14
. Bobby, IMWE-HOD, [email protected], (254) 287-8716 1 12 July 2011 12 July 2011 Fort Hood LONWORKS ® UMCS / Metering Implementation PRESENTED BY Bobby Lynn & Dick Strohl Fort Hood,Texas DPW

Mr. Bobby, IMWE-HOD, [email protected], (254) 287-8716 1 12 July 2011 Fort Hood L ON W ORKS ® UMCS / Metering Implementation PRESENTED BY Bobby Lynn

Embed Size (px)

Citation preview

Page 1: Mr. Bobby, IMWE-HOD, Bobby.Lynn@us.army.mil, (254) 287-8716 1 12 July 2011 Fort Hood L ON W ORKS ® UMCS / Metering Implementation PRESENTED BY Bobby Lynn

Mr. Bobby, IMWE-HOD, [email protected], (254) 287-8716 1 12 July 201112 July 2011

Fort Hood LONWORKS®

UMCS / MeteringImplementation

PRESENTED BY

Bobby Lynn & Dick Strohl Fort Hood,Texas DPW

Page 2: Mr. Bobby, IMWE-HOD, Bobby.Lynn@us.army.mil, (254) 287-8716 1 12 July 2011 Fort Hood L ON W ORKS ® UMCS / Metering Implementation PRESENTED BY Bobby Lynn

Mr. Bobby, IMWE-HOD, [email protected], (254) 287-8716 2 12 July 201112 July 2011Mr. Bobby, IMWE-HOD, [email protected], (254) 287-8716

FORT HOOD UMCS

PURPOSE

• Provide a general overview of the Fort Hood’s Utility Monitoring and Control System (UMCS) and Metering System

TOPICS

• Fort Hood UMCS History• System Configuration• Facility Performance Indexing (Continuous Commissioning)• Use of Meter Data

• Mock Billing• Reimbursable customers

• Next Step• Summary

Page 3: Mr. Bobby, IMWE-HOD, Bobby.Lynn@us.army.mil, (254) 287-8716 1 12 July 2011 Fort Hood L ON W ORKS ® UMCS / Metering Implementation PRESENTED BY Bobby Lynn

Mr. Bobby, IMWE-HOD, [email protected], (254) 287-8716 3 12 July 201112 July 2011

Fort Hood UMCS / DDC

Army’s First Base-Wide Facility Control SystemUsing Flat LonWorks Open Controls

Technology

In Cooperation with:

• Headquarters U.S. Army Corps of Engineers (HQUSACE)

• COE Engineer Research Development Center CERL

• COE Huntsville Mandatory Center of Expertise for UMCS

• COE Fort Worth District Mechanical Design Branch

• Johnson Controls Inc, Circon, Echelon, Loytec, Honeywell, TAC, Trane, Voyant, Invensys, Gesytec, Distech, Continental Control Systems, Capelon, ABB, others

Page 4: Mr. Bobby, IMWE-HOD, Bobby.Lynn@us.army.mil, (254) 287-8716 1 12 July 2011 Fort Hood L ON W ORKS ® UMCS / Metering Implementation PRESENTED BY Bobby Lynn

Mr. Bobby, IMWE-HOD, [email protected], (254) 287-8716 4 12 July 201112 July 2011Mr. Bobby, IMWE-HOD, [email protected], (254) 287-8716

Fort Hood Open Systems History:

• 2001: Begin collaboration with CERL, HNC, SWF, and vendors on open system technologies

• Led to whiter paper decision to develop LonWorks specification• UFGS 25 10 10 (UMCS), and UFGS 23 09 23 (DDC)

• 2003: ESPC Delivery Order #1 • DDC in 36 Buildings• Non-flat, less than fully open LONWORKS ®

• Accessible via PC over LAN• Eliminated the need for laptops and software

• 2006: ESPC Delivery Order #2• DDC in 55 Buildings• JCI provided a PC solution to replace Network Application Engines (NAEs),

Flat/Open LONWORKS• Workstations and printers delivered to Maintenance Shops• Local Display Panels (LDPs) were included for local access to DDC

• 2009 ESPC Delivery Order #3• Commission and integrate an additional 54 facilities• Includes Facility Performance Indexing (Continuous Commissioning) for a chilled

water thermal storage plant and 17 satellite facilities

Page 5: Mr. Bobby, IMWE-HOD, Bobby.Lynn@us.army.mil, (254) 287-8716 1 12 July 2011 Fort Hood L ON W ORKS ® UMCS / Metering Implementation PRESENTED BY Bobby Lynn

Mr. Bobby, IMWE-HOD, [email protected], (254) 287-8716 5 12 July 201112 July 2011

Fort Hood BAS

Page 6: Mr. Bobby, IMWE-HOD, Bobby.Lynn@us.army.mil, (254) 287-8716 1 12 July 2011 Fort Hood L ON W ORKS ® UMCS / Metering Implementation PRESENTED BY Bobby Lynn

Mr. Bobby, IMWE-HOD, [email protected], (254) 287-8716 6 12 July 201112 July 2011

JCI Facility Performance Indexing (JCFPI)

• Continuous Commissioning is becoming the standard for optimizing and sustaining performance of mechanical/electrical systems

• Definition of a Performance Index: A number derived from a formula, used to characterize a set of data

“You can’t manage if you don’t measure”

Page 7: Mr. Bobby, IMWE-HOD, Bobby.Lynn@us.army.mil, (254) 287-8716 1 12 July 2011 Fort Hood L ON W ORKS ® UMCS / Metering Implementation PRESENTED BY Bobby Lynn

Mr. Bobby, IMWE-HOD, [email protected], (254) 287-8716 7 12 July 201112 July 2011

Page 8: Mr. Bobby, IMWE-HOD, Bobby.Lynn@us.army.mil, (254) 287-8716 1 12 July 2011 Fort Hood L ON W ORKS ® UMCS / Metering Implementation PRESENTED BY Bobby Lynn

Mr. Bobby, IMWE-HOD, [email protected], (254) 287-8716 8 12 July 201112 July 2011Mr. Bobby, IMWE-HOD, [email protected], (254) 287-8716

Why is the VAV zone temp Red? Setpoint is not being achieved.

Page 9: Mr. Bobby, IMWE-HOD, Bobby.Lynn@us.army.mil, (254) 287-8716 1 12 July 2011 Fort Hood L ON W ORKS ® UMCS / Metering Implementation PRESENTED BY Bobby Lynn

Mr. Bobby, IMWE-HOD, [email protected], (254) 287-8716 9 12 July 201112 July 2011Mr. Bobby, IMWE-HOD, [email protected], (254) 287-8716

FORT HOOD METERING SYSTEM

Utilities Monitoring and Control System (UMCS)• Metasys (software) by Johnson Controls, Inc.• Based on LonWorks (open communication system)• Using Run-Time Management• Flat Architect (communication peer-peer)• Point mapping: Current 29,161 points are mapped.

Metering System• Meters Online

• Electric: 125• Gas: 15

• Meter: Wattnode (by CCS)• Variables (42 available) - RMS Power - Watts (ph) - Voltage (ph) - Reactive Power - VARs (ph) - Current (ph) - Power Factor (ph) - Reactive Energy (sum) - RMS Energy – WH, kWh (ph) - Net Energy (ph) - RMS Voltage (Phase A, B, C) - Demand (int, pk) - Reactive Energy - VAR-hours (ph) - AC Frequency

Page 10: Mr. Bobby, IMWE-HOD, Bobby.Lynn@us.army.mil, (254) 287-8716 1 12 July 2011 Fort Hood L ON W ORKS ® UMCS / Metering Implementation PRESENTED BY Bobby Lynn

Mr. Bobby, IMWE-HOD, [email protected], (254) 287-8716 10 12 July 201112 July 2011Mr. Bobby, IMWE-HOD, [email protected], (254) 287-8716

SYSTEM CONFIGURATION

Authorized Users

UMCS SERVER

Lon Router / Lon Devices

FORT HOOD LAN/ /

Wireless xtr / Lon Devices

RF Wireless //

1. Two methods of transmission2. NEC recently approved RF (Wireless)3. Data stored on Servers4. Assessable by authorized users

NEW TRANSMISSION METHOD

Lon Router / Wireless xtr

Page 11: Mr. Bobby, IMWE-HOD, Bobby.Lynn@us.army.mil, (254) 287-8716 1 12 July 2011 Fort Hood L ON W ORKS ® UMCS / Metering Implementation PRESENTED BY Bobby Lynn

Mr. Bobby, IMWE-HOD, [email protected], (254) 287-8716 11 12 July 201112 July 2011Mr. Bobby, IMWE-HOD, [email protected], (254) 287-8716

BILLING

Used at Ft Hood to modify behavior and collect reimbursement from non-ASIP organizations.

Reimbursable Customers• Billed with UBS for actual usage• Reimbursements made thru DFAS

Mock Billing• Increases awareness• Fosters competition• Provided to O-6 level commanders by

Garrison Cdr monthly

Family Housing• Residents billed by RCI partner• Refund/charge based on individual unit

baseline

Page 12: Mr. Bobby, IMWE-HOD, Bobby.Lynn@us.army.mil, (254) 287-8716 1 12 July 2011 Fort Hood L ON W ORKS ® UMCS / Metering Implementation PRESENTED BY Bobby Lynn

Mr. Bobby, IMWE-HOD, [email protected], (254) 287-8716 12 12 July 201112 July 2011Mr. Bobby, IMWE-HOD, [email protected], (254) 287-8716

NEXT STEP

• Install electric meters down to 10,000 SF facilities • Continue with installation of gas and water meters • Continue to add buildings to the UMCS

• Expand “Mock” billing

No Measuring – No Management

Page 13: Mr. Bobby, IMWE-HOD, Bobby.Lynn@us.army.mil, (254) 287-8716 1 12 July 2011 Fort Hood L ON W ORKS ® UMCS / Metering Implementation PRESENTED BY Bobby Lynn

Mr. Bobby, IMWE-HOD, [email protected], (254) 287-8716 13 12 July 201112 July 2011Mr. Bobby, IMWE-HOD, [email protected], (254) 287-8716

SUMMARY

• Open systems planning is necessary to get the desired results. The system must be properly specified, designed, and managed.

• Securing NEC approval is lengthy – need Army policy • Investment funding • Recruiting qualified energy employees, including techs to maintain advanced meters and UMCS

• Identify how systems are turned over to the installation• Fully tested and commissioned• To a highly trained staff

Page 14: Mr. Bobby, IMWE-HOD, Bobby.Lynn@us.army.mil, (254) 287-8716 1 12 July 2011 Fort Hood L ON W ORKS ® UMCS / Metering Implementation PRESENTED BY Bobby Lynn

Mr. Bobby, IMWE-HOD, [email protected], (254) 287-8716 14 12 July 201112 July 2011Mr. Bobby, IMWE-HOD, [email protected], (254) 287-8716

Questions?