CONNECTICUT YANKEE ATOMIC P0b'ER COMPANY

HADDAM NECK PI).NT

HADDAM, CONNECTICUT

,

.

.

MONTHLY OPERATING REPORT NO. 80-2

FOR THE MONTH OF

FEBRUARY, 1980

.

8 003 7 70 Qgo

Page 2: Monthly operating rept for Feb 1980

-. .

PLANT OPERATIONS

The following is a chronological description of plant operationsfor the month of February, 1980.

At the beginning of this report period the plant was operatingat 605 MNe, 100% power.

On 2/3/80 the unloading ano storing of last shipment of newfuel was completed. 52 new fuel assembl.es are in new fuel storageracks.

On 2/4/EO, EG2A was out or service for maintenance. Retested.

and returned to service on same day.

On 2/4/80 pressurizer pressure dropped to 1992 psig due tospurious opening of PR-SOV-570 and PR-MOV-269. Operator closed valvesand restored pressurizer pressure to normal.

On 2/6/80 fire pressure maintenance pump was returned toservice following pump overhaul.

On 2/6/80 load was reduced to 530 MWe due to broken air line*

on heater drains tank normal level control valve. Line was repairedand plant returned to full power at 0245 hours on 2/7/80.

On 2/16/80 load was reduced to 500 MWe and "A" circulatingwater pump was removed from service due to motor ground. '

On 2/17/80 load was reduced to 400.MWe to perform turbine stopand control valve test. Test completed and load returned to 500 MWe onsame day.

On 2/19/80 load was reduced to 345 MWe to check condenser tubesin "C" and "D" water boxes. Two tubes were plugged in each waterbox.Load was returned to 575 MWe on same day.

On 2/20/80 load was reduced to 125 MWe due to steam generatorchemistry specifications. Load was increased to 180 MWe for better feedwater control. Maintenance removed "C" Cire. pump motor and installed iton "A" cire pump. "B" condenser water box checked for tube leaks.Plugged two tubes in "B" waterbox.

ON litt/80 steam generator chemistry in specs. and load increasewas started.

On 2/22/80 all circulating water pumps were returned to serviceand load increased to 100% power.

On 2/26/80 the main stack monitor failed. Hourly sampling procedureinstituted. I&C changed detector and main stack monitor was returned toservice at 0100 hours on 2/27/80.

On 2/29/80 "B" charging pump out of service to change motor drivenoil pump. Returned to service same day.

Page 3: Monthly operating rept for Feb 1980

EFFdCT SPECIAL PRECAUTIONSSYSTEM ON CORRECTIVE ACTION TAKEN TO PROVIDE

*

OR MALFUNCTION SAFE TAKEN TO PREVENT FOR REACTOR SAFETYCOMPONENT CAUSE RESULT OPERATION REPETITION DURING REPAIR

EG2A Frequency Meter Unknown Meter inaccurate None Replaced freq. meter None Required. EC2A neverinoperable for this season

"B" Waste Gas Faulty diaphragm Minor gas leak None Replaced diaphragms "A" waste gas compressorCompressor into PAB available

MA0947 (2/7/80)

"B" charging pump Leaking Mech. Oil leak None Replaced pump "A" charging pump availablemain lube oil pump seal

Pressurizer Pressure Unknown Opening of P0ftV None due to Removed from service Closed MOV 569 and racked*

Controller PC 401-1 570 and MOV 569 oper. action checked unit, found no the breaker openReduced press- problem

,

urizer pressurebelow Tech. Speclimit

Loop #1 Steam Flow Faulty Feedback Indication None Removed from service and Inserted trip signalIndicator slidewire and would not follow replaced motor and slide-

indication drive measured wiremotor variable

loop #2 Feedwater Worn positioner Excessive air None Replaced all worn parts in Clamped valve in positionregulating valve seat demand and valve valve positioner and controlled flow usingpositioner instability . bypass valve

RMS Channel 14 Main Faulty G.M. Failed low None Replaced tube Samples taken by plant asStack Rad. Monitor Tube per Tech. Spec. Req.

;

.

.

Page 4: Monthly operating rept for Feb 1980

..

cONNFCTICUT YAllEEEREACTOR CCOLAN T DATAMONTH: FEBRUARY 1980

R FAClQ8_.CQ.0LoilT ANALYSIS 7;fNIMUM AVERAGE MAXIMUM

.....................................................................PH D 25 DEGREES C : 6.38E+00 : 6.79E+00 : 7.12E+00 :e n v ro ir T T U T T v n'tmgs/rM) : n inFAnn : 9,nzE4on ? ?,or)E4n1 :

_

CHLORIDES (PFM) : (4.00E-02 : (4.00E-02 : s4.00E-02 :DISSOLVED OXYGEN (PPB) : <5.00E+00 : <G.00E+00 : (5.00E+00 :

"

POROM._ red) ! 1.34E*02 : 1.93Ein'! ;- 3.32E+0'? :

LITHIUd ( PPrf ) : 5.00E-OL : 8.36E-01 : 1.25E+00 :TOTAL SAMMA ACT. (UC/ML) : 5.1SE+00 8.12E+00 : 9.44E+00 :

.

r omg 4 ,4 a. , - rips w 3 1, ing_nq , a g a p. n, ; c , a p y.n o.

I-131/[-133 RATIO : 7.70E-01 : ?.14E-01 : 1.17E+00 :CRUD (MG/ LITER) : 1.00E-02 : 3.50E-02 5.00E-02 :*

TP CIUM (t!C/ML) ! t.21;+00 : 2 . 9 "< E + 0 0 ? 3.60E+00 :M ish'OLiEN (GU/M3) : 3.4SE+01 4.74E+v1 : 6.74EYO1 :......................................................................

_

AERATED LTOUID WASTE PROCESSED (GAi.l ONS): 7.67E+04WASTE LIGUID PROCESSED THROUGH BORON RECOVERY (GALLONS): 4.44E+04

AVERAGE PRIMARY LEAK RATE (GALLONS PER MINUTE): 6.40E-02po r tenv r n c:c r p > m e c. v ir,w p a rr I n si i n g q p rc p s;ny7c3, n,nogino

.

mesp

Page 5: Monthly operating rept for Feb 1980

..

AVERACE DAILY UNIT POWER LEVEL

.

DOCKET NO. 50-213Conn. Yankee

UNIT Haddam Neck

DATE March 5,1980

COMPLETED BY Reactor Engineering

TELEPHONE (203) 267-2556

MONTH: Februarv, 1980

DAY AVERAGE DAILY POUER LEVEL DAY AVERAGE DAILY POWER LEVEL(MWe-Net) (MWe-Net)

1 578 17 471

2 577 18 479

3 577 19 429

4 578 20 419

5 578 21 195

6 565 22 558

7 575 23 578

8 578 24 579

9 579 25 579

10 578 26 579

11 578 27 579

12 578 28 579

13 578 29 577

14 576 30

15 575 31

16 536

INSTRUCTIONS

On this format, list the average daily unit power level in MWe-Net for cach dayin the reporting month. Complete the nearest whole megawatt.

(9/77)

_.

Page 6: Monthly operating rept for Feb 1980

-

.*

. -

g-

n ,- ,. .

i .

r ,e

I .gen -

G.e i Se c j l ,

lk n ,li

n E g f - t

a o N*. .Y r j _ .. I

0 t, e3s le

-n.n6s.

1 ut 3

mI. i J a

2 e g o ns. J cl :- n n

MiDh{ e.e

g

y t l .0 g e e r nf h5 C I{tt e 1ov t

su. u. h ; .

e..

ti n l

6 e sOIEEYA A i t s s

i.

s

.. ts :.e .

ih

l te , t

l

i u m i. e . hNAD i n, e e .

. .n .t e p

T N D (' l Gsa h (e IE, nt

i

pS1E g

KT &i i C .t

ct

T il ut s h lI E. wAn r inP)inl lC N .i u

t e oetO U !' u v o . s e. -

D s .I

. sl s. * i

. nt 'a s t n !'.. lI t I

( l' aoO .riC 4 5et

* na . -ecGi .

fmiacee .t p *

S s

S '

N 0 .

O 8,

ml9 Z a l ,I

* ",gU,rT 1 Z mt a~ a. Z aSl*J y SgpSv 'Z r pccim* D r Z Sti-

E a Z:.l l

al

m (-F ui uu o: .

a ar st

nntR b n -

ou U ! 1 11a a u1E e t Z

M F c g^ Z tc44 A (3-

0 M1 2 l. 1*- -

-

I'D 1 - I.

i* ,1

N 1

A NCS l e 8

eN h s i tn nW T n e e At e v p ll0 l

k. 1:. e f' i

*: O t Hl 1 il l'

IJ. U EI . .

t nI' i.

S lB

. T 21. I 'L3.;. y c sin 2 .N ' *

l

U uc g g ) *1

, in W lal

3 ji<.lp

J a n i

e Ji - lpt

a ml al a

l'e s($ 1 (lil d. e> c

l

1 lriuI

ic 't) ui

ts

l s llin el

-s e mi

a l-

ai

- e ,| i r.l lp* tI J

t l%s{

*EgE 0 tnnc ) l'l

e

pil

i.

ea g u.l int

,

eZ. 3d mnnt es

nt i_ cti at l

pi cl J a:ne n u ul u s cmia l c ' n%hni gC -

e1 f t |li!tsgisi e

{a:4l,y,H s i t

Fl * l ' IIi ( it l j

.i( l

,

!.. *

.

e . 1t 2b 2

I .0 *

l

0 fri8 Jn. . ci *ni

s. i

.l.

'..lS , l

lN 1 l'S f*. 1 , f ,

' sl at

.

. .

,~

--

' *,

jgJBa_ J' G _,?'e '

f2,%M"4i

27LL

Page 7: Monthly operating rept for Feb 1980

- . - -- --~ - ~ ~

6 .

( .( '' I t ., J -) 3 [) ) ) *.

- e4

| j S [~~ l'*

,8 |-'

i 1-

'

aui |o. i . l i.

..

. - t9 t I i ec

I' *4,

e e. *t get a ib- m

.*n | s .

oom - f ! I ! I || w el i 'I *

.mmun w .* e u ,- , ,e- i i ,n .= a m !, e,

4 < i i+ e .o oa v. o. * e ec , e o e e a eme. > i O",

i - o. m. o. n. m. e. a. e. e* m.,

mI . e co . . . .

|r. m m ~ r- .mu w n .o u o e moa. .,i

.oq 6. o w > m m . w ao ao Nes o m.o. m n- o o .=. mE w -- m , aQ >- m e< -e rs

$C.4 a. d m os e o5>- ,o,. i~a w .

~.-.- .o ~~ m o e. .a w.g u

,i 4 * m a nuw a M o 'l3 t. 1 [ io nd w i , wO QU M U Ai .

I | .

I | - '"3 d -s! l . . " C"4;--'*3''

i I* ci ai |

. ,a r-T,. 8 a

1 ! 5 9o mi i? ,. a. -:

e. || ; c.. ' O r".' 3es

! ! 7,

: ! ; cra'l.w\

,

y! I . , s . . o,' e

l o O. ' o. o'. o. - o.i <

C. ii. o

o o, m.2

.o. . e4 m. o. . os

-'i

! re: . ..

t@w@_ ,o o o o e. .> o e4 r- o .w a i a a e m <. o o o m x ;' ,o*'S.

.

>-w ,

, ; ' '2o J m e9 M *< L-2 - ;.e.J ,J* - m. . < ~ r- oi

- i I ;C. n t ee I

s. ___A. x a a .o *Q , - _.s. >. m aa =

i mgdw ,.3

13' " I i J~+

25 I o, i M.

(3 r _)=*

j t, * ! | 3 eu !i

.

*2I %

| 1,'3 4 i ei|

i.,- a e- *

i I: 8- i i,

| W I'i. ,,i

.i' 4 .i. o ;- !

e 6c j -

i e u |

s I i ! . O $* w .

''

fy | H, ,' OI

.- = s < a e

.' d *J w c1 'ei p i . *, <|m { W D U i- =

b'' .!Wf M3! O

I l' ^ o|'

8"* i - | = c" .I'

e .W ' oo 4 Q.

!' 5 : . C |- H < ;

.

* *j 2. M i s' . .

i.W ' taJ Ie u. O. ,o a 5 o -"

!M U *, - o. . O. O. o. o. . . o. o. '31 e. o. o2c9 - 2 . . w

- o o , o o,. ,_ .- em , o, o e o m o.* - -~ . o o o es 2 <s . m n n~. .

|Z o -- .2<* : r- o e o n -. o - e+

z i> , , " " ,. . n e. m '* O e W o oto .' 9. W ,m, , , , - ,_

m_=

i,~< <. -. o , -3

i s' - 2 W2 '2 4 5'i ,,e= - i J = a' -- t

j N p u p ;, .

, a, g a a*i 1 - >= w

r- x a o a.i w ~ ,, w ,n. a . .- .2 ,a. m. o o n- | 6 !m . m gt, s _< e4.' o * ~< - i ua

8 o.i .i - i ~ ' p a~..a aui .-

o., ,, = _ <g es

,- -

. 9- e.c.s_ 5 m. ,-

-2 , o .-,,.

w . m ,-_ i - e y __ ,.s . w w. u

- . :> w ..o - o

-

. ; ~3 - . , - .= =8 @

, o.2 m ,,. ,

'i . .. w. (. : .oi. .

t 4 (3 3 $ :2 a.s e,_o~o .

u g e. o. w d. +=.. . - -m=~

- o 6

r o x =. > . !2 3 o.

-s - w g22-g: oW Wgi is e a 1 99 ge :i_

w -s ~ :. =- w8 = - -- . .--- uw - o s s y e o*C " e ."* w >= > p- o U 3 g ~ > c -3 3 3 w

w r" U1 M p=a g ~ O- --

S t.: w ;- t- >- - = - < --ga d gw ~- -a r , = g e - - r ,o C q

g$5g MM#3 '=3.

'I'3 i d ~ 6 U 5 . w- D M -

4 ,3"o "3 Pe -yq" ea-m = i w a g >a = m - m a F,. mw J o W Od w W o. w .1 H f a Q .

**

* '250 - - " a 5 * w ~' C < U< i.2.-sg 6-

U i < 2 <~ -= O *-* $ E3

2 J w U2 > w *-''5S 4' w 4 4ww- - u.- s.- w w x

- N = 0 .) O J w - w w.

E *. JJe .J 3

3" b D"T 7 T W J -

U - M % Q < H Wg'. O J 'J < M g "7500<sgoa . w m

4, O t -w $ Tgd. w Q w - w - g 9 M a w z- - (3 <-

-age

if - 3 oa u2>~uu rw i = y-x> < c.d w i. ow xuo 2 u. a u w

-4

. u. u $. s - C .J 3 .'.) w'. )- U** w m. 5 3O I d O % <- Q. - w

.I- W*J 9 b.J .* O-.

T O T

.Cd*** H w- W w > o >=ww W pJ rt # g3 .

-=J 4 4 W ]3 W "j ' .s w d .$> m i-. w g w r A

ga u r; d w As 4 -w5.

-- u - t- a > s- r s >- s .3 e a, , - 1 x,

- c- u * w-

2, ,4== = 3 g >- = = = - 2 : e= ;.2.a >- ,aa =. a u

..

4 3*b

' :5 a a W 5 m s a 3 a. S 5 .

', a o

| | | I I:IS Cf 3 l .=. u a. w- y ii ; |qy a . .. .

. . . .! . .' o i. lc .,. ! ,.

.

t.ss . . . ,. . . , . . . . .

,,, , m e n , m- -e

. .,s. [ 4 .. i -4 m.-< . o .- 3.o e-o.- .< ~ n n ~ -< n m -e< - .< .-. -< ~

. .

.

1 .

I

Page 8: Monthly operating rept for Feb 1980

.

,,.c,

_ REFUELING TNFORMATION REOUEST

1. Name of facility

Connecticut Yankee Atomic Power Company

2. Scheduled date for next refueling shutdown.

April, 19SO

3. Schedaled date for restart following refueling.

Approximately cight to 12 weeks from shutdown date.

4. (a) L'111 refueling or resumption of operation thereaf ter require atechnical specification change or other license a=cacment?

No technical specification changes are anticipated at this date.

(b) If answer 4.s yes, what, in general, will these be?

N/A.

(c) If answer is no, has the reload fuel design and core configuraticabeen reviewed by your Plant Safety Review Cncmittee to determinewhether any unreviewed safety questions are associated with thecore relcad (Ref.10 CFR Section 50.59)? Uhen the above stated

documents are received from the fuel vendor they will be reviewed in ac.cordance ulti10CrR50.59 to deteraine if any unreviewed safety questions are associated uitt the

'

(d) If no such review has taken place, when is it scheduled? core reloa

N/A

5. Scheduled date(s) for submitting proposed licensing action andsupporting informatien.

There are no scheduled dates because of (4) above.6. Important licensing considerations associated with refueling,

e.g., new or different fuel design or supplier, unreviewed designor performance analysis methods, significant changes in fuel design,new operating procedures. .

None

7. Tne number of fuel assemblics (a) in the core and (b) in thespent fuel storage pool. .

(a) 157 (b) 3408. The present licensed spent fuel pool storage capacity and the sisc.

.

of any increase in licensed storage capacity that has been requested.

or is planned, in number of fuel assemblics,

1168

9. The projected date of the last refueling that can be disclargedto the spent fuel pool assu:aing the present licensed capacity.

1994 to 1995-

.

==