ICEF ROADMAP What business needs Ben Vickers 22 April 2016

Mr. Ben Vickers - icef.go.jp

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Mr. Ben Vickers - icef.go.jp

ICEF ROADMAP

What business needs

Ben Vickers

22 April 2016

Page 2: Mr. Ben Vickers - icef.go.jp

1 22 April 2016

WHAT BUSINESSES AND INVESTORS NEED

Page 3: Mr. Ben Vickers - icef.go.jp

2 22 April 2016

DIFFERENT GRANULARITY FOR DIFFERENT AUDIENCES

Page 4: Mr. Ben Vickers - icef.go.jp

3 22 April 2016

TALKING HELPS GET THINGS DONE

Page 5: Mr. Ben Vickers - icef.go.jp

4 22 April 2016

UPDATES MAKE FOR A BETTER STORY

Page 6: Mr. Ben Vickers - icef.go.jp

5

Source: Bloomberg New Energy Finance

22 April 2016

AMERICAS INSTALLED CAPACITY 2012 AND 2040 AND PROJECTED CAPACITY ADDITIONS, BY TECHNOLOGY (GW)

2012 2040 Annual capacity additions, 2015-40

61%8%

4%

24%

1,571GW

27%

26%12%

19%

13%

2,696GW

Page 7: Mr. Ben Vickers - icef.go.jp

6 22 April 2016

CAPITAL INVESTMENT BY REGION AND BY TECHNOLOGY, 2015-40 ($BN REAL)

Source: Bloomberg New Energy Finance

0 1,000 2,000 3,000 4,000 5,000 6,000 7,000

MEA

Europe

RoW

Americas

APAC

Solar Fossil fuels Wind Other renewables Nuclear

$6,146bn

$1,760bn

$1,372bn

$1,738bn

$1,185bn

Page 8: Mr. Ben Vickers - icef.go.jp

7 22 April 2016

COAL AND CO2 PRICE PROJECTION, 2015-40 ($T, NOMINAL)

Source: Bloomberg New Energy Finance

China

India

China CO2

Europe

California CO2

EU CO2

0

20

40

60

80

100

120

2015 2020 2025 2030 2035 2040

Page 9: Mr. Ben Vickers - icef.go.jp

8

IMPACT OF FLOATING FOUNDATION ON CONVENTIONAL CAPEX BREAKDOWN, 2015 (%)

Note: Source: Bloomberg New Energy Finance

Development

Turbine nacelle assembly

Blades

Castings and forgings

Drive Train

Tower

Turbine OtherCables

Foundations

Substations

Installation Foundations

Installation Turbine

Installation cables

Impacted by floating foundations

4%

45%

33%

18%

Development Wind turbine supply Balance of plant Installation

4%2%

12%

3%

14%

7%

7%

6%

20%

7%

8%

4%

7%

Capex

22 April 2016

Page 10: Mr. Ben Vickers - icef.go.jp

9 22 April 2016

GET THE DECISION MAKERS TO TALK TO EACH OTHER

Page 11: Mr. Ben Vickers - icef.go.jp

10 22 April 2016

Page 12: Mr. Ben Vickers - icef.go.jp

11 22 April 2016

MARKET SHARE IN CCS TECHNOLOGIES

Note: The pool of projects considered here includes all projects in our high case forecast in Figure 1. Source: Bloomberg New Energy Finance

Alstom

AlstomAker

UOP

UOP

UOP

UOP

Lurgi

Lurgi

Air Products

Mitsubishi

Cansolv

GE

Air Liquide

unknown

unknown

unknownTBD

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Power plant Industrial Gas processing plant Oil refining Coal gasification

Page 13: Mr. Ben Vickers - icef.go.jp

12 22 April 2016

WHO’S SPENDING WHAT WHERE

Source: Bloomberg New Energy Finance

Page 14: Mr. Ben Vickers - icef.go.jp

13

HISTORIC AND FUTURE COST OF FLOATING AND CONVENTIONAL FOUNDATIONS, 2005-20 (USDM/MW)

Source: Bloomberg New Energy Finance, METI,

Statoil

Hywind demonstration

WindFloat demonstration

Fukushima phase 1

IDEOL demonstration

Fukushima phases 2-3

Hywind Scotland

0

5

10

15

20

25

30

2005 2007 2009 2011 2013 2015 2017 2019 2021

Monopile

Gravity

Jacket

Tripod

Floating

Historic learning curve

Projected learning curve

Historic learning rate for floating foundations = 34%

Floating foundation in 2020: $6.02m/MW

Conventional foundation in 2020: $0.74m/MW

22 April 2016

Page 15: Mr. Ben Vickers - icef.go.jp

14

Note: Values from 2010-2014 are based on BNEF’s annual battery price index. Cumulative production is based on total

EVs sold and their respective battery pack size. Source: Bloomberg New Energy Finance.

22 April 2016

EV LITHIUM-ION BATTERY COST OUTLOOK, 2011-2030

0

100

200

300

400

0

100

200

300

400

500

600

700

800

900

1,000

1,100

1,200

2010 2012 2014 2016 2018 2020 2022 2024 2026 2028 2030

Global EV li-ionbatteryproduction

BNEF observedvalues

Moderatescenario: 15%learning rate

Aggressivescenario: 22%learning rate

BNEF observed values: annual lithium-ion battery price index 2010-15

Long-termcost range

EV battery pack costs ($/kWh) Global volumes (GWh)

Page 16: Mr. Ben Vickers - icef.go.jp

15

What works:

● Being close to investors and close to business

● Having numbers and the names that go with those numbers

● And their phone number

● Giving information in the right format for each audience

● Defining the measures of success, in addition to markets

● Show what people are missing

● Don’t forget business must decide where to put its money

WHAT BUSINESS IS LOOKING FOR IN A ROADMAP

22 April 2016

Page 17: Mr. Ben Vickers - icef.go.jp

16

This publication is the copyright of Bloomberg New Energy Finance. No portion of this document may be photocopied,

reproduced, scanned into an electronic system or transmitted, forwarded or distributed in any way without prior consent of

Bloomberg New Energy Finance.

The information contained in this publication is derived from carefully selected sources we believe are reasonable. We do

not guarantee its accuracy or completeness and nothing in this document shall be construed to be a representation of such

a guarantee. Any opinions expressed reflect the current judgment of the author of the relevant article or features, and does

not necessarily reflect the opinion of Bloomberg New Energy Finance, Bloomberg Finance L.P., Bloomberg L.P. or any of

their affiliates ("Bloomberg"). The opinions presented are subject to change without notice. Bloomberg accepts no

responsibility for any liability arising from use of this document or its contents. Nothing herein shall constitute or be

construed as an offering of financial instruments, or as investment advice or recommendations by Bloomberg of an

investment strategy or whether or not to "buy," "sell" or "hold" an investment.

COPYRIGHT AND DISCLAIMER

22 April 2016

Page 18: Mr. Ben Vickers - icef.go.jp

Unique analysis, tools and data for decision-makers

driving change in the energy system

[email protected]

MARKETS Renewable Energy

Energy Smart Technologies

Advanced Transport

Gas

Carbon and RECs

SERVICES Americas Service

Asia Pacific Service

EMEA Service

Applied Research

Events and Workshops

Ben Vickers

[email protected]