' AVERAGE DAILY UNIT POWER LEVEL , . . * DOCKET NO. 50 - 277 . ____-__---___________________ $ UNIT PEACH BOTTOM UNIT 2 _____________________________ DATE MARCH 10,1979 __-__________________________ COMPANY PHILADELPHIA ELECTRIC COMPANY _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 _____________________________ MONTH FEBRUARY 1979 ______________ DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 1077 17 751 2 1075 18 1026 3 1075 19 1066 4 1072 20 1074 5 1074 21 1074 6 1075 22 1079 7 1075 23 1057 8 1061 24 953 9 967 25 1067 10 10 26 1070 11 0 27 1076 12 0 28 1069 13 0 14 29 15 589 16 892 . 7903190227

Monthly operating rept for Feb 1979

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Monthly operating rept for Feb 1979

' AVERAGE DAILY UNIT POWER LEVEL,

. .

* DOCKET NO. 50 - 277.

____-__---___________________

$ UNIT PEACH BOTTOM UNIT 2_____________________________

DATE MARCH 10,1979__-__________________________

COMPANY PHILADELPHIA ELECTRIC COMPANY_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

W.M.ALDENENGINEER-IN-CHARGENUCLEAR SECTIONGENERATION DIVISION-NUCLEAR

TELEPHONE (215) 841-5022_____________________________

MONTH FEBRUARY 1979______________

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL(MWE-NET) (MWE-NET)

1 1077 17 751

2 1075 18 1026

3 1075 19 1066

4 1072 20 1074

5 1074 21 1074

6 1075 22 1079

7 1075 23 1057

8 1061 24 953

9 967 25 1067

10 10 26 1070

11 0 27 1076

12 0 28 1069

13 0

14 29

15 589

16 892

.

7903190227

Page 2: Monthly operating rept for Feb 1979

OPERATING DATA REPORT*.

.

DOCKET NO. 50 - 277-

__________________..._._____.

DATE MARCH 10,1979--- __- __._-___-___-___

COMPLETED BY PHILADELPHIA ELECTRIC COMPANY..____________ _______..__

W.M.ALDFNENGINEER-IN-CHARGENUCLEAR SECTIONGENER ATION DIVISION-NUCL E AR

TELEPHONE (215) e41-5022______-_______---_------____-

OPERATING STATUS

1. UNIT NAME: PEACH BOTTOM UNIT 2 | NOTES: THIS UNIT EXPERIENCED ONE l| |

- ________

2. RE PORT ING PERIOD: FEBRUARY, 1979 | OUTAGE THIS MONTH |____---- - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ | |

3. LICENSED THERMAL POWER (MWT): 3293 I I__-_____________ | g

4. NAMEPLATE RATING (CROSS MWE): 1152 l I_______________ | |

5. DE SIGN E LECTRICAL RATING (NET MWE ): 1065 | |_________ | |

6. MAXIMUM DEPENDAPLE CAPACITY (GROSS MWE): 1098 | 1___. | |

7. MAXIMUM DEPENDABLE C APACITY (NET MWE ): 1051 | |

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY INET MWE):

10. REASONS FOR RESTRICTIONS, IF ANY:

THIS MONTH 'YR-10-DATE CUMULATIVE

HOURS IN REPORTING PERIOD 672 1,416 40,000.

12. N U. .M B E R OF HOURS RE ACTOR WAS CRITICAL 567 1,311 30,730'' ' . .

}3. REACTOR RESERVE SHUT 00WN HOURS 0.0 0.0 0.0

44, HOURS GENERATOR ON-LINE 557.4 1,301.4 29,987.7''

____________ - _______ ____________

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0___-- _-_ --__-__ ____ ______----__

16. GROSS THERMAL ENERGY GENERATED (MWH) 1,728,919 4,097,129 84,118,086

l i. GROSS ELECTRICAL ENERGY GENER ATED IMWH) 579,010 1,369,830 27,535,760--____--____ ___ -- _. _________.--

18. NET ELECTRICAL ENERGY GENER ATED (MWH) 561.729 1,327,395 26,368,750

19. UNI T SERVICE FACTOR 82 9 91.9 73.5______-_____ ___.________ _______ ____

20. UNIT AVAILABILITY FACTOR 82.9 91.9 73.5

21. UNIT CAPACITY FACTOR IUSING MDC NET) 79.5 89.2 61.5

22. UNIT CAPACITY FACTOR (USING DER NET) 78.5 88.0 60.7

23. UNIl FOPCED DUTAGE RATE 5.4 2.4 7.6___.---_-___ -___________ _.______--__

24. SHUIDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):;<:

25. IF S HUT OCWN AT END OF REPCRT PERICD, ESTIMATED DATE OF STARTUP: N/A

26. UNI T S IN TEST STATUS (PRIOR TO COMMEPCIAL OPERATION): FCRECAST ACHIEVED

INITIAL CRITICALITY____ - __- _

INITIAL ELECTRICITY

COMMERCIAL OPERATION- _- _ ______

b

Page 3: Monthly operating rept for Feb 1979

.

UNIT SHUT 00wNS AND POWER REDUCTIONS DOCKET NO. 50 - ??? .

UNIT NAME RSACH 90TTCM UNIT 2---- ....-------------...----

DATE WARCH 10,1979 -

----- -------------------

REPORT MONTH FEBRUARY, 1979 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY

W.M.ALDENENGINEER-IN-CHARGENUCtEAR SECTIONGENERATION DIVI S ICN-NUL L E AR

TELEPHONE (215) P41-5022

| 1 I | | METHOD OF l L ICE NSE E ISYSTEMICDMPONENil CAUSE AND CORRECTIVEI I T YPE I OURA T IONl RE A SONI SHUT T ING DOWNI EVENT | C 00E I CODE I ACTICN TO

NO.I DATE i Illi (HOURS)l (2) i REACTOR (3) 1 REPORT s 1 (4) 1 (5) | PREVENT RECURRENCE- -

1 I I I I I I I |2 I 790210 | F | 32.0 | A I 1 | NONE I HH | XXXXXX | EXTERNAL PIPE LEAK ON PEACTCR FEEOPUMP BYPASS

I I I I I I I I I LINEI I l | I I I I I

2 1 790210 | 5 | 82.6 | 8 | 1 1 NONE I CH | HTEXCH | FEE 0 WATER HEATER REPAIR (CONTINU?OUS FROMi i l I I i l i I 790210)! I I ----- 1 I i i l il I i 114.6 | | 1 | | | .

(1) (2) (3) (4)

F - FORCED REASON METHC0 EXHIBIT G- INSTRUCTIONS '

S - SCHE 00 LEO A - EOUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATAB - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEEC - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)0 - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-Ol61)E - OPERA 10R TRAINING + LICENSE EXAMINATIONF - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE

i

e

I

'Y.c

Page 4: Monthly operating rept for Feb 1979

**

AVERAGE DAILY UNIT POWER LEVEL

DOCKET NO. 50 - 278_____________________________

UNIT PEACH BOTTOM UNIT 3_- __________________-_____

DATE MARCH 10,1979______________________ ___

COMPANY PHILADELPHIA ELECTRIC COMPANY____________________________

W.M.ALDENENGINEER-IN-CHARGENUCLEAR SECTIONGENERATION DIVISION-NUCLEAR

TELEPHONE (215) 841-5022_____________________________

MONTH FEBRUARY 1979_____________

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL(MWE-NET) (MWE-NET)

1 1066 17 1066

2 1059 18 1063

3 781 19 1065

4 1026 20 1062

5 1064 21 1065

6 1065 22 1068

7 1064 23 1068

8 1064 24 1060

9 1067 25 1008

10 1062 26 1057

11 1061 27 1051

12 1065 28 1056

13 1066

14 1066

15 1063

16 1066

Page 5: Monthly operating rept for Feb 1979

, ~ ~ ~ _._

DOCKET NO. 50 - 278*

* =- - -----_

DATE MARCH 10,1979

.

COMPLE TED BY PHILADELPHIA ELECTRIC COMPANY

W.M.ALDENE NGI N E E P.-I N-CH AR GENUCLEAR SECTIONGE NER ATION DIVISION-NUCL F A R

TELEPHONE (215) 841-5022-__ _-----_-----__

OPERATING STATUS

1 UNIT NAM 5: PEACH BOTTOM UNIT 3 | NOTES: THIS UNIT EXPERIENCED ONE i_-_ __--- -_--_---_-_--- -- g |

2. REPORTING PERIOD: FEBRUARY, 1979 | M4JOR POWER REDUCTION THIS |

| |_ _ _ _ _ _ _ - - - _ - - _ _ . - - _ _ - - -

3 L ICENSE D THERMAL POWER (MWT): 3293 | MONTH I

g ;_ _ - - _ . _ - - - - _ _ _

4. NAMEPLATE RATING (GROSS MWE); 1152 l 1

i (--_______--.---

5. DESIGN ELECTRICAL RATING (NET MWE): 1065 | |

| [------- -

6. MAXIMUM DE PE ND ABLE CAP AC ITY (GROSS MWElt 1098 | |

| l

7 MAXIMUM DEPENDABLE CAPACITY (NET MWE): 1035 I l~ --- -------- *re

8. IF CHAN0tS OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE RE A SC*i$ i

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):

10. REASONS FOR RESTRICTIONS, IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE

11 HOURS IN REPORTING PERIOD 674 1,416 36,696

12 NUMBER OF HOURS RCACTOR WAS CRITICAL 672 1,243 29,352

13. REAC10R RESERVE SHUTDOWN HOURS 0.0 0.0 0.0---_--_-_-__ ... --- - - _ _ _ __

14. HOURS GENERATOR ON-LINE 672.0 1,226.7 28,656.6

15. UNIT RESERVE SHUTDOWN HOURS 00 0.0 0.0

16. GRO,5 THERMAL ENEhGY GENERATED (MWH) 2,185,027 3,800,897 78,675,033----_--_---_ -- _-

17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 726,440 1,252,100 25,480,210

18. NET ELECTRICAL ENERGY GENERATED (MWH) 705,405 1,212,313 24,455,456

19. UNIT SERVICE F AC TOR 100.0 86.6 78.1

20. UNIT AVAILABILITY FACTOR 100.0 86.6 78.1- - - - - - - _

21. UNIT CAPACITY FACTOR (USING MOC NET) 101 4 82 7 64.4_

22. UNIT CAPACITY FACTOR (USING DER NET) 98.6 80.4' 62.6-- -

-- ---- - --

23. UNIT FORCED OUTAGE RATE 0.0 1. 6 * 7.3*

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

25. IF SHUTOOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

26. UN11S IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED

INITIAL CRITICALITY---

INITIAL ELECTRICITY

COMMERCIAL OPERATION- - -

_

-

Includes a carrection which accet:nta for incorrect ICR reported in January report.*

m correct PCR for January is 3.5%

Page 6: Monthly operating rept for Feb 1979

.

UNIT SHUT OOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 27S .

- -----

UNIT NAME PEACH BOTTOM UNIT 3

DATE MARCH 10,1979

REPORT MONTH FEBRUARY, 1979 COMPLETED BY PHILADtLPHIA ELECTRIC COMPANY

W.M.ALDENENG I NE E A-IN -C H ARGENUCLEAR SECTIONGENERATION DIVISION-NJCLEAR

TELEPHDNE (215) 841-5022

I l | I | METHOD OF | LICENSEE |SYSTEMICOMPONENTl CAUSE AND CORRECilVEl ITYPElDURATIONIREASONISHUTTING DOWN1 EVENT | CODE I CODE I ACTION TO ,

NO.I DATE I (111 (HOURS)| (2) | REACTOR (3) | REPORT 4 | (4) I (5) | PRE 9ENT RECURRENCE I,

I I I I I I I I I i3 1 790203 1 S | 0.0 l F | 1 1 NONE i RC | ZZZZZZ l MANUAL REDUCTION IN PDWER TO ADJUST CONTROL ROD {

l | | | | | | | | PATTERN ,

'I I i - -- -- 1 I I I I II I I - 1 I I I I I t

,

4

4

(1) (2) (3) (4)

F - FORCED REASON METHOD EXHIBIT G- INSTRU;TIONS

S - SCHEDULED A - ECUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA6 - MAINTEN ANCE OR TE ST 2 - MANUAL SCRAM, ENTRY SHEETS FOR LICENSEEC - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-Ol61)E - OPERATOR TRAINING + LICENSE EXAMINATIONF - ADMINISTRATIVE (5)G - OPERATIONAL ERROR (EXPLAIN)H - OTHER(EXPLAIN) EXhlBIT I - SAME SOURCE

I

h!

u

Page 7: Monthly operating rept for Feb 1979

- Ibcket !!a. 50-277.

/,',tachmen t to.

Ibnthly Operating lieport" 9liEFTIEhl flG J ';FOMIATIO!!

1 Ilace of facility:

Feach Bottom Unit 2

2. Schedaled date for next refueling chu tdown:

March 22, 19803. Scheduled date for restart following refueling:

June 6, 198014 Will refueling or recumption of operation thereaf ter require a

technical specification change or other license amendment?Yes.

If annwer la yea, what, in general, will these be?Technical opecification changea to accomodate reload fuel.

Modifications to reactor core operating limito are expected.

$. Scheduled date (a) for submit ting proponed licensing action andsupporting information:

February 8, 19806. Important licensing c.onsiderationo associated with refueling, e.g. ,

new or different fuel design or cupplier, unreviewed decign orperformance analysis methods, cignificant changen in fuel design,new operating procedures:

Initial utilizataan of General Electric pre-pressurizedFuel Assemblica.

7. The number of fuel aaacablico (a) in the core and (b) in the opentfuel storage pool:

a) Core - 7614 Fuel Accembliesb) Fuel pool - 618 Irraidated Fuel Assemblies

i3. The precent licenced crent fuel pool s tora 6e capacity and the sizeof any increase in licensed storage capacity that han been requeatedor is planned, in number of fuel accemblier -

Original inatalled capacity la 1110 fuel ecoemblies. An increasein capacity to 2816 fuel assembliec has been liccnced, prcridingcapacity for 1706 additional fuel accemblioc. Flant radificationsto be completed prior to next refueling.

9. The projected date of the 1,ct refueling t ha t enn be cicenarced tothe opent fuel peol acnumine; the precen' lier:nned capac i ty-

September, 1990

Page 8: Monthly operating rept for Feb 1979

'

Ibcket th. 50-278*

.

-

Attaciunent toIIonthly Operating lieport

IlEFUEh11;G ' ' IOliMATIOf1

1. !!am of facility:

Peach llottom Unit 3

2. Scheduled date for next refueling ohutdown:

September 8, 19793. Scheduled date for restart following refueling:

I

Octuier 27, 1979h. k'ill refueling or renumption of operation thereaf ter rer;uire a

technical npecification change or other licence amendment?

Yes.

If answer in yen, what, in general, will thene be?Technical opecification changen to acecmodate reload fuel.

Modifications to recc tor core operating linito are expected.

$. Scheduled date (a) for nubmitting proposed licensing action andsupporting information:

July 25, 19796. Important licencing conniderationo aanociated with refueling, e.g. ,

new or different fuel design or cupplier, unrn"uved denign orperformance analynic methodo, ni nificant cV16cn in f"el design,Gnew operating procedurco:

Initial utilization of General Electr c pre-preccuricedFuel Accemblico.

7. The number of fuel accenfolien (a) in the c ire and (b) in the opentfuel otorage pool:

a Core - 76h Fuel Ascembliesb Fuel poel - hh0 Irradiated Fue1 Assemblier

8. The precent licensed opent fuel pool ctor. ge capacity ,nd the cineof any increase in licence <1 otorage capac _ ty tha t han r een requec tedor is planned, in number of fuel assemblion:

Original inctalled capacity le 1110 Juel acaemblies. An increasein capacity to 2816 fuel asceablies has b'en licensed, pe"idingcapacity for 1706 additional fuel accembl..ec. Plant modificationato be completed prior to next refueling.

9 The projected date of the lact refueling t ha t can be dj acharred tothe opent fuel pool acruning the preacnt liconced enrncit :

September, 1991

Page 9: Monthly operating rept for Feb 1979

-.,

.

IIARRATIVE SD24ARY OF OPERATII!G EXPElIE!;CES

PEACH BOTTOM U'IITS 2 and 3Februart, 1979

UlIIT 2

The unit operated at full power until February 9 when a controlledchutdown was begun for a maintenance outage to repair an externalleak on the reactor feed pump bypacc line. Additional work completedduring the outage included feedwater heater leak repair, recombinercondencer leak repair and reactor feed pump external leak repair.Maintenance work nac completed and the unit was returned to serviceon February 1h, reaching 1030 IOle on February 16. On February 16,a load reduction to $60 IG'o was taken to adjust the control rodpattern. Load was then increaced via a preconditioning rarp with fullpower being reached on February 13. On Februarf 19, during calibrationof a feedwater flow trancaitter, n recirculation pump runback occurredresulting in a 90 IOle load reduction. Load was rectored immediately.The unit operated at lated power until Febrnry 23 when a load reductionto 750 Isle was taken to perfom a rod cequence exchange and to repaira condencer leak. The unit then increased in load, via a preconditioningramp, reaching full power on Februar/ 2h.

UIITT 3

The unit operated at rated power until February 2 when a load reductionto about $80 M4e was taken to adjust the control rod pattern. Followingthe adjustment, load was increased via a preconditioning ramp with fullload being reached on February L. On February 25 a load drop ofapproximately 100 IOle was taken to accocmodate control rod adjustments.On February 26, an incert colenoid on a control rod drive failed open,during normal control rod drive exercising, fully incerting the driveat normal drive speed. Following repairs to the colenoid valve, a loaddrop of 1$0 Nie was required to withdraw the control rod to its fo merposition. The unit returned to full power on February 27