P D C A Counter Measure BEFORE Benefit THEME-PRODUCTIVITY AREA-CT.CLL Significant Kaizen-1 Problem Analysis AFTER . . Starting rollers has been broken so job movement is not being done easily Roller has been repaired ,additional roller has been provided Problem has been rectified Problem Description Rotary case RCG 01 is not working properly TEAM -MOHIT DAMAGED ROLLERS AFTER REPAIRING

Mohit Project 7

Embed Size (px)

DESCRIPTION

jkjjkkkknnmm.

Citation preview

Slide 1.
.
Starting rollers has been broken so job movement is not being done easily
Roller has been
.
.
During the job lifting time hook lift the hyd. Pipe line also .
A protect guard has
.
.
Feed found manually changed on the m/c .so feed valve to be locked
Feed valve has
Conveyor passing path is not safely activity .to be modified
Path has been
Heavy leakage found under platform due to cylinder seal damage
Seal has been
Facing slide has been jammed to be cleaned by disassembled
Facing slide has
.
.
Break down time increasing therefore control to be changed with PLC circuit.
Control has been
.
.
Feed found manually changed on the m/c .so feed valve to be locked
Feed valve has
.
.
Spindle coupling loose due to ,key found damaged . to be changed
Damaged key has
Timer belt has been
Frequently broken on
SFB 07 M/C
.
.
Leg guard not available on HMC 23 M/C , to be provided .
Leg support has
to be shifted