Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China Huang Chengwei May 12, 2007 Nanchang, China East Asia PADI Consultation Meeting & Regional Workshop on Poverty Monitoring and Evaluation

Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

Embed Size (px)

DESCRIPTION

East Asia PADI Consultation Meeting & Regional Workshop on Poverty Monitoring and Evaluation. Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China. Huang Chengwei May 12, 2007 Nanchang, China. A. Introduction B. Main Contents of the Monitoring System - PowerPoint PPT Presentation

Citation preview

Page 1: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

Monitoring and Evaluation System of WB Poverty Reduction Project in

Southwest China

Huang ChengweiMay 12, 2007 Nanchang, China

East Asia PADI Consultation Meeting & Regional Workshop on Poverty Monitoring and Evaluation

Page 2: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

• A. Introduction

• B. Main Contents of the Monitoring System

• C. Application of Monitoring Approaches

• D. Enlightenments

Page 3: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

The World Bank loan project on poverty reduction in Southwest China is a comprehensive poverty reduction project,which includes various aspects, such as education, health, infrastructure facilities, labor transfer, and the development of agriculture, secondary and tertiary industries, monitoring and institution building, etc. In project villages, sub-projects were conducted in line with their demand.

The secondary and tertiary industry projects included processing factories, rural fairs and trade markets, and absorbing certain surplus laborers in rural areas. The education projects were mainly training faculty, constructing teaching buildings, purchasing desks and chairs, and offering subsidies to particularly poor students.The healthcare projects were constructing village level health centers, purchasing related equipment, and constructing a cooperative medical treatment system. Improvements to infrastructure facilities were mainly constructing village roads, providing access to human and animal drinking water, and power supply projects. Labor transfer is mainly focused on establishing labor service agencies and transferring surplus laborers to developed areas through loans and organized training. Agricultural projects were mainly developing planting and breeding industries, etc.

The project started from the first half of the year 1995 and was completed in 2002 with prominent effect and influence.

Page 4: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China
Page 5: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

Fundamental Impact by the Project

• The successful implementation of the Southwest Poverty Reduction Project (SWPRP) has explored new options for the world to fight against poverty.

• The successful implementation of the project has promoted the opening up to the outside world of poor areas in Guangxi, and the development of international cooperation.

• The SWPRP has increased the total funds input in poverty reduction and accelerated the poverty reduction drive in Guangxi.

• The preparation and implementation of the project has established a good management team for the project area, and improved the overall quality of the cadres and the masses in the project area.

• A series of proven-to-be effective and worthy-of-learning poverty reduction development modes have been formulated during throughout continuous practice.

Page 6: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

Study Series on the World Bank China Southwest Poverty Reduction Project Mode:

• Project Check & Acceptance Evaluation Report

• The Records on the Ten-Year Process of the Project

• Analysis on the Project Effects and Influential Cases

• Project Design and Management Innovations

• Study on the Project Participatory Evaluation Approach and its Application

• Comprehensive Study on the Project Mode

Page 7: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

Main Contents of the Monitoring System of the Southwest Poverty Reduction Project

A. Design, implementation, and monitoring of sub-projects

• Poverty monitoring: stat. departments with the National Stat. Bureau in charge of the implementation

• Project monitoring: project offices at the national, prov

incial, county, township and village levels in charge of implementation

(Project contents : 1. Office; 2. Office Facilities: Computers, Printers, Telephones, Telefaxes, Office Furniture, Duplicating Machine; 3. Vehicles: Jeep; 4. Project Administration: Training Staff (home and abroad), Various Research and Investigation, Various Seminars and Books)

Page 8: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

Monitoring the Completion Status of Sub-ProjectsProject objective after adjustment

Project completion

Proportion to the objective %

Total of project monitoring & poverty monitoring

20887603 24592787 117.74

Project monitoring

17861931 24287184 135.97

Office building 2400000 2400000 100

Office facilities 479975 550496 123.02

Vehicles 3190488 10147610 318.06

Project management

11791468 11189078 94.89

Poverty monitoring

3025672 305603 10.10

Page 9: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

B. Main Contents of the Monitoring System of the Southwest Poverty Reduction ProjectB-1. Comprehensive project monitoring

organization system (project monitoring network)

Planning & monitoring department of the autonomous region project office

Monitoring section of county project office

Monitoring group of the project’s township work station

Monitoring points of the project villages

Page 10: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

Table for Monitoring Staff Arrangement and Work Completion Status

Monitoring staff (persons) Statement of the completed monitoring report (copies)

Total County Township

Village Province

County Township Village

Total 631 22 91 517 6 124 834 3118

Inspection to the project area (Estimated)

Persons Days

Total Province County Township Total Province County Township

Total 57963 36 4701 53226 75064 180 10416 64468

Page 11: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

Hardware Equipment: Office building of 3,000 square meters; Computer, Printers, Telephones, Telefaxes, Office Furniture, Duplicating Machine: One Set for Each County; Jeeps: Two for Each County

Staff Training: Monitoring Training Classes at National, Provincial, Township Levels: 812 Times; 135 Times for Each Year;

32,918 Trainees.

Page 12: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

B-2 Complete Project Monitoring Content System • ①Personnel and organization management

monitoring• ②Project implementation progress monitoring• ③Project financial affairs management and fund

monitoring• ④Materials and equipment management monitoring• ⑤Project results and benefits monitoring• ⑥Special subject monitoring

Page 13: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

B-3 Complete Project Monitoring Standard System

• Project implementation and management method • Various sub-projects implementation and

management method• Project monitoring management method• Project purchasing management system and

method• Project fund management method• Fund retrieval management method • Project check & acceptance management• Various sub-projects implementation plans• Scheduled monitoring table

Page 14: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

B-4 Operable Sub-Project Monitoring Indicator System

• ⑴ Education sub-projects : Newly building (reconstructing or expanding) village teaching points and complete primary schools, areas, book quantity, enrollment rate, schooling completion rate, reduction and exemption of charges for books and other expenses, nutrition allowance, the number of teachers, the number of teachers taking part in training, the number of qualified teachers, etc.

• ⑵ Health sub-projects

• ⑶ Infrastructure sub-projects

• ⑷ Agricultural sub-projects

• ⑸ Secondary and tertiary industry sub-projects

• ⑹ Labor service transfer sub-projects

Page 15: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

B-5 Alternative Monitoring Approach System

Report forms Inspection Check & acceptance Monitoring households Special theme conference Participatory Computer system Auditing

Page 16: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

B-6 Exploring How to Implement Project Management Monitoring in a Large Comprehensive Poverty Reduction Project

(a) Make positive attempts to conduct household tracing and monitoring and establish a project household monitoring system:

(1) Draw samples randomly in the proportion of 4:3:3 from project rural households in line with project features;

(2) Select 10 households in every project village to be the project

monitoring households ; (3) The proportion of planting monitoring households, breeding

monitoring households and labor service monitoring households is 4:3:3 (4 planting households, 3 breeding and labor service transfer households);

(4) The project office prints and places monitoring plates at the door of

every monitored household; (5) Monitoring tables are issued to every monitored households.

Page 17: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

(b) Innovatively Apply Computer Management Software in Project Monitoring Management

• Develop “Computerized household poverty monitoring information (PMI) management system for the comprehensive poverty reduction project” to conduct management of the project .

• PMI is an integrated system with a combination of management information, data, tables, and monitoring.

Page 18: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

Southwest Poverty Reduction Project Monitoring System Construction: Monitoring Methods and their Application

1. Report forms( quarterly financial plan and progress reports of various sub-projects)

2. Inspection: Sampling inspections; Interleaving ⑴ ⑵inspection( uniform indicators, standards and methods);

Key⑶ ( special) inspections (supervision); Overall ⑷inspections; Inspection by the World Bank⑸

3. Check & acceptance: six sub-projects, five important project works (purchase, payment, accounting check, basis work and project village) 182 check & acceptance standards, 400 specific standards for sub-projects

Page 19: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

4. The Network of Project Monitoring households

Total of

monitored

households

Planting

monitored

households

(number)

Breeding

monitored

households

(number)

Labor service transfe

r households

(number)

Training at the regional, county

and township levels

Training times

Trainees

Total 8029 3429 2230 2370 675 48967

Page 20: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

Every monitoring household has one monitoring registration book, and it is divided into two parts:

Monitoring table for the basic status of project households ( 1 ) Basic status of family ( 2 ) Resources status ( 3 ) Income status

Planting ( breeding or labor service transfer ) monitoring card

( 1 ) The implementation status of technology standard ; ( 2 ) Benefits obtained; ( 3 ) Trainings received.

Page 21: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

5. Special subject meeting: intercommunication, analysis, discussion →get to know the project progress and problems, unify solutions

6. Participatory approach: group discussion, rural household interview

7. Development and application of the computer management system: GIS system/ monitoring system (PMI) on project rural households . The drive and process of the development:

   ----To enhance the work efficiency of the project  ----To improve project management : Quality and standa

rdization      ----To be the pilot and trial of poverty reduction work: ef

ficiency, quality and criteria

8. Auditing: regular/irregular

Page 22: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

Rural Household Information Management System for Comprehensive Poverty Reduction Project

System Composition System Function

1. Cards of village, township and county

1. Data input

2. Basic status of rural households 2. Data inquiry

3. Debt status of project rural households

3. Data drawing

4. Status of project monitoring households

4. Data summary

5. Data creation and printing

6. Separate data saving

7. Data transferring

8. System maintenance

9. Help functions

Page 23: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

Main Interface of the System

Page 24: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

Interface of Rural Household Participatory Stat. Table

Page 25: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

Interface of Data Extraction Functions

Page 26: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

• Application and effect of PMI ——Working efficiency ( regional, local, county, township, v

illage and WB) ——Management level( standardization, quality, reach rura

l households) ——Concept upgrading ——Team building —— Demonstration

• The 14th inspection team of the World Bank:“ The inspection group takes notice that Guangxi not only sets an example in aspects of project implementation, but also has created the computerized loan management system as a pioneer and realized a high loan retrieval rate. The township working station of Guangxi has already established a set of computerized data information management system for the rural households to take part in the project activities and record loan gaining status.

Page 27: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

Enlightenment: Practice and Reflection on the Monitoring of the Comprehensive Poverty Reduction Project

Main problems Existing in the Southwest Poverty Reduction Project Monitoring

• ⒈ Conception • ⒉ Standardization • ⒊ Operation( Cost and personnel)• ⒋ Sustainability • ⒌ Replicability

Page 28: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

Enlightenments gained from the Monitoring Practice of the Southwest Poverty Reduction Project

• ⒈ Project monitoring system construction is a component of the project construction contents, an important measure for project management, and the fundamental guarantee for the realization of project objectives.

• ⒉ Project monitoring is an effective way to reduce project operation and management costs.

• ⒊ The basic requirements for project monitoring are as follows: standard approaches, modern tools, highly efficient measures and simple operations.

• ⒋ Factors affecting the sustainability of project monitoring system are: concepts, costs, practicability, and a stable team.

Page 29: Monitoring and Evaluation System of WB Poverty Reduction Project in Southwest China

Advice on Constructing the Complete Poverty Reduction Monitoring System

Contents: Organization system Working system Qualitative system (Participatory

monitoring and evaluation) Features: Operable Low cost Sustainable Open