    Module 7: Materials Management Configuration

    for Goods Receipt

    With the accounts and vendors configured, more configuration activities are required in the

    Materials Management module before purchasing transactions can be completed. First, default

    values and tolerance limits must be set.

    7.1 Default Values for Inventory Management Reservations

    To set up the default values for inventory management reservations, follow the menu path:

    Materials Management Inventory Management and Physical Inventory

    Plant Parameters (click clock icon )

    which will produce the following screen:

    Click on the New entries icon ( ), which will produce the following screen:

    7 - 1

  • 7/30/2019 Module 7 - Materials Management Configuration for Goods Receipts Reach.ucf.Edu

    2/12

    Module 7: Materials Management Configuration

    for Goods Receipt

    Enter your plant (##PT), then enter/select the following:

    Create Sloc. Automat.: CheckedThis option allows automatic creation of the storage location data in the materialmaster record at the time of the first goods receipt.

    Del. compl. Default: Checked

    If this indicator is set, the system suggests the "delivery completed" indicator as adefault value when a goods receipt is posted with reference to a purchase order or

    order (provided that the quantity delivered falls within the under/over delivery

    tolerances). The delivery completed indicator denotes a closed purchase orderitem for which no more goods receipts are expected.

    Reservations

    Movement allowed: CheckedDays mvt. allowed: 30Retention period: 30

    A reservation is a request to the warehouse to keep a material ready for issue at a future

    date for a certain purpose. The purpose of a reservation is to ensure that a material is

    7 - 2

    Enter plant ##PTCheck these items

    Enter 30 in both Reservations fields

  • 7/30/2019 Module 7 - Materials Management Configuration for Goods Receipts Reach.ucf.Edu

    3/12

    Module 7: Materials Management Configuration

    for Goods Receipt

    available when required. A material can be reserved for a cost center, an asset, or an

    order for example. The Days mvt. allowedparameter sets the number of days before the

    reservation data that material can be moved. If the requirement date of a reservation itemis further in the future than the number of days specified here, no movements are yet

    allowed in respect of this item. For example, if the current date is 6/1/2004 and the Daysmvt. allowed is set to 30, then material with a reservation date of 7/1/2004 or earlier can

    be moved. The Retention period indicates the time in days during which a reservationitem resides in the system before being deleted by the reservation management program.

    If the "date required" of a reservation item is older than the current date minus the

    number of days specified here, the system sets the deletion indicator in the reservationitem.

    When you have made the appropriate entries, click on save icon ( ), then click on the back

    icon ( ) and verify that your plant is now listed, then click on the back icon ( ) one more

    time to exit to the IMG.

    7.2 Maintain Purchase Price and Discount Tolerance Limits

    These settings decide how much deviation from the data in the purchase order that will be

    allowed. To set the purchasing tolerance limits, follow the menu path:

    Materials Management Purchasing Purchase Order Set Tolerance Limits for

    Price Variance (click clock icon )

    which will produce the following screen:

    7 - 3

  • 7/30/2019 Module 7 - Materials Management Configuration for Goods Receipts Reach.ucf.Edu

    4/12

    Module 7: Materials Management Configuration

    for Goods Receipt

    Click on the New entries icon ( ), which will produce the following screen:

    EnterPE for the Tolerance key, ##FS for the Company code, select Check limit for the

    percentage tolerance limits and enter 5% for the value. Click on the next entry icon ( ),

    which will give you an empty version of this screen:

    7 - 4

    EnterPE (price variance: purchasing) for

    Tolerance key, ##FS for company codeCheck and enter5 for percentage limits

  • 7/30/2019 Module 7 - Materials Management Configuration for Goods Receipts Reach.ucf.Edu

    5/12

    Module 7: Materials Management Configuration

    for Goods Receipt

    EnterSE for the Tolerance key, ##FS for the Company code, select Check limit for the

    percentage tolerance limits and enter 10% for the value. Click on the save icon ( ), followed

    by the back icon ( ). Verify that both tolerance keys (PE and SE) are now listed for your

    company code, then click on the back icon ( ) two more time to return to the IMG.

    7.3 Maintain Goods Receipt Tolerance Limits

    Next, we can set the Goods Receipt Tolerance Limits to decide how much variation from thedata in a purchase or production order will be allowed at goods receipt. To do this, follow the

    menu path:

    Materials Management Inventory Management and Physical Inventory Goods

    Receipt Set Tolerance Limits (click clock icon )

    which will produce the following screen:

    7 - 5

    EnterSE (maximum. cash discount deduction: purchasing)

    for the Tolerance key, ##FS for company code, check andenter10 for percentage limits

  • 7/30/2019 Module 7 - Materials Management Configuration for Goods Receipts Reach.ucf.Edu

    6/12

    Module 7: Materials Management Configuration

    for Goods Receipt

    Click on the New entries icon ( ), which will produce the following screen:

    7 - 6

    EnterB1 for Tolerance key

    ##FS for Company Code

    Enter 5 for lower and upper

  • 7/30/2019 Module 7 - Materials Management Configuration for Goods Receipts Reach.ucf.Edu

    7/12

    Module 7: Materials Management Configuration

    for Goods Receipt

    EnterB1 for the Tolerance key, ##FS for the Company code, select Check limit for the

    percentage tolerance limits and enter 5% for the value. Tolerance key B1 determines the level

    where a warning message will be displayed. A warning message merely informsit will still let

    you complete the transactions. Click on the next entry icon ( ), which will give you an

    empty version of this screen:

    EnterB2 for the Tolerance key, ##FS for the Company code, select Check limit for the

    percentage tolerance limits and enter 10% for the value. Tolerance key B2 determines the levelwhere an error message will be displayed. An error message will not let you complete the

    transaction. Click on the next entry icon ( ) which will give you another empty version of

    this screen:

    7 - 7

    EnterB2 for Tolerance key

    ##FS for Company Code

    Enter 10 for lower and upper limits

  • 7/30/2019 Module 7 - Materials Management Configuration for Goods Receipts Reach.ucf.Edu

    8/12

    Module 7: Materials Management Configuration

    for Goods Receipt

    EnterVP for the Tolerance key, ##FS for the Company code, select Do not checkfor all entries.The VP tolerance key checks the moving average price in the material master to the purchase

    order price. As the moving average valuation is a complicated process in SAP, we will choose

    here to avoid problems by not checking for this variance. Click on the save icon ( )

    followed by the back icon ( ). Verify that three tolerance keys (B1, B2 and VP) are now

    listed for your company code, then click on the back icon ( ) two more time to return to the

    IMG.

    7.4 Maintain Invoice Receipt Tolerance Limits

    We also need to set tolerance limits for invoices to determine how much variation from the

    purchase order will be allowed. To do this, follow the menu path:

    7 - 8

    EnterVP for Tolerance key

    ##FS for Company CodeSelect Do not checkfor all options

  • 7/30/2019 Module 7 - Materials Management Configuration for Goods Receipts Reach.ucf.Edu

    9/12

    Module 7: Materials Management Configuration

    for Goods Receipt

    Materials Management Logistics Invoice Verification Invoice Block Set

    Tolerance Limits (click clock icon )

    Click on the New entries icon ( ), which will produce the following screen:

    7 - 9

  • 7/30/2019 Module 7 - Materials Management Configuration for Goods Receipts Reach.ucf.Edu

    10/12

    Module 7: Materials Management Configuration

    for Goods Receipt

    There are a number of tolerance keys that need to be set. Using the same procedure as before,

    set the following tolerance keys for invoice receipts:

    Lower Limit Upper Limit

    ToleranceKey

    Comp.Code Absolute Percentage Absolute Percentage

    AN ##FS Do not check Check limit: 5% Do not check Check limit: 5%

    AP ##FS Do not check Check limit: 5% Do not check Check limit: 5%

    BD ##FS Do not check Do not check Do not check Do not check

    BR ##FS Do not check Do not check Do not check Do not check

    BW ##FS Do not check Do not check Do not check Do not check

    DQ ##FS Do not check Do not check Do not check Do not check

    KW ##FS Do not check Do not check Do not check Do not check

    PP ##FS Do not check Check limit: 5% Do not check Check limit: 5%

    PS ##FS Do not check Do not check Do not check Do not check

    ST ##FS Do not check Do not check Do not check Do not check

    After each tolerance key entry, use the next entry icon ( ) to get a blank screen. When all

    tolerance keys are entered, click on the save icon ( ) to save the tolerance keys.

    7.5 Confirm Qty and Value Updating in Material Type for Plant

    In cost accounting, it is important to have a correct value for the cost of material used in

    production. The R/3 system can be configured to collect information on material movements

    (such as goods receipts and invoice receipts) in each period at historical exchange rates. Thisdata is used during material price determination to calculate new valuation prices for the

    material. Then, the material stock account is reconciled in multiple currencies with the accounts

    in Financial Accounting. To allow for automatic updating of material values for the material

    types we are using, follow the menu path:

    Logistics General Material Master Basic Settings Material Types

    Define attributes of material types (click clock icon )

    which will produce the following screen:

    7 - 10

  • 7/30/2019 Module 7 - Materials Management Configuration for Goods Receipts Reach.ucf.Edu

    11/12

    Module 7: Materials Management Configuration

    for Goods Receipt

    Select material type FERT, then double-click on Quantity/value updating. This will bring

    up the following screen:

    7 - 11

    Select FERT, then double-click

    on Quantity/value updating

    CheckQty. updating and Value upd.

    for your plant, then click on the saveicon

  • 7/30/2019 Module 7 - Materials Management Configuration for Goods Receipts Reach.ucf.Edu

    12/12

    Module 7: Materials Management Configuration

    for Goods Receipt

    Check the Qty. updating and Value upd. options for your plant (##PT), then click on the save

    icon ( ).

    Click on the back icon ( ), then repeat the process for material types

    HALB and ROH.