DESIGN OF BEAM TO COLUMN MOMENT CONNECTIONS
(acc. to AISC EDICIN 9 PGS 4-116 A 4-122)
BEAM ID:
8/21/2019 Moment Connections.xls
2/15
2007
8/21/2019 Moment Connections.xls
3/15
DESIGN OF BEAM TO COLUMN MOMENT CONNECTIONS
(acc. to AISC EDICIN 9 PGS 4-116 A 4-122)
BEAM ID: 2007
GEOMETRIC DATA FOR CONNECTION:
Total bolt number = 8.00 Bolts distances (cm):
Number of bolts in Tension= 4.00 a= 4.00
Bolt diameter to be used ,dbo (mm)= 25.00 Pf= 4.00
Bolt area (cm2)= 5.00 b= 6.50
Thickness of head plate(mm)= 19 c= 32.00
Total lengh of head plate(cm)= 61 d= 4.00
Width of head plate(cm)= 23 gh= 15.00 (see Note 1)
Effective width of head plate (cm)= 21.5 gv= 10.50 (see Note 2)
=(bfb beam + 2.5 cm)
Note 1: recomended 9 cm if tfc 13 mmNota 2:recomended 9 cm mn. if tfc 13 mm
DATA OF BEAM AND COLUMN TO BE CONNECTED:
db beam (cm)= 45.00 dc col (cm)= 35.00
bfb beam (cm)= 19.00 cfw col (cm)= 30.00
tfb beam (cm)= 1.46 tfc col (cm)= 1.75
twb beam (cm)= 0.94 twc col (cm)= 1.00
k (cm)= 4.4
T (cm)= 26.2
MATERIALS:
Bolts:
Fv allow(k/cm2)=
DESIGN FORCES: Steel:
Axial force (T(+)/C(-)),(kg)= 352.00 Fy(k/cm2)=
Shear (V),(kg)= 3784.00 Fu(k/cm2)=
Weldements:
Bending Moment (M),(k-m)= 11581.00 Fv (k/cm2)=
Is a load comb. with earthquake or wind? (YES=1,NO=0): 1
a)Forces on beam flanges (kg): 26774.53 (tension flange)
26422.53 (compression fla
b)Stresses acting on bolts:
Shear stress (fv),(k/cm2)= 94.60
Allowable shear stress (Fv),(k/cm2)= 1973.33 OK!
Tension stress (ft max),(k/cm2)= 1338.73
Allowable tension stress (Ft),(k/cm2)= 4110.00 OK!
8/21/2019 Moment Connections.xls
4/15
c)Clculation of Head Plate thickness:
Pe=Pf - dbo/4, (cm)= 3.38
Ca= 1.13
Cb= ( bfb/bep)^1/2= 0.94
Af ,(cm2)= 27.74
Aw,(cm2)= 39.5552
Cm=CaCb(Af/Aw)^1/3*(Pe/dbo)^1/4= 1.02
Me=Cm Ft Pe/4, (kg-cm)= 22982.08
tep req= (6Me/eff. width.*0.75Fy)^1/2,(cm)= 1.60 required thk
USE HEAD PLATE THICKNESS tep,(cm)= 1.9
d)Flange of beam-head plate weldment (it must support max.tension on beam flange):
l weld = 39.98 cm
t weld= 0.48 cm
USE WELD. THICNESS MIN. w,(cm)= 0.60
e)Beam web-head plate weldement (it must support max. tension due to bending in beam web 0.6Fy):
l weld = 84.16 cm
t weld= 0.67 cm
USE WELD. THICNESS MIN. w,(cm)= 0.70
f)Check of Column stiffeners:
Pbf: compression force in flange. Value shall be multiplied by 4/3 if earthquake or wind loads act
or by 5/3 if includes only live and dead loads.
Pbf (kg)= 35230.04
Ductility of web column failure:
Pbf
8/21/2019 Moment Connections.xls
5/15
trig= tfb beam (recomended)= 1.46 cm
brig/trigtrig (mnimum)= 0.88 cm
Ast used= 45.26 cm2 Increase stiffener thickness
Weldement of stiffeners= 7.72 mm
h)Shear failure of column web:
twc>=2,67.M/(Abc*Fy)
Abc=(dc col-tfc)*(db beam-tfb) Abc= 1447.71 cm2
2,67.M/(Abc.Fy)= 0.85 cm Reinforcement of column web not needed
8/21/2019 Moment Connections.xls
6/15
A-3251480.00
A36
2500.00
3700.00
E70
1480.00
ge)
8/21/2019 Moment Connections.xls
7/15
8/21/2019 Moment Connections.xls
8/15
8/21/2019 Moment Connections.xls
9/15
8/21/2019 Moment Connections.xls
10/15
8/21/2019 Moment Connections.xls
11/15
8/21/2019 Moment Connections.xls
12/15
11.5 700 -16200 -16200 -28150 -35500523024.29 523024.29 427972.82 373081.85
966750
OK!No cumple
8/21/2019 Moment Connections.xls
13/15
OK!No cumple. Aumentar espesor plancha o numero de pernos
OK!
Stiffener RequiredNo stiffener required
Use minimun dimensions
8/21/2019 Moment Connections.xls
14/15
OK!Increase stiffener thickness
Reinforce column webReinforcement of column web not needed