Monthly Project Progress Report - Augustus - September - October 2014 (Section 1)

Embed Size (px)

Citation preview

  • 8/10/2019 Monthly Project Progress Report - Augustus - September - October 2014 (Section 1)

    1/9

    10

    Gambar 10.a-d. Pekerjaan Beton Bertulang: Segmen atas Kolom Teras, dimensi 50x50 cm,

    Pekerjaan Beton Bertulang Pelat Atap (Dak), t = 10 cm.

  • 8/10/2019 Monthly Project Progress Report - Augustus - September - October 2014 (Section 1)

    2/9

    11

    Gambar 11.a-e. Pekerjaan Beton Bertulang Kolom Struktural Lantai II, dimensi 40x40 cm,

    Mutu beton K250 (kg/cm2)

  • 8/10/2019 Monthly Project Progress Report - Augustus - September - October 2014 (Section 1)

    3/9

    12

    ]

    Gambar 12.a-h. Pekerjaan Beton Bertulang Balok Struktural Lt. II, Dim. 25x40 cm dengan L=7.0

    m, Balok Struktural Lt.II, Dim. 20x30 cm L=4.0 5.0 m, dan Ringbalk (Blk Tepi)

  • 8/10/2019 Monthly Project Progress Report - Augustus - September - October 2014 (Section 1)

    4/9

    13

    Gambar 13.a-h. Pek. Bekisting & Pembesian/Penulangan Pelat Talang Beton Bertulang Lantai 2

  • 8/10/2019 Monthly Project Progress Report - Augustus - September - October 2014 (Section 1)

    5/9

    14

    Gambar 14.a-e. Detail Konfigurasi Tulangan Pelat (Kantilever) Talang Beton Bertulang, t = 10

    cm. Tulangan tarik (negatif) =10 15 cm, tulangan bagi10 15 cm.

  • 8/10/2019 Monthly Project Progress Report - Augustus - September - October 2014 (Section 1)

    6/9

    15

    Gambar 15.a-e. Pekerjaan Susunan Dinding Bata Batu Campuran 1:3 (Traasram) dan Cam-

    puran 1 semen : 5 pasir.

  • 8/10/2019 Monthly Project Progress Report - Augustus - September - October 2014 (Section 1)

    7/9

    16

    Gambar 16.a-f. Pekerjaan Plesteran Dinding Bata Batu Campuran 1 semen: 3 pasir

    (traasram) dan Campuran 1 semen : 5 pasir (plesteran biasa)

  • 8/10/2019 Monthly Project Progress Report - Augustus - September - October 2014 (Section 1)

    8/9

    17

    Gambar 17.a-h. Pekerjaan Pemasangan Rangka Kuda-kuda dan Reng Baja Ringan dan Peker-

    jaan Lapis Penutup Atap Genteng Metal

  • 8/10/2019 Monthly Project Progress Report - Augustus - September - October 2014 (Section 1)

    9/9

    18