this deprived

    community based in northern KZN, for the Crossways Church Mission. • MSW recycles all our paper waste, the funds from which support a local crèche and the SPCA. • Prior to the 2010 Soccer World Cup, South Africa was abuzz with the tournament excitement. To ensure that

    children in the rural Tugela valley could also partake in this build-up MSW sponsored 50 soccer balls.

    MENTORSHIP

    Besides the Singakwenza Ndawonye Student Training Scheme which has already assisted more than 14 students through their in-service training, MSW Consulting is also involved in a scholarship program with a local

    high school, to promote youth development in maths and science, with a view to mentoring continuity of skills

    in the engineering industries.

  • 12

    MMBBOONNAA SSAAUUNNDDEERRSS && WWIIUUMM cccc C I V I L & S T R U C T U R A L E N G I N E E R S

    GALLERY PLATE 1: VARIOUS

    FACTORY LAYERWORKS – MT EDGECOMBE

    SUSPENSION PIPE BRIDGE: MOOI RIVER

    FILTERS – MOOI RIVER WATER WORKS

    FILTERS – MOOI RIVER WATER WORKS

    ROAD REHABILITATION - HAMMERSDALE

    INTAKE TOWER – TUGELA RIVER

  • 13

    MMBBOONNAA SSAAUUNNDDEERRSS && WWIIUUMM cccc C I V I L & S T R U C T U R A L E N G I N E E R S

    PLATE 2: VARIOUS

    REINFORCEMENT – 500 Kl RESERVOIR: UMBUBA

    15 Kl BREAKPRESSURE TANK: NJENGABANTU

    500 Kl RESERVOIR: UMBUBA

    WATER WIDGET STANDPIPE: NGCEBO

    INTAKE TOWER: MAKHABELENI

    CLEARWATER PUMP: MAKHABELENI

  • 14

    MMBBOONNAA SSAAUUNNDDEERRSS && WWIIUUMM cccc C I V I L & S T R U C T U R A L E N G I N E E R S

    PLATE 3: UMGENI WATER/ILEMBE DM

    SAFETY FIRST

    PACKAGE TREATMENT WORKS: NGCEBO

    SCOUR CHAMBER: NGCEBO

    CROSS BONDED STEEL PIPE: NGCEBO

    RAPID GRAVITY FILTER: MAPHUMULO

    CLARIFIERS: MAPHUMULO

  • 15

    MMBBOONNAA SSAAUUNNDDEERRSS && WWIIUUMM cccc C I V I L & S T R U C T U R A L E N G I N E E R S

    PLATE 4: UMZINYATHI DM

    MAKHABELENI UPGRADE: GETTING STARTED

    FILTER BLOCK: MAKHABELENI

    FLOC CHANNELS: MAKHABELENI

    PUMP HOUSE: MAKHABELENI

    RESERVOIR: MAKHABELENI

    CLARIFIERS: MAKHABELENI

  • 16

    MMBBOONNAA SSAAUUNNDDEERRSS && WWIIUUMM cccc C I V I L & S T R U C T U R A L E N G I N E E R S

    PLATE 5: GAMTOOS

    1.8m STEEL PIPE INSTALLATION

    CANAL ROCK TRAP

    2.8m CONCRETE PIPE REFURBISHMENT

    1.9m STEEL PIPE TUNNEL SLIP LINING

    1.8m STEEL PIPE RIVER CROSSING

    1.8m STEEL PIPE LAY