7/21/2019 Monte Raso Hut http://slidepdf.com/reader/full/monte-raso-hut 1/10  ASE STUDY : MONTE ROSA HUT Completion 2009 Floor area/size 698 m²  Architect Bearth & Deplazes Developer architektur !auprozess  Associate architect Architektur& Desi"n #m!$  Associate architect %$ '(rich )ervices en"ineer *au!er +,+)A A# #eneral consultant -atterhorn %n"ineerin" A# #eneral consultant ,## )chnetzer .uskas +n"enieure Client %$ 'urich Contri!ute ! 1oerick TE HNI AL DATA .opulation %uivalent 3.%4 55 .% ,asteater in7lo 3m/4 :5 Filterin" sur7ace installe 3m²4 50  Aeration tank 3m4 5:5 ,asteater stora"e tank 3m4 :0

Monte Raso Hut

Embed Size (px)

DESCRIPTION

it is a sustainable construction in switzerland .eco friendly hut.

Citation preview

Page 1: Monte Raso Hut

7/21/2019 Monte Raso Hut

http://slidepdf.com/reader/full/monte-raso-hut 1/10

  ASE STUDY : MONTE ROSA HUT

Completion 2009

Floor area/size 698 m²

 Architect Bearth & Deplazes

Developer architektur !auprozess

 Associate architect Architektur& Desi"n #m!$

 Associate architect %$ '(rich

)ervices en"ineer *au!er +,+)A A#

#eneral consultant -atterhorn %n"ineerin" A#

#eneral consultant ,## )chnetzer .uskas +n"enieure

Client %$ 'urich

Contri!ute ! 1oerick

TE HNI AL DATA

.opulation %uivalent 3.%4 55 .%

,asteater in7lo 3m/4 :5

Filterin" sur7ace installe 3m²4 50 Aeration tank 3m4 5:5

,asteater stora"e tank 3m4 :0

Page 2: Monte Raso Hut

7/21/2019 Monte Raso Hut

http://slidepdf.com/reader/full/monte-raso-hut 2/10

Page 3: Monte Raso Hut

7/21/2019 Monte Raso Hut

http://slidepdf.com/reader/full/monte-raso-hut 3/10

Elevations: 1:400

Page 4: Monte Raso Hut

7/21/2019 Monte Raso Hut

http://slidepdf.com/reader/full/monte-raso-hut 4/10

Page 5: Monte Raso Hut

7/21/2019 Monte Raso Hut

http://slidepdf.com/reader/full/monte-raso-hut 5/10

he ne monte rosa hut as !uilt !eteen sno; ice; "laciers an mountains in the mile o7 the

siss alps:

he hut serves as a "uest house 7or clim!ers; hikers an skiers:

here is a restaurant an accommoation 7or upto <0 people:

he !uilin" is not connecte to the "ri nor to a central ater suppl 7acilit:he onl access to hut is ! 7oot; or helicopter:

he pro=ect is a cooperation !eteen the siss 7eeral institute o7 technolo" %$ an the siss

alpine clu! )AC:

he hut as !uilt as a test o!=ect 7or sustaina!le construction in such e>treme conitions:

he aim as to emonstrate sel7 su77icienc an sustaina!ilit:

he hut 7eatures a uniue architecture that makes it an unmistaka!le pro=ect in the siss alps:

DES RIPTION:

DES RIPTION OF SPE IAL LO AL ONDITIONS:

he ne monte rosa hut is locate in the siss alps near 'ermatt at the 7oot o7 the mountain monte

rosa an other ?000 meters mountains locate in the area: !elo the hut is the "lacier calle

@"orner "lacier:

ALTITUDE:

288 meters a!ove the sea level:

%nvironmental conitions climate zone alpine climate climate tpe col; latitue ?5:96 E;

lon"itue :8<%:

FINAN IAL S ALE:

construction cost 6:5 millons:

Page 6: Monte Raso Hut

7/21/2019 Monte Raso Hut

http://slidepdf.com/reader/full/monte-raso-hut 6/10

WATER :

)ince there is no connection to a central ater suppl 7acilit; service ater has to !e o!taine 7rom

meltin" ice:

For this purpose; a ater cavern as installe ?0 meters a!ove the hut here urin" summer ice is

melte to 7ill the cavern:

he sanitar 7acilities ere esi"ne to operate ith lo ater consumption:

he aste ater can !e store in a aste ater tank epenin" on the availa!le ener" 7or the

puri7ication process:

he sea"e is puri7ie in a compact aste ater treatment plant; hich consists o7 the mechanical

preGtreatment; the aeration tank; the 7iltration cham!er an the separate surplus slu"e stora"e

tank:

he puri7ie ater is use 7or the toilet 7lushin" an the ashin" machine:

BIOMASS:

the or"anic aste 7rom the kitchen is composte in a site a!ove the hut: 7urthermore there is no

nutrients recover 7rom the asteater: he slu"e 7rom the asteater treatment plant is 7lon !

helicopter to the valle an !urnt in the aste incineration plant:

WASTEWATER LEANING PRO ESS:

+7 the hutHs !atter an asteater tank are hal7 7ull an the immeiate 7orecast calls 7or

sunshine; the controller starts the poerGconsumin" asteater cleanin" process; thus

preventin" the !atter 7rom char"in" too uickl; hich oul leave solar ener"

unuse: +7 the 7orecast calls 7or !a eather; the cleanin" process is stoppe: Itherise

the !atterHs poer reserves mi"ht !e use up; necessitatin" a sitch to *. "as; a

scarce resource at this remote location:

Page 7: Monte Raso Hut

7/21/2019 Monte Raso Hut

http://slidepdf.com/reader/full/monte-raso-hut 7/10

90J o7 the ener" eman is covere ! solar ener"; i:e a photovoltaic sstem inte"rate into

the !uilin" 7asae an solar thermal collectors:

)urplus electricit is store in !atters:

he remainin" <0J ener" eman is supplie ! the rape oilG7ire co"eneration unit:

$oever the crucial element that ena!les such a hi"h level o7 ener" e77icienc an sel7G

su77icienc are not the sole technical installations:

+t is the inte"rative approach here each element is inte"rate into the sstem as a hole:

he per7ormance o7 the entire sstem is !ein" optimize in contrast to the optimization o7 the

sin"le element:

For this purpose a moel preictive re"ulatin" sstem is installe to control each element o7 the

sstem:

ENERGY: 

he re"ulatin" sstem receives ata o7 the

eather 7orecast an the 7uture occupanc:

+n oin" so each element such as

asteater treatment plant can !e operate

at the optimum time re"arin" 7uture ener"

eman an "eneration:he active ener" suppl is !ase on solar

thermal collectors; a photovoltaic sstem; as

ell as !uilin" technolo" an its control

components: +7 neee; the sstem is

!acke up ! a com!ine heat an poer

3C$.4 plant operate ith liue7ie

petroleum 3*.4 "as:

Page 8: Monte Raso Hut

7/21/2019 Monte Raso Hut

http://slidepdf.com/reader/full/monte-raso-hut 8/10

he sanitar 7acilities ere esi"ne to

operate ith lo ater consumption:

Furthermore; the ater eman is

aitionall reuce ! reusin" the

!iolo"icall puri7ie asteater 7or the

toilet 7lushin" an as ash ater:

he compact asteater treatment plantconsists o7 the mechanical preGtreatment

37ine screen4; the aeration tank; the

7iltration cham!er ith su!merse siClaroK

7lat sheet mem!ranes an the separate

surplus slu"e stora"e tank:

he e77luent in7lo is carrie out ! theli7tin" station ith an aeuatel

imensione asteater stora"e tank:

SERVICES

Page 9: Monte Raso Hut

7/21/2019 Monte Raso Hut

http://slidepdf.com/reader/full/monte-raso-hut 9/10

 Aluminium prouction

throu"h the poer o7 ater

)stem

evelopment ith

%coGesi"n

%ner"Gsavin"

utilisation perio1ecclin"

 Aluminium is an ieal material 7or a

ma>imum level o7 sustaina!ilit:

Due to the hi"h ualit o7 aluminium;

the utilisation perio o7 the proucts

is virtuall unlimite L ithout an

nee 7or repaintin" or postG

installation treatment:

Mp to <00J o7 aluminium can !ereccle; here! onl 5J o7 the

ori"inal ener" consumption is

reuire 7or recclin":

here7ore; 7or the most part;

aluminium is not NconsumeN !ut

NutiliseN an then use a"ain an

a"ain as ino construction :

Page 10: Monte Raso Hut

7/21/2019 Monte Raso Hut

http://slidepdf.com/reader/full/monte-raso-hut 10/10

.ro=ect level pilot pro=ect:

 A nearl ener"Gsel7Gsu77icient !uilin" in the hei"ht o7 the alps emonstrate that sustaina!ilit

knos no !ounaries:

+t is the leain" e>ample in sustaina!le !uilin" that shos ne as o7 ho to use our resources

e77icientl:

he ne monte rosa hut is iel knon an has on man prizes 7or its architecture an technicalimplementation:

PROJE T BENEFITS

  ONTEXT ZERO EMISSION

BUILDINGS:he ne monte rosa hut is a "reat e>ample o7 zero emission !uilin" ue to the operation as an

islan installation in the remote alps:

   F  r  e  s   h 

  6  a  t  e  r

   u  s  e

   ,  a  s  t  e   6  a  t  e

  r   t  r  e  a

  t  m  e  n

  t

  "   r   i  /   e   l  e  c

  t  r   i  c   i  t  0

   u  s  e  /

   %  >  t  e  r  n

   e  n  e

  r  "   0   s  o

  u  r  c  e

   B   i  o

  m  a  s

  s 

  A  /  /   i  t   i  o

  n  a   l    M

   B   .    t  o   t  a   l

 Aitional MB.

Biomass

%>tern ener" source

#ri electricit use

,aste ater treatment

Fresh ater use

!enchmark'ero emission

50000

?5000

?0000

5000

0000

25000

20000

<5000<0000

5000

0

     M

     B     .     /    s    2 :    m

otal ratin" points 3MB./sm4De"ree o7 achievement 3J4

'ero emission la!le

?2<<?

8<:28Oes