MOTION PICTURES PRODUCTION ANALYTICSMONEYBALL
January 7, 2014
2
ProductionCost
Control
INDUSTRY
TREND
PRODUCTIONSPEND
The goal of the Moneyball initiative is to provide an analytics platform to Motion Pictures Creative, Business Affairs, Production and Finance executives for insight into Production cost drivers and create a model to improve decisions in the planning process and manage against that framework throughout the production lifecycle for a higher return on each annual slate of films.
BUSINESS PROBLEM
1.
Current industry trend of flat Box Office and a decreasing return on Home Entertainment reducing overall studio revenue
Parallel trend of increasing Talent, Production, & Post-production costs increases overall production cost investment, reducing overall margin
2.
3
Design
Develop
Test
Implement
Analyze
PROPOSED SOLUTION
Work collaboratively with stakeholders to automate current analysis models (e.g. 99 titles) and design new models with emphasis on trend analysis across the production process of a film or year-over-year slate.
Determine the best technology platform for development and delivery of the analyses from currently available SPE tools (Tableau, BO, BIRT), and build out the models.
In the UAT environment, work collaboratively with stakeholders to test the analytic hypotheses through what-if scenarios and adapt the model.
Once a model is validated, it is promoted into the production environment with appropriate security depending on the data sources.
Collaborate with stakeholders to determine and measure the success of the models across the following benefits:• Automation of manual analyses
increasing productivity at the executive level, accuracy of data, and up-to-date data refresh making analyses dynamic and reflecting current trends
• Provide new insights or prove production variance hypotheses with data analysis
• Apply new insights and corresponding production cost management policies to a test project and measure results
Security & Compliance: All dashboard analytics & reporting will adhere to the same security model as the underlying databases/applications require, with full review
from SPE Legal and PMO.
Financial Summary
4
Inception Phase Project Costs Five-Year Summary and Payback Software: $8,000 Three-Year Total Cost: $1,376,750Hardware: $0 Five-Year Total Benefit: $7,020,000Internal Labor: $73,125 Five-Year Net Benefit: $5,643,250External Labor $343,500 Internal Rate of Return: 654%Misc./Other: $0 Net Present Value at 10%: $6,323,569TOTAL $424,625 Payback in Months: 2.30 Years
Blended Onshore/Offshore Labor Rate: $68*includes ADM & Exec Mgmt oversight
Funding by Fiscal YearFY1 $133,167
FY2 $291,458
TOTAL $424,625
Depreciation: FY15 18K, FY16-19 72K
Ongoing Costs: N/A
5
Deliverable Type Work Tasks Cost Benefit
MP Production data cleanup
Data - Current Slate Year review- Parsing out of text data to fields- Hot Costs GL code association- Tax Incentive GL code association- Date sync-up from manual records (R.
Hendler review)- Location cleanup
40,000
Assuring data migration and historical clean-up and parsing of data is complete and data is verified for accurate trend analysis
C2 Project Integration
Data - Industry & AP Genre- SPE Managing Business Unit- Distribution Studio(s)
7,000 Cleanup and correct association for accurate tracking by Studio & Business Unit
C2 Talent Data - Clean-up of ~5,000 talent records- Removal of duplicates- Integration of Union Occupation
Codes- Addition of Participation Code
generation & migration of existing from DARTS
- Upload of Crew Lists
40,000
Baseline database for ATL and BTL talent analysis.
99 Titles Analysis
- Create data views to support each of the 9 tabs of 99 Titles
- Create the framework and filters for each of the 9 tabs of 99 Titles
- Test data extraction & promote to the Prod environment
- Train users on the usage, filters etc.
92,850
Update of 99 titles from 2009 through FY2014. Providing currently unavailable portfolio analysis over this critical 5-year period with the ability for trend analysis at user-defined intervals.
Phase 1 Deliverables: Deliverables & Benefits
6
Deliverable Type Work Tasks Cost Benefit
Production Cost Statement
Analysis
- Data Views- Design, Testing and Delivery through
Tableau
42,250
Project Post Mortem analysis
Production Spend Report (Qtr/Annual)
Analysis
- Data Views- Integration with local excel files for non-
MP Production Data- Design, Testing and Delivery through
Tableau
50,500
Ability to run Qtr & Annual with auto update of financial information from MP Production Data. Currently all manual process by Scott Abrams. Phase 2 - SAP
ATL Comparison Model
Analysis
- Data Views- Design, Testing and Delivery through
Tableau
60,000
For Andy Davis. Ability to select ATL personnel and get a comp model on financial profile of past films against similar films for input into deal terms
Project Perpetual Analysis
Analysis
- Data Views- Design, Testing and Delivery through
Tableau
33,750
In-flight and Post Mortem analysis of Variance growth
Year-Over-Year Slate
Analysis
- Data Views- Design, Testing and Delivery through
Tableau
24,775
On the fly analysis of production areas to compare against Year over Year slate at user-defined time intervals.
Phase 1 Deliverables: Deliverables & Benefits
7
Deliverable Type Work Tasks Cost Benefit
Budget Comparison
Analysis
- Data Views- Design, Testing and Delivery
through Tableau
22,929 Currently limited in format and up to 3 films. Convert to tableau to run comparisons across user-defined inputs
EFC by Title(s) Analysis
- Data Views- Design, Testing and Delivery
through Tableau
22,929 Run comparisons across user defined selection of films. Currently pulled together manually.
Phase 1 Deliverables: Deliverables & Benefits
8
Competitive Analysis• The business challenge is common across the studio, SPE has taken a lead in
creating the infrastructure that supports the ability for motion pictures portfolio financial management in the form of the creation of the Concept-to-Camera (C2)application suite and corresponding integrated database. This is evidenced by the presentation and interest in the suite at the Hollywood IT forum and presentation of the suite and its capabilities to other studio with the potential interest of licensing its capability.
• The combination of layering an analytics tool over the C2 database in combination with other databases e.g. SAP, MP Marketing, Box Office, Home Entertainment to provide a full analytical view follows the emerging, cross-industry focus on “Big Data” and extracting more value out of enterprise data stores that formerly were disparate to provide a more advanced Decision Support System (DSS)
• The only company utilizing a similar approach is Relativity Media which uses algorithms based on hedge-fund modeling for selecting films it produces.
9
TimelineDec Jan Feb Mar Apr May June July Aug
MP Data Clean up, Normalization, Views and Joins
Year-Over-Year Slate
Budget Comparison& EF by Title
ProjectPerpetualAnalysis
Production Cost Statement
Talent Comparison Model
Production Spend Report
99 Titles
10
Appendix
11
Security, Risk and Compliance Considerations
• Security, particularly data security, is in compliance with the organizational rules governing data.
• Analyses are reviewed with legal and security to workbooks is set at the user level and matches the users data security for the underlying applications which provide the data
• The tableau application is IDM enabled.