Mr. Fedro B. P riz, Ass:ciata Director <
Departm::nt cf Nucidr Enginrring March 2; 1999.
North Carolina Steta Univ rsityP. O. Box 7909.
Raleigh, North Carolina. 27695 7909
SUBJECT: NRC INSPECTION REPORT NO. 50-297/99-201.!
Dear Mr. Perez: |
This refers to the inspection conducted on February.9-12,1999,' at your PULSTAR researchreactor facility. The inspection included a review of activities authorized for your facility. The ;
enclosed report presents the results of that inspection. ;;
|Various aspects of your safety program were inspected including selective examinations ofprocedures and representative records, and interviews with personnel. Based on the results of ;
this inspection, no significant safety issues were identified.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and itsenclosure will be placed in the NRC Public Document Room.
Should you have any questions concerning this inepection, please contact us.
Sincerely,
Marvin M. Mendonca for:
Seymour H. Weiss, DirectorNon-Power Reactors and DecommissioningProject Directorate
Division of Regulatory improvement ProgramsOffice of Nuclear Reactor Regulation
Docket No. 50-297License No. R-120
Enclosure: NRC Inspection Report No. 50-297/99-201
cc w/ encl: See next page
9903080158 990302~
'
PDR ADOCK 05000297E8 FiE 8FijiEB 88PY* """
Distribution: w/ enclosureE-MAIL HARD COPYTBurdick TDragoun YDocket File 50-297PDoyle - TMichaels PUBLIC SWeiss
|WErecian Pisaac EHylton PDND r/f -
MMendonca SHolmes AAdams GTracy, OEDO fBDavis (Form only) CBassett ( ,
( v , c ,a ,.,),
P M PDND: PDND:DEHylton SWeiss
3 / I /99 . 1/( / 1/ d /99 3 / P/99
OFFICIAL RECORD COPY ^ DOCUMENT NAME: G:\SECY\BASSETT\NCS99201g
.
.
a - _.__._ ______________m m__is._____ _ _ _ _ _ _________#- )
- _ _ . _ . _ . _ _ _ _ . _ _ . _ _ . . . . . _ . _ . . _ . _ . _ _ . . . . __._._ _ _ __
i
! .6Mr. Pzdro B. Perez, Associate Director.-*
;
. D:psrtmsnt of Nucisar Engin: ring March 2,-1999'
.
North Carolina State Universityi -
i P. O. Box 7909Raleigh, North Carolina 27695 7909
SUBJECT: NRC INSPECTION REPORT NO. 50-297/99-201 i;
$j Dear Mr. Perez:
i
: This refers to the inspection conducted on February 9-12,1999, at your PULSTAR research -|
| reactor facility. The inspection included a review of activities authorized for your facility. Thei enclosed report presents the results of that inspection.i
j Various aspects of_ your safety program were inspected includirg selective examinations of ,
j procedures and representative records, and interviews with personnel. Based on the results ofthis inspection, no significant safety issues were identified.- ,
1in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its ;
| enclosure will be placed in the NRC Public Document Room. :i
a
1 'j Should you have any questions concerning this inspection, please contact us.
Sincerely,
iiI Marvin M. Mendonca for: >
!;d
Seymour H. Weiss, Director|- Non-Power Reactors and Decommissioning >
Project Directorate ;;
j Division of Regulatory improvement ProgramsOffice of Nuclear Reactor Regulation;
!Docket No. 50-297 |"
License No. R-120
Enclosure: NRC Inspection Report No. 50-297/99-201
cc w/ encl: See next page'
(
1
e
|a
.
"
Qistribution: w/ enclosureE MAIL HARD COPY4
! TBurdick TDragoun Docket File 50-297PDoyle TMichaels PUBLIC SWeissWEresian Plsaac EHylton PDND r/f :
MMendonca SHolmes AAdams GTracy, OEDOBDavis (Form only) CBassett ,
,.
.
Pr M PDND:LAs Y. PDND:D j'/ >
EHylton 9/ SWeiss J tc xA'
3/( /99 'l / ( / 1/ v /99 \ 3 / F/99 ,
:
- OFFICIAL RECORD COPY DOCUMENT NAME: G:\SECY\BASSETT\NCS99201
_ _ .
*,
' ',.
$pn nouq'o-
,
O'- t UNITED STATES
g g NUCLEAR REGULATORY COMMISSION* WASHlHGToN, D.C. 206t&o001o
'% , , , g # March 2, 1999:
Mr. Pedro B. Perez, Associate DirectorDepartment of Nuclear Engineering
,
North Carolina State UniversityP. O. Box 7909Raleigh, North Carolina 27695-7909
SUBJECT: NRC INSPECTION REPORT NO. 50-297/99-201
Dear Mr. Perez:
~
This refers to the inspection conducted on February 9-12,1999, at your PULSTAR researchreactor facility. The inspection included a review of activities authorized for your facility. Theenclosed report presents the results of that inspection.
Various aspects of your safety program were inspected including selective examinations ofprocedures and representative records, and interviews with personnel. Based on the results ofthis inspection, no significant safety issues were identified.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its! enclosure will be placed in the NRC Public Document Room.
' Should you have any questions concerning this inspection, please contact us.
Sincerely,; l
""h L
1
!~
1Seymour H. Weiss, DirectorNon-Power Reactors and Decommissioning
Project DirectorateDivision of Regulatory improvement ProgramsOffice of Nuclear Reactor Regulation
Docket No. 50-297 |
License No. R-120 ji
Enclosure: NRC inspection Report No. 50-297/99-201 i|
cc w/ encl: See next page1
|
|
i,
1
_
______._--.____m. _ _ _ _ _ _ _ _m.- --__m- -- ._ w *
---
-s
.
.
.
.
cc w/ encl:- ,
Dr. D. Dudziak, HeadNuclear Engineering DepartmentNorth Carolina State UniversityP. O. Box 7909Raleigh, NC 27695-7909
Nelson W. CouchRadiation Safety OfficerNorth Carolina State UniversityP. O. Box 7909Raleigh, NC 27695-7909
- Test, Research, and TrainingReactor Newsletter
University of Florida202 Nuclear Sciences CenterGainesville, FL 32611
Dayne H. Brown, Director-!
i Division of Radiation Protection
| Department of Environment,Health, and Natural Resources
; - P. O. Box 27687', Raleigh, NC 27611-7687 ;
-t
*
1,
!
F
:d
@
s
,
0
,
k
3 i
i
i
.
I
'
'
,
,
n'
.
._v_ , . - _ _ _ __ _ _ . . . _