MP Load Simulation
Presented in observing the Load Increment upon GPEH Record Activation during BH
Objectives
The aim of this document is to present the MP Load simulation with respect to the GPEH recordings under two different scenarios; where all event-selected scenario against the minimal requirement of 62* event selected run under the Networks’ Busy Hours
* : minimum requirement of input to Actix terminal
Timeline
No Activity7/23/2012
7/24/2012
7/25/2012
7/26/2012
1 Data Preparation
2 TEST 01 scheduled
3 TEST 02 scheduled
4 Final Reporting
Page 3
Methodology of Simulation
Page 4
Test #01: a. All Event selected b. Duration: 2 hoursc. Pre-condition:
• Run under busy hours (12:00 – 14:00) & (17:30 – 19:30)• No other data tracing collection running in parallel on the RNC (to be confirmed
by OPERATOR A Team)• No Rehoming activity on progress (to be confirmed by OPERATOR A Team• No New site(s) configured on air during the monitoring (to be confirmed by
OPERATOR A Team)
2. Test #02:
a. Several events selected as per Actix minimal requirements (62)b. Duration: 2 hoursc. Pre-condition:
• Run under busy hours (12:00 – 14:00) & (17:30 – 19:30)• No other data tracing collection running in parallel on the RNC (to be confirmed
by OPERATOR A Team)• No Rehoming activity on progress (to be confirmed by OPERATOR A Team)• No New site(s) configured on air during the monitoring (to be confirmed by
OPERATOR A Team)
Minimal Event GPEH
TEST 01
Page 5
Precondition (1): Activation Time
• Scheduled Profiles on OSS targeted on RNRST06• Profiles to activate:
– C146704_RNRSTO6_all 2012/7/25 for all events: 1200hr-1400hr– C146704_RNRST06_all_2 2012/7/25 for all events: 1730hr-1930hr
Precondition (2): Event Selection
• All event were selected for this TEST 01 scenario
Precondition (3): No Major Alarms
• No major alarms found on RNRTS06
Precondition (4): No Major Activities
• No integration, rehoming on RNRTS06
RESULTS
Page 10
MP LOAD PERFORMANCES TEST 01
• Comparisons for 2 BH frames: 1200-1400 & 1730-1930• Missing ROP found 1745hr – 1930hr on 24/7• Peak of MP Load on 25/7 at 1st BH: 25.89% and 2nd BH: 28.27% • Peak of MP Load on 23/7 1st BH: 24.77% and 2nd BH: 25.05%• Increment: 3.22%
23/07/2012 0:00 23/07/2012 9:00 23/07/2012 18:00 24/07/2012 3:00 24/07/2012 12:00 24/07/2012 23:00 25/07/2012 8:00 25/07/2012 17:000
5
10
15
20
25
30
MP LOAD RNRST06
Total
Max Load@1730hr: 25.05%
Incomplete ROP: 1745-1930
MP LOAD TEST01
Max Load @1730hr= 28.27%
GPEH record activation
Analysis TEST 01
TEST1 Avg MP LOAD,
%Percentage of Increment, %
1200-1400
1730-1930
1200-1400
1730-1930
23/07/2012 24.13 21.98 - -
24/07/2012 23.4 24.8 - -
25/07/2012 25.6 24.38 1.47 2.40
1. Methodology: average of MP Load utilization for each BH frame per day2. The data on 24/7 has missing ROP: 1745hr - 1930hr
TEST 02
Page 13
7/23/2012 0:00 7/23/2012 12:00 7/24/2012 0:00 7/24/2012 12:00 7/25/2012 2:00 7/25/2012 14:00 7/26/2012 2:00 7/26/2012 14:000
5
10
15
20
25
30
35
MP Load PErformances RNRST06
Total
% M
P LO
AD
MP LOAD PERFORMANCES TEST 02
• Comparisons for 2 BH frames: 1200-1400 & 1730-1930• Missing ROP found 1745hr – 1930hr on 24/7• Peak of MP Load on 26/7 at 1st BH: n/a and 2nd BH: 29.01% • Peak of MP Load on 23/7 1st BH: 24.77% and 2nd BH: 25.05%• Increment: 3.96%
Max Increment @1730hr: 29%
GPEH record activation
Max Load@1730hr: 25.05%
Microsoft Office Excel Worksheet
Analysis TEST 02
1. Methodology: average of MP Load utilization for each BH frame per day2. The data on 24/7 has missing ROP: 1745hr - 1930hr
TEST 02Avg BH
Percentage of Increment
1200-1400
1730-1930 1200-1400
1730-1930
7/23/2012 24.13 21.98 - -
7/24/2012 23.4 24.87 - -
7/25/2012 25.6 24.38 - -
7/26/2012 not used 25.74 Not used 3.76
Traffic Overview – CS Erlang
• CS Traffic has increased from 6395E to as high as 7182E for 23/7 and 26/7 respectively
• 23/7 VS 26/7: An increment of 12.31%
6395.18 7182.74
Traffic Overview – R99DL Volume• Traffic R99_DL has
increased from 5068.17MByte to as high as 5403MByte on 23/7 and 26/3 respectively
• 23/7 VS 26/7: An increment of 6.63%
5068.17
Summary
Page 18
The simulation of MP Load on RNRTS06 has been done to observe the MP LOAD impact upon the activation of GPEH records for two different scenarios
Maximum increase for MP LOAD of 3.96% observed on TEST 02 due to the highest traffic level compared to that of TEST 01 and reference
Traffic increased by 6.63% and 12.31% for R99 DL and CS Erlang respectively when compared 26/7 to 23/7
Typical MP LOAD range for RNRST06 for the past few days: 24% ~ 30%, therefore it is considered safe to run the Recordings in longer duration
MP Load is significantly affected by the level of Traffic being handled in addition to other factors of Channel switching rates, Mobility, Attached/Detach rates, etc
1st BH 2nd BH
Reference
% Increment
1st BH 2nd BHTEST 01 25.89%
28.27%
24.77% 1.12% 3.50%
TEST 02 n/a
29.01%
25.05%n/a 3.96%